Attachment - Statement of Work Section C.12.4 CSO Phase II Orientation.pdf
PDF 103 KB Posted
- Solicitation number
- 15M20021RA32CSO21
About this file
This sources sought announcement requests capability statements from interested parties to provide Court Security Officer services for the 1st, 3rd, 4th, 5th, 8th, and 12th Federal Judicial Circuits. Services include all necessary personnel, management, supervision, and administrative support to maintain the United States Marshals Service Court Security Officer Program. Interested parties must submit responses by March 31, 2021 detailing their company information, past performance history, NAICS code 561612 services, and comments on CSO Phase II orientation and training requirements, including location, frequency, and maximum student-to-instructor ratios. The attachment provides the CSO Phase II orientation program requirements and special standards of responsibility, requiring financial documentation to support three months of operating expenses. Determinations will be made for potential small business set-asides, requiring at least two qualified small business responses demonstrating compliance with limitation on subcontracting.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15M20021RA32CSO21
1st,3rd,4th,5th,8th, and 12th Federal Judicial Circuit
Attachment C - Statement of Work, Section C.12.4, CSO Phase II Orientation
C.12.4 CSO Phase II Orientation
The contractor shall be responsible for conducting a CSO Phase II Orientation (Phase
II) for each eligible CSO. Phase II shall be a two-step phase comprised of forty (40) hours of introductory academic instruction and forty (40) hours of OJT. Upon successful completion of the academic instruction and OJT requirements of Phase II, the CSO may be assigned to all CSO duties, including posts which require the use of screening equipment.
C.12.4.1
Before a CSO is permitted to participate in Phase II , the Contractor shall ensure that the CSO has successfully completed Phase I Orientation. A CSO must wait 120 days after successfully completing CSO Phase I Orientation to commence Phase II
Orientation.
C.12.4.2
At a minimum, the Contractor’s training shall cover all requirements of the academic and OJT portions outlined in Attachment J.7(G), CSO Phase II Orientation Training
Program.
C.12.4.3
Upon completion of the academic portion of the Phase II Orientation, the Contractor shall be responsible for ensuring that the new CSO completes a 40-hour OJT program. The CSO shall be assigned to work with (paired with) a CSO with at least one year of experience operating screening equipment as a CSO and has no prior history of failed Unannounced Facility Security Tests. At a minimum, OJT shall consist of a minimum of eight (8) hours of OJT on each type of screening equipment.
The OJT program should work to reinforce the academic Phase II lessons through comprehensive hands-on training.
C.12.4.4 Examination and Practical Proficiency Demonstration
At the completion of Phase II Orientation, the Contractor shall administer both a written examination through the LMS and conduct a structured practical proficiency demonstration of each CSO’s individual skills, knowledge, and abilities related to training. The proficiency demonstration shall be in the form of a self-certified checklist signed by both the applicant/CSO and the experienced, CSO or LCSO who was paired with the applicant.
• The examination shall consist of at least 100 questions and include all subject areas covered during the Phase II Orientation. A passing score of 70% is required to perform on the contract.
• A proficiency assessment is required for each skill which requires demonstrated use and shall be measured as pass/fail or non-applicable. If a CSO/applicant does not pass the examination or proficiency assessment on the first attempt, the CSO may retest two additional times within seven (7) calendar days from the initial test date. If a CSO/applicant does not obtain a passing score on the retest, the CSO may not perform on the contract.
15M20021RA32CSO21
1st,3rd,4th,5th,8th, and 12th Federal Judicial Circuit
Attachment - Statement of Work, Section C.12.4, CSO Phase II Orientation
C.12.4.5
After completion of CSO Phase II Orientation, the Contractor shall require the CSO to complete the CSO-008-II In-District (Phase II) Orientation Certification
Attachment J.2(G) and require the District Supervisor to certify that the individual has satisfied the requirement. The Contractor shall retain the original form and forward a copy to the COR within seven (7) calendar days of completing the Phase
II Orientation.
File details come from the government source that posted it. Updated .