Attachment - Performance Work Statement .pdf
PDF 105 KB Posted
- Solicitation number
- W912DQ26QA057
About this file
This is a Performance Work Statement for testing and calibration of testing equipment at two U.S. Army Corps of Engineers powerplants: Stockton Powerplant and Harry S. Truman Powerplant. The contractor shall provide inspection, testing, and calibration services for approximately 40 items of testing equipment at each facility to ensure accuracy, reliability, and compliance with applicable standards and regulations. This is a non-personnel services contract with the contractor responsible solely to provide all personnel, equipment, supplies, tools, materials, transportation, supervision, and other necessary services except for items specified as government-furnished property.
The period of performance runs for one base year (2026) plus two 12-month option years (2027 and 2028), with services performed onsite at both powerplants during normal business hours (Monday-Friday, excluding federal holidays) and offsite report generation at the contractor's facility. Key requirements include maintaining current certifications from standards organizations such as NIST, furnishing site-specific Accident Prevention Plans and Activity Hazard Analysis within 30 days of award, complying with EM 385-1-1 safety standards, and meeting all facility security requirements including background checks and Antiterrorism Level I training. Deliverables include calibration certificates or detailed service reports listing all tests performed with Pass/Fail results, calibration labels affixed to each equipment item, and two printed plus one electronic copy of all reports and certifications submitted to the Contracting Officer's Representative annually. The contract is structured under six Contract Line Item Numbers (CLINs) for base year and option year work at each location.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Testing and Calibration of Testing Equipment
Stockton Powerplant & Harry S. Truman Powerplant
General Information
This is a non-personnel services contract to provide testing and calibration of testing equipment.
The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Description of Services
The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform inspection, testing, and calibration of testing equipment as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2. Description of the Facilities
The services will be performed at the Stockton Powerplant and the Harry S. Truman Powerplant.
Each plant has approximately 40 items of testing equipment requiring service.
1.3. Objective
To provide inspection, testing, and calibration services for testing equipment to ensure accuracy, reliability, and compliance with all applicable standards and regulations.
1.4. Period of Performance
The period of performance shall be for one (1) base year of 12 months and two (2) 12-month option years. The period of performance is as follows: Base Year (2026), Option Year 1 (2027), and Option Year 2 (2028).
1.5. Contractor Personnel
The Contractor must ensure that all personnel, whether employees or subcontractors, possess current certifications and qualifications required for the testing and calibration of the specified equipment. This includes documented training and certification from relevant standards organizations (e.g., NIST, or equivalent).
1.6. Quality Assurance
The Government will evaluate the Contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels.
1.7. Hours of Operation
Normal hours of operation are Monday thru Friday, excluding Federal holidays or when Government facilities are closed. Services shall be scheduled with the COR to minimize disruption to plant operations.
1.8. Place of Performance
Onsite services will be performed at the Stockton Powerplant and Harry S. Truman Powerplant.
Offsite work (e.g., report generation) will be performed at the Contractor's place of business.
1.9. Safety
All onsite work must be performed in compliance with the current version of the EM 385-1-1, "U.S. Army Corps of Engineer's Safety and Health Requirements Manual," and all applicable local, state, and federal safety regulations. The contractor shall furnish a site-specific Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA) within 30 days of contract award.
1.10. Security
The contractor and all personnel shall comply with all security requirements, including access control procedures, background checks (NCIC-III), and security training as required by the facility. This includes Antiterrorism (AT) Level I training and OPSEC awareness.
1.11. Data Rights
The Government has unlimited rights to all documents, reports, and materials produced under this contract. All materials are the property of the Government and shall not be used or sold by the contractor without written permission from the Contracting Officer.
1.12. Post Award Conference/Periodic Progress Meetings
Definitions and Acronyms
AHA
Activity Hazard Analysis
APP
Accident Prevention Plan
COR
Contracting Officer's Representative
IGE
Independent Government Estimate
KO
Contracting Officer
PWS
Performance Work Statement
QASP
Quality Assurance Surveillance Plan
Government Furnished Items and Services
* The Government will provide physical access to the facilities and the equipment to be serviced.
* The Government will provide existing documentation related to the testing equipment where available.
* The Government will provide basic utilities (e.g., electricity) necessary for the contractor to perform their duties.
Contractor Furnished Items and Responsibilities
General
Furnish all supplies, tools, and calibrated testing equipment required to perform the services.
Certifications
Maintain and provide proof of all required business and personnel certifications for performing calibration and testing services.
Reporting
Provide detailed service reports after each site visit and a comprehensive annual report summarizing all work performed.
Services (Specific Tasks)
5.1. Inspection and Maintenance
Perform annual inspection, testing, and calibration on all designated testing equipment at both Stockton and Truman powerplants.
5.2. Documentation
For each piece of equipment serviced, provide a calibration certificate or a detailed report of findings. The report shall list all tests performed, the results (Pass/Fail), any adjustments or repairs made, and the calibration standards used.
5.3. Labeling
Affix a calibration label to each piece of equipment indicating the date of calibration, the due date for the next calibration, and the identity of the technician who performed the service.
5.4. Reporting
Provide two (2) printed copies and one (1) electronic copy of all reports and certifications to the
COR.
Applicable Publications (Current Editions)
* EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual
* Relevant NIST standards for calibration
* Manufacturer's specifications for the equipment being tested
Attachments/Technical Exhibits
Performance Objective
PWS Section Performance Standard
Surveillance Method
Annual Inspection and Calibration
5.1 All equipment listed
is inspected, tested, and calibrated in accordance with industry and manufacturer standards. All required reports and certifications are accurate and delivered on time.
100% Inspection of deliverables
Deliverable Frequency Medium/Format Submit To Accident Prevention Plan (APP) & Activity Hazard Analysis
(AHA)
Once, within 30 days of award
Electronic COR
Proof of Certifications
Once, within 30 days of award
Electronic COR
Service Reports & Calibration Certificates
Annually, after completion of work
Electronic & 2 Printed Copies
COR
CLIN Description Year Location 0001 Base Year Stockton
Inspection and Maintenance
2026 Stockton
0002 Base Year Truman Inspection and Maintenance
2026 Truman
1001 Option Year 1 Stockton Inspection and Maintenance
2027 Stockton
1002 Option Year 1 Truman Inspection and Maintenance
2027 Truman
2001 Option Year 2 Stockton Inspection and Maintenance
2028 Stockton
2002 Option Year 2 Truman Inspection and Maintenance
2028 Truman