PERFORMANCE WORK STATEMENT (PWS)
21-21-231QT3165
Rescue Swimmer Training Facility (RSTF) Turf Replacement USCG Aviation Technical Training Center (ATTC)
1664 Weeksville Road BLDG 3 Elizabeth City, NC 27909
1. BACKGROUND
The 3900 sf of artificial turf currently in place adjacent to the Rescue Swimmer Training Facility (RSTF) located in United States Coast Guard (USCG) Aviation Technical Training Center (ATTC) was installed in 2018 without any type of drainage system. During heavy rainfalls water pools up underneath the surface of the turf which has created multiple large and small potholes in the soil, making it very unstable in certain areas. The standing water has also caused the seams to become weak and the edges of the turf to peel up. Additionally, the short blades combined with no rubber fill causes the turf to get very hot in the summer months, which causes minor burning to exposed skin.
2. OBJECTIVE
This requirement is for the removal of existing artificial turf, the proper preparation of approximately 3900 sf of ground area and installation of 3900 sf of artificial turf. The turf located outside the RSTF is used by Aviation Swimmer Technicians (AST) students and Instructor daily to complete body weight movements without incurring injury that one would likely incur training on a hard surface. The turf is meant to absorb shock from impact while remaining stable. Our students and Instructors conduct a wide range of movements on the turf to include push-ups, sit-ups, flutter kicks, body weight squats, burpees, etc. The turf blades should remain cool in warmer weather, which keeps the students hands, knees and back from getting burned unlike concrete surfaces. Because of the large amounts of rain, the turf needs to be able to drain properly without eroding the undersoil which cause various size divots.
3. SCOPE OF WORK
In order to prevent a serious injury from occurring to current and incoming Aviation Swimmer Technicians (AST) and AST Instructors, the area that is currently covered by turf area needs to be completely removed and replaced.
MINIMUM REQUIREMENTS:
a. Remove and dispose of existing 3900 sq. ft. of existing turf (130sfX30sf approx.)
b. Excavate existing soil, to a depth of no less than 4”
c. Securely install perimeter board.
a. Preferably composite
d. Back fill excavated area with no less than 3” of aggregate stone
a. Ensure stone is graded and compacted to finish grade
e. Install shock pad over graded/compacted aggregate stone
a. No less than 14mm in thickness
f. Replacement Turf will consist of the following characteristics:
a. Polyethylene XP slit film
b. Color: Field Green
c. Yarn Count: 8,040/1 file://///HQS-FS-STE-014/users1/NCVeno/Home/SCOPE%20PARAGRAPHS.doc
d. Tufting Construction: Dual Yarn, same row
e. Blade Height: 1-7/8”
f. Tufting Gage: 3/8”
g. Backing: 18 pic reinforced tricomponent
g. Install new turf over shock pad.
a. Each piece will be cut and seamed together
i. Seaming: Micromechanical bonding
b. Secured to perimeter boards with staples
c. Install infill to fill any remaining gaps
i. 1.25 to 1.5 pounds of rubber psf
4. CONTRACTOR’S QUALITY CONTROL PROGRAM
The Contractor shall establish and maintain a complete quality control program to assure the requirements of the contract are provided as specified. When copies of these records are requested by the Government, the Contractor shall furnish them within one (1) business day after receiving notification. The Contractor’s Quality Control Plan shall include:
4.1 An Inspection Plan addressing the title of the individual who shall perform the inspection, and how inspection shall be
4.2 The methods for identifying and preventing deficiencies in the quality of service performed, before the level of service becomes unacceptable.
4.3. Records of all inspections conducted by the Contractor and necessary corrective action taken.
5. SITE VISIT
Highly Recommended, contact COR SKCM Bridget M Townsend at 252-335-6402 or bridget.m.townsend@uscg.mil to set up appointment The contractor is expected to satisfy himself as to the existing conditions and the work to be performed. The contractor shall verify all dimensions and equipment data prior biding, ordering materials, and commencement of work. The contractor shall wear the appropriate Personal Protective Equipment (PPE) when visiting the site IAW OSHA, State, and Federal Regulations.
6. DELIVERY / WORK PERIOD
Work to be started within 45 days of Acceptance of Contract.
Work to be completed within 5 business days from start of project
7. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE:
The designated contracting officers’ QAE Representative and Point of Contact for this project is ASTC Michael Linehan: Michael.E.Linehan@uscg.mil
ATTC POC: _________________________________________ DATE: ______________
Print/sign name
Contracting Officer Signature: _________________________ DATE: ______________ mailto:bridget.m.townsend@uscg.mil
File details come from the government source that posted it. Updated .