Attachment - Pricing Breakdown 36C26127Q0029.docx

DOCX document 48 KB Posted

Attached to
Amendment 0002 Y1DZ--36C261-28-AP-0022 | 612-27-1-6009-0001 | Construct Modular Imaging Center in Stockton | 612A4-CSI-002
Solicitation number
36C26127Q0029
Issued by

About this file

This is a pricing breakdown template for a Request for Quote (RFQ) issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 for the construction of a modular imaging center in Stockton, California. The template is structured according to the MasterFormat classification system and requires bidders to provide detailed cost estimates organized by construction trade divisions, including general requirements, existing conditions, concrete, metals, wood and plastic, thermal and moisture protection, doors and windows, finishes, specialties, furnishings, special construction, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, earthwork, exterior improvements, and utilities. Each division section requires vendors to itemize labor costs (number of personnel, hourly rates, and total hours), material costs (quantity and unit costs), and subtotals for each trade.

The pricing breakdown template directs contractors to provide line-item costs for project management, superintendent oversight, general requirements, mobilization, premium after-hours work, infection control (ICRA), storage containers, dumpsters, and design fees for engineer-stamped shop drawings within Division 01. The completed form requires calculation of a grand total that incorporates subtotals from all divisions (items 1-23), with separate line items for overhead, profit, bonds and insurance, and a final total offer price. This template is applicable to RFQ No. 36C26127Q0029 and relates to previously issued RFP No. 36C26126R0025, indicating a two-stage procurement process for the modular imaging center construction project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. 36C26126R0025 QUOTE PRICE BREAKDOWN

RFQ No. 36C26127Q0029 QUOTE PRICE BREAKDOWN

QUOTE PRICE BREAKDOWN

Construct Modular Imaging Center, Stockton, CA

DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

01. General Requirements (Division 01)

A. Project Manager

$
$

B. Superintendent

$
$

C. General Requirements

$
$

D. Mobilization

$
$

E. Premium After Hours Work

$
$

F. Infection Control (ICRA)

$
$

G. Storage Container/Office (rent)

$
$

H. Dumpster (rent)

$
$

I. Design Fee (Engineer stamped shop drawings)

$
$
$
$
$
$
$
$
$
$
$
$

01. General Requirements Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

02. Existing Conditions (Division 02)

$
$
$
$
$
$
$
$
$
$

02. Existing Conditions Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

03. Concrete (Division 03)

$
$
$
$
$
$
$
$

03. Concrete Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

05. Metals (Division 05)

$
$
$
$
$
$
$
$

05. Metals Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

06. Wood and Plastic (Division 06)

$
$
$
$
$
$
$
$

06. Wood and Plastic Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

07. Thermal and Moisture Protection (Division 07)

$
$
$
$
$
$
$
$

07. Thermal and Moisture Protection Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

08. Doors and Windows (Division 08)

$
$
$
$
$
$
$
$

08. Doors and Windows Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

09. Finishes (Division 09)

$
$
$
$
$
$
$
$

09. Finishes Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

10. Specialties (Division 10)

$
$
$
$
$
$
$
$

10. Specialties Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

11. Furnishings (Division 12)

$
$
$
$
$
$
$
$

11. Furnishing Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

12. Special Construction (Division 13)

$
$
$
$
$
$
$
$

12. Special Construction Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

13. Fire Suppression (Division 21)

$
$
$
$
$
$
$
$

13. Fire Suppression Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

14. Plumbing (Division 22)

$
$
$
$
$
$

14. Plumbing Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

15. Heating, Ventilating, and Air Conditioning (Division 23)

$
$
$
$
$
$

15. Heating, Ventilating, and Air Conditioning Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

16. Electrical (Division 26)

$
$
$
$
$
$

16. Electrical Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

17. Communications (Division 27)

$
$
$
$
$
$

17. Communications Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

18. Electronic Safety and Security (Division 28)

$
$
$
$
$
$

18. Electronic Safety and Security Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

19. Earthwork (Division 31)

$
$
$
$
$
$

19. Earthwork Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

20. Exterior Improvements (Division 32)

$
$
$
$
$
$

20. Exterior Improvements Subtotal

$
$
DESCRIPTION
# OF PERSONNEL
HOURLY RATE
# OF HOURS
TOTAL LABOR COST
QUANTITY
MATERIAL COST
TOTAL MATERIAL COST

21. Utilities (Division 33)

$
$
$
$
$
$

21. Utilities Subtotal

$
$

SUB TOTAL (Items 1 – 23)

Overhead

$
$

Profit

$
$

Bonds and Insurance

$
$

Total

$
$

TOTAL OFFER

Note: All other costs may be included as a separate item and shall be specified in this breakdown.