Attachment REPAIR SATCOM B100_DRAWINGS_DRAFT DESIGN.pdf

PDF 17 MB Posted

Attached to
Sources Sought for HVAC Repair, Fort Buckner Japan
Solicitation number
W912HVZ0013
Issued by

About this file

This file is a draft design drawing attachment for SATCOM B100 repair work at Fort Buckner, Kadena Air Base, Okinawa, Japan. The document serves as a visual reference for the Sources Sought market survey issued by the U.S. Army Corps of Engineers, Japan District, under solicitation number W912HVZ0013 for FY26 OMSF Repair HVAC and Related Work. The drawing provides technical specifications and design details necessary for potential contractors to understand the scope of the repair project and assess their capability to perform the work.

This market survey is restricted to local sources—firms physically located and licensed to conduct business in Japan. The Government is conducting this pre-solicitation research for planning purposes only and has not committed to any follow-on solicitation or contract award. No payment will be provided for responses to this market survey. The information gathered will be used internally by USACE-POJ for acquisition planning and decision-making. Respondents should note that while USACE will protect information marked as confidential, submissions may be subject to FOIA requests under 41 C.F.R. parts 105-60. This represents a Design-Bid-Build (DBB) project approach, and the Government encourages all interested and qualified Japanese-based contractors to submit responses demonstrating their qualifications and experience in HVAC repair and related construction work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

OKINAWA, JAPAN

PACIFIC OCEAN

JAPAN

OKINAWA,JAPAN

SEA OF JAPAN

PROJECT LOCATION

FOR REVIEW

ONLY

THESE DOCUMENTS ARE FOR

CONCEPT DESIGN AND NOT

INTENDED FOR CONSTRUCTION

BIDDING OR PERMIT PURPOSES.

THEY WERE PREPARED BY, OR

UNDER SUPERVISION OF:

NAME

REGISTRATION # DATE

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

IS

O

A

A

D R

A W

IN

G

C O

D E

PLOT SCALE:PLOT DATE:

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10

PLOTTED BY:

FILE PATH:

A

G U

E R

R A

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

US Army Corps of Engineers

Japan District ®

J A

P A

N E

N G

IN

E

E R

D

IS

T R

IC

T

O K

IN

A

W A

J A

P A

N

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

JEG Proj. No. D3449300

J E

G

D

C A

M P

B U

C K

N E

R C

O M

M U

N

IC

A T

IO

N

S A

N N

E X

IN

A W

A

J A

P A

N P

R O

J E

C T

N U

M B

E R

:D

F Y

R

E P

A

IR

H V

A C

W

ID

E B

A N

D S

A T

C O

M O

P S

B

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

Christopher M. Surles

TX 23638 09/04/2025

TEXAS REGISTERED

ENGINEERING FIRM F-2966

J A

C O

B S

G O

V E

R N

M E

N T

S E

R V

IC

E

S C

O M

P A

N Y

M

A

IN

S T

R E

E T

F

O R

T W

O R

T H

T

X

U S

A

CUI

CUI BACKCHECK SUBMITTAL DESIGN

S O

L

IC

IT

A

T

IO

N N

O

/0

/2

1 : 18/29/2025 10:51:31

AM

C:\_Revit_Local_Models\2022\D3449305-G-3D_Jake.Metzler.rvt

C H

R

IS

S U

R L

E S

L A

M O

N T

F A

L L O

N

G-001

K E

L V

IN

C

A R

L S

O N

C O

V E

R S

H E

E T

G G

-0

G -0

JAPAN DISTRICT

FY25 REPAIR HVAC WIDEBAND SATCOM OPS B100

CAMP BUCKNER COMMUNICATIONS ANNEX,

OKINAWA JAPAN

JACOBS ENGINEERING GROUP INC.

777 MAIN STREET, FORT WORTH, TX 76102

USA

PRIME CONSULTANT

VICINITY MAP

SITE LOCATION MAP

DRAFT

FOR REVIEW

ONLY

THESE DOCUMENTS ARE FOR

CONCEPT DESIGN AND NOT

INTENDED FOR CONSTRUCTION

BIDDING OR PERMIT PURPOSES.

THEY WERE PREPARED BY, OR

UNDER SUPERVISION OF:

NAME

REGISTRATION # DATE

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

IS

O

A

A

D R

A W

IN

G

C O

D E

PLOT SCALE:PLOT DATE:

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10

PLOTTED BY:

FILE PATH:

A

G U

E R

R A

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

US Army Corps of Engineers

Japan District ®

J A

P A

N E

N G

IN

E

E R

D

IS

T R

IN

A

W A

J A

P A

N

J E

G

D

C A

M P

B U

C K

N E

R C

O M

M U

N

IC

A T

IO

N

S A

N N

IN

A W

A

J A

P A

N P

R O

J E

C T

N U

M B

E R

:D

F Y

R

E P

A

IR

H V

A C

W

ID

E B

A N

D S

A T

C O

M O

P S

B

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

Christopher M. Surles

TX 23638 09/04/2025

TEXAS REGISTERED

ENGINEERING FIRM F-2966

J A

C O

B S

G O

V E

R N

M E

N T

S E

R V

IC

E

S C

O M

P A

N Y

M

A

IN

S T

R E

E T

F

O R

T W

O R

T H

T

X

U S

A

CUI

CUI BACKCHECK SUBMITTAL DESIGN

S O

L

IC

IT

A

T

IO

N N

O

/0

/2

8/29/2025 10:51:31

AM

C:\_Revit_Local_Models\2022\D3449305-G-3D_Jake.Metzler.rvt

C H

R

IS

S U

R L

E S

L A

M O

N T

F A

L L O

N

G-002

K E

L V

IN

C

A R

L S

O N

S H

E E

T I

N D

E X

G G

-0

G -0

GENERAL

NO DRAWING TITLE

G-001 COVER SHEET

G-002 SHEET INDEX

G-100 HAUL ROUTE & CONTRACTOR LAYDOWN

G-I002 DRAWING ABBREVIATIONS AND SYMBOLS

G-I003 DRAWING ABBREVIATIONS AND SYMBOLS

G-I110 CODE COMPLIANCE PLAN

GI010 OVERALL PHASING PLAN - PHASE 1

GI011 OVERALL PHASING PLAN - PHASE 2 & 3

Gl012 BUILDING CODE ANALYSIS

Gl013 LIFE SAFETY CODE ANALYSIS

Gl014 LIFE SAFETY OVERALL FLOOR PLAN

STRUCTURAL

NO DRAWING TITLE

S-001 STRUCTURAL NOTES-LEGENDS-SYMBOLS

S-002 GENERAL STRUCTURAL NOTES

S-100 FOUNDATION PLAN

S-201 RETROFIT AND NEW CONSTRUCTION SECTIONS/DETAILS

ARCHITECTURAL

NO DRAWING TITLE

A-001 GENERAL NOTES AND PERSPECTIVES

AD101 OVERALL DEMOLITION PLANS

AD102 PARTIAL DEMOLITION FLOOR PLAN - AREA A

AD103 PARTIAL DEMOLITION FLOOR PLAN - AREA B

AD122 PARTIAL DEMOLITION REFLECTED CEILING PLAN - AREA A

AD123 PARTIAL DEMOLITION REFLECTED CEILING PLAN - AREA B

AD131 DEMOLITION ROOF PLAN

AE101 OVERALL PLANS

AE102 PARTIAL FLOOR PLAN - AREA A

AE103 PARTIAL FLOOR PLAN - AREA B

AE122 PARTIAL REFLECTED CEILING PLAN - AREA A

AE123 PARTIAL REFLECTED CEILING PLAN - AREA B

AE131 OVERALL ROOF PLAN

A-401 ENLARGED PLANS - VESTIBULE, TOILET AND TOILET ACCESSORIES

A-451 CANOPY DETAILS

A-521 CEILING DETAILS

A-601 PARTITION TYPE, DOOR, FRAME AND FINISH SCHEDULES

A-602 DOOR DETAILS

A-603 PENETRATION AND LOUVER DETAILS

FIRE PROTECTION

NO DRAWING TITLE

FA001 FIRE ALARM / MASS NOTIFICATION GENERAL NOTES

FD101 FIRE ALARM / MASS NOTIFICATION DEMOLITION PLAN

FA101 FIRE ALARM / MASS NOTIFICATION OVERALL PLAN

FA102 FIRE ALARM / MASS NOTIFICATION PARTIAL FLOOR PLAN - AREA A

FA103 FIRE ALARM / MASS NOTIFICATION PARTIAL FLOOR PLAN - AREA B

FA501 FIRE ALARM / MASS NOTIFICATION DETAILS

MECHANICAL

NO DRAWING TITLE

M-001 MECHANICAL GENERAL NOTES

MD101 OVERALL DEMOLITION HVAC PLAN

MD102 PARTIAL DEMOLITION HVAC - AREA A

MD103 PARTIAL DEMOLITION HVAC - AREA B

M-101 OVERALL HVAC PLAN

M-102 PARTIAL HVAC FLOOR PLAN - AREA A

M-103 PARTIAL HVAC FLOOR PLAN - AREA B

M-301 HVAC BUILDING SECTION

M-302 HVAC BUILDING SECTION

M-401 HVAC ENLARGED PLANS

M-501 HVAC DETAILS

M-502 HVAC DETAILS

M-503 HVAC DETAILS

M-504 HVAC DETAILS

M-601 HVAC SCHEDULES

M-602 HVAC SCHEDULES

M-701 CHILLED WATER DIAGRAM

M-801 HVAC CONTROLS

M-802 HVAC CONTROLS

M-803 HVAC CONTROLS

M-804 HVAC CONTROLS

M-805 HVAC CONTROLS

M-806 HVAC CONTROLS

M-807 HVAC CONTROLS

M-808 HVAC CONTROLS

M-809 POINT LIST INSTRUCTIONS

M-810 I/O POINTS LIST

M-811 I/O POINTS LIST

M-812 I/O POINTS LIST

M-813 I/O POINTS LIST

M-814 I/O POINTS LIST

ELECTRICAL

NO DRAWING TITLE

E-001 LEGEND AND ABBREVIATIONS

ED101 PARTIAL DEMOLITION POWER PLAN - AREA A

ED102 PARTIAL DEMOLITION POWER PLAN - AREA B

ED103 PARTIAL DEMOLITION LIGHTING PLAN - AREA A

ED104 PARTIAL DEMOLITION LIGHTING PLAN - AREA B

E-101 PARTIAL POWER PLAN - AREA A

E-102 PARTIAL POWER PLAN - AREA B

E-103 PARTIAL POWER ROOF PLAN - AREA A

E-104 PARTIAL LIGHTING PLAN - AREA A

E-105 PARTIAL LIGHTING PLAN - AREA B

E-501 DETAILS

E-502 DETAILS

E-601 DEMOLITION ONE-LINE DIAGRAM

E-602 ONE-LINE DIAGRAM

E-603 EQUIPMENT SCHEDULE

E-604 PANEL SCHEDULES

E-605 PANEL SCHEDULES

E-606 PANEL SCHEDULES

E-607 LIGHTING SCHEDULES

COMMUNICATIONS

NO DRAWING TITLE

T-001 GENERAL NOTES & LEGEND

T-101 TELECOM - OVERALL PLANS

T-102 TELECOM - PARTIAL FLOOR PLAN - AREA A

T-103 TELECOM - PARTIAL FLOOR PLAN - AREA B

T-201 TELECOM ELEVATIONS

T-401 TELECOM ENLARGED PLANS

T-501 TELECOM DETAILS

T-502 TELECOM DETAILS

T-503 TELECOM DETAILS

T-504 TELECOM DETAILS

T-601 TELECOM RISER DIAGRAM

ENVIRONMENTAL

NO DRAWING TITLE

H-001 BUILDING 100 HAZARDOUS MATERIALS REMOVAL PLAN

HD-101 BUILDING 100 HAZARDOUS MATERIALS REMOVAL PLAN

HD-102 PARTIAL DEMOLITION FLOOR PLAN - AREA B

PLUMBING

NO DRAWING TITLE

P-101 PARTIAL PLUMBING FLOOR PLAN - AREA B

PROJECT

LOCATION

CONTRACTOR

LAYDOWN AREAS

HAUL ROUTE

MAIN GATE

HIG

HW

AY

KITAMAE CHATAN

1 CHOME-27-15 FUTENMA

1 CHOME-27-1-2 FUTENMA

1 CHOM

E-34-1 FUTENM

A

1 CHOME-33 FUTENMA

A1 HAUL ROUTE & CONTRACTOR LAYDOWN

1 : 1000

H

AU

L R

O U

TE

C O

N

TR

AC

TO

R L

AY

D

O W

N

G-100

G -1

C:\_Revit_Local_Models\2022\D3449305-G-3D_lamont.fallon.rvt 3/11/2025 10:13:38

AM

A

C

B

FOR REVIEW

ONLY

THESE DOCUMENTS ARE FOR

CONCEPT DESIGN AND NOT

INTENDED FOR CONSTRUCTION

BIDDING OR PERMIT PURPOSES.

THEY WERE PREPARED BY, OR

UNDER SUPERVISION OF:

NAME

REGISTRATION # DATE

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

IS

O

A

A

D R

AW

IN

G C

O D

E:

PLOT SCALE:PLOT DATE:

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10

PLOTTED BY:

FILE PATH:

A.

G

U

ER

R A

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

US Army Corps of Engineers Japan District ®

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

O

KI

N

AW

A, J

AP

AN

JE

G

: D

C A

M P

B U

C K

N

ER

C O

M M

U N

IC

A

TI

O

N S

A N

N

EX

O K

IN

A

W A

, J A

PA

N

PR

O

JE

C

T N

U M

B

ER

:D

FY

R

EP

A

IR

H

VA

C W

ID

EB

A N

D S

A

TC

O M

O

PS

B

IS

SU

E

D

AT

E:

C O

N

TR

AC

T

N O

TEXAS REGISTERED

ENGINEERING FIRM F-2966

JA

C

O

BS

G O

VE

R

N M

EN

T

SE

R

VI

C

ES

C

O M

PA

N

Y

M

AI

N

S

TR

EE

T, F O

R T

W O

R

TH

, T X

U

SA

CUI

CUI

SO

LI

C

IT

AT

IO

N N

O

BACKCHECK SUBMITTAL DESIGN

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

D . G

IM

BE

L

B.

C

AP

PE

LL

A

L.

H

ER

O

U X

/0

4/

LISA M. HEROUX

TX 156321 09/04/2025

0 20000 40000

SCALE: 1:1000

GENERAL NOTES

LEGEND

D

REVISION

DRAWING SYMBOLS

SHEET ON WHICH DETAIL

IS DRAWN

BUILDING ELEVATION

WALL SECTION

BUILDING SECTION

ROOM NAME AND

NUMBER

NOTES BY SYMBOL

(KEYNOTES)

A2

A-201

A1

A-310

A1

A-301

A1

A-301

A0

A-101

A-201

A4

A4

A4

A4

INTERIOR ELEVATION

MULTIPLE VIEWS

DETAIL IDENTIFICATION

TITLE OF DRAWING

STATED SCALE

TRUE NORTH ARROW

PLAN

NORTH

T R

U E

N T

R U

E N

DETAIL IDENTIFICATION

ENLARGED PLAN/DETAIL

REFERENCE

A1

A-101

A1

A2

A3

SCALE 1 = 100

VIEW NAME

A1

ROOM

NAME

NUMBERING SYSTEM

G-001

DISCIPLINE:

G - GENERAL

V - SURVEY/MAPPING

B - GEOTECHNICAL

C - CIVIL

L - LANDSCAPE

S - STRUCTURAL

A - ARCHITECTURE

I - INTERIORS

F - FIRE PROTECTION

P - PLUMBING

M - MECHANICAL

E - ELECTRICAL

T - TELCOMMUNICATION

R - RESOURCE

SERIES NUMBER

0 - GENERAL

1 - PLANS

2 - ELEVATIONS

3 - SECTIONS

4 - ENLARGED PLANS

5 - DETAILS

6 - SCHEDULES

7 - DIAGRAMS

8 - USER DEFINED

9 - 3D REPRESENTATIONS

SHEET NUMBER

WITHIN SERIES

A

GRID TYPE

NOTES BY SYMBOL

(DEMO-KEYNOTES)

SCALE: 1:1

0 10 20 40 GRAPHIC SCALE

PLAN NORTH ARROW

DRAWING ABBREVIATIONS

XX

FOR REVIEW

ONLY

THESE DOCUMENTS ARE FOR

CONCEPT DESIGN AND NOT

INTENDED FOR CONSTRUCTION

BIDDING OR PERMIT PURPOSES.

THEY WERE PREPARED BY, OR

UNDER SUPERVISION OF:

NAME

REGISTRATION # DATE

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

IS

O

A

A

D R

A W

IN

G

C O

D E

PLOT SCALE:PLOT DATE:

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10

PLOTTED BY:

FILE PATH:

A

G U

E R

R A

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

US Army Corps of Engineers

Japan District ®

J A

P A

N E

N G

IN

E

E R

D

IS

T R

IN

A

W A

J A

P A

N

J E

G

D

C A

M P

B U

C K

N E

R C

O M

M U

N

IC

A T

IO

N

S A

N N

IN

A W

A

J A

P A

N P

R O

J E

C T

N U

M B

E R

:D

F Y

R

E P

A

IR

H V

A C

W

ID

E B

A N

D S

A T

C O

M O

P S

B

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

Christopher M. Surles

TX 23638 09/04/2025

TEXAS REGISTERED

ENGINEERING FIRM F-2966

J A

C O

B S

G O

V E

R N

M E

N T

S E

R V

IC

E

S C

O M

P A

N Y

M

A

IN

S T

R E

E T

F

O R

T W

O R

T H

T

X

U S

A

CUI

CUI BACKCHECK SUBMITTAL DESIGN

S O

L

IC

IT

A

T

IO

N N

O

/0

/2

1 : 548/29/2025 10:51:31

AM

C:\_Revit_Local_Models\2022\D3449305-G-3D_Jake.Metzler.rvt

C H

R

IS

S U

R L

E S

L A

M O

N T

F A

L L O

N

G-I002

K E

L V

IN

C

A R

L S

O N

D R

A W

IN

G

A B

B R

E V

IA

T

IO

N

S A

N D

S Y

M B

O L

S

G G

-I

G -I

A

A AMPERE

A/C AIR CONDITIONING

A/C

UNIT

AIR CONDITIONING UNIT

A/E ARCHITECT/ ENGINEER

AB ANCHOR BOLT

ABA ARCHITECTURAL BARRIERS ACT STANDARD

AC ALTERNATING CURRENT/ABOVE COUNTER, ASPHALT

CONCRETE

ACC ACCESSIBLE

ACI AMERICAN CONCRETE INSTITUTE

ACS AUTOMATIC CONTROL SYSTEM

ACS DR ACCESS DOOR

ACS

FLR

ACCESS FLOOR

ACS

PNL

ACCESS PANEL

ACST ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AIR DEVICE

ADA AMERICANS WITH DISABILITIES ACT

ADDL ADDITIONAL

ADJ ADJUSTABLE

ADMIN ADMINISTRATION

AF AMPERE FRAME

AFC ABOVE FINISHED COUNTER

AFCI ARC FAULT CIRCUIT INTERRUPTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AIB AIR INFILTRATION BARRIER

AIC AMPERE INTERRUPTING CAPACITY

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALNMT ALIGNMENT

ALUM ALUMINUM

ANOD ANODIZE

ANT ANTENNA

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATE (-LY)

ARCH ARCHITECT (-TURAL)

ASC ABOVE SUSPENDED CEILING

ASCE AMERICAN SOCIETY OF CIVIL

ASPH ASPHALT

ASSY ASSEMBLY

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AVG AVERAGE

AWG AMERICAN WIRE GAUGE

AWI ARCHITECTURAL WOODWORK INSTITUTE

AWT ACOUSTICAL WALL TREATMENT

AWWA AMERICAN WATER WORKS ASSOCIATION

B

B-B, B/B BACK TO BACK

BATT BATTERY

BB BASEBOARD

BC BACK OF CURB, BOTTOM OF CURB, BOOKCASE

BD BOARD

BDRY BOUNDARY

BF BOTH FACES

BFF BELOW FINISH FLOOR

BFG BELOW FINISHED GRADE

BFP BACKFLOW PREVENTER

BHMA BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BKBD BACKBOARD

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BLW BELOW

BM BALANCED MAGNETIC SWITCH, BEAM, BENCHMARK

BN BULLNOSE

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BOS BOTTOM OF STEEL

BOT BOTTOM

BP BASE PLATE, BUILDING PAPER

BRES BULLET-RESISTANT

BRG BEARING

BRKR BREAKER

BRKT BRACKET

BS BOTH SIDES

BTU BRITISH THERMAL UNIT

BTWN BETWEEN

BUR BUILT-UP ROOFING

# NUMBER, POUND

& AND

@ AT

Ø DIAMETER

C

C CHANNEL, CHANNEL SHAPE, COMPRESSION, CONDUIT

C CONT CAST CONCRETE

CAB CABINET

CAV CAVITY

CB CATCH BASIN, CERAMIC BASE, CIRCUIT BREAKER

CBB CEMENTITIOUS (BACKER) BOARD

CD CARBON DIOXIDE SENSOR

CDW CHILLED DRINKING WATER

CEM CEMENT

CEQ COLLATERAL EQUIPMENT

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/ CONTRACTOR INSTALLED

CF/GI CONTRACTOR FURNISHED/ GOVERNMENT INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CFLG COUNTER FLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CHFR CHAMFER

CI CAST IRON, CURB INLET

D

D DEPTH

D/S DISCONNECT SWITCH

DA DRAINAGE AREA

DALI DIGITAL ADDRESSABLE LIGHTING INTERFACE

DB DIRECT BURIAL, DRY BULB

DBL DOUBLE

DBM DOUBLE BALANCED MAGNETIC SWITCH

DC DIRECT CURRENT

DCBFP DOUBLE CHECK BACKFLOW PREVENTER

DCD DOUBLE CHECK DETECTOR

DCO DOUBLE CLEANOUT

DCW DOMESTIC COLD WATER

DEF DEFLECTION/DEFORM

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DHW DOMESTIC HOT WATER

DI DUCTILE IRON

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIR DIRECTION

DISC DISCONNECT

DIST DISTANCE

DL DEAD LOAD

DN DOWN

DOC DOCUMENT

DR DOOR

DR FR DOOR FRAME

DR OPN DOOR OPENING

DS DOWNSPOUT

DWG(S) DRAWING(S)

DWL DOWEL

DX DIRECT EXPANSION

E

E EAST (FOR COORDINATES)

EA EACH, EXHAUST AIR

EDP1 EMERGENCY DISTRIBUTION PANELBOARD 1

EEWS EMERGENCY EYEWASH/SHOWER

EF EACH FACE

EF, EXH

FN

EXHAUST FAN

EGB ELECTRICAL GROUND BAR

EHD ELECTRIC HAND DRYER

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRIC (-AL)

EMCS ENERGY MANAGEMENT CONTROL SYSTEM

EMER EMERGENCY

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

ENGR ENGINEER

ENTR ENTRANCE

ENVIR ENVIRONMENT

EPS EXPANDED POLYSTYRENE BOARD (INSULATION)

EQ EQUAL

EQUIP EQUIPMENT

ES EACH SIDE, HVAC EMERGNECY SWITCH

ESB EMERGENCY SWITCHBOARD

ESD ELECTROSTATIC DISSIPATING

ET EXPANSION TANK

ETR EXISTING TO REMAIN

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWEF EACH WAY, EACH FACE

EX,

EXIST

EXISTING

EXH EXHAUST

EXH HD EXHAUST HOOD

EXHV EXHAUST VENT

EXP EXPANSION, EXPOSED

F

F FEMALE, FIRE WATER

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACIL FACILITY

FACP FIRE ALARM CONTROL PANEL

FAS BD FASCIA BOARD

FB FACE OF BUILDING

FC FREQUENCY CONVERTER/FOOTCANDLE

FC BRK FACE BRICK

FC/ DC FREQUENCY CONVERTER/DC RECTIFIER

FCO FLOOR CLEANOUT

FCU FAN COIL UNIT

FD FIRE DAMPER, FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDN,

FDT

FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FED FEDERAL

FF FINISH FACE, FINISH FLOOR

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURES & EQUIPMENT

FG FINISHED GRADE

FH FIRE HOSE

FIN FINISH

FIN BS FINISH BOTH SIDE

FIN GR FINISH GRADE

FIXT FIXTURE

FL FLOW LINE

FLA FULL LOAD AMPERES

FLG FLOORING

FLMT FLUSH MOUNT

FLOUR FLOURESCENT

FLR FLOOR

FM FACTORY MUTUAL, FORCE MAIN, FREQUENCY MODULATION

FO FINISH OPENING

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FOW FACE OF WALL

FP FIRE PROTECTION

FSTNR FASTENER

FTG FOOTING

FU FUSE

FURG FURRING

FURN FURNITURE

FVNR FULL VOLTAGE, NON-REVERSING

FWC FABRIC WALL COVERING

FXTR FIXTURE

G

G GROUND/GROUNDING CONDUCTOR, NATURAL GAS

GA GAGE OR GAUGE

GALV GALVANIZED

GB GRAB BAR, GRADE BEAM

GEN GENERAL, GENERATOR

GF/CI GOVERNMENT FURNISHED / CONTRACTOR INSTALLED

GF/GI GOVERNMENT FURNISHED / GOVERNMENT INSTALLED

GFCI,

GFI

GROUND FAULT CIRCUIT INTERRUPTER

GFRG GLASS-FIBER-REINFORCED GYPSUM

REINFORCED GYPSUM

GLZ GLAZING

GND/GR

D

GROUND/GROUNDING

GR GRADE

GRTG GRATING

GV GATE VALVE

GYP BD GYPSUM BOARD

H

HB HOSE BIBB

HC HANDICAP

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEF HIGH EXPANSION FOAM

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HH HANDHOLE

HID HIGH INTENSITY DISCHARGE

HM HOLLOW METAL

HMAC HOT MIX ASPHALT CONCRETE

HOA HAND-OFF-AUTOMATIC

HORIZ HORIZONTAL

HP HIGH POINT, HORSEPOWER

HR HOUR

HS HEADED STUD

HSF HIGH FLOW SILT FENCE

HSS HOLLOW STRUCTURAL SECTION

HT, H HEIGHT

HVAC HEATING VENTILATION & AIR CONDITIONING

HW HOT WATER

HYDR HYDRAULIC

HZ HERTZ

I

IAP INITIAL ACCUMULATION POINT

IBC INTERNATIONAL BUILDING CODE

ID INTERNAL DIAMETER

IDA INITIAL DECONTAMINATION AREA

IDS INTRUSION DETECTION SYSTEM

INCL INCLUDE

INL INLET

INT INTERIOR

INV INVERT

J

J-SIIDS JOINT-SERVICE INTERIOR INTRUSION DETECTION SYSTEM

JAN JANITOR

JB JUNCTION BOX

JRCP JOINT REINFORCED CONCRETE PAVEMENT

JST JOIST

JT JOINT

K

K KILO, KIPS (1000LBS)

KAIC KILO AMPERE INTERRUPTING CAPACITY

KCMIL THOUSAND CIRCULAR MILS

L

L LENGTH

LAM LAMINATE

LAV LAVATORY

LB, LBS POUND

LBP LEAD BASED PAINT

LBR LUMBER

LCP LEAD CONTAINING PAINT, LIGHTING CONTROL PANEL

LDG LANDING

LE/FE LOW EMITTING AND FUEL EFFICIENT

LED LIGHT EMITTING DIODE

LF LINEAR FEET (LONG)

LFMC LIQUID-TIGHT FLEXIBLE METAL CONDUIT

LG LONG

LH LEFT HAND

LIB LIBRARY

LIN LINEAR

LKR LOCKER

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LNDSCP LANDSCAPE

LOC LOCATION

LP LOW POINT

LPS LITERS PER SECOND

LS LIME-STABILIZED, LUMP SUM

LSIG LONG TIME, SHORT TIME, INSTANTANEOUS, GROUND FAULT

LT LEFT, LIGHT

LTG LIGHTING

LV LOW VOLTAGE

LVDR LOUVER DOOR

LVR LOUVER

LYR LAYER

M

M METER

M/S MOTOR STARTER

MACH

RM

MACHINE ROOM

MAINT,

MX

MAINTENANCE

MAN MANUAL

MATL MATERIAL

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MCA MINIMUM CIRCUIT AMPACITY

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MD METAL DECK, MOTORIZED DAMPER

MECH MECHANICAL

MECH

RM

MECHANICAL ROOM

MEP MECHANICAL, ELECTRICAL, PLUMBING

MEZZ MEZZANINE

MFG,

MFR

MANUFACTURER

MGB MAIN GROUNDING BUSBAR

MH MANHOLE, MAINTENANCE HOLE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM, MINUTE

MISC MISCELLANEOUS

MJ MECHANICAL JOINT

MLDG MOLDING (MOULDING)

MLO MAIN LUGS ONLY

MLWK MILLWORK

mm MILLIMETER

MNS MASS NOTIFICATION SYSTEM

MO MASONRY OPENING

MOD MODIFY

MOP MAXIMUM OVERCURRENT PROTECTION

MOT MOTOR

MP MAIN PANELBOARD

MSB MOP SERVICE BASIN

MSD MAIN SERVICE DISCONNECT

MSE MAIN SERVICE ENTRANCE

MT STRUCTURAL TEE CUT FROM MISC STEEL

MTD MOUNTED

MTG MOUNTING

MTL METAL

MW MICROWAVE, MONITORING WELL

MWP MEMBRANE WATERPROOFING

N

N NORTH (FOR COORDINATES)

N/A NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTERERS ASSOCIATION

NF NEAR FACE, NON-FUSED

NFP NAVFAC PACIFIC

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NFWH NON-FREEZE WALL HYDRANT

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN, NUMBER

NOM NOMINAL

NP NO PAINT

NRC NOISE REDUCTION COEFFICIENT

NS NARROW STILE, NEAR SIDE

NSB NORMAL SWITCHBOARD

NTS NOT TO SCALE

C

CIP CAST IRON PIPE, CAST-IN-PLACE

CJ CONSTRUCTION JOINT, CONTROL JOINT

CKT CIRCUIT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG

DIFF

CEILING DIFFUSER

CLG HT CEILING HEIGHT

CLL COLUMN LINE

CLR CLEAR

CM CENTIMETER

CMU CONCRETE MASONRY UNIT

CNDS CONDENSATE

CO CLEAN OUT

CO/

NOX

CARBON MONOXIDE / NITROGEN OXIDE

COE CORPS OF ENGINEER'S (US ARMY)

COMM COMMUNICATION (-S)

COMPR COMPRESSOR

CONC CONCRETE

CONC

FLR

CONCRETE FLOOR

CONF CONFERENCE

CONN CONNECT (-ION)

CONST CONSTRUCT (-ION)

CONT CONTINUED, CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER'S REPRESENTATIVE

CORR CORRIDOR

CP CIRCULATION PUMP, CONCRETE PIPE

CPT CARPET

CRS COLD ROLLED STEEL

CSWK CASEWORK

CT CERAMIC TILE, CURRENT TRANSFORMER

CTB CEMENT TREATED BASE, CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTR CENTER

CTRL CONTROL

CU CONDENSING UNIT, COPPER

CU FT CUBIC FEET

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

E

EXT EXTERIOR, EXTINGUISHER

EXT GR EXTERIOR GRADE

EXT LT EXIT LIGHT

K

KIT KITCHEN

KPD KEYPAD

KV KILOVOLT

KVA KILOVOLT-AMPERE

KW KILOWATT

KWh KILOWATT HOUR

DRAWING ABBREVIATIONS

FOR REVIEW

ONLY

THESE DOCUMENTS ARE FOR

CONCEPT DESIGN AND NOT

INTENDED FOR CONSTRUCTION

BIDDING OR PERMIT PURPOSES.

THEY WERE PREPARED BY, OR

UNDER SUPERVISION OF:

NAME

REGISTRATION # DATE

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

IS

O

A

A

D R

A W

IN

G

C O

D E

PLOT SCALE:PLOT DATE:

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10

PLOTTED BY:

FILE PATH:

A

G U

E R

R A

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

US Army Corps of Engineers

Japan District ®

J A

P A

N E

N G

IN

E

E R

D

IS

T R

IN

A

W A

J A

P A

N

J E

G

D

C A

M P

B U

C K

N E

R C

O M

M U

N

IC

A T

IO

N

S A

N N

IN

A W

A

J A

P A

N P

R O

J E

C T

N U

M B

E R

:D

F Y

R

E P

A

IR

H V

A C

W

ID

E B

A N

D S

A T

C O

M O

P S

B

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

Christopher M. Surles

TX 23638 09/04/2025

TEXAS REGISTERED

ENGINEERING FIRM F-2966

J A

C O

B S

G O

V E

R N

M E

N T

S E

R V

IC

E

S C

O M

P A

N Y

M

A

IN

S T

R E

E T

F

O R

T W

O R

T H

T

X

U S

A

CUI

CUI BACKCHECK SUBMITTAL DESIGN

S O

L

IC

IT

A

T

IO

N N

O

/0

/2

1 : 548/29/2025 10:51:31

AM

C:\_Revit_Local_Models\2022\D3449305-G-3D_Jake.Metzler.rvt

C H

R

IS

S U

R L

E S

L A

M O

N T

F A

L L O

N

G-I003

K E

L V

IN

C

A R

L S

O N

D R

A W

IN

G

A B

B R

E V

IA

T

IO

N

S A

N D

S Y

M B

O L

S

G G

-I

G -I

O

OA OUTDOOR AIR, OVERALL

OC ON CENTER

OCEW ON CENTER EACH WAY

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OFF OFFICE

OH OPPOSITE HAND

OH OPT OPPOSITE HAND OPTIONAL

OHCD OVERHEAD COILING DOOR

OHE OVERHEAD ELECTRIC

OHT OVERHEAD TELEPHONE

OHW OVERHEAD WIRE

OPP OPPOSIT

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

OS OCCUPANCY SENSOR

OSP OUTSIDE PLANT

OWS OIL/WATER SEPARATOR

OWSJ OPEN WEB STEEL JOIST

P

P PAGE, POLE

P/T POST-TENSION (-ED, -ING)

PA PUBLIC ADDRESS

PAT PATTERN

PB PULL BOX

PC POINT OF CURVATURE

PCC POINT OF COMPOUND CURVATURE, PORTLAND CEMENT

CONCRETE, PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PDS PROTECTED DISTRIBUTION SYSTEM

PE POLYETHYLENE

PEJ PREMOLDED EXPANSION JOINT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PF POWER FACTOR

PG PLATE GIRDER

PH PHASE

PI POINT OF INTERSECTION

PICV PRESSURE INDEPENDENT CONTROL VALVE

PIL PILASTER

PIR PASSIVE INFRARED

PIV POST INDICATOR VALVE

PL PLATE, PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATED

PLAS PLASTER

PLBG PLUMBING

PLG PILING

PLY WD PLYWOOD

PNEU PNEUMATIC

PNL PANEL, PANELBOARD

PORT PORTABLE

POV PRIVATELY OWNED VEHICLE

PP POWER POLE

PP PL PUSH/PULL PLATE

PR PAIR, PIPE RAIL

PRCST PRECAST

PREFAB PREFABRICATED

PREFIN PREFINISHED

PRELIM PRELIMINARY

PRKG PRKG

PROJ PROJECT, PROJECTION PRESTRESSED GIRDER

PROT PROTECTION

Q

QT QUARRY TILE

QTY QUANTITY

R

RA RETURN AIR

RAD RADIUS

RB RESILIENT BASE

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REINFORCED CONCRETE

RCP RECEPTACLE CONTROL PANEL, REFLECTED CEILING PLAN

RD ROOF DRAIN

RDC REDUCER

RE, REF REFER, REFERENCE, REFRIGERATOR

REBAR REINFORCING STEEL BARS

REC RECEPTACLE, RECESSED

REC RM RECREATION ROOM

RECD RECEIVED

RECT RECTIFIER

RED REDUCER

REINF REINFORCING (-ED, -MENT)

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RESIST RESISTANT

REST RESTROOM

RET RETAINING

REV REVISION

RF RESILIENT FLOORING

RFG ROOFING

RGS RIGID GALVANIZED STEEL

RH ROOF HATCH, ROOF HOOD, RIGHT HAND

RHR RIGHT HAND REVERSE

RL ROOF LADDER

RLG RAILING

RM ROOM

RMC RIGID METAL CONDUIT

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RP RADIUS POINT

RPM REVOLUTIONS PER MINUTE

RPZ REDUCED PRESSURE ZONE

RSD ROLLING STEEL DOOR

RT RIGHT

RV ROOF VENT

RVL REVEAL

S

S SINK, SOUTH (FOR COORDINATES), STANDARD SHAPE

SA SUPPLY AIR

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SB SPLASH BLOCK

SC SEALED CONCRETE, SHEAR CONNECTORS, SLIP CRITICAL

SCD SEAT COVER DISPENSER

SCHED SCHEDULE

SCWD SOLID CORE WOOD DOOR

SD SMOKE DETECTOR, STORM DRAIN

SDI STEEL DECK INSTITUTE

SE SERVICE ENTRANCE

SEC SECONDARY

SECT SECTION

SEER SEASONAL ENERGY EFFICIENT RATIO

SEG SEGMENT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SG STATIC GROUND

SGL SINGLE

SH SHOWER

SHT SHEET

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SAW JOINT, SCORED JOINT

SJI STEEL JOIST INSTITUTE

SKLT SKYLIGHT

SLNT SEALANT

SMK SMOKE

SMLS SEAMLESS

SND SANITARY NAPKIN DISPENSER

SP SINGLE POLE, SUMP PIT

SP EL SPOT ELEVATION

SP, SPA SPACE(S

SPD SURGE PROTECTION DEVICE

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS STAINLESS STEEL, SANITARY SEWER

ST SINGLE THROW, STREET, STAIRS, STORAGE TANK

STA STATION

STC SOUND TRANSMISSION CLASS

STIFF STIFFENER

STL STEEL

STL JST STEEL JOIST

STL RF

DK

STEEL ROOF DECK

STND STANDARD

STOR STORAGE

STR STRINGERS

STRB/H

RN

STROBE/HORN

STRUCT STRUCTURE (-AL)

SUB FL SUBFLOOR

SV SHEET VINYL

SVC SERVICE

SW SIDEWALK

SW SWITCH

SYM SYMBOL

SYMM SYMMETRICAL

T

T TANGENT, TREAD

T&B TOP & BOTTOM

T&G TONGUE AND GROOVE

T/G TOP OF GRATE

T/PIPE TOP OF PIPE

T/S TUB/SHOWER

TA TRANSFER AIR

TB THROUGH BOLT, TOWEL BAR

TBM TEMPORARY BENCHMARK

TC TERRA COTTA, TOP OF CURB

TCE TRICHLOROETHYLENE

TD TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPERATURE, TEMPORARY

TER TELECOMMUNICATIONS EQUIPMENT ROOM

TERM TERMINAL

TFF TOP OF FINISH FLOOR

TGB TELECOMMUNICATIONS GROUNDING BUSBAR

THK THICKNESS

THRES THRESHOLD

TK BD TACKBOARD

TMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBAR

TMPD

GL

TEMPERED GLASS

TMR TIMER

TMV THERMOSTATIC MIXING VALVE

TN TRUE NORTH

TO TOP OF

TOC TABLE OF CONTENT, TOP OF CONCRETE

TOPO TOPOGRAPHY

TOS TOP OF SLAB, TOP OF STEEL

TP TOP OF PAVEMENT

TPD TOILET PAPER DISPENSER

TR TELEPHONE ROOM

TRANS TRANSOM

TRTD TREATED

TS TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TW TILT WALL, TOP OF WALL

TYP TYPICAL

U

U/G UNDERGROUND

UC UNDERGROUND CONDUIT

UGC UNDERGROUND CABLE

UGE UNDERGROUND ELECTRIC

UGT UNDERGROUND TELEPHONE

UH UNIT HEATER

UL UNDERWRITER'S LABORATORIES

UNK UNKNOWN

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTED POWER SUPPLY

V

V VENT, VOLT

V/PH/HZ VOLT/PHASE/FREQUENCY

VA VOLT-AMPERE

VAC VACUMM

VAR VARIES

VAV VARIABLE AIR VOLUME

VB VINYL COMPOSITION TILE

VC VERTICAL CURVE

VD VOLUME DAMPER

W

W WATER, WATT, WEST (FOR COORDINATES), WIDE, WIDE

FLANGE, WIDTH

W/ WITH

W/O WITHOUT

WB WALL BOX, WET BULB

WC WATER CLOSET

WCO WALL CLEANOUT

WD WOOD

WDW WINDOW

WGL WIRED GLASS

WH WALL HUNG, WATER HEATER

WHM KILOWATT-HOUR METER

WL WATER LINE

WP WEATHERPROOF, WORK POINT

WPJ WEAKENED PLANE JOINT

WSCT WAINSCOT

WT HECTARE

WT STRUCTURAL TEE CUT FROM WIDE FLANGE BEAM, WEIGHT

WV WATER VALVE

WWF WELDED WIRE FABRIC

X

XFMR TRANSFORMER

XFR TRANSFER

XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)

Y

Y YARD

Z

Z IMPEDANCE

P

PS PARKING STRUCTURE

PS

CONC

PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT POINT OF TANGENCY, PORCELAIN TILE, PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER AND RECEPTACLE

PTN PARTITION

PTR PAPER TOWEL RECEPTACLE

PVC POINT OF VERTICAL CURVATURE, POLYVINYL CHLORIDE

PIPE, POLYVINYL CHLORIDE

PVI POINT OF VERTICAL TANGENCY

PVMT PAVEMENT

PWR POWER

R

RVTR RADON VENT THROUGH ROOF

RW RETAINING WALL

S

SYS SYSTEM

V

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VFI VACUUM FAULT INTERRUPTER

VIF VERIFY IN FIELD

VOL VOLUME

VP VACUMM PUMP FOR RADIANT HEATER

VTR VENT THROUGH ROOF

VWF VINYL WALL FABRIC

SDX

E E

E

W X W X

W X

F X

X

X

SS

X

SS

X

SS

X

SS

X

SS

X

SD

X

S

S

CB

CB CB

CB

F X

F X

F X

SSXSSX

SSX

SS

X

SS

X

CO

CB

XXXX

XXX

X X

X X

X X X X X

X

X

SD

X

SD

X

CB

E X

CB

CB

E E E E E E E E E E

CB

S

SDX

SDX SDX SDX SDX

D

D

D

D D

D

SDXSDXSDXSDX

E

XE

X

C X

C X

BLDG #100

NEW ADDITION

BLDG.

R2663

R26

FOR REVIEW

ONLY

THESE DOCUMENTS ARE FOR

CONCEPT DESIGN AND NOT

INTENDED FOR CONSTRUCTION

BIDDING OR PERMIT PURPOSES.

THEY WERE PREPARED BY, OR

UNDER SUPERVISION OF:

NAME

REGISTRATION # DATE

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

IS

O

A

A

D R

AW

IN

G C

O D

E:

PLOT SCALE:PLOT DATE:

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10

PLOTTED BY:

FILE PATH:

A.

G

U

ER

R A

D

AT

E D

ES

C

R

IP

TI

O

N M

AR

K

US Army Corps of Engineers Japan District ®

JA

PA

N E

N G

IN

EE

R D

IS

TR

IC

T

O

KI

N

AW

A, J

AP

AN

JE

G

: D

C A

M P

B U

C K

N

ER

C O

M M

U N

IC

A

TI

O

N S

A N

N

EX

O K

IN

A

W A

, J A

PA

N

PR

O

JE

C

T N

U M

B

ER

:D

FY

R

EP

A

IR

H

VA

C W

ID

EB

A N

D S

A

TC

O M

O

PS

B

IS

SU

E

D

AT

E:

C O

N

TR

AC

T

N O

TEXAS REGISTERED

ENGINEERING FIRM F-2966

JA

C

O

BS

G O

VE

R

N M

EN

T

SE

R

VI

C

ES

C

O M

PA

N

Y

M

AI

N

S

TR

EE

T, F O

R T

W O

R

TH

, T X

U

SA

CUI

CUI

SO

LI

C

IT

AT

IO

N N

O

BACKCHECK SUBMITTAL DESIGN

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

D . G

IM

BE

L

B.

C

AP

PE

LL

A

L.

H

ER

O

U X

/0

4/

LISA M. HEROUX

TX 156321 09/04/2025

A1 CODE COMPLIANCE PLAN

1 : 200

C O

D E

C O

M

PL

IA

N

C E

PL

AN

GI110

G I1

C:\_Revit_Local_Models\2022\D3449305-G-3D_lamont.fallon.rvt 3/11/2025 10:13:38

AM

F EXISTING FIRE PROTECTION

WATER SUPPLY LINE

W EXISTING WATER MAIN LINE

EXISTING GATE VALVE

EXISTING FIRE RISER

0 4000 8000

SCALE: 1:200

GENERAL NOTES

LEGEND

SHEET KEYNOTES

FIRE LANE

EXISTING FIRE DEPARTMENT

CONNECTION (FDC)

FIRE LANE100

EXISTING FIRE HYDRANT101

EXISTING FIRE RISER103

EXISTING FIRE DEPARTMENT CONNECTION

EXISTING FIRE HYDRANT

A REFER TO ARCHITECTURAL PLANS FOR BUILDING

DIMENSIONS

PRIMARY FIRE DEPARTMENT ACCESS105

EXISTING BACKFLOW PREVENTER

EXISTING BACKFLOW PREVENTER

3 4 5 6 7 8

G

F

D

C

B

A

7a6a5a4a3a2a1a

E

A1

C1

E1

F1

F2

108109

109A 109B 109C

113 112 111 110 115

CHILLER 1

CHILLER 2

OVERALL PHASING PLAN LEGEND

PHASE 1

FOR REVIEW

ONLY

THESE DOCUMENTS ARE FOR

CONCEPT DESIGN AND NOT

INTENDED FOR CONSTRUCTION

BIDDING OR PERMIT PURPOSES.

THEY WERE PREPARED BY, OR

UNDER SUPERVISION OF:

NAME

REGISTRATION # DATE

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

IS

O

A

A

D R

A W

IN

G

C O

D E

PLOT SCALE:PLOT DATE:

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10

PLOTTED BY:

FILE PATH:

A

G U

E R

R A

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

US Army Corps of Engineers

Japan District ®

J A

P A

N E

N G

IN

E

E R

D

IS

T R

IN

A

W A

J A

P A

N

J E

G

D

C A

M P

B U

C K

N E

R C

O M

M U

N

IC

A T

IO

N

S A

N N

IN

A W

A

J A

P A

N P

R O

J E

C T

N U

M B

E R

:D

F Y

R

E P

A

IR

H V

A C

W

ID

E B

A N

D S

A T

C O

M O

P S

B

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

Christopher M. Surles

TX 23638 09/04/2025

TEXAS REGISTERED

ENGINEERING FIRM F-2966

J A

C O

B S

G O

V E

R N

M E

N T

S E

R V

IC

E

S C

O M

P A

N Y

M

A

IN

S T

R E

E T

F

O R

T W

O R

T H

T

X

U S

A

CUI

CUI BACKCHECK SUBMITTAL DESIGN

S O

L

IC

IT

A

T

IO

N N

O

/0

/2

As indicated

8/29/2025 9:56:37 AM

C:\_Revit_Local_Models\2022\D3449305-A-3D_Jake.Metzler.rvt

C .S

U R

L E

S

J

M E

T Z

L E

R

GI010

K

C A

R L S

O N

O V

E R

A L

L P

H A

S

IN

G P

L A

N

P H

A S

E

G I

G I0

G I0

1 : 200A1

OVERALL PHASING PLAN - PHASE 1

AREA A AREA BAREA A AREA BAREA A AREA A

SCALE: 1:200

0 4000 8000

PLAN

NORTH

T R

U E

N

GRAPHIC SCALE(S)

KEY PLAN

MECHANICAL NOTES - PHASE 1

A REMOVE EXISTING CHILLER 2, CHILLED WATER PUMP 2,

CONDENSING UNIT 2, AND ALL ASSOCIATED PIPING AND

APPURTENANCES. CLEAN AND PREPARE AREAS FOR

NEW CONSTRUCTION. INSTALL CHILLER 2, CHILLED

PUMP 2, CONDENSING UNIT 2, AND CHILLED WATER

PIPING LOOP THROUGHOUT AREA B.

B REMOVE EXISTING CRAC UNITS AND ALL ASSOCIATED

PIPING AND APPURTENANCES. CLEAN AND PREPARE

AREAS FOR NEW CONSTRUCTION AND INSTALL CRAC

UNITS THROUGHOUT AREA B.

C REMOVE EXISTING VAV AHU UNITS AND ALL

ASSOCIATED PIPING AND APPURTENANCES. CLEAN AND

PREPARE AREAS FOR NEW CONSTRUCTION AND

INSTALL VAV AHU.

D REMOVE EXISTING DOAS UNIT AND ALL ASSOCIATED

PIPING AND APPURTENANCES. CLEAN AND PREPARE

AREAS FOR NEW CONSTRUCTION AND INSTALL DOAS

UNIT.

E REMOVE EXISTING BREAKROOM SPLIT SYSTEM AND ALL

ASSOCIATED PIPING AND APPURTENANCES. CLEAN AND

PREPARE AREAS FOR NEW CONSTRUCTION AND

INSTALL BREAKROOM SPLIT SYSTEM.

F REMOVE EXISTING ENTRY FCU AND ALL ASSOCIATED

PIPING AND APPURTENANCE. CLEAN AND PREPARE

AREAS FOR NEW CONSTRUCTION AND INSTALL ENTRY

FCU.

FIRE PROTECTION NOTES - PHASE 1

A INSTALL NEW SPEAKERS FOR OCCUPANT MASS

NOTIFICATION THROUGHOUT.

B INSTALL NEW WIRING AND DEVICES FOR MONITORING

AND CONTROL FOR NEW HVAC EQUIPMENT FOR SMOKE

CONTROL.

GENERAL NOTES - PHASING PLANS

A COORDINATE WITH THE CONTRACTING OFFICER FOR

SEQUENCING OF WORK WITHIN EACH PHASING AREA.

CONSTRUCTION PHASING PLAN IS INTENDED TO

IDENTIFY SEPARATE AREAS OF WORK AND NOT

MANDATORY SEQUENCING OF WORK. AREAS A AND B

REQUIRE EXTENSIVE PLANNING AND SEQUENCING OF

WORK REQUIRING REVIEW AND APPROVAL BY THE A/E

PRIOR TO CONSTRUCTION WITHIN THESE AREAS.

B PHASING DRAWINGS PROVIDE A PROPOSED SEQUENCE

OF WORK, LEVEL OF PROTECTION, AND ASSOCIATED

SEPARATION FROM OCCUPIED PORTIONS OF BUILDING

100. FINAL LOCATIONS OF CONSTRUCTION TRAILERS

AND LAYDOWN ZONES ARE TO BE APPROVED BY THE

CONTRACTING OFFICER.

C CONSTRUCT TEMPORARY WORK DEMARCATION WALLS

PRIOR TO COMMENCEMENT OF CONSTRUCTION WITHIN

AREA A AND AREA B AS REQUIRED.

D PREPARE AND SUBMIT A SAFETY PLAN COMPLIANCE

DOCUMENT PRIOR TO COMMENCEMENT OF

CONSTRUCTION.

E COORDINATE SECURITY AT DESIGNATED TIMES AND

UNDER SPECIAL CONDITIONS AS DIRECTED BY

CONTRACTING OFFICER.

F COORDINATE TEMPORARY FACILITIES/ PARKING OF ANY

DISPLACED PERSONNEL AS DIRECTED BY

CONTRACTING OFFICER IF REQUIRED.

G COORDINATE WORK OF MECHANICAL, ELECTRICAL,

PLUMBING, STRUCTURAL, FIRE PROTECTION,

COMMUNICATIONS, AND SECURITY DESIGN, AS WELL AS

MATERIAL FINISH SELECTIONS IN THE VARIOUS WORK

AREAS.

H REFER TO SPECIFICATION 01 35 26 – GOVERNMENTAL

SAFETY REQUIREMENTS FOR ALL SYSTEM OUTAGES.

COORDINATE BUILDING OUTAGES WITH BUILDING

OWNER.

J FIRE PROTECTION SYSTEM SHUT DOWN MUST BE

HANDLED IN ACCORDANCE WITH NFPA 25 AND

COORDINATED WITH THE BASE FIRE DEPARTMENT

PRIOR TO ANY SHUT DOWNS.

K BUILDING TO REMAIN OPERATIONAL 24/7 DURING

CONSTRUCTION. ALL WORK MUST BE COORDINATED

AROUND THE EXISTING FUNCTIONS AND ACTIVITIES TO

MINIMIZE DISTURBANCES.

ELECTRICAL NOTES - PHASE 1

A DEMOLISH DISCONNECT SWITCHES, CABLES, CONDUITS,

AND DISCONNECTING MEANS ASSOCIATED WITH

MECHANICAL EQUIPMENT TO BE DEMOLISHED IN PHASE

1.

B INSTALL CABLE AND CONDUIT ASSOCIATED WITH NEW

MECHANICAL EQUIPMENT PRIOR TO DENERGIZING

PANELBOARD OR MOTOR CONTROL CENTER.

C INSTALL DISCONNECTS SWITCHES ASSOCIATED WITH

NEW MECHANICAL EQUIPMENT TO BE INSTALLED IN

PHASE 1. COORDINATE DOWNTIME WITH BUILDING

OWNER.

ARCHITECTURAL NOTES - PHASE 1

A CONSTRUCTION OF AREA B PHASE 1 MUST NOT

COMMENCE UNTIL PERMANENT CONSTRUCTION

MATERIALS AND EQUIPMENT ARE ON SITE AND

VERIFIED BY CONTRACTING OFFICER.

B AREA B PHASE 1 WILL INCLUDE: AREA AS INDICATED ON

SHEET GI010/A1 AND ANY ASSOCIATED ITEMS

REQUIRED TO COMPLETE PHASE 1 IN ITS ENTIRETY.

COORDINATE FULL SCOPE AMONGST ALL DISCIPLINES.

C PERFORM DEMOLITION WORK AS DESCRIBED IN THE

DEMOLITION PLANS ON SHEETS AD101-AD131 WITHIN

THE AREAS DEFINED UNDER PHASE 1, AREA B.

D RENOVATIONS TO THE ARCHITECTURAL AND INTERIOR

DESIGN ELEMENTS, ELECTRICAL, FIRE PROTECTION,

AND PLUMBING SYSTEMS WILL BE COMPLETED TO THE

EXTENT REQUIRED TO RETURN THE ROOMS TO A

COMPLETE AND FINISHED CONDITION.

E VESTIBULE 107 AND TOILET IN AREA B TO BE

RENOVATED TO COMPLY WITH ACCESSIBILITY

STANDARDS PER ARCHITECTURAL BARRIERS ACT (ABA)

STANDARDS 2015 AND INTERNATIONAL BUILDING CODE

(IBC) 2024. REFER DEMOLITION SHEETS AD101-AD131

AND PLAN SHEETS AE101-AE131.

F COORDINATE WITH THE CONTRACTING OFFICER FOR

LOCATION OF TEMPORARY BARRIER PARTITION AS

REQUIRED FOR RENOVATION WORK

TELECOM NOTES - PHASE 1

A PROTECT NETWORK AND MONITORING CONNECTIONS

SUPPORTING MECHANICAL AND ELECTRICAL DURING

DEMOLITION

B PROVIDE NETWORK CONNECTIONS FOR MECHANICAL

MONITORING EQUIPMENT AS NEEDED AND

COORDINATE WITH EQUIPMENT PROVIDER. NETWORK

CONNECTIONS FOR PHASE 1 & 2 WORK ORIGINATE

FROM THE COMMUNICATIONS CABINET LOCATED IN

ROOM ISSO OFFICE 111. OR COMM RM 117

STRUCTURAL NOTES - PHASE 1

A COORDINATE REPAIR OF MISCELLANEOUS CRACKS AND

SPALLS IN THE CONCRETE WALLS AND SLABS WITH THE

OVERALL ELECTRICAL AND MECHANICAL WORK.DRAFT

OVERALL PHASING PLAN LEGEND

PHASE 2

PHASE 3

3 4 5 6 7 8

G

F

D

C

B

A

7a6a5a4a3a2a1a

E

A1

C1

E1

F1

F2

113 112 111 110 115 114 120

108109 122

105106

CHILLER 1

CHILLER 2

FOR REVIEW

ONLY

THESE DOCUMENTS ARE FOR

CONCEPT DESIGN AND NOT

INTENDED FOR CONSTRUCTION

BIDDING OR PERMIT PURPOSES.

THEY WERE PREPARED BY, OR

UNDER SUPERVISION OF:

NAME

REGISTRATION # DATE

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

IS

O

A

A

D R

A W

IN

G

C O

D E

PLOT SCALE:PLOT DATE:

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10

PLOTTED BY:

FILE PATH:

A

G U

E R

R A

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

US Army Corps of Engineers

Japan District ®

J A

P A

N E

N G

IN

E

E R

D

IS

T R

IN

A

W A

J A

P A

N

J E

G

D

C A

M P

B U

C K

N E

R C

O M

M U

N

IC

A T

IO

N

S A

N N

IN

A W

A

J A

P A

N P

R O

J E

C T

N U

M B

E R

:D

F Y

R

E P

A

IR

H V

A C

W

ID

E B

A N

D S

A T

C O

M O

P S

B

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

Christopher M. Surles

TX 23638 09/04/2025

TEXAS REGISTERED

ENGINEERING FIRM F-2966

J A

C O

B S

G O

V E

R N

M E

N T

S E

R V

IC

E

S C

O M

P A

N Y

M

A

IN

S T

R E

E T

F

O R

T W

O R

T H

T

X

U S

A

CUI

CUI BACKCHECK SUBMITTAL DESIGN

S O

L

IC

IT

A

T

IO

N N

O

/0

/2

As indicated

8/29/2025 9:56:41 AM

C:\_Revit_Local_Models\2022\D3449305-A-3D_Jake.Metzler.rvt

C .S

U R

L E

S

J

M E

T Z

L E

R

GI011

K

C A

R L S

O N

O V

E R

A L

L P

H A

S

IN

G P

L A

N

P H

A S

E

G I

G I0

G I0

AREA A AREA BAREA A AREA BAREA A AREA A

SCALE: 1:200

0 4000 8000

PLAN

NORTH

T R

U E

N

GRAPHIC SCALE(S)

KEY PLAN

1 : 200A1

OVERALL PHASING PLAN - PHASE 2 & 3

GENERAL NOTES - PHASING PLANS

A COORDINATE WITH THE CONTRACTING OFFICER FOR

SEQUENCING OF WORK WITHIN EACH PHASING AREA.

CONSTRUCTION PHASING PLAN IS INTENDED TO

IDENTIFY SEPARATE AREAS OF WORK AND NOT

MANDATORY SEQUENCING OF WORK. AREAS A AND B

REQUIRE EXTENSIVE PLANNING AND SEQUENCING OF

WORK REQUIRING REVIEW AND APPROVAL BY THE A/E

PRIOR TO CONSTRUCTION WITHIN THESE AREAS.

B PHASING DRAWINGS PROVIDE A PROPOSED SEQUENCE

OF WORK, LEVEL OF PROTECTION, AND ASSOCIATED

SEPARATION FROM OCCUPIED PORTIONS OF BUILDING

100. FINAL LOCATIONS OF CONSTRUCTION TRAILERS

AND LAYDOWN ZONES ARE TO BE APPROVED BY THE

CONTRACTING OFFICER.

C CONSTRUCT TEMPORARY WORK DEMARCATION WALLS

PRIOR TO COMMENCEMENT OF CONSTRUCTION WITHIN

AREA A AND AREA B AS REQUIRED.

D PREPARE AND SUBMIT A SAFETY PLAN COMPLIANCE

DOCUMENT PRIOR TO COMMENCEMENT OF

CONSTRUCTION.

E COORDINATE SECURITY AT DESIGNATED TIMES AND

UNDER SPECIAL CONDITIONS AS DIRECTED BY

CONTRACTING OFFICER.

F COORDINATE TEMPORARY FACILITIES/ PARKING OF ANY

DISPLACED PERSONNEL AS DIRECTED BY

CONTRACTING OFFICER IF REQUIRED.

G COORDINATE WORK OF MECHANICAL, ELECTRICAL,

PLUMBING, STRUCTURAL, FIRE PROTECTION,

COMMUNICATIONS, AND SECURITY DESIGN, AS WELL AS

MATERIAL FINISH SELECTIONS IN THE VARIOUS WORK

AREAS.

H REFER TO SPECIFICATION 01 35 26 – GOVERNMENTAL

SAFETY REQUIREMENTS FOR ALL SYSTEM OUTAGES.

COORDINATE BUILDING OUTAGES WITH BUILDING

OWNER.

J FIRE PROTECTION SYSTEM SHUT DOWN MUST BE

HANDLED IN ACCORDANCE WITH NFPA 25 AND

COORDINATED WITH THE BASE FIRE DEPARTMENT

PRIOR TO ANY SHUT DOWNS.

K BUILDING TO REMAIN OPERATIONAL 24/7 DURING

CONSTRUCTION. ALL WORK MUST BE COORDINATED

AROUND THE EXISTING FUNCTIONS AND ACTIVITIES TO

MINIMIZE DISTURBANCES.

MECHANICAL NOTES - PHASE 2 & 3

A REMOVE EXISTING CHILLER 1, CHILLED PUMP 1,

CONDENSING UNIT 1, AND ALL ASSOCIATED PIPING AND

APPURTENANCES. CLEAN AND PREPARE AREAS FOR

NEW CONSTRUCTION. INSTALL CHILLER 1, CHILLED

PUMP 1, AND CONDENSING UNIT 1.

B CONTRACTOR TO TEST AND BALANCE THE EXISTING

AIRFLOWS AS A BASELINE FOR THE NEW EQUIPMENT.

SUBMIT A CERTIFIED TAB REPORT IN ACCORDANCE

WITH SPEC 23 05 93.

C REMOVE EXISTING AHU AND ALL ASSOCIATED PIPING

AND APPURTENANCES. CLEAN AND PREPARE AREAS

FOR NEW CONSTRUCTION AND INSTALL AHU.

D REMOVE EXISTING DOAS UNIT AND ALL ASSOCIATED

PIPING AND APPURTENANCES. CLEAN AND PREPARE

AREAS FOR NEW CONSTRUCTION AND INSTALL DOAS

UNIT.

E REMOVE EXISTING CONFERENCE ROOM 104 SPLIT

SYSTEM AND ALL ASSOCIATED PIPING AND

APPURTENANCES. CLEAN AND PREPARE AREAS FOR

NEW CONSTRUCTION AND INSTALL CONFERENCE

ROOM 104 SPLIT SYSTEM.

F REMOVE EXISTING COMM ROOM MINI SPLIT AND ALL

ASSOCIATED PIPING AND APPURTENANCES. CLEAN AND

PREPARE AREAS FOR NEW CONSTRUCTION AND

INSTALL COMM ROOM MINI SPLIT.

G REMOVE EXISTING EXHAUST FANS AND ASSOCIATED

APPURTENANCES. CLEAN AND PREPARE AREAS FOR

NEW CONSTRUCTION AND INSTALL EXHAUST FANS.

H REMOVE EXISTING REFRIGERANT PIPING. CLEAN AND

PREPARE AREAS FOR NEW CONSTRUCTION AND

INSTALL REFRIGERANT PIPING THROUGHOUT AREA A.

REFER MECHANICAL SHEETS.

FIRE PROTECTION NOTES - PHASE 2 & 3

A DEMOLISH EXISTING WAVES MASS NOTIFICATION

SYSTEM AND INSTALL NEW SPEAKERS FOR OCCUPANT

MASS NOTIFICATION THROUGHOUT.

B CONNECT NEW SPEAKERS TO EXISTING MONACO FACP

TO CREATE COMBINATION FIRE ALARM/MASS

NOTIFICATION SYSTEM.

C PERFORM INTEGRATED TESTING TO CONFIRM

FUNCTIONALITY WITH NEW HVAC EQUIPMENT AND FIRE

ALARM EQUIPMENT.

ELECTRICAL NOTES - PHASE 2 & 3

A DEMOLISH DISCONNECT SWITCHES, CABLES,

CONDUITS, AND DISCONNECTING MEANS ASSOCIATED

WITH MECHANICAL EQUIPMENT TO BE DEMOLISHED IN

PHASE 2.

B INSTALL CABLES AND CONDUITS ASSOCIATED WITH

NEW MECHANICAL EQUIPMENT PRIOR TO

DENERGIZING PANELBOARD OR MOTOR CONTROL

CENTER.

C INSTALL DISCONNECT SWITCHES ASSOCIATED WITH

NEW MECHANICAL EQUIPMENT TO BE INSTALLED IN

PHASE 2. COORDINATE DOWNTIME WITH BUILDING

OWNER.

D DEMOLISH DISCONNECT SWITCHES, CABLE, CONDUIT,

AND DISCONNECTING MEANS ASSOCIATED WITH

MECHANICAL EQUIPMENT TO BE DEMOLISHED IN

PHASE 3.

E DEMOLISH LIGHTING AND ASSOCIATED CABLE AND

CONDUIT IN AREAS WHERE THE CEILING IS AFFECTED

BY MECHANICAL WORK.

F INSTALL DISCONNECT SWITCHES ASSOCIATED WITH

NEW MECHANICAL EQUIPMENT TO BE INSTALLED IN

PHASE 3. COORDINATE DOWNTIME WITH BUILDING

OWNER.

G INSTALL NEW LIGHTING, RE-WIRE WITH NEW CABLE

AND CONDUIT.

ARCHITECTURAL NOTES - PHASE 2 & 3

A CONSTRUCTION OF AREAS A AND B FOR PHASE 2 & 3

MUST NOT COMMENCE UNTIL PERMANENT

CONSTRUCTION MATERIALS AND EQUIPMENT ARE ON

SITE AND VERIFIED BY CONTRACTING OFFICER.

B AREA B PHASE 2 WILL INCLUDE: AREA AS INDICATED ON

SHEET GI011/A1 AND ANY ASSOCIATED ITEMS

REQUIRED TO COMPLETE PHASE 2 IN ITS ENTIRETY.

COORDINATE FULL SCOPE AMONGST ALL DISCIPLINES.

C AREA A PHASE 3 WILL INCLUDE: AREA AS INDICATED ON

SHEET GI011/A1 AND ANY ASSOCIATED ITEMS

REQUIRED TO COMPLETE PHASE 3 IN ITS ENTIRETY.

COORDINATE FULL SCOPE AMONGST ALL DISCIPLINES.

D PERFORM DEMOLITION WORK AS DESCRIBED IN THE

DEMOLITION PLANS ON SHEETS AD101-AD131 WITHIN

THE AREAS DEFINED UNDER PHASE 2 & 3, AREA A AND

AREA B.

E RENOVATIONS TO THE ARCHITECTURAL AND INTERIOR

DESIGN ELEMENTS, ELECTRICAL, FIRE PROTECTION,

AND PLUMBING SYSTEMS WILL BE COMPLETED TO THE

EXTENT REQUIRED TO RETURN THE ROOMS TO A

COMPLETE AND FINISHED CONDITION.

F COORDINATE WITH THE CONTRACTING OFFICER FOR

LOCATION OF TEMPORARY BARRIER PARTITION AS

REQUIRED FOR RENOVATION WORK

TELECOM NOTES - PHASE 2 & 3

A PROTECT NETWORK AND MONITORING CONNECTIONS

SUPPORTING MECHANICAL AND ELECTRICAL DURING

DEMOLITION

B PROVIDE NETWORK CONNECTIONS FOR MECHANICAL

MONITORING EQUIPMENT AS NEEDED, AND

COORDINATE WITH EQUIPMENT PROVIDER. NETWORK

CONNECTIONS FOR PHASE 1 & 2 WORK ORIGINATE

FROM THE COMMUNICATIONS CABINET LOCATED IN

ROOM ISSO OFFICE 111 OR COMM RM 117

C PROVIDE NETWORK CONNECTIONS FOR MECHANICAL

MONITORING EQUIPMENT AS NEEDED, AND

COORDINATE WITH EQUIPMENT PROVIDER. NETWORK

CONNECTIONS FOR PHASE 3 WORK ORIGINATE FROM

THE TWO POST COMMUNICATIONS RACK LOCATED IN

ISSO OFFICE 111.

SATCOM - IBC SUMMARY

APPLICABLE CODES AND STANDARDS

UFC 1-200-01 - DoD BUILDING CODE

UFC 3-600-01 - FIRE PROTECTION ENGINEERING FOR FACILITIES

UFC 4-010-01 - DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS

UFC 4-021-01 - DESIGN AND O&M: MASS NOTIFICATION SYSTEMS

NFPA 1 - FIRE CODE

NFPA 10 - STANDARD FOR PORTABLE FIRE EXTINGUISHERS

NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

NFPA 70 - NATIONAL ELECTRICAL CODE

NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE

NFPA 80 - STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES

NFPA 90A - STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS

NFPA 101 - LIFE SAFETY CODE (LSC)

NFPA 220 - STANDARD ON TYPES OF BUILDING CONSTRUCTION

NFPA 291 - RECOMMENDED PRACTICE FOR FIRE FLOW TESTING AND MARKING OF HYDRANTS

INTERNATIONAL BUILDING CODE (IBC)

USACE JAPAN DISTRICT DESIGN GUIDE

USACE JAPAN EDITED SPECIFICATIONS (JES)

IBC OCCUPANCY CLASSIFICATION

NON-SEPARATED MIXED USE OCCUPANCY IN ACCORDANCE WITH IBC §508.3

FIRST FLOOR

GROUP B, BUSINESS

GROUP S-1, STORAGE

SMALL ASSEMBLY SPACES WITH OCCUPANT LOADS LESS THAN 50 PERSONS AND ACCESSORY TO THE MAIN OCCUPANCY OR ROOMS/SPACES LESS THAN 750 FT2 IN AREA AND ACCESSORY TO ANOTHER OCCUPANCY WILL BE CLASSIFIED AS A GROUP B OCCUPANCY OR AS PART OF THE ASSOCIATED OCCUPANCY IN ACCORDANCE WITH IBC §303.1.2. ROOMS OR SPACES USED FOR STORAGE PURPOSES THAT ARE ACCESSORY TO ANOTHER OCCUPANCY WILL BE CLASSIFIED AS PART OF THAT OCCUPANCY IN ACCORDANCE WITH IBC §311.1.1.

BUILDING CONSTRUCTION TYPE

TYPE IIB - IBC §602.2

TYPE II (0,0,0) - NFPA 220 AND UFC 3-600-01 APPENDIX D

FIRE-RESISTANCE RATING REQUIREMENTS

PRIMARY STRUCTURAL FRAME

FLOOR CONSTRUCTION AND ASSOCIATED SECONDARY MEMBERS

ROOF CONSTRUCTION AND ASSOCIATED SECONDARY MEMBERS

WALLS

EXTERIOR BEARING WALLS

INTERIOR BEARING WALLS

NONBEARING WALLS

EXTERIOR NONBEARING WALLS (FIRE SEPARATION

DISTANCE LESS THAN 3.048 M)

INTERIOR NONBEARING WALLS

REQUIREMENT

0 HOUR

0 HOUR

0 HOUR

0 HOUR

0 HOUR

1 HOUR

0 HOUR

CODE REFERENCE

IBC TABLE 601

IBC TABLE 601

IBC TABLE 601

IBC TABLE 705.5

IBC TABLE 601

IBC TABLE 705.5

IBC TABLE 601

BUILDING HEIGHT AND AREA

BUILDING HEIGHT (NO. OF STORIES):

BUILDING HEIGHT (M):

BUILDING AREA (M2)

ALLOWABLE

4 STORIES

22.6 M

BUILDING OCCUPANCY B:

8,546.8 SM

(SPRINKLERED)

BUILDING OCCUPANCY S:

6,503 SM (SPRINKLERED)

ACTUAL

1 STORIES

6.7 M

1,718.7 SM

BUILDING SEPARATION AND EXPOSURE PROTECTION

BUILDING SEPARATION IS REQUIRED TO BE PROVIDED IN ACCORDANCE WITH IBC AS REFERENCED IN UFC 3-600-01. IT APPEARS THAT THE NEAREST RADOME STRUCTURE TO THE SOUTH OF B100 IS LESS THAN 4.57 M AWAY WITH THE OVERHANG OF THE RADOME STRUCTURE. THIS WOULD REQUIRE 1 HOUR EXTERIOR WALLS BASED ON IBC TABLE 705.5. THIS REQUIREMENT DOES NOT APPEAR TO BE MET, AND THE EXISTING CONDITION WILL BE DOCUMENTED HERE AND DISCUSSED WITH THE DFPE. IT IS NOT EXPECTED THAT OUR PROJECT WOULD CORRECT THIS

EXISTING CONDITION.

FACILITY IS CONSIDERED A NON-SEPARATED MIXED USE FACILITY. OCCUPANCY SEPARATION IS NOT REQUIRED BECAUSE THE QUANTITIES OF ANY HAZARDOUS MATERIALS DO NOT EXCEED THE MAXIMUM ALLOWABLE

QUANTITIES OF NFPA 400 ANYWHERE WITHIN THE FACILITY.

OCCUPANCY SEPARATION

WATER FOR FIRE FLOWS WILL BE PROVIDED BY EXISTING FIRE PUMP. IN ACCORDANCE WITH UFC 3-600-01 §9-2.1; SINCE THE BUILDING IS FULLY PROTECTED BY AUTOMATIC SPRINKLER SYSTEMS THE FIRE FLOW MUST BE IN ACCORDANCE WITH NFPA 1 OR 3,785 LPM AT 138 KPA WHICHEVER IS GREATER. NFPA 1 §18.4.4.3.1 REQUIRES FIRE FLOWS TO BE IN ACCORDANCE WITH TABLE 18.4.4.2.1. THE FACILITY IS APPROXIMATELY 1,718.7 SM IN AREA AND TYPE II (0,0,0) CONSTRUCTION. THE REQUIRED FIRE FLOW IS 10,409 LPM FOR A DURATION OF 2 HOURS. NFPA 1 §18.4.4.3.2 PERMITS A 75% REDUCTION UP TO 3,785 LPM IN THE REQUIRED FIRE FLOW WHEN THE FACILITY IS PROTECTED BY AN AUTOMATIC SPRINKLER SYSTEM. THIS RESULTS IN A FIRE FLOW

OF 3,785 LPM AT 138 KPA.

FIRE FLOWS

WATER FOR THE FIRE PROTECTION SYSTEMS IS PROVIDED BY AN 200 MM FIRE LINE FED BY AN EXISTING FIRE PUMP. A FIRE FLOW TEST HAS NOT BEEN CONDUCTED. A FUTURE FIRE HYDRANT FLOW MUST BE PERFORMED UNDER THE DIRECTION OF THE QFPE IAW NFPA 291 UNLESS OTHERWISE DIRECTED

BY THE DFPE.

FIRE WATER SUPPLY

FACILITY IS CURRENTLY EQUIPPED WITH WET-PIPE AND DOUBLE INTERLOCK PRE-ACTION AUTOMATIC SPRINKLER PROTECTION . A STANDPIPE SYSTEM IS NOT REQUIRED SINCE THE FACILITY IS LESS THAN FOUR STORIES IN HEIGHT AND ALL PORTIONS OF THE FACILITY CAN BE REACHED FROM AN EXTERIOR

DOOR IN LESS THAN 140 M.

AUTOMATIC FIRE SUPPRESSION SYSTEMS

PORTABLE FIRE EXTINGUISHERS MUST BE PROVIDED WHERE REQUIRED BY NFPA 101 IN ACCORDANCE WITH UFC 3-600-01 §9-17.1. UNIFORM SIGNAGE

MUST BE PROVIDED AT ALL EXTINGUISHERS.

PORTABLE FIRE EXTINGUISHERS

FACILITY WILL BE EQUIPPED WITH A COMBINATION FIRE ALARM/MASS NOTIFICATION SYSTEM SINCE THE FACILITY WILL BE REGULARLY OCCUPIED BY MORE THAN 11 DoD PERSONNEL. FIRE ALARM/MASS NOTIFICATION SYSTEM IS DESIGNED ACCORDANCE WITH UFC 4-021-01 AND UFC 3-600-01. FIRE ALARM AND MASS NOTIFICATION SYSTEMS USE EXISTING MONACO TO REPORT FIRE ALARM SIGNALS TO BASE RECEIVING STATION. HOWEVER THERE IS NO RECEIVING STATION FOR MASS NOTIFICATION SIGNALS AND THE SYSTEM WILL BE LOCAL TO THIS BUILDING ONLY.

FIRE ALARM AND MASS NOTIFICATION SYSTEMS

EDITION

CHANGE 3, 2024

CHANGE 6, 2021

CHANGE 3, 2024

CHANGE 1, 2010

WITHIN THE UPS AND BATTERY ROOM 122 THERE IS A LARGE QUANTITY OF LEAD ACID BATTERIES (2-300KVA CABINETS) PROVIDED WITHIN THE CABINETS TO SUPPORT THE BACKUP POWER TO THE FACILITY. IT WAS MENTIONED THERE IS A PLANNED SCOPE OF WORK UPCOMING TO REPLACE THE UPS SYSTEM. AS PART OF THIS UPGRADE, A FULL HAZARD MITIGATION ANALYSIS (HM) SHOULD BE COMPLETED TO DOCUMENT EXISTING CONDITIONS AND COMPLIANCE WITH NFPA 855 AND APPLICABLE UL LISTING AND CERTIFICATIONS.

IT APPEARS AS IF DURING CONSTRUCTION AT SOME POINT A WALL WAS REMOVED IN THIS SPACE BETWEEN THE MAIN ELECTRICAL AND UPS EQUIPMENT. AN RFI WILL BE ASKED TO CONFIRM THE EXISTING EQUIPMENT AND ITS UL LISTING. IAW NFPA 855 TABLE 9.4.1 THE MAQ FOR LEAD ACID BATTERY IS UNLIMITED. THIS PROJECT CURRENTLY ASSUMES THE INSTALLATION WAS DONE AS PER ITS UL LISTING (UL 1778 OR UL9520). A 1 HOUR RATED SEPARATION SHOULD BE PROVIDED AT A MINIMUM BETWEEN THE UPS AND OTHER OCCUPANCIES FOLLOWING NFPA 855 SECTION 9.6.4

HOWEVER CURRENTLY THERE IS NO SEPARATION PROVIDED.

EXHAUST IS CURRENTLY PROVIDED IN THE UPS SPACE.

HAZARDOUS MATERIALS

FOR REVIEW

ONLY

THESE DOCUMENTS ARE FOR

CONCEPT DESIGN AND NOT

INTENDED FOR CONSTRUCTION

BIDDING OR PERMIT PURPOSES.

THEY WERE PREPARED BY, OR

UNDER SUPERVISION OF:

NAME

REGISTRATION # DATE

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

F

IL

E N

A M

E

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

C H

E C

K E

D B

Y

IS

O

A

A

D R

A W

IN

G

C O

D E

PLOT SCALE:PLOT DATE:

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10

PLOTTED BY:

FILE PATH:

A

G U

E R

R A

D A

T E

D E

S C

R

IP

T

IO

N M

A R

K

US Army Corps of Engineers

Japan District ®

J A

P A

N E

N G

IN

E

E R

D

IS

T R

IN

A

W A

J A

P A

N

J E

G

D

C A

M P

B U

C K

N E

R C

O M

M U

N

IC

A T

IO

N

S A

N N

IN

A W

A

J A

P A

N P

R O

J E

C T

N U

M B

E R

:D

F Y

R

E P

A

IR

H V

A C

W

ID

E B

A N

D S

A T

C O

M O

P S

B

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

W H

V D

ALEX D SHEFFERMAN

147009 04/28/2025

TEXAS REGISTERED

ENGINEERING FIRM F-2966

J A

C O

B S

G O

V E

R N

M E

N T

S E

R V

IC

E

S C

O M

P A

N Y

M

A

IN

S T

R E

E T

F

O R

T W

O R

T H

T

X

U S

A

CUI

CUI

FINAL DESIGN

S O

L

IC

IT

A

T

IO

N N

O

1 : 17/18/2025 10:23:22

AM

C:\_Revit_Local_Models\2022\D3449305-F-3D_Estefania.Hinojosa.rvt

A .S

E .H

Gl012

B .B

B U

IL

D

IN

G

C O

D E

A N

A L

Y S

IS

G l0

G l0

/1

/2

LEVEL COMPONENTS AND RAMPS

STAIRS

7.6

NFPA 101 §7.3.3.1

NFPA 101 §7.3.3.1

LOCKS, LATCHES, AND ALARM DEVICES

THE HARDWARE FOR EGRESS-SIDE OCCUPANT RELEASE WILL HAVE AN ELECTRIC LOCK

AFFIXED TO THE DOOR LEAF.

THE HARDWARE WILL HAVE AN OBVIOUS METHOD OF OPERATION THAT IS READILY OPERATED

UNDER ALL LIGHTING CONDITIONS.

THE HARDWARE SHALL BE CAPABLE OF BEING OPERATED WITH ONE HAND IN THE DIRECTION

OF EGRESS.

OPERATION OF THE HARDWARE WILL DIRECTLY INTERRUPT THE POWER SUPPLY TO THE

ELECTRIC LOCK AND UNLOCK THE DOOR ASSEMBLY IN THE DIRECTION OF EGRESS.

LOSS OF POWER TO THE LISTED RELEASING HARDWARE WILL AUTOMATICALLY, ELECTRICALLY

UNLOCK THE DOOR ASSEMBLY IN THE DIRECTION OF EGRESS.

NFPA 101 §7.2.1.6

NFPA 101 §7.2.1.6

NFPA 101 §7.2.1.6

NFPA 101 §7.2.1.6

NFPA 101 §7.2.1.6

BUSINESS

STORAGE

NFPA 101 TABLE A.7.6

NFPA 101 TABLE A.7.6

ILLUMINATION OF THE MEANS OF EGRESS WILL BE PROVIDED WITHIN THE EXIT ACCESS AND EXIT DISCHARGE. THE EXIT ACCESS WILL INCLUDE ONLY STAIRS, CORRIDORS, AND AISLES LEADING TO AN EXIT. THE EXIT DISCHARGE WILL INCLUDE

STAIRS, AISLES, CORRIDORS, AND WALKWAYS LEADING TO A PUBLIC WAY.

FLOORS AND WALKING SURFACES WITHIN AN EXIT AND WITHIN PORTIONS OF THE EXIT ACCESS AND EXIT DISCHARGE WILL BE

ILLUMINATED WITH A LIGHT NO LESS THAN 10.8 LUX, MEASURED AT THE FLOOR LEVEL.

NFPA 101 §7.8.1.1

NFPA 101 §7.8.1.3

NFPA 101 §7.8.1.4

EMERGENCY LIGHTING WITHIN THE MEANS OF EGRESS WILL BE PROVIDED WITHIN THE EXIT ACCESS AND EXIT DISCHARGE.

THE EXIT ACCESS WILL INCLUDE ONLY STAIRS, CORRIDORS, AND AISLES LEADING TO AN EXIT. THE EXIT DISCHARGE WILL

INCLUDE STAIRS, AISLES, CORRIDORS, AND WALKWAYS LEADING TO A PUBLIC WAY.

EMERGENCY LIGHTING WILL BE PROVIDED FOR A MINIMUM OF 1-1/2 HOURS IN THE EVENT OF FAILURE OF NORMAL LIGHTING

EMERGENCY LIGHTING WILL PROVIDE AN INITIAL ILLUMINATION THAT IS NOT LESS THAN AN AVERAGE OF 10.8 LUX AND, AT ANY POINT, NOT LESS THAN 2.2 LUX IN ACCORDANCE WITH NFPA 101 SECTION 7.9.2.1.1, MEASURED ALONG THE MEANS OF EGRESS

AT FLOOR LEVEL.

NFPA 101 §7.9.1.2

NFPA 101 §7.9.2.1

NFPA 101 §7.9.2.1.1

MEANS OF EGRESS CAPACITY CAPACITY FACTOR (MM/PERSON) CODE REFERENCE

NOTE: DOOR OPENINGS WITHIN THE MEANS OF EGRESS WILL BE NOT LESS THAN 810 MM CLEAR IN ACCORDANCE WITH NFPA 101 §7.2.1.2.3.2. CORRIDORS SERVING AN OCCUPANT LOAD OF 50 OR MORE PERSONS WILL BE NOT LESS THAN 1,120 MM.

MEANS OF EGRESS COMPONENTS CODE REFERENCE

EXIT ACCESS AND ARRANGEMENT OF

MEANS OF EGRESS

COMMON PATH LIMIT DEAD-END LIMIT TRAVEL DISTANCE LIMIT CODE REFERENCE

ILLUMINATION OF MEANS OF EGRESS CODE REFERENCE

EMERGENCY LIGHTING WITHIN THE MEANS OF EGRESS CODE REFERENCE

SATCOM - LSC SUMMARY

MIXED OCCUPANCY IN ACCORDANCE WITH LSC §6.1.14.2.2

FIRST FLOOR

BUSINESS

STORAGE

ORDINARY HAZARD CONTENTS

IT EQUIPMENT ROOM

BATTERY ROOM

1 HOUR

1 HOUR

NFPA 855 §9.6.4

NFPA 101 §6.2.2.3

ONE HOUR FIRE BARRIERS

TWO HOUR FIRE BARRIERS

45 MINUTE

1-1/2 HOUR

NFPA 101 §8.3.3.2.2

NFPA 101 §8.3.3.2.2

BUSINESS

STORAGE

CLASS A OR B

CLASS A OR B

CLASS A, B, OR C

CLASS A, B, OR C

CLASS A, B, OR C

CLASS A, B, OR C

NFPA 101 TABLE A.10.2.2

NFPA 101 TABLE A.10.2.2

USE OF ROOM OR SPACE

BUSINESS

STORAGE

MECHANICAL/ELECTRICAL EQUIPMENT

TELECOM ROOMS

ASSEMBLY

14 SM GROSS

27.9 SM GROSS

46.5 SM GROSS

27.9 SM GROSS

1.4 SM GROSS

NFPA 101 TABLE 7.3.1.2

NFPA 101 TABLE 7.3.1.2

UFC 3-600-01 TABLE 10-1

UFC 3-600-01 TABLE 10-1

NFPA 101 TABLE 7.3.1.2

LSC OCCUPANCY CLASSIFICATION

CLASSIFICATION OF HAZARD OF CONTENTS

FIRE-RESISTANCE RATED CONSTRUCTION REQUIREMENT

CODE REFERENCE

CODE REFERENCE

OPENING…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .