This document is an amendment to Solicitation 36C26024R0028 for a project to remodel a 2nd CT location at the VA Medical Center in Boise, Idaho. The purpose of this amendment is to provide answers to questions received from interested offerors.

Key details:

  • The solicitation is being amended to clarify that there are no bid alternatives or deducts, and that the offeror is required to complete the provided price schedule to cover all work in the Statement of Work, specifications, and drawings.
  • The amendment confirms that the Site Superintendent and Quality Control Manager can be the same individual as the Site Safety and Health Officer (SSHO), but the Site Superintendent cannot be the Quality Control Manager.
  • There are no other substantive changes to the solicitation requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 06/11/2024

531-CSI-106

NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661 To all Offerors/Bidders

36C26024R0028 05-20-2024

X X X

X Project: Remodel for 2nd

CT

Location : VA Medical Center at Boise, Idaho

The purpose of this amendment is to provide answers to questions received from interested parties. See continuation page for attached questio ns and answers.

Amendments shall be acknowledged at time of offer either by signing each amendment or by acknowledging on the back of the SF1442 Solicitation, Offer, Award.

Stephen E. Slaby Contracting Officer

CONTINUATION PAGE

Attachment 1 Questions and Answers Question 1: On RFP Page 69 of 78, under Section 5 instructions for the Bid Schedule, it states, “Offerors shall clearly note on page 4 which alternate(s), if any, from the Specifications Volume 2a, Section 01 00 00, paragraph 1.3, included with their base proposal.” This paragraph also indicates that each alternative is a “deductive”. The Price Schedule only has one CLIN. In addition, we are unable to locate Specifications ‘Volume 2a’ but in the specifications that were provided, Section 01 00 00 para 1.3 only discusses one bid item and does not indicate any alternates or deducts. Please advise.

Answer 1: There are no bid alternatives or deducts.

Section 5 is changed to read:

Section 5: Each offeror is required to complete the price schedule (page 6 of this solicitation). The proposal shall include all work identified in the SOW, specifications, and drawings.

Question 2: On RFP Page 66 of 78 under Factor 2, it states that all (key personnel) roles shall be filled by separate individuals and dual-hatting is not acceptable. Can you please confirm that the Site Superintendent, Quality Control Manager, and SSHO must be three separate individuals on this project?

Answer 2: Per the COR, the Site Superintendent could be the SSHO but not the Quality Control Manager. The Quality Control Manager could also be the SSHO. It is important that the Site Superintendent not be Quality Control.

-End of amendment to answer contractor requests for information-