About this file

This is a Technical Specifications document for the State of Alaska's Request for Proposal 2027-1200-0113 concerning the design and construction of a Large Class Patrol Vessel. The procurement is managed by the State of Alaska with primary points of contact Jason Monkelien (Procurement Specialist 3) available November 9-13 and Kelly Pahlau (Procurement Specialist 5) available November 14-27. All questions must be submitted in writing to the designated procurement specialist by the deadline, with oral conversations requiring written confirmation. Proposals must be received no later than 4:30 p.m. Alaska Standard Time on November 30, 2026, via electronic submission only; faxed, oral, or physical submissions will not be accepted. Interested parties must register with the procurement specialist to receive notification of amendments, as failure to do so may result in proposal rejection.

The file does not specify pricing terms, contract duration, renewal options, or set-asides within the technical specifications document itself. The State of Alaska is bound by the Alaska Public Records Act and applicable federal and state disclosure requirements. Offerors seeking to withhold proprietary information must comply with all relevant statutes, regulations, and solicitation requirements, including Alaska Statute 30.30.230(a). Amendment 1 is noted as a mandatory return amendment that bidders must acknowledge.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Large Class Enforcement Vessel

Specification

Prepared for: Alaska Wildlife Troopers | Anchorage, AK

Ref: 24065-200-832-0

Rev. -

October 23, 2026

ST

ATE OF ALASKA

49TH

ST

ATE OF ALASKA

49TH

ST

ATE OF ALASKA

49TH

10/23/2026 10/23/202610/23/202610/23/2026

Alaska Wildlife Troopers Large Class Enforcement Vessel 10/23/26

24065-200-832-0 i

Prepared by

ELLIOTT BAY DESIGN GROUP

PO BOX 45790

SEATTLE, WA 98145

General Notes

1. Samuel Waterhouse, WA PE# 55707, is the engineer in responsible charge of the naval architecture and structural design. Patrick Eberhardt, AK PE# 13275, is the engineer in responsible charge of HVAC and steering systems. Sarah Nichols, AK PE# 146884, is the engineer in responsible charge of other mechanical systems. Taylor Herinckx, AK PE# 13580, is the engineer in responsible charge of electrical systems. Refer to the sealed Contract Guidance drawings for a more detailed description of responsible engineer subdivision

Revisions

REV DESCRIPTION DATE APPROVED

− Initial issue 10/23/26 SKW, 55707

PTE, 13275

SEN, 146884

TMH, 13580

CONFIDENTIAL AND PROPRIETARY PROPERTY OF

ELLIOTT BAY DESIGN GROUP LLC

MAY NOT BE USED FOR CONSTRUCTION OR PROVIDED TO

ANY THIRD PARTIES WITHOUT PRIOR WRITTEN CONSENT.

© 2026 ELLIOTT BAY DESIGN GROUP

24065-200-832-0 ii

Table of Contents

PAGE

Group 000 – Requirements for Design and Construction 1 011 General Description 1 012 Definitions 2 030 Contract Plans 3 044 Material Substitutions 4 070 Requirements for Design and Construction 5 071 Access Requirements 6 073 Vibration and Noise 6 074 Welding 6 078 Materials and Workmanship 7 079 Environmental Conditions 8 084 Equipment Storage 9 088 Care of Vessel During Construction 9 091 Quality Assurance Program 10 092 Inspections 10 093 Weight Control Program 10

Group 100 – Hull Structure 11 100 General 11 110 Hull Structure 14 130 Main Deck and Bulwarks 15 131 Swim Step 16 150 Deck House Superstructure 16 171 Masts 16 180 Foundations 16

Group 200 – Propulsion and Ship Service Machinery 17 233 Main Engines and Reduction Gears 17 243 Propulsion Shafting 17 244 Ecology Box 19 256 Cooling System 20 259 Exhaust Piping 21 260 Engine Room Air Supply and Exhaust 21 264 Lube and Waste Oil Systems 22

Group 300 – Electrical Systems 23 265 General 23 301 Degree of Protection 24 302 Materials and Equipment 24 303 Bonding 24 304 Nameplates and Labels 25 305 Documentation 25 306 Electrical Test and Trials 25 307 Motors 26 308 Motor Controllers 26 309 Variable Frequency Drives 26

24065-200-832-0 iii

310 Fire Shutdown Circuit 26 311 Circuit Breakers 27 312 Cables and Wiring 27 313 Generator Sets 29 314 Switchboard 30 315 Power Distribution Equipment 33 316 Receptacles 35 317 Shore Power 36 318 Lighting 37

Group 400 – Command and Monitoring 39 400 General 39 421 Navigational Aids 39 422 Navigation Lights 39 423 Electrical Navigation Systems 40 432 Communications 41 436 Alarm and Monitoring Systems 41 439 CCTV and Thermal Imaging Systems 42

Group 500 – Auxiliary Systems 42 500 General 42 503 Pumps 43 505 Piping 44 506 Fills, Vents, and Sounds 47 508 Piping and Machinery Insulation 48 512 Heating, Ventilation, and Air Conditioning Requirements 48 520 Sea Water Systems 53 521 Fire Main System 54 522 Deck Washdown 54 526 Weather Deck Drains 55 528 Black and Gray Water System 55 529 Bilge System 56 533 Potable Water System 56 541 Fuel Piping 56 551 Compressed Air 57 555 Fixed Fire Extinguishing Systems 57 556 Hydraulic Systems 58 562 Maneuvering Systems 59 572 Lifting Equipment 61 573 Crab Pot Gear 61 581 Anchor Handling and Storage Systems 62 582 Mooring Systems 63

Group 600 – Outfitting 63 602 Signage, Markings, and Displays 63 603 Interior and Exterior Railings 68 622 Floor Plates 68 623 Ladders and Stairways 69 625 Doors, Windows, and Hatches 69

24065-200-832-0 iv

631 Painting 71 633 Cathodic Protection 77 635 Insulation 77 637 Sheathing 80 638 Furnishings and Fixtures 81 681 Fire and Safety Equipment 85

Group 800 – Management and Engineering 85 810 Engineering and Working Drawings, Calculations, Review 85 835 Tonnage Admeasurement 87 843 Stability 87 851 Training 88 856 Installation Instructions, Operating Manuals, and Parts Lists 88

Group 900 – Shipyard Contract Services 89 982 Tests and Trials 89 983 Delivery, Acceptance, and Substantial Completion 97 996 Launching and Drydocking 99

24065-200-832-0 1

Group 000 – Requirements for Design and Construction

011 General Description The vessel to be delivered is a patrol vessel, built of a steel hull and aluminum superstructure, outfitted for year-round service in Alaskan waters and icy conditions. It will have a 2,400nm range at 10kt cruising speed, and a design life of 50 years.

Fully redundant main propulsion shall be provided by two CAT C18 engines with reduction gears connected to independent fixed pitch propellers. An installed bow thruster will assist with steering and docking maneuvers.

011.1 Principal Characteristics

The principal characteristics of the vessel are as follows in Table 1.

Table 1: Principal characteristics of the vessel Characteristic Value

USCG Certification Built to 46 CFR Subchapter T standards

Classification No Classification or Load Line

Gross Tonnage < 200 GRT

Length Overall 96' – 1/2"

Length on Design Load Waterline 91' – 7 7/8"

Beam, Molded 27' – 6"

Beam over Guards 28' or less

Depth at Main Deck side 11' – 9"

Draft at Design Load Water Line (DLWL) 7' – 9"

Light Ship Weight, Estimated 175LT

Maximum Displacement 270LT

Propulsion 2x fixed pitch propellers

Fuel Oil Capacity (95%) 14,400 gallons @ 95% capacity

Minimum Crew Complement 3 operators, 2 troopers, 5 passengers

Service Speed 10 knots

011.2 Route and Mission Description

This vessel is intended to patrol the waters of Alaska year-round in all conditions, including icy conditions. It will primarily patrol both inside waters and outside waters in Southeast Alaska and also transit through the Gulf of Alaska to destinations such as Kodiak, Yakutat, and Cordova. It is expected to perform patrolling missions to Yakutat two to three times per year.

24065-200-832-0 2

012 Definitions

Term Definition

ABS American Bureau of Shipbuilding

Contractor or Shipyard

Where the term "Contractor" or "Shipyard" appear in this Specification and Contract Plans, such terms refer to the individual, firm, or corporation undertaking the execution of the work under the terms of the Contract.

Contract The document which binds the Contractor with the Owner for the construction and delivery of the vessel.

Contract Plans Contract Plans include Contract Drawings, Contract Guidance Drawings, and Supporting Documents as further defined and delineated in Section 030.

Install, or Furnish

Used together or separately, refers to the actions required of the Contractor to supply all materials, equipment, tools, labor, and incidentals to perform the work necessary to properly fit/integrate the equipment or system into the vessel and verify proper function for the intended use.

Detail Design / Construction Drawings

Developed by Contractor for purpose of Construction, to include shop drawings and other working drawings that support construction.

Naval Architect Where the term "Naval Architect" appears in this Specification, this term refers to Elliott Bay Design Group LLC (EBDG), Naval Architects and Marine Engineers, Seattle, WA.

or equal

An "or equal" product or material is one which exhibits the same general size, weight, characteristics, performance, reliability, and maintainability as the product or material identified in this Specification. Demonstrating "or equal" is defined in Section 044.

OSHA Occupational Safety and Health Administration

Owner Alaska Wildlife Troopers (AWT) or a sanctioned representative of AWT.

Prepare To develop or produce data or information for submittal and/or distribution to the Owner, or to regulatory bodies.

Provide Design, purchase, install/integrate into the vessel, test, and verify proper function for intended use.

Regulatory Body

Any organization, government agency, or commission that regulates or oversees the construction, certification, and/or operation of vessels, as required by federal or state laws, including but not limited to: ABS, OSHA, USCG

Specification Technical Specification (this document).

USCG United States Coast Guard

24065-200-832-0 3

030 Contract Plans This Specification and the Contract Plans referenced herein are part of the Contract. In case of any difference or discrepancy between this Specification and the Contract Plans, this Specification shall govern. In the case of any difference or discrepancy between Contract Plans, or this Specification, and the Contract, the Contract shall govern.

Contract Drawings shall not be deviated from without prior written approval from the Owner. The Lines Plan showing the design of the vessel hull form is a Contract Drawing. The shape of the hull shall conform to the Lines Plan, and the hull shall be carefully faired. Except for fairing, deviations from the Lines Plan shall not be made without prior written approval from the Owner.

The arrangement of the vessel shall conform to the Profile and Arrangements drawing. The size and layout of spaces within the vessel, seating arrangements and other major features shown shall not be changed without written approval of the Owner.

Except where strict conference is expressly stated in these Specifications, the Contract Guidance Drawings show acceptable arrangements, basic technical information, performance requirements, and features to guide the Contractor in development of additional details required for construction, regulatory agency approvals, and Owner review.

Contract Guidance Drawings are not intended to restrict the Contractor to the details shown therein.

Equivalent details, which may make use of more readily available material or permit use of the Contractor's standards and procedures of equal merit and quality are acceptable. Changes to major features, functionality, and materials shall not be made without written approval of the Owner prior to start of construction.

It is not the intent of this Specification and Contract Plans to cover every detail of construction and equipment. Any material or parts, the omission of which would be detrimental to the seaworthiness or serviceability of the vessel, and the inclusion of which is generally accepted good shipbuilding practice, shall be provided by the Contractor to the satisfaction of and without increase in cost to the Owner.

Contract Guidance Drawings illustrating piping, mechanical, electrical, and other systems are generally diagrammatic in nature. The Contractor is required to develop the systems and conduct its own interference survey. Machinery and equipment shall be arranged such that there are proper clearances for convenient operation, regular maintenance, and repair.

The Contractor is cautioned to check and verify dimensions, weights, and sizes from the manufacturer's certified drawings or the actual machinery or equipment itself, to ensure that the customary growth in machinery and equipment size does not cause interferences. Large changes in equipment size that may significantly affect the arrangement of the equipment must be promptly called to the attention of the Owner, including calling to the attention of the Owner any reasonably anticipated impacts of such changes on other systems and/or Specifications.

The Supporting Documents were developed with and in support of the Contract Plans. Any calculations provided therein support the Contract Design. As the Contractor develops the Functional and Detail Designs, the Contractor shall develop, update, or verify the supporting calculations as necessary.

The Contractor shall develop detailed other design and construction drawings (Construction Drawings or Working Drawings) as appropriate and as necessary for vessel construction, and construction and/or installation of components, equipment and machinery using sources of information not available during contract design development including certified vendor drawings, templating from actual equipment, or using more detailed information provided by equipment vendors under contract to the Contractor.

24065-200-832-0 4

Construction Drawings shall be submitted to the Owner for review and approval in accordance with Section 810.

Contract Drawings

(A) 24065-100-1, Lines Plan

Contract Guidance Drawings

(B) 24065-200-101-1, Profiles and Arrangements

(C) 24065-200-101-2, Fire and Safety Plan

(D) 24065-200-120-0, Hull Structure

(E) 24065-200-150-0, Deck House Structure

(F) 24065-200-243-0, Shafting Arrangements

(G) 24065-200-256-0, Fresh Water Cooling System Diagram

(H) 24065-200-259-1, Engine Exhaust Arrangement

(I) 24065-200-259-2, Engine Room Air Supply and Exhaust

(J) 24065-200-320-0, Electrical AC One-Line Diagram

(K) 24065-200-506-0, Vents, Fills, and Sounds

(L) 24065-200-521-0, Bilge and Fire Main Piping Diagram

(M) 24065-200-528-0, Black and Gray Water System Schematic

(N) 24065-200-533-0, Fresh Water System Schematic

(O) 24065-200-541-0, Fuel Piping Diagram

(P) 24065-200-562-0, Steering and Rudder Arrangement

Supporting Documents

(Q) 24065-200-300-1, AC Electrical Loads Analysis

(R) 24065-200-833-0, Weight Estimate

(S) 24065-200-832-1, Electronics Specification

(T) 24065-200-843-5, Stability Assessment

044 Material Substitutions Names of certain manufacturers and items, where mentioned in this Specification and Contract Guidance Drawings, are included as a means of describing the general character and quality of the design and construction of various items and articles. Further, specific equipment identified may have been selected as a basis for development of the Contract Design guidance. Substitutions for such items must be of equal quality and function and must be approved by the Owner in writing in advance of purchase.

An "or equal" product or material is one which exhibits the same general size, weight, characteristics, performance, reliability, and maintainability as the product or material identified in this Specification.

The Contractor shall be wholly responsible for demonstrating the "or equal" status of any product or material, which is offered as a substitute for those sited in this Specification.

Requests for substitutions shall be made in writing to the Owner setting forth the reason for the proposed substitution and providing documented evidence of the substitute's equivalence or superiority to the specified product or material. The request shall also provide the Contractor's assurance that the substitution, if approved, will not result in any increase in the Contract Price nor an extension of the delivery date of the vessel.

24065-200-832-0 5

Requests for substitution must include:

• Construction to marine appropriate recognized standards (UL, IEEE, ANSI, ASTM, etc.).

• Comprehensive comparison of construction features, quality of fabrication, and materials of construction between the specified item and the proposed item. Complete drawings and dimensional data shall be substituted for each item. The weight of each item shall be provided.

• Comprehensive comparison of the performance and functional characteristics between the specified item and the proposed item, including capacity, safety features, rated service duty life, maintenance life cycle, requirements, and warranty terms.

• Comprehensive list of impacts that the substitution will cause to arrangements, structure and interfacing piping, ventilation, electrical, and control systems.

• Valid manufacturers price (and if applicable, warranty) quote for the specified and the proposed substitute item.

• Location of nearest distributor stocking parts for the items and providing field service for the proposed substitution and the specified item.

• Statement from Contractor indicating that the proposed substitution will not be a cost increase and will not extend the delivery date of the vessel.

070 Requirements for Design and Construction All work performed on the vessel shall comply with the requirements of the various regulatory body rules and standards listed in that are in force at the time of Contract signing, insofar as they may have jurisdiction or application.

[1] 46 CFR Subchapter T: Small Passenger Vessels (Under 100 Gross Tons)

[2] ABS Rules for Building and Classing Steel Vessels Under 61 Meters (200 Feet) in Length

[3] ABS Rules for Building and Classing Marine Vessels

[4] American Welding Society D1.1 "Structural Welding Code - Steel" (AWS D1.1)

[5] ABS Guide for Nondestructive Inspection

[6] International Association of Classification Societies No. 47 "Shipbuilding and Repair Quality Standard" (IACS No. 47)

[7] ABS Rules for Materials and Welding

[8] American Welding Society D1.2 "Structural Welding Code – Aluminum" (AWS D1.2)

[9] American Welding Society D3.7 "Specification for Aluminum Brazing" (AWS D3.7)

[10] SNAME T&R Bulletin 3-39, Guide for Shop and Installation Tests

[11] SNAME, T&R Bulletin No. 3-47, Guide for Sea Trials

[12] SNAME, T&R Bulletin No. 3-51, Practices and Procedures for the Alignment of Marine Maine Propulsion Shafting Systems

[13] ASTM F1166-95a, Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities

[14] ASTM F994, Standard Specification for Design and Installation of Overboard Discharge Hull Penetration Connections

24065-200-832-0 6

[15] 29 CFR 1910.95 Occupational Noise Exposure

071 Access Requirements The Contractor shall ensure that adequate and immediate access is provided throughout the vessel to operate, inspect, maintain, and repair installed equipment and machinery, including associated valves, filters, controls, sensing devices, and other features requiring periodic operation, adjustment, maintenance and repair. This requirement will involve care in routing exhaust piping, cabling, and ductwork and consideration of further restrictions imposed by insulation, linings, hangers, and brackets.

Access shall be provided throughout spaces and to and around machinery and equipment by means of adjacent deck plates or gratings, permanent ladders, doors, manholes, scuttles and/or bolted plates.

Restriction of accession openings by pipes and valves or other items will not be acceptable. Permanent fittings shall not be installed in a manner to restrict routes for removal of machinery and equipment.

Controls and valves shall not be located in areas rendered inaccessible by the positioning of other fittings.

071.1 Headroom and Clearances

The Contractor shall take care to maximize headroom in all spaces, especially those under the main deck.

Fittings, piping, machinery/equipment components and/or structure shall not be installed in such a manner as to hinder the free passage of, or cause injury to, an individual walking along normal ship passageways. Large items potentially protruding down from the ceiling shall be located and oriented so as not to inhibit the clear headroom requirements along primary walkways and frequently access areas.

The required clear height in spaces is shown in Reference (B). If the Contractor needs to protrude below this threshold, the Contractor should discuss with the Owner to determine the best course of action.

Where not specified, the minimum headroom in spaces below the main deck shall be 6'-6", or the maximum possible in these spaces.

071.2 Ergonomics

The ergonomic design criteria of Reference [13] shall be applied to the placement and layout of the vessel systems, equipment, controls, and other features with ergonomic implications. The Contractor is strongly encouraged to review this standard prior to establishing the location and/or layout of any vessel equipment control or operational devices.

073 Vibration and Noise The Contractor is cautioned to pay particular attention to the design, construction, materials and equipment, both airborne and structural, in order to minimize vibration and noise. Noise levels shall be suitable for mission requirements and in accordance with good marine practice and OSHA standards for maritime operations (29 CFR 1910.95), to the satisfaction of the Owner. Joinery systems, in particular, shall be selected to mitigate noise in accommodations. It is the Contractor's responsibility to locate and correct unusual vibration and noise arising during tests/trials or subsequently during the warranty period.

074 Welding Welding shall meet all applicable Regulatory requirements References [1] and [2], the Specification, and the Contract Guidance Drawings.

24065-200-832-0 7

Prior to the start of construction, the Contractor shall submit the weld schedule, Welding Procedure Specifications (WPS), and Procedure Qualification Records (PQR). No deviation from the approved weld joint designs or procedures will be permitted without Owner review prior to fabrication.

All welding shall be performed by welders holding current certifications for the approved procedures in accordance with Reference [4]. Prior to the start of construction, the Contractor shall provide a roster of all qualified welders and their welding certifications. Certificates shall be maintained during the Contract performance period.

The Contractor shall visually inspect all welds. Cyclically loaded structure shall be visually inspected to the standards in Reference [4]. The Contractor is also responsible for visual and other non-destructive testing (NDT) of welds by the frequency, location, and methods specified by the Reference [5], and to the Owner's satisfaction. The Contractor shall prepare an NDT plan which must be reviewed by the Owner prior to performing NDT on the vessel. Defective welds and welds of poor quality that do not meet the satisfaction of the Owner shall be removed and rewelded or repaired in accordance with Reference [4] by the Contractor.

The welding sequence shall be designed to minimize distortion and locked-in stresses. Structural welding shall be carried out in such sequence as to compensate for creeping and shrinkage as the work progresses, keeping distortion within the fairness standards of Reference [6] unless a higher requirement for fairness is specified elsewhere in this Specification.

Intermittent welding is not permitted in the foundations for the main engines, generators, propeller struts, rudders, anchor winch, fore deck crane, and hull structure immediately in way of these foundations.

Welding in areas exposed to the weather or other conditions which may result in corrosion to the faying surfaces of attached members shall be continuous or shall be sealed between intermittent welds with an applied fillet of paintable marine grade epoxy or polyurethane-based caulking. Areas where continuous welding or caulking may be applied include bulwarks, curtain plates, exterior overhead structures, and pilothouse top and visor.

Fillet welds shall be wrapped around the ends of members, in weld relief locations, and around brackets to eliminate stress risers and corrosion points, and in accordance with Reference [7]. In way of built-up, radiused intersections of girders, welding of the flange to the web shall be double continuous through the extent of the radius. Errant arc strikes outside the area of permanent welds shall be avoided. The Contractor shall grind smooth any blemishes caused by errant arc strikes and repair any defects per Reference [4]. Peening or caulking of weld material will not be allowed. Surfaces to be welded shall be free from mill scale, excessive rust, moisture, grease, or other contaminants that would prevent proper welding.

078 Materials and Workmanship Unless otherwise stated in this Specification, the Contractor shall supply the necessary labor, material, skill, and equipment required to complete the construction and testing of the vessel. All materials shall be new and of current manufacture unless specific approval to the contrary is obtained from the Owner in writing. At time of substantial completion, installed equipment shall be actively supported by manufacturer with readily available replacement parts, technical support, and software updates, where applicable.

The work shall be complete in all respects. Anything inadvertently omitted from this Specification or Contract Plans that is necessary and usual to a complete vessel, shall be supplied as a part of this

24065-200-832-0 8

Contract. Materials used and the workmanship thereon shall be of the best description and quality throughout and of adequate sizes to accomplish the purpose intended. The work, in every respect, shall be to the complete satisfaction of the Owner.

Defects appearing at any stage of the work shall be cause for rejection even though the piece in question may have previously passed as satisfactory.

Pipe materials and fittings shall be appropriate for the service type and as noted on the Contract Guidance Drawings.

Structural steel shall be ABS Grade A and manufactured by an ABS approved steel mill. ASTM A36 may be substituted for ABS Grade A for plate thicknesses up to and including 0.5in and section thicknesses up to and including 0.75in. All materials (including plate, shapes, welding electrodes, etc.) shall be in accordance with ABS requirements. The Contractor shall provide mill certification or ABS certification to the Owner prior to installation of the material. Certification to include origin, heat number, size of member, and quantity.

Structural aluminum shall be 5086 H116 for plate and 6061 T6 for shapes and pipe. Flat bar bay be cut from plate. The Contractor shall provide mill certification to the Owner prior to installation of the material. Certification to include origin, heat number, material series and temper, size of member, and quantity.

Brasses and bronzes shall be mixtures of virgin material of proper proportion for the purpose intended and shall be clean, smooth castings, uniform in texture and finish.

Galvanizing shall be done by the hot-dip process after hot work has been completed. Electro-galvanizing will not be accepted except for pre-manufactured items and as approved by the Owner. Where galvanizing is damaged during construction, the Contractor shall repair the galvanizing using hot stick or zinc-spray metalizing methods in accordance with ASTM A780. Zinc repairs shall be lead free.

Where fasteners, pipe, tube, sheet metal, or plates and shapes are described as being stainless steel, marine grade 300 series stainless steel shall be used in all cases. Fasteners, fluid piping, and hose fittings shall be 316 stainless steel, unless otherwise specified. Piping and materials used for exterior handrails and ladders shall be 316L stainless steel where mounted to steel structure or 6061 T6 aluminum where mounted to Aluminum superstructure, unless otherwise specified. Where stainless steel is used and wire-brushed, only non-ferrous wire brush materials shall be used.

079 Environmental Conditions The vessel shall be designed and built to operate safely and efficiently in all relevant water and weather conditions, including icy conditions. All vessel systems, structures, machinery, and outfit shall be capable of sustained operation while subjected to the pertinent static and dynamic design angles of inclination prescribed in Reference [3].

Structures not specifically addressed by the contract design or the ABS Rules, such as foundations, and equipment and machinery mounted on weather decks must be designed using standard AISC factors of safety to withstand all applicable loads, including the following:

• Wind Loading: 30lb/ft2 of projected area. Reduction of the projected area because of heel must be neglected for vertical members.

• Snow and Ice Loading: 80lb/ft2

The worst-case ambient air and sea water temperatures are as shown in Table 2.

24065-200-832-0 9

Table 2: Worst-case ambient air and sea water temperatures Parameter Units Summer Winter

Air Temperature, dry bulb °F 80 -10

Relative Humidity % 80 100

Sea Water Temperature °F 70 28

The vessel shall be designed to transit safely in 60kt winds and 12ft significant wave heights and survive wind gusts up to 100kt and 18ft significant waves.

084 Equipment Storage Equipment purchased by the Contractor for use in the construction of this vessel shall be securely warehoused by the Contractor and segregated from equipment for other projects. The equipment shall be kept in a covered, clean, dry environment and relatively constant temperature (±30° from 70° ambient). Equipment requiring special handling by its manufacturer shall be stored in accordance with the manufacturer's requirements.

The Owner shall be provided with access to stored equipment at any time upon request.

The Contractor shall adequately protect equipment from overspray of solvents, paints, impact damage, and weld or cutting materials contact while in storage and onboard. Temporary fire-resistant covers or enclosures shall be placed over all equipment where overhead or adjacent hot work is being performed.

Scaffolding or work platforms shall be placed over equipment to stand on or walk across for access to overhead or beyond. The Contractor and subcontractors shall not stand on equipment or furnishings to work overhead.

The Contractor shall immediately comply with all directives form the Owner to protect or improve protection of equipment and components from physical damage.

088 Care of Vessel During Construction The Contractor is solely responsible for the welfare of the vessel, equipment, and construction materials until vessel acceptance. The Contractor shall maintain the vessel and surrounding worksite in a manner suitable for safe, efficient construction in accordance with modern shipbuilding practice and applicable regulations. All necessary measures shall be taken to minimize and prevent wear or deterioration due to installation, testing, weather, sunlight, water, dust, or moisture during construction.

The Contractor shall ensure that frequent cleaning of the vessel during construction to remove excess debris and components and interim cleanups are performed to maintain a housekeeping standard to the approval of the Owner.

All joiner and finished surfaces, including equipment components and machinery, installed before delivery shall be protected from scuffs, damage, dirt, or debris intrusion, and paint overspray or drips by appropriate covers and shields to the approval of the Owner. Protective coverings include the use of fire blankets during welding and cutting operations, covering walkways and interior floor finishes, and covering equipment, decks, and finished surfaces with adequate protection prior to any painting in the space. The protective covers and shields shall be maintained in satisfactory order during the remainder of construction and delivery and refreshed as necessary. Any damaged or inadvertently coated finished surfaces or equipment finishes shall be restored to a like-new condition prior to delivery of the vessel.

24065-200-832-0 10

The Contractor shall remove any adhesive residue left after final removal of the protective covers or shields.

088.1 Fire Protection

During construction, flammable materials shall not be stored on board the vessel in such a manner as to create a serious fire hazard. The Contractor shall exercise special care to prevent the possible outbreak of fire and perform periodic cleaning to minimize fire hazards. A pressurized fire hose shall be available and maintained at the vessel construction site at all times.

Hot work shall comply with applicable regulations or orders of OSHA and the local fire department.

Experienced supervisors shall be present during all hot work. Gas hoses shall be pulled out of spaces when work is not in progress.

Where hot work (torch cutting, welding, and grinding) is being carried out in the vicinity of combustible material, a fire watch, whose sole purpose shall be to watch for fires and keep firefighting equipment on hand, shall be on duty. Fire watch personnel shall remain on duty in the same space where hot work was performed for a period of at least 30 minutes after cessation of hot work.

Spent or partially spent portable fire extinguishers shall be immediately replaced with fully charged extinguishers. The Contractor shall ensure that there are no open fires on or within 50ft of the vessel at all times while in custody of the Contractor.

088.2 Hull Protection

The Contractor shall maintain rigid control of welding and grounding for the protection of the hull, its systems, and appendages during the entire time the vessel is in custody of the Contractor.

091 Quality Assurance Program The Contractor shall develop and implement a comprehensive testing and quality assurance program.

Contractor shall provide a description of the plan and procedures of this plan to the Owner for approval.

The purpose of this program is to ensure that all workmanship is satisfactory, all equipment has been correctly installed, all systems are functioning properly, and all work performed by subcontractors is acceptable. The testing and quality assurance program will encompass all aspects of the vessel's construction including hull fabrication, machinery systems, piping systems, electrical systems, and outfitting.

092 Inspections During construction and at any time prior to delivery of the vessel, the Owner shall be given free access to the Contractor's facility for the purpose of inspecting work and materials. The Owner shall be granted access to the vessel at any time prior to final acceptance and will have the authority to reject any material or workmanship that does not conform to the requirements of this Specification and the Contract Plans.

093 Weight Control Program Minimizing weight growth during construction is vital to the success of this project. The Contractor shall not change the structural sizes, exceed the scantlings, or increase the pipe sizes and wall thicknesses described by this Specification and Contract Guidance Drawings unless it can be demonstrated by the Contractor to be necessary for the suitability of the vessel for its service.

24065-200-832-0 11

The Owner will revise the Contract weight estimate during the course of this construction project, based on Contractor provided information. Contractor shall promptly report any changes in weight and location of installed equipment to the owner.

Throughout the construction of the vessel on a monthly basis, the Contractor and owner shall meet to discuss the actual weight and centers of equipment and materials against the contract weight estimate.

Weight growth, changes in centers of gravity, final heel angle, and final trim angle shall be addressed and any corrective action discussed and implemented.

The Contractor is cautioned to pay close attention to the longitudinal and transverse centers of gravity of the vessel and will be responsible for additional permanent ballast if the vessel has trim or list exceeding the limits described in Section 843.3. The Contractor shall be responsible for delivering the vessel within the limit of the maximum light ship weight and operational freeboard range.

The Owner and the Contractor shall jointly conduct an informal deadweight survey at the time of launching for the purpose of establishing the as-built weight of the vessel.

Group 100 – Hull Structure

100 General This section outlines the general hull construction requirements for the vessel. This section is intended to provide requirements, along with the referenced Contract Drawings and Contract Guidance Drawings and all applicable regulations, for the Contractor's development of Detail Design packages for the vessel.

The Contractor shall be responsible for the design, detailing, and construction of all structural components of the vessel meeting the requirements of this Specification, to the satisfaction of the Owner. The Contractor shall be responsible for the vessel's integrity during construction and ensure that the completed vessel is structurally designed and constructed for its intended service, including future drydocking.

100.1 Steel Construction

The structural arrangement and scantlings reflected on the Contract and Contract Guidance Drawings have generally been developed in accordance with Reference [2].

The Contractor shall develop the Detail Design package for use in construction based on this Specification and the Contract Plans. Scantlings and structural details shall meet the requirements of Reference [2]. Scantlings indicated in this Specification and Contract Guidance Drawings that exceed the requirements of Reference [2] shall not be reduced without Owner review.

All dimensional tolerances, fit, alignment, general workmanship, and finish of new structure shall be in accordance with References [4], [5], and [6]. Where tolerance limits are indicated in both Reference [6] and this Specification, the lesser limit shall apply. Reference [6] provides "Standard" and "Limit" ranges.

For this contract, "Standard" shall define the expected range of regular work under normal circumstances. Work exceeding the "Standard" range, but within the "Limit" range may be acceptable only by Owner approval. Work exceeding the "Limit" range shall be corrected by Contractor.

The Contract Guidance Drawings referenced by this section describe primary structure and are not intended to show all structure and structural details. The Contractor shall develop detailed construction drawings and is responsible for all structure design and detailing including foundations, hangers, supports, framing, containment, enclosures, brackets, and localized stiffening that is necessary but not shown on the Contract Guidance Drawings.

24065-200-832-0 12

The thickness of plating shall be as shown on the Contract Guidance Drawings. The boundaries of differing plate thickness shall be maintained as shown. Seams and butts shall be located to suit the Contractor's standard practice, subject to Owner review. Four-way joint intersections shall be avoided.

Changes from the structure (scantlings, shapes used, arrangement, etc.) shown on the Contract Guidance Drawings will be considered but are subject to Owner review and comment prior to fabrication. All changes in scantlings must consider lightship weight, systems clearance, and other elements of the completed vessel. The Contractor is responsible for any drawings, calculations, and resolution of interferences which may be associated with changes generated by the detail design drawings or other changes proposed by the Contractor.

The Contractor shall be responsible for adding brackets, chocks, and clips as required to develop the full strength of the members shown in the Contract Guidance Drawings. Brackets, chocks, and clips shall be in accordance with Reference [2] and good marine practice.

Longitudinal strength shall be developed by maintaining continuity of longitudinal structure including the deck, side, and bottom plates and longitudinal beams and girders. Where the strength of a main structural member is impaired by cuts or interruptions in continuity, efficient means of compensation shall be fitted. The termination of longitudinal structural members shall allow for the full strength of the member to be developed and avoid hard spots and stress concentrations. End brackets of large primary structural members shall be soft-toed.

Efficient means of compensation shall be fitted where necessary to provide holes for passage of wiring, piping, or ventilation in important structural members. In general, if holes remove more than 30% of the depth of a web of a member and/or if they are unfavorably located, reinforcement will be required.

Openings in structural members shall be cut as near to the neutral axis of the combined section as possible. Opening details are subject to Owner review and approval.

Trunks and coamings in general shall be worked with corners rounded to approximately a 3in radius.

Cutouts in decks, bulkheads, and any structural member shall have radiused corners. All cutout sizes for windows, doors, and hatches are nominal; the Contractor must obtain required cutout sizes from the vendors and incorporate them in the Detail Design.

Plating for the shell, bulkheads, and decks shall meet the fairness standards in Reference [6] and this Specification, whichever is more rigorous. Care shall be taken to obtain good alignment of structural members, particularly where such members oppose each other on opposite sides of bulkheads or decks.

Misalignment exceeding the standards of References [4] and [6] shall be considered cause for rejection.

Where discontinuities of structure are unavoidable, suitable brackets or other reinforcement shall be installed and brought to the attention of the Owner for review prior to installation.

Limber and vent holes, 1 1/2in radius minimum, shall be cut as necessary to ensure proper venting and drainage of all tanks, compartments, voids, and pockets to the lowest point of the tank or compartment.

All burning of notches and holes in the structure shall be carefully laid out and shall be regular in outline with jagged edges removed and with rounded corners. Semicircular weld reliefs shall be provided in framing members in way of passing welded seams or butt welds in the attached plating.

Sharp and ragged edges or corners of structure that could cause a stress riser, injury to personnel, interference with subsequent coatings applications, or which are unsightly, shall be removed, ground smooth, or sniped. Weld spatter shall be removed or ground smooth.

24065-200-832-0 13

Use flush welds where practicable for interior and exterior deck plating. Remaining weld crown height shall not cause poor coating adhesion or cause excessive wear of deck coating in way of the weld crown.

Leveling compound may be used to improve the smoothness of a deck with permission of the Owner.

The Contractor shall break edges on all cutouts and rat holes to allow for satisfactory coating adhesion.

100.2 Aluminum Construction

Design, fitup, and welding for the aluminum assemblies indicated for this project shall be accomplished per the ABS Rules([2] and [3]), Coast Guard regulations [1], and this Specification.

The Contractor shall use efficient means of compensation to restore continuity when cuts or interruptions impair the continuous strength of a main structural member. Brackets, chocks, and collars shall be used to develop the full strength of the structural connections for the aluminum assemblies.

Fabricate and fair all structure and fair, free of distortion, and in alignment within the construction tolerances indicated in the ABS Rules [7] and Reference [6]. The Contractor's aluminum welding practices and workmanship standards shall conform to References [8] and [9].

Precisely prepare material edges for welding. Material edges shall be smooth and free of discontinuities.

Inspect and deburr all edges before welding. Wipe away all lofting and fabrication ink marks with an acetone swab, prior to welding. Weld surfaces shall be free of paint, grease, oxide film, and moisture.

Oxide films shall be cleaned within 24 hours of welding operations. Bevel angles, bevel dimensions, root dimensions, and virtual position of joining members shall be prepared as detailed in the Contractor's qualified WPS and the requirements of this Specification. Slugging is prohibited.

The Contractor shall adequately support and stiffen plate and sheet panels and modules to produce smooth finished surfaces, free of buckles, bulges, and wrinkles to the satisfaction of the Owner. The Contractor shall control heat input and welding processes to eliminate print-through on all exposed surfaces. Aluminum plates with exposed exterior surfaces and unlined interior surfaces shall be free of lüder stripes and exfoliation. Provide standard mill finish aluminum sheet and plate for assemblies expected to be coated with paint or concealed behind linings. Provide standard bright finish aluminum sheet and plate for all exposed interior assemblies.

Welded aluminum tee joints exposed to salt water or other corrosive environments shall be sealed as necessary to eliminate crevice corrosion per Section 074. Alternative methods for sealing joints may be used upon owner approval.

Temporary welds, clips, dogs, and pad-eyes installed incidental to erection shall be carefully removed and disc-abraded smooth or, where undercut or gouged, shall be welded and disc-abraded smooth to the Owner's satisfaction.

Remove oxidation and burn marks, before and after assembly, on all hand cut and machine cut parts.

Wipe away all soot and smoke on the welds and adjacent area. Remove all splatter when the joint is complete. Wire brush all welds clean when complete.

Aluminum may not be directly fastened to Steel, except in case of Detacouple (explosion bonded strip).

Aluminum must be electrically isolated from Steel to reduce bimetallic corrosion.

100.3 Fit Up and Weld Inspection

The Contractor is responsible for 100% visual inspection of all fit up and welding of the hull to the standards set forth in this Specification and to the satisfaction of the Owner. Contractor shall provide timely notice to provide Owner opportunity to attend inspections and testing.

24065-200-832-0 14

The Contractor is responsible for developing a non-destructive testing (NDT) plan for the vessel, to be submitted to the Owner for review prior to commencement of welding. The Contractor shall hire a certified weld inspector subcontractor to perform specialized NDT procedures as necessary. NDT shall be performed on a minimum of 5% of watertight and highly stressed welds. All welds shall receive visual inspection.

The Contractor will hydrostatically test tanks and test watertight hull boundaries; see Section 857 of this Specification.

Any deficiencies identified by the Contractor, third party NDT specialists, Owner, or USCG must be corrected at the Contractor's expense to the satisfaction of the party that identified the deficiency prior to application of coatings.

110 Hull Structure

110.1 Frames

The Contractor shall detail, layout, and construct transverse deck, side, and bottom frames as shown in the Contract Guidance Drawings. Frames shall be efficiently bracketed to stringers, girders, and floors where required. The offset between the molded line of each frame and the installed frame plate edge along the bottom shell, side shell, and deck shall be no more than 1/8in to either side. The as-built frame spacing between individual frames shall differ by no more than 1/4in from the molded layout dimension.

This requirement does not override the global dimensional tolerance per [6].

110.2 Girders

Longitudinal girders shall be installed as shown on the Contract Guidance Drawings. Longitudinal girders shall be bracketed on both sides of oil-tight and watertight bulkheads or slotted through watertight bulkheads and collared.

110.3 Stanchions

Stanchions shall be fitted at both the top and bottom with sole plates, and the associated girders or plating to which they are attached shall be reinforced with sufficient bracketing to provide full support.

Stanchion ends shall have 100% contact prior to welding to avoid putting weld in shear under loading.

110.4 Watertight Bulkheads

Transverse watertight bulkheads shall be located and constructed as shown on the Contract Guidance Drawings. Bulkhead scantlings shall be as shown in the Contract Guidance Drawings. Special treatment must be given to bulkheads in way of loads imposed by girders and superstructure bulkheads. The Contractor shall provide stiffeners, brackets, and chocks as required to complete the installation.

Bulkhead stiffeners shall be arranged to line up with bottom and deck longitudinal stiffeners, girders, and/or bulkheads where practicable. Where watertight bulkhead stiffeners do not align with structure, they may have unattached sniped ends.

The offset between the molded line of each frame and the installed bulkhead plate along the bottom shell, side shell, and deck may be no more than 1/8in to either side.

24065-200-832-0 15

110.5 Tanks

The Contractor must detail and install the integral tanks as described in the Contract Guidance Drawings.

Tanks are to be tested in accordance with Section 857 of this Specification. The ends of all stiffeners in integral tanks are to be provided with an end connection, either bracketed or clipped.

130 Main Deck and Bulwarks

130.1 Main Plating and Stiffening

Deck cutouts shall be compensated for with radiused corners.

Deck inserts in way of mooring equipment, not shown in the Contract Guidance Drawings, are the responsibility of the Contractor. Also see Section 180 of this Specification.

Between deck stiffening, the main deck plate shall be fair within 3/16in.

All deck stiffeners shall be of the scantlings shown on the Contract Guidance Drawings. The Contractor shall detail and install headers and other required structure in way of openings in the deck.

130.2 Bulwarks

Bulwarks shall be provided and installed as shown on the Contract Guidance Drawings. The bulwarks shall meet all regulatory requirements. The bulwark cap shall be a flanged plate at a height of 42in above the working deck level. Welding on the bulwark cap shall be ground smooth. Distortion in the curved sides and caps of the bulwarks shall be minimized by the Contractor. Except for the chocks, no opening in the bulwark shall exceed 4in across its smallest dimension.

The bulwarks shall be fitted with freeing ports in the locations shown in the Contract Guidance Drawings.

A 1/2in round bar shall be fitted around the edge of each opening, and lengths of 1/2in round bar shall be installed across the freeing ports to reduce the smaller dimension of the clear opening to no more than 4in.

Mooring ring chocks and cleats, as described in Section 582 of this Specification and the Contract Guidance Drawings, shall be installed in the bulwarks. The Contractor is responsible for strengthening the bulwarks in way of the chocks for the expected mooring loads.

Bulwark Notch Closure Plate

In way of port side skiff boarding notch, design and provide a removable aluminum closure plate that maintains the continuity of the bulwark from the main deck to the bulwark cap when inserted. Closure plate shall be designed to slot into place in channels built into forward and aft sides of notch.

This is the start of the file's text. The full file is on GovTribe.