Attachment Pricing Breakdown Correct Fuel Lines.pdf
PDF 114 KB Posted
- Solicitation number
- 36C26123R0013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26123R0013 0002.docx | DOCX document | |
| 36C26123R0013 0001.docx | DOCX document | |
| Site Visit Pics.pdf | ||
| Attachement REQUEST FOR INFORMATION (RFI) FORM.pdf | ||
| Attachment Exhibit C - Fuel Line Photos 08012022.pdf | ||
| Attachment Exhibit A - Site Overviews.pdf | ||
| Attachment Exhibit B - B20 Plumbing Drawings Fuel Lines.pdf | ||
| Attachment SOW Correct Fuel Lines.pdf | ||
| Attachment Pre-solicitation Site Vistit Briefing.pptx | PPTX presentation | |
| 36C26123R0013_1.docx | DOCX document | |
| Attachment General Specifications 02-08-2023.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. 36C26123R0013
PRICE BREAKDOWN
Correct Fuel Lines Martinez and Mare Island
DESCRIPTION MATERIAL LABOR TOTAL
01. General Requirements (Division 01) A. Project Manager $ $ $ B. Superintendent $ $ $ C. General Requirements (Mobilization) $ $ $ D. System Commissioning $ $ $
01. General Requirements Subtotal $ $ $
02. Concrete (Division 03)
A. Cut and refinish street curbs, gutters, & bldg.
floors
02. Concrete Subtotal $ $ $
03. Plumbing (Division 22)
A. Install 1” diameter, schedule 40, steel pipe B20
B. Demolition of existing piping B20 $ $ $ C. Install 1” diameter, schedule 40, steel pipe
B19
D. Demolition of existing piping B19 $ $ $ E. Install 1” diameter, schedule 40, steel pipe
B201
F. Demolition of existing piping B201 $ $ $ G. Valve $ $ $ H. Demolish Valve $ $ $ I. Temporary Mobile Diesel Fuel Tanks $ $ $ J. Replace Day Tank $ $ $ K. Miscellaneous (containment pan, etc.) $ $ $
03. Plumbing subtotal $ $ $
04. Earthwork (Division 31)
A. Excavate existing steel pipes and replace ground
04. Earthwork Subtotal $ $ $ SUB TOTAL (Items 1 – 5) $ $ $ General Conditions $ $ $ Overhead $ $ $ Profit $ $ $ Bonds and Insurance $ $ $ Total $ $ $ SUB TOTAL (Items 6 – 7) $ $ $ General Conditions $ $ $ Overhead $ $ $ Profit $ $ $ Bonds and Insurance $ $ $
TOTAL OFFER $ $ $