Attachment - Statement of Work.pdf

PDF 406 KB Posted

Attached to
Exterior Front Stair Restoration - FILA
Solicitation number
140P6420R0032
Issued by

View the file

Other files

File Type Posted
Sol_140P6420R0032.pdf PDF
Attachment - Technical Questionnaire.docx DOCX document
Attachment - Bid Schedule.xlsx XLSX spreadsheet
Attachment - Wage Determination- 07-10-20.pdf PDF
Attachment - Past Performance Questionnaire.docx DOCX document
Attachment - Drawings-Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST LADIES NATIONAL HISTORIC SITE

CANTON, OHIO

EXTERIOR FRONT STAIR RESTORATION

PMIS 241962

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

29 April, 2020

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 10 00 - Division 01 General Requirements

DIVISION 05 – METALS

Section 05 01 70 Decorative Metal Repair Section 05 12 00 Structural Steel Framing Section 05 51 13 Metal Pan Stairs Section 05 52 00 Metal Railings

DIVISION 09 – PAINTS AND FINISHES

Section 09 91 13 Exterior Painting

DRAWINGS

L00 Cover L01 Existing Conditions, Removals, and Public Right of Way Access L02 Construction Details

SECTION 01 10 00

DIVISION 1 GENERAL REQUIREMENTS

PART 1 – GENERAL

ITEM 1 - DESCRIPTION OF WORK

1.1 Background: In 1999, the National Park Service acquired the City National Bank building, originally constructed in 1895, in downtown Canton, Ohio. The building serves as the education center and library documenting the past and present First Ladies of the United States. This project focuses on restoration of the historic steel exterior stair with mortar set slate treads and ornamental steel railing. The stairs have fallen into disrepair due in part to de-icing chemical practices and age resulting in significant corrosion of the steel, including voids formed through the risers, and points of connection of the ornate steel handrail.

The slate stair treads have remained in sound condition and are to be removed, cleaned, and turned over to the Park.

1.2 Work Covered by the Contract Documents:

A. Project Location: First Ladies National Historic Site, Canton, Ohio.

B. Work consists of: The work for this project consists of removing the existing stair steel structure and existing condensate tube heating within tread mortar bed. Carefully remove and salvage steel ornate railing to first street elevation newel post, and slate stair treads. Fabricate new steel pan and stringer structure, repair and restore railing, incorporate new pipe railing to the restored rail to achieve Architectural Barriers Act (ABA) compliance, clean slate treads and turn over to the Park, install new honed granite stair treads, and reinstall as a restored complete stairway. The work shall also include cleaning and re-painting extents of street elevation ornate railing on site.

1. Work in order to complete the project shall additionally include:

a. Construction of a temporary wood steps and rail (or existing steps with temporary rail at Contractor option) to provide access to the lower level while work is temporarily suspended during shop fabrication work.

b. Construction of temporary fencing, coning and flagging, or other methods to divert pedestrian sidewalk traffic around the open stairway and street level work areas that does not damage, mechanically or mastic fasten to the concrete walk.

c. Provision of all necessary signage, cones, barricades, and flagmen necessary to protect the public and divert traffic (vehicular and pedestrian) for allowable periods of active work requiring disruption to public traffic flow.

C. Period of Performance (POP): Work shall be completed within 100 calendar days from notice to proceed.

ITEM 2 - EXISTING UTILITIES

2.1 Existing Utilities: Notify Contracting Officer / Contracting Officer Representative (COR) and utility companies of proposed locations and times for excavation.

2.2 Contractor shall be responsible for locating and preventing damage to known utilities. If Contractor causes any damage, repair utility at no additional expense to the Government. If damage occurs to an unknown utility, repair utility.

2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

2.3.1 Notify Contracting Officer / COR not less than seventy-two hours in advance of proposed utility interruptions.

2.3.2 Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance.

ITEM 3 - CONTRACTOR’S USE OF PREMISES

3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

A. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.

C. Pubic Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public. The Contractor shall construct all temporary steps and railings to a level of stability, as deemed appropriate by the COR, to safely protect the public from fall.

3.2 On-site work hours: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.

A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the Contracting Officer / COR. Submit requests for work outside of the stated normal business hours to the Contracting Officer / COR for approval at least 48 hours in advance of the work.

3.3 Contractor Use of Site:

A. General: Contractor shall have limited use of the site for construction operations due to location within a downtown urban location. Limit use of premises to the immediate building frontage. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Limits: Construction shall be restricted to the public walk frontage of the building where the railing extends. Materials shall not be staged on the site nor public way and remain on truck or at an offsite location until ready to directly transfer to reinstallation. Unless approved for temporary closure of the walk, the contractor shall provide a minimum 5’ clear lane of passage by pedestrians with allowed reduction of 3’ clear at existing fire hydrant located within the sidewalk frontage.

C. Public Street and Entrances: Keep the public street, Market Ave. South, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials beyond what is identified by the COR. Schedule deliveries to minimize obstruction of entrances, public walks, and street.

Contractor employee parking shall be limited to downtown public parking areas. Curb lane in Market Avenue shall not be used for parking outside of temporary curb lane closure pre-arranged and approved by the City and COR.

D. Temporary Street Lane or Sidewalk closure:

1. The Contractor shall be allowed to temporarily close the curbside lane only of Market Ave.

South for loading or offloading equipment and materials. The second (outside) southbound lane shall remain open to the public. The Contractor shall be responsible for communication with the City of Canton Engineering Traffic Division a minimum 72 hours prior to any temporary closures and coordination with the Contracting Officer Representative (COR).

The Contractor shall provide all barricades, cones, and/or flagmen while the street lane is closed. The drive lane shall be cleared and returned to public use by the end of the workday.

2. The Contractor shall be allowed to temporarily close the sidewalk while removing or delivering and setting new stairway pan as an oversized unit and while street elevation railing restoration is taking place that requires diverting public such as sandblasting or pressure washing as allowed by the COR. The Contractor shall be responsible for communication with the City of Canton Engineering Traffic Division a minimum 72 hours prior to any temporary closures and coordination with the Contracting Officer / COR. The Contractor shall provide all necessary signage as well as cones and/or barricades to divert pedestrian traffic at 2nd and 3rd Street intersections. No mid-block crossing diversions allowed.

3. The contractor shall provide cones, caution ribbon, barricades or other to the extent necessary to define limits of public passage along sidewalk and alley at all times workers or materials and equipment are present when full closure of the walk is not warranted.

3.4 Storage - Staging Areas:

A. Confine Storage of materials and equipment to Contractor’s vehicles or offsite locations approved by the Contracting Officer /COR. Deliver to site when ready to directly incorporate into the work.

3.5 Preservation of Natural Features: The building is on the National Register of Historic Places and a major asset of the Park and the City of Canton. All measures required by the Contractor to protect the building from damage due to construction activity shall be employed.

3.6 Hauling Restrictions: Comply with State of Ohio Department of Transportation road requirements for all work/access (http://www.dot.state.oh.us/Divisions/Operations/Maintenance/Permits/Documents/2011TDGB%5B1%5 D.pdf)

3.7 Housekeeping:

A. Keep project neat, orderly, and in a safe condition at all times. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all hazardous rubbish. Do not allow rubbish to accumulate. Provide onsite containers for daily collection of rubbish and dispose of it at end of each workday during progress of work.

B. Dispose of waste materials legally off site.

C. Recycling shall be recognized by the contractor and reasonable means to participate in diversion from the landfill shall be employed which may include removed steel (stringer and stair pan) to a recycling center that will receive it, plastics and aluminum recycling by employees with dedicated disposals at the work site, or other efficiently possible methods and measures.

3.8 Occupancy Requirements for Buildings:

A. Existing Buildings:

1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO/COR.

http://www.dot.state.oh.us/Divisions/Operations/Maintenance/Permits/Documents/2011TDGB%5B1%5D.pdf http://www.dot.state.oh.us/Divisions/Operations/Maintenance/Permits/Documents/2011TDGB%5B1%5D.pdf

b. Repair damage caused by construction operations. Protect building, its occupants, and the public right-of-way during construction period.

3.9 Photo Documentation:

All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted via CD-R or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from date of taken, or as approved by COR.

A. Existing Condition Images: Before starting construction, take color, dated, digital images of project site and adjacent property/street/etc. that may be impacted by construction activity/traffic.

Include existing items to remain or be salvaged from different vantage points and with context for location identification.

B. Construction Images:

1. Maintain organized index for photos with date, description, etc.

2. Take additional photographic images as needed when questions or emergency situations occur. Submit within 24 hours.

C. Photo Documentation Submittal: Submit all photo document files to the COR per Part 9.1 General Submittal Procedures of this section.

3.10 Fire and Life Safety:

As a minimum, conduct one weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the COR within one day after the meeting.

A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations).

B. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements. Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.

i. Immediately report all spills of hazardous materials to the National Historic Site (NHS) staff.

ii. Maintain a spill emergency response kit.

iii. Train employees how to respond to a spill and use the emergency response kit.

3.11 Noise and Acoustics Management:

A. Noise Control: Perform demolition and construction operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the COR

B. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.

1. Do not exceed the following dB(A) limitations at 50 feet:

Sound Level in dB(A) Time Duration of Impact Noise 70 More than 12 minutes in any hour 80 More than 3 minutes in any hour

2. Maximum permissible construction equipment noise levels at 50 feet:

MATERIALS HANDLING dB(A) Pneumatic Tools 80 Saws 75

C. Ambient Noise:

1. Maximum noise levels (dB) for receiving noise area at property line shall be as follows:

a. Commercial/Industrial receiving area:

Daytime: 67 dB Nighttime: 65 dB

ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION

4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.

ITEM 5 - EXAMINATION OF THE SITE

5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids. All bidders will be held to have the same knowledge concerning the site and the on ground conditions as if they had inspected the job site.

ITEM 6 - ABBREVIATIONS

6.1 The list of abbreviations, which may be used in the Construction Specifications or Special Provisions, refer to the organizations and specifications of the organizations may be found at the below https://www.nps.gov/orgs/1671/do-business-with-us.htm

ITEM 7 - ACCIDENT PREVENTION

7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.

https://www.nps.gov/orgs/1671/do-business-with-us.htm

A. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary personal protective equipment in good repair at all times. As a minimum, maintain four hard hats and all other APP required equipment.

7.2 Submittals:

A. Accident Prevention Program: Within 10 days from Notice to Proceed (NTP), submit for approval an accident prevention program. The program shall include:

1. Name of responsible supervisor to carry out the program

2. First aid procedures

3. Training, both initial and continuing

4. Planning for possible emergency situations

5. Contractor to identify nearest location of medical facility for emergencies

6. Recognition that work will be performed in remote areas with limited communication or cell phone coverage

B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute

"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections.

Contractor shall document the “toolbox” meetings through the daily logs.

7.3 Qualification of Employees:

A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

7.4 Accident Reporting: The Contractor shall report all accidents to the Contracting Officer/ COR or designee within one hour of occurrence and assist the Contracting Officer and other officials as required in the investigation of the accident.

7.5 First Aid Facilities: Provide adequate facilities for the number of employees and the type of construction at the site.

7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

7.7 Protective Equipment: It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources.

Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.

A. If a spill, leak or other release occurs, the operator shall, without impeding cleanup, notify the National Park Service Emergency Dispatch immediately.

ITEM 8 - PRECONSTRUCTION CONFERENCE: See FAR 52.236-26

ITEM 9 - SUBMITTALS

9.1 General Submittal Procedures:

A. General: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual specific sections.

1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using

National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit to the Contracting Officer Representative.

B. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.

C. Documents to be submitted to Contracting Office before Notice to Proceed (NTP) will be issued (all are due 10 days after notice of contract award – per block #12a of SF 1442 and this SOW):

1. Signed Contract

2. Alternative Payment Protection - Must provide either a Payment Bond or Irrevocable

Letter of Credit for construction contracts greater than $35,000, but not greater than $150,000

• Payment Bonds - Must be provided for construction contracts exceeding $150,000

• Performance Bond - Must be provided for any construction contract exceeding $150,000

3. Certificate of Liability Insurance

4. Letter Designating the Project Manager and Site Superintendent and their authority as it pertains to this project

D. If all of the documents listed above have not been received, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.

E. Documents to be submitted to Contracting Office after NTP has been issued and work can be performed on-site/begin (all are due 10 days after issuance of NTP – per block #11 of SF 1442):

F. The following submittals shall be submitted with a CM_16 transmittal cover to the CO/COR and submitted for approval as outlined below:

1. Work/Project Schedule -- delineating the various stages of work by phase (milestones)

2. Contractor shall provide, when applicable but not limited to, copies of product specifications, manufacturer’s literature and installation instructions of all materials and products to be furnished and installed. COR will verify that product specifications meet contract requirements.

3. Safety/Accident Prevention Plan

4. Documentation of licensing or certification as an approved installer by manufacturer of materials to be used.

5. List of individuals working on the project

6. SF1413 – Statement of prime contractor/ acknowledgement of subcontractor

7. Safety Data Sheets (SDS) for all applicable materials (if applicable)

G. The following submittals are required to be submitted before final payment is made:

1. Contractor is required to provide at the end of the project a series of before, during and after pictures of what was completed. The pictures will include all areas the contractor is authorized to work on. This document will be reviewed weekly to ensure compliance to the contract.

2. Manufacturers recommended care and cleaning requirements (if applicable)

3. Receipts from recycling companies showing quantity of material being recycled.

4. Warranty documentation for workmanship (as outlined in the SOW. Start date of warranty will be the date shown on the Final Inspection Checklist/Report)

5. Product warranties (if applicable)

6. Pay applications

7. Certified payrolls

8. Contractor quality control daily reports (any outstanding)

9. Release of claims - must be for the full amount of the contract (to include modifications)

10. SF1413 (any outstanding) - Statement of prime contractor/ acknowledgement of subcontractor

11. Drawings/pictures (if applicable), etc.

12. Final Inspection Checklist/Report (initiated by the COR, all parties sign once complete)

9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.

A. Shop Drawings: Indicate materials, connection details, anchorage spacing, hardware locations, welds, and installation details.

1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.

B. Product Data: Provide component construction, anchorage method, hardware, etc.

1. Submit Product Data according to Part 9.1 of this section to include one digital file

(.PDF or .TIF) to COR.

C. Samples: Submit 2 color samples 4” x 6” in size minimum of actual paint finish color selected for steel. Submit minimum of 3 different granite samples 4”x4”x1 ¼” size for COR review and selection, or request for additional alternatives if priorities of material noted in the drawings are not met.

1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.

D. For submittals specified above, forward submittals to Contracting Officer/COR at least 15 days before need for approval.

E. After approving submittals, Contracting Officer will return one copy to the Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.

9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 3 manufacturers, the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation or relevant specification.

A. For each item proposed as an “approved equal,” submit supporting data, including:

1. Drawings and samples as appropriate.

2. Comparison of the characteristics of the proposed item with that specified.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of vendor.

5. Manufacturer’s literature regarding installation, operation, and maintenance, and parts lists. Describe availability of maintenance service, and state source of replacement materials where applicable.

B. A request for approval constitutes a representation that Contractor:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

C. Approved Equals will be evaluated and approved/disapproved during the submittal process.

9.4 Progress Schedules: Within 10 days after Notice to Proceed, submit Progress Schedule. Contracting Officer/COR will review the Progress Schedule for format and content. Submit digital PDF of Progress Schedule (normally in bar chart form) showing estimated starting and completion dates for each part of the work. The first progress payment will not be issued until an acceptable progress schedule is submitted.

The following information must accompany submission of progress schedules prior to processing any pay application:

A. Daily/weekly progress reports during construction as part of the administration process.

B. Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values.

A sample Schedule of Values will be provided by the Contracting Officer.

ITEM 10 – TEMPORARY SERVICES

10.1 Description: The work of this section consists of providing temporary services required for Contractor's performance of the work of this Contract.

10.2 Fire Prevention and Protection:

A. Hazard Control: Take all necessary precautions to prevent fire during construction.

10.3 Toilet/Sanitary Services:

A. The contractor shall be responsible for providing and maintaining satellite toilet facilities for their employees for the duration of the project. Toilet to be located within alley as directed by the

COR.

ITEM 11 - PROJECT CLOSEOUT

11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures, and safety precautions.

11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.

11.3 Substantial Completion and Final Inspection: Submit written certification that project is substantially complete, and a final inspection must be requested to the Contracting Officer in writing. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.

A. If the work is determined to be substantially complete, following the final inspection, the.

Contracting Officer will prepare a Punch List and issue a Letter of Substantial Completion.

B. If the work is not determined to be substantially complete following the final inspection, the

Contracting Officer will notify Contractor in writing. Contractor shall request a new final inspection after completing the work. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

C. Contractor shall complete the Punch List within 20 calendar days, documented weather permitting.

D. If Contracting Officer determines that the work is not substantially complete; he will immediately notify Contractor in writing, stating reasons. After completing work, Contractor shall resubmit certification and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

E. If Contractor completes all items of work on the Punch List and all contractually required items, Contracting Officer will issue Letter of final acceptance of work.

F. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.

G. Disposition of any permits and warranties required by the specifications in this section.

11.4 Acceptance of the Work: After all deficiencies have been corrected, a Letter of Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.

11.5 Warranties

A. Construction Warranty shall be for 1 (one) year, based on date of project acceptance.

B. Provide All Warranty information of products installed organized by Division. All contact information, extents and conditions shall be clearly noted as well as date of overall project Substantial Completion.

C. Information shall include operation and maintenance manuals for each warranted material.

SUBMITTAL LIST

The intent of this list is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on this submittal list.

Deliverable Description Format Date Due

1 Section 01 10 00 Part 9.1 C:

1. Signed Contract

2. Alternative Payment Protection - Must provide either a Payment Bond or Irrevocable Letter of Credit for construction contracts greater than $35,000, but not greater than $150,000

• Payment Bonds - Must be provided for construction contracts exceeding $150,000

• Performance Bond - Must be provided for any construction contract exceeding $150,000

3. Certificate of Liability Insurance

4. Letter Designating the Project Manager and Site Superintendent and their authority as it pertains to this project

Electronic Copy, Hardcopy

10 days after Notice of Award

2 Section 01 10 00 Part 9.1 F:

1. Work/Project Schedule --delineating the various stages of work by phase (milestones)

2. Contractor shall provide, when applicable but not limited to, copies of product specifications, manufacturer’s literature and installation instructions of all materials and products to be furnished and installed. COR will verify that product specifications meet contract requirements.

3. Safety/Accident Prevention Plan

4. Documentation of licensing or certification as an approved installer by manufacturer of materials to be used.

Electronic Copy

10 days after Notice to Proceed

5. List of individuals working on the project

6. SF1413 – Statement of prime contractor/ acknowledgement of subcontractor

7. Safety Data Sheets (SDS) for all applicable materials (if applicable)

3 Section 01 10 00 Part 9.1 G:

1. Contractor is required to provide at the end of the project a series of before, during and after pictures of what was completed. The pictures will include all areas the contractor is authorized to work on. This document will be reviewed weekly to ensure compliance to the contract.

2. Manufacturers recommended care and cleaning requirements (if applicable)

3. Receipts from recycling companies showing quantity of material being recycled.

4. Warranty documentation for workmanship (as outlined in the SOW.

Start date of warranty will be the date shown on the Final Inspection Checklist/Report)

5. Product warranties (if applicable)

6. Pay applications

7. Certified payrolls

8. Contractor quality control daily reports (any outstanding)

9. Release of claims - must be for the full amount of the contract (to include modifications)

10. SF1413 (any outstanding) - Statement of prime contractor/ acknowledgement of subcontractor

11. Drawings/pictures (if applicable), etc.

Electronic Copy

Prior to award of Final Payment

12. Final Inspection Checklist/Report (initiated by the COR, all parties sign once complete)

4 Section 05 01 70 – Decorative Metal Repair:

- Fabrication Shop drawings

- Product data

- Samples of exposed product, color and texture

Electronic Copy and Physical Samples

35 days after Notice to Proceed

5 Section 05 12 00 – Structural Steel Framing

- Product data

- Shop drawings

- Welding Certifications, Mill Test

Reports, and Quality Control Reports

Electronic Copy

35 days after Notice to Proceed

6 Section 05 51 13 – Metal Pan Stairs

- Product Data

- Shop drawings

- Welding Certificates

Electronic Copy

35 days after Notice to Proceed

7 Section 05 52 00 – Metal Railings:

- Fabrication Shop drawings

- Product data

- Welder Qualifications

Electronic Copy

35 days after Notice to Proceed

8 Section 09 91 13 – Exterior Painting

- Product data

- Paint cut sheet sample

Electronic Copy, Physical sample.

30 days prior to conducting painting work

9 Drawing sheet L02 – Granite Samples Physical samples.

25 days after notice to Proceed

END OF SECTION

SECTION 05 01 70

DECORATIVE METAL REPAIR

PART 2 - GENERAL

2.1 SUMMARY

A. Section includes decorative metal repairs as follows:

1. Repairing metal and replacing damaged and missing components in place.

2. Removing metal for shop repair and replacement of components; reinstalling repaired metal.

2.2 DEFINITIONS

A. Low-Pressure Spray: 100 to 400 psi

B. Medium-Pressure Spray: 400 to 800 psi

2.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

2.4 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings: Include plans, elevations, and sections showing locations and extent of repair and replacement work and details of each new metal item and component and its location on the structure.

C. Samples: For each exposed product, shop fabricated mockup of decorative metal repair processes, and for each color and texture specified.

D. All Action Submittals to be in accordance with Section 01 10 00, Item 9.

2.5 INFORMATIONAL SUBMITTALS

A. AISC Quality Certificates.

B. All Informational Submittals to be in accordance with Section 01 10 00, Item 9.

2.6 QUALITY ASSURANCE

A. Decorative Metal Repair Specialist Qualifications: A qualified decorative metal fabrication and repair specialist that participates in the AISC Quality Certification Program is required.

Experience installing and finishing new decorative metalwork is insufficient experience for repairing decorative metal.

B. Mockups: Prepare shop fabricated mockups of decorative metal repair processes to demonstrate aesthetic effects and to set quality standards for materials and execution and for fabrication and installation.

PART 3 - PRODUCTS

3.1 PERFORMANCE REQUIREMENTS

A. Structural Performance: Railings and handrails, including attachment to building construction, shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated:

1. Uniform load of 50 lbf/ft. applied in any direction.

2. Concentrated load of 200 lbf applied in any direction.

3. Uniform and concentrated loads need not be assumed to act concurrently.

3.2 METAL MATERIALS

A. General: Provide decorative metal materials made of the alloys, forms, and types that match existing metals and have the ability to receive finishes matching existing finishes unless otherwise indicated.

3.3 PREPARATORY CLEANING MATERIALS

A. Water: Potable.

B. Hot Water: Water heated to a temperature of 140 to 160 deg F.

C. Detergent Solution, Job Mixed: Solution prepared by mixing 2 cups of tetrasodium pyrophosphate (TSPP), 1/2 cup of laundry detergent, and 20 quarts of hot water for every 5 gal. of solution required.

D. Abrasive Materials:

1. Abrasives for Ferrous Metal Cleaning: Aluminum oxide paper, emery paper, fine steel wool, steel scrapers, and steel-wire brushes of various sizes.

E. Rust Remover: Manufacturer's standard phosphoric acid-based gel formulation, also called "naval jelly," for removing corrosion from iron and steel.

3.4 FASTENERS

A. Fasteners: Fasteners of the same basic metal as fastened metal unless otherwise indicated. Use metals that are noncorrosive and compatible with each metal joined.

1. Match existing fasteners in material and in type of fastener unless otherwise indicated.

2. Use concealed fasteners for interconnecting decorative metal components and for attaching them to other work unless exposed fasteners are unavoidable or the existing fastening method.

3. For exposed fasteners, use Phillips-type machine screws of head profile flush with metal surface unless otherwise indicated.

4. Finish heads of exposed fasteners to match finish of metal fastened unless otherwise indicated.

B. Anchors, General: Use bolt heads of same basic metal as fastened metal unless otherwise indicated. Use metals that are noncorrosive and compatible with each metal anchored.

C. Post-Installed Structural Anchors: Fastener systems; with working capacity greater than or equal to the design load, according to an evaluation report acceptable to authorities having jurisdiction, based on ICC-ES as appropriate for the substrate.

D. Post-Installed Nonstructural Anchors: Fastener systems with an evaluation report acceptable to authorities having jurisdiction, based on ICC-ES as appropriate for the substrate.

3.5 MISCELLANEOUS MATERIALS

A. Welding Electrodes and Filler Metal: Select according to AWS specifications for metal alloy welded; use metal type and alloy as recommended in writing by producer of metal to be welded or filled and as required for color match, strength, and compatibility in fabricated items.

B. Metal-Patching Compound: Two-part, polyester-resin metal-patching compound; knife-grade formulation as recommended in writing by manufacturer for type of metal repair indicated, tooling time required for the detail of work, and site conditions. Compound shall be produced for filling metal that has deteriorated because of corrosion. Filler shall be capable of filling deep holes and spreading to feather edge.

C. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout complying with ASTM C1107/C1107M. Provide grout specifically recommended in writing by manufacturer for interior and exterior applications.

3.6 METAL FABRICATION

A. Fabricate repairs of decorative metal items and components in sizes and profiles to match existing decorative metal, with accurate curves, lines, and angles. Mill joints to a tight, hairline fit. Form assemblies and joints exposed to weather to resist water penetration and retention.

B. Provide rebates, lugs, and brackets necessary to assemble components and to attach to existing work. Drill and tap for fasteners. Use concealed fasteners where possible; use exposed fasteners to match existing work.

C. Comply with AWS for recommended practices in welding and brazing. Provide welds and brazes behind finished surfaces without distorting or discoloring exposed side. Clean exposed welded and brazed joints of flux, and dress exposed and contact surfaces.

D. Replacing Cast-Metal Components: bottom rail picket tabs to weld to c-channel stringer, splice bar steel to significantly rusted pickets (lower 4”-6” of picket) and other as field verified by Contractor and COR replaced with exact duplicates.

3.7 FERROUS METAL FINISHES

A. Repair Primer: Manufacturer's standard, rust-inhibiting, fast-curing, lead- and chromate-free universal primer, compatible with firmly adhered existing paint and applied finish. Comply with coating manufacturer's written instructions for cleaning, pretreatment, application, and minimum dry film thickness.

B. Finish Primer: Primer complying with applicable requirements in Section 09 91 13 for finish painting of primed existing metal.

PART 4 - EXECUTION

4.1 DECORATIVE METAL REPAIR, GENERAL

A. Execution of the Work: In repairing items, disturb remaining existing work as minimally as possible and as follows:

1. Stabilize decorative metal to reestablish structural integrity and weather resistance while maintaining the existing form of each item.

2. Remove deteriorated coatings and corrosion.

3. Sequence work to minimize time before protective coatings are reapplied.

4. Repair items where stabilization is insufficient to stop progress of deterioration.

5. Repair items in place where possible.

6. Replace or reproduce items where indicated or scheduled.

7. Install temporary protective measures to stabilize decorative metal that is indicated to be repaired later.

B. Mechanical Coating Removal: Use gentle methods, such as scraping and wire brushing, that will not abrade metal substrate.

C. Repair Decorative Metal Item: Match existing materials and features.

D. Replace Decorative Metal Component: Where indicated, duplicate and replace items with new metal matching existing metal.

1. Replace heavily deteriorated or missing parts or features of decorative metal with compatible materials, using surviving prototypes to create patterns or molds for duplicate replacements.

4.2 PREPARATORY CLEANING

A. General: Use those methods indicated for each type of decorative metal and its location.

1. Brushes: If using wire brushes, use brushes of same base metal composition as metal being cleaned. Use brushes that are resistant to chemicals being used.

2. Spray Equipment: Use spray equipment that provides controlled application at volume and pressure indicated, measured at nozzle. Adjust pressure and volume to ensure that spray methods do not damage surfaces.

a. Equip units with pressure gages.

b. For water-spray application, use fan-shaped spray that disperses water at an angle of

25 to 50 degrees.

c. For heated water-spray application, use equipment capable of maintaining temperature between 140 and 160 deg F at flow rates indicated.

3. Uniformity: Perform each cleaning method in a manner that results in uniform coverage of all surfaces, including corners, contours, and interstices, and that produces an even effect without streaks or damaging surfaces.

B. Water Cleaning: Clean with water applied by pressure spray. Supplement with natural-fiber or plastic-bristle brush. Use small brushes to remove soil from joints and crevices.

C. Detergent Cleaning:

1. Wet surface with water applied by low-pressure spray.

2. Scrub surface with detergent solution and natural-fiber or plastic-bristle brush until soil is thoroughly dislodged and can be removed by rinsing. Use small brushes to remove soil from joints and crevices. Dip brush in solution often to ensure that adequate fresh detergent is used and that surface remains wet.

3. Rinse with water applied by pressure spray to remove detergent solution and soil.

D. Cleaning with Abrasive Pads: Clean surfaces to remove dirt by light rubbing with abrasive pads and water. Rinse with cold water to remove residue. Apply rinse by low-pressure spray.

E. Chemical Rust Removal:

1. Remove loose rust scale with approved abrasives for ferrous metal cleaning.

2. Apply rust remover with brushes or as recommended in writing by manufacturer.

3. Allow rust remover to remain on surface for period recommended in writing by manufacturer or as determined by preconstruction testing. Do not allow extended dwell time.

4. Wipe off residue with mineral spirits and either steel wool or soft rags, or clean with method recommended in writing by manufacturer to remove residue.

5. Dry immediately with clean, soft cloths. Follow direction of grain in metal.

6. Prime immediately to prevent rust. Do not touch cleaned metal surface until primed.

F. Mechanical Rust Removal:

1. Remove rust with approved abrasives for ferrous metal cleaning.

2. Wipe off residue with mineral spirits and either steel wool or soft rags.

3. Dry immediately with clean, soft cloths. Follow direction of grain in metal.

4. Prime immediately to prevent rust. Do not touch cleaned metal surface until primed.

4.3 REMOVAL, REPAIR, AND REINSTALLATION

A. General: Perform removal work for specific requirements relating to selectively demolishing construction, including decorative metal removal for repair or reinstallation elsewhere.

B. Defects in Painted Metal Surfaces: Repair non load-bearing defects in existing metal surfaces, including dents and gouges more than 1/8 inch deep or 1 inch across, and all holes and cracks by filling with metal-patching compound and sanding smooth. Remove burrs and protruding fasteners. Prime iron and steel surfaces immediately after repair to prevent flash rusting.

4.4 PRIMING

A. Repair Primer: Apply immediately after completing a repair.

B. Finish Primer: Apply as soon after cleaning as possible.

SECTION 05 12 00

STRUCTURAL STEEL FRAMING

PART 5 - GENERAL

5.1 SUMMARY

A. Section Includes:

1. Structural steel.

5.2 DEFINITIONS

A. Structural Steel: Elements of the structural frame indicated on Drawings and as described in

ANSI/AISC 303.

5.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

5.4 ACTION SUBMITTALS

A. Product Data:

1. Structural-steel materials.

2. Shop primer.

B. Shop Drawings: Show fabrication of structural-steel components.

C. All Action Submittals to be in accordance with Section 01 10 00, Item 9.

5.5 INFORMATIONAL SUBMITTALS

A. Welding certificates.

B. Mill test reports for structural-steel materials, including chemical and physical properties.

C. Source quality-control reports.

D. Field quality-control reports.

E. All Informational Submittals to be in accordance with Section 01 10 00, Item 9.

5.6 QUALITY ASSURANCE

A. Fabricator Qualifications: A qualified fabricator that participates in the AISC Quality Certification Program and is designated an AISC-Certified Plant, Category BU or is accredited by the IAS Fabricator Inspection Program for Structural Steel (Acceptance Criteria 172).

B. Welding Qualifications: Qualify procedures and personnel in accordance with

AWS D1.1/D1.1M.

PART 6 - PRODUCTS

6.1 PERFORMANCE REQUIREMENTS

A. Comply with applicable provisions of the following specifications and documents:

1. ANSI/AISC 303.

2. ANSI/AISC 360.

B. Connection Design Information:

1. Fabricator's experienced steel detailer shall select or complete connections in accordance with ANSI/AISC 303.

6.2 STRUCTURAL-STEEL MATERIALS

A. Channels, Angles, Shapes: ASTM A36/A36M Grade 50.

B. Plate and Bar: ASTM A36/A36M Grade 50.

C. Welding Electrodes: Comply with AWS requirements.

6.3 BOLTS AND CONNECTORS

A. High-Strength A325 Bolts, Nuts, and Washers: ASTM F3125/F3125M, Grade A325, Type 1, heavy-hex steel structural bolts; ASTM A563, Grade DH, heavy-hex carbon-steel nuts; and ASTM F436/F436M, Type 1, hardened carbon-steel washers; all with plain finish.

6.4 PRIMER

A. Steel Primer:

1. Comply with Section 09 91 13 "Exterior Painting".

2. SSPC-Paint 23, latex primer.

3. Fabricator's standard lead- and chromate-free, nonasphaltic, rust-inhibiting primer complying with MPI#79 and compatible with topcoat.

6.5 FABRICATION

A. Structural Steel: Fabricate and assemble in shop to greatest extent possible. Fabricate in accordance with ANSI/AISC 303 and to ANSI/AISC 360.

6.6 SHOP CONNECTIONS

A. High-Strength Bolts: Shop install high-strength bolts in accordance with RCSC's "Specification for Structural Joints Using High-Strength Bolts" for type of bolt and type of joint specified.

B. Weld Connections: Comply with AWS D1.1/D1.1M for tolerances, appearances, welding procedure specifications, weld quality, and methods used in correcting welding work.

6.7 SHOP PRIMING

A. Shop prime steel surfaces.

B. Surface Preparation of Steel: Clean surfaces to be painted. Remove loose rust and mill scale and spatter, slag, or flux deposits. Prepare surfaces in accordance with the following specifications and standards:

1. SSPC-SP 2.

2. SSPC-SP 3.

3. SSPC-SP 7 (WAB)/NACE WAB-4.

4. SSPC-SP 6 (WAB)/NACE WAB-3.

C. Priming: Immediately after surface preparation, apply primer in accordance with manufacturer's written instructions and at rate recommended by SSPC to provide a minimum dry film thickness of 1.5 mils. Use priming methods that result in full coverage of joints, corners, edges, and exposed surfaces.

PART 7 - EXECUTION

7.1 EXAMINATION

A. Verify elevations of concrete- and masonry-bearing surfaces and locations of angles, and other embedments for compliance with requirements.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

7.2 FIELD CONNECTIONS

A. High-Strength Bolts: Install high-strength bolts in accordance with RCSC's "Specification for Structural Joints Using High-Strength Bolts" for bolt and joint type specified.

SECTION 05 51 13

METAL PAN STAIRS

PART 8 - GENERAL

8.1 SUMMARY

A. Section Includes:

1. Preassembled steel stairs with mortar bedded stone treads.

8.2 COORDINATION

A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and coating manufacturers' written instructions to ensure that shop primers and topcoats are compatible with one another.

8.3 ACTION SUBMITTALS

A. Product Data: For metal pan stairs and the following:

1. Shop primer products.

2. Honed Granite treads.

3. Handrail wall brackets.

4. Mortar.

B. Shop Drawings:

1. Include plans, elevations, sections, details, and attachments to other work.

2. Indicate sizes of metal sections, thickness of metals, profiles, holes, and field joints.

C. All Action Submittals to be in accordance with Section 01 10 00, Item 9.

8.4 INFORMATIONAL SUBMITTALS

A. Welding certificates.

B. All Informational Submittals to be in accordance with Section 01 10 00, Item 9.

8.5 QUALITY ASSURANCE

A. Welding Qualifications: Qualify procedures and personnel according to the following:

1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."

2. AWS D1.3/D1.3M, "Structural Welding Code - Sheet Steel."

PART 9 - PRODUCTS

9.1 PERFORMANCE REQUIREMENTS

A. Structural Performance of Stairs: Metal stairs shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated:

1. Uniform Load: 100 lbf/sq. ft.

2. Concentrated Load: 300 lbf applied on an area of 4 sq. in.

3. Uniform and concentrated loads…