Sheet1

Attachment U - Master Plan Sign Design Estimate
Park: MIMA
Component A
HFC (Pre-Contract)VISSr. VIS
HoursHours
Prepare SOW and review Proposals
SOW

Proposals

Total Hours this Phase0.000.00
Total Dollars this Phase$0.00$0.00$0.00
125.00100.0075.00
Component B
ContractPMGD IGD II
HoursHoursHours
Task l. Existing Conditions Documentation
1.1 Kick-Off Meeting and Site Visit

1.2 Survey site and locate all existing signs

Travel

1.3 Update Existing Sign Survey

1.4 Update Existing Sign Location Plan

1.5 Prepare and submit existing conditions documentation

Total Hours this Phase0.000.000.00
Total Dollars this Phase$0.00$0.00$0.00$0.00
Task 2. Preliminary Sign Planning/Schematic Design, Messaging, and Locations
2.1 Develop a Visual Sign Type Menu

2.2 Develop a Sign Message Programming

2.3 Develop a New Sign Location Plan

2.4 Develop a Sign Demolition Plan

2.5 Prepare and submit Visual Sign Type Menu, Sign Message Programming, Sign Location Plan and Sign Demolition Plan

Total Hours this Phase0.000.000.00
Total Dollars this Phase$0.00$0.00$0.00$0.00
Task 3. Design Development
3.1 Design Development of all Sign Type Drawings with Layouts and Details

3.2 Prepare and submit Sign Type Drawings with Layouts and Details and Sign Location Plans

Total Hours this Phase0.000.000.00
Total Dollars this Phase$0.00$0.00$0.00$0.00
Task 4. Fabrication Document Drawings
4.1 Prepare and submit final documentation0.000.00
Total Hours this Phase0.000.000.00
Total Dollars this Phase$0.00$0.00$0.00
Contract Estimated Total$0.00
75.0065.00
Component C
HFC (During Contract)VISSr. VIS
HoursHours
Management and Reviews
Kick-Off meeting and Site Survey with Contractor

Travel to Site with Contractor

Review Task 1

Review Task 2

Review Task 3

Review Task 4 and Project Closeout

Total Hours this Phase0.000.00
Total Dollars this Phase$0.00$0.00$0.00

HFC Estimated Total $0.00

Project Estimated Total $0.00

National Park Service U.S. Department of the Interior

NPS Sign Program Harpers Ferry Center

PO Box 50 Fillmore Street Harpers Ferry, WV 25425

Sheet2

Sheet3 image1.jpeg

File details come from the government source that posted it. Updated .