Attachment No. 2 - Specification No. CSA 2755.pdf
PDF 13 MB Posted
- Solicitation number
- 697DCK-20-R-00241
About this file
This is a solicitation for construction services for the installation of a Fiber Optics Transmission System at San Antonio International Airport in San Antonio, Texas. Interested firms must have experience with similar projects valued between $250,000 and $500,000 and successfully completed at operational airports. Offerors must submit their proposals by April 13, 2020. The solicitation requires the standard solicitation forms, an offer guarantee of 20% of the offer amount, a price breakdown sheet, hazardous materials identification documentation, and representations and certifications. The work must be completed within 60 calendar days of the anticipated May 25, 2020 start date. The solicitation is being conducted by the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CSA 2755
08/2019
U. S. Department of Transportation Federal Aviation Administration
Southwest Region Engineering Services
SPECIFICATIONS
FIBER OPTICS INSTALLATION
SAN ANTONIO INTERNATIONAL AIRPORT
San Antonio, Texas
JCN 1705921
SECTION 4.0 SPECIFICATIONS
CSA 2755
08/2019
U. S. Department of Transportation Federal Aviation Administration
Southwest Region Engineering Services
SPECIFICATIONS
FIBER OPTICS INSTALLATION
SAN ANTONIO INTERNATIONAL AIRPORT
San Antonio, Texas
TABLE OF CONTENTS
for
FIBER OPTICS INSTALLATION
SAN ANTONIO INTERNATIONAL AIRPORT
San Antonio, Texas
Section Title
CSA 2755 TOC-1
DIVISION 1 GENERAL REQUIREMENTS
Section 01010 - Summary of Work Section 01030 - Special Provisions Section 01040 - Project Administration Section 01041 - Job Management Section 01060 - Regulatory Requirements Section 01080 - Identification Systems Section 01090 - Reference Standards Section 01300 - Submittals Section 01400 - Quality Control Section 01510 - Temporary Facilities Section 01700 - Contract Closeout Section 01710 - Cleaning
DIVISION 2 SITEWORK
Section 02053 - Existing Utility Exploration Section 02100 - Site Preparation Section 02200 - Earthwork Section 02223 - Aggregate Fill Classifications Section 02224 - Earth Fill Classifications Section 02225 - Excavating, Backfilling, and Compacting for Utilities Section 02226 - Trench Safety
DIVISION 3 CONCRETE
Section 03100 - Concrete Formwork Section 03200 - Concrete Reinforcement Section 03300 - Cast-in-Place Concrete
TABLE OF CONTENTS
for
FIBER OPTICS INSTALLATION
SAN ANTONIO INTERNATIONAL AIRPORT
San Antonio, Texas
Section Title
CSA 2755 TOC-2
DIVISION 4 MASONRY
Section 04010 - Masonry
DIVISION 7 THERMAL AND MOISTURE PROTECTION
Section 07921 - Caulking and Sealants
DIVISION 9 FINISHES
Section 09901 - Painting
DIVISION 16 ELECTRICAL
Section 16010 - General Requirements for Electrical Work Section 16111 - Conduits Section 16114 - Cable Tray Section 16131 - Terminal Boxes Section 16190 - Supporting Devices Section 16450 - Grounding Section 16890 - Fiber Optic Cable and Hardware
APPENDIX TO THE SPECIFICATIONS
Appendix A - Appendix B - Appendix C -
List of Drawings FAA Order C-1391E - Installation and Splicing of Underground Cables FAA Standard 19F – Lighting and Surge Protection, Grounding, Bonding, and Shielding Requirements for Facilities and Electronic Equipment FAA Order 5200.11 – FAA Airport Safety Management System
Fiber Optic transmission System (FOTS) Installation Handbook
Appendix D -
Appendix E -
CSA 2755 01010-1
01010 SUMMARY OF WORK
PART 1.00 GENERAL
1.01 WORK INCLUDED:
A. These specifications, along with the accompanying drawings, describe the requirements for the installation and testing of Fiber Optic Cable at SAN ANTONIO INTERNATIONAL AIRPORT, San Antonio, Texas. This includes associated electrical work, grounding, and electrical substructure as indicated by the drawings and specified herein.
B. Contractor must furnish all plant, labor, equipment and materials, supplies and transportation required to perform the work in strict accordance with the drawings and specifications.
C. The construction site is located at SAN ANTONIO INTERNATIONAL AIRPORT, San Antonio, Texas. This is an active airport and the Contractor must comply with all procedures, rules and regulations of the airport and the city of San Antonio, including limitations on equipment heights, taxiway and runway barricade requirements, traffic control, allowable work hours, and other items which will affect the contractor’s operations. Refer to FAA Order 5200.11 – Airport Safety. Refer to contract drawing SAT-D-FOTS-G002 for site location.
D. The construction site is located in an area having developed construction. Utilities are existing on, or adjacent to the site. Contractor must be responsible for locating and protecting all utilities, HYDRO-EXCAVATION must be used to expose all cables and utilities. NO HEAVY MACHINERY IS ALLOWED NEAR CABLES. Any modifications of and extensions to these utilities must be made by the Contractor as indicated on the drawings. Any damage done to utilities must be repaired by the Contractor at no expense to the government or owner.
E. The work consists of the installation, testing, and termination of approximately 3000 LF of fiber optic cable in new two-way concrete encased duct bank. Fiber Optic cable must be installed in 4 (4”) schedule 80 PVC conduits with 4 (1") inner duct from end to end to the service point as defined in the plans and placing HDPE schedule 80 under road crossings and swell crossings. Fiber Optic cables must consist of installation of two 24 strand Corning Altos double jacket/single armor cable in smooth wall innerducts within the duct banks. Cables must originate from the RTR B equipment room and be routed to RTR D. Cables must terminate at RTR D. Installation must include the placement of 3 total new AIRCRAFT RATED manholes with service loops at every manhole. Brass cable identification tags will be required at every manhole. If necessary, installed cable runs must contain no more than one splice. Other work include repairing masonry, paint, and electrical work associated with installation of conduits at building; Areas disturbed during construction must be backfilled, graded, and re-graveled. All debris hauled away from the site and site must be restored to pre-construction conditions.
F. This work must be accomplished in accordance with Specification CSA 2755 and project drawings listed in Appendix A..
CSA 2755 01010-2
1.02 RELATED WORK COVERED ELSEWHERE:
Special Provisions Section 01030 Submittals Section 01300 Temporary Facilities Section 01510
1.03 SUBMITTALS: [Not Used]
1.04 STANDARDS AND REFERENCES:
A. STANDARDS:
All FAA, Military, Federal, Industrial and other Standards, Specifications, and Codes referenced in the following Divisions form a part of this specification and are applicable to the extent specified herein.
B. APPLICABLE DRAWINGS:
All civil and electrical drawings form a part of requirements of the construction. Refer to the List of Drawings, Appendix "A" for a listing of drawings that are applicable to this Project.
1.05 WORK COMPLETION TIME:
Work must be completed within 60 calendar days of the notice to proceed. This time includes FAA holidays and moratoria, when no construction work must be performed at the site.
1.06 CONSTRUCTION COORDINATION:
All work must be coordinated with the Contracting Officer or his representative, City of San Antonio, FAA Operations and Air Traffic.
Daily and weekly construction meetings may be required by the San Antonio Airport authority or the FAA and will be mandatory for the contractor to attend. Contractor must have a representative attend meetings at no additional expense to the government.
PART 2.00 PRODUCTS
2.01 MATERIALS:
The Contractor must furnish all materials required for installation on the site as directed by the contract documents. All materials provided, including fiber optic cables, must be tested, maintained, and in FAA-approved working condition for final acceptance of the project by the government.
CSA 2755 01010-3
PART 3.00 EXECUTION
3.01 COORDINATION AND REGULATORY AUTHORITY:
The Contractor must coordinate all contacts with other governing agencies, such as airport authorities, through the FAA's designated Contracting Officer, or the Resident Engineer when such responsibility has been delegated by the Contracting Officer.
END OF SECTION
THIS PAGE IS INTENTIONALLY BLANK
CSA 2755 01030-1
01030 SPECIAL PROVISIONS
PART 1.00 GENERAL
1.01 RELATED WORK COVERED ELSEWHERE:
Submittals Section 01300 Site Preparation Section 02100
1.02 JOB CONDITIONS:
A. Contractor is hereby notified that written notification of any planned shut-down of existing facilities and/or utilities which may affect airport or FAA operations, must be provided 2 weeks in advance of such a shut-down.
B. Due to the nature of Air Traffic Operations, the Contractor is notified that, under certain conditions, he may be required to work during low peak traffic times (2300 hours to 0600 hours).
1.03 PLANS OF ACTION:
A. The Contractor must not perform any work which will require shutting down essential services, including electrical power or control power, without an approved Plan of Action.
B. The Plan of Action must consist of a typewritten report describing the construction necessary, the utilities, piping or other services that will be affected, the length of time that the service or utility will be disturbed, and the procedures to be employed by the Contractor to carry out the work in a timely manner. This plan must also include action to be taken in the case of emergencies, and an alternate plan that can be employed in the event that the original schedule can not otherwise be met. The Contracting Officer must approve the plan prior to any work being performed.
C. Shutdowns must be approved by the Contracting Officer in all circumstances, and must be scheduled in a manner to create the minimum amount of interferences with existing FAA or Airport facility operations. When shutdowns are necessary and have been approved by the Contracting Officer, Contractor must employ additional labor and must work overtime as necessary to restore the facilities to operation at the earliest possible time.
1.04 OBSTRUCTION LIGHTING AND MARKING OF SUPERSTRUCTURE:
A. When the superstructure or construction machinery reaches a height of 100-feet, temporary day marking and night lighting must be provided by the Contractor.
Temporary lighting must consist of two (2) double LED obstruction lights. The lights must be placed at the highest points of the structure and spaced as designated by the Resident Engineer. Lights must be operated by means of photocell having a manual by-pass switch. They must be operative from sunset to sunrise and at time of low visibility and as directed by the Resident Engineer.
CSA 2755 01030-2
B. Daytime marking must be provided by attaching four (4) aviation orange and white checkerboard pattern flags 36-inch square on the highest points of the construction, spaced as designated by the Resident Engineer. Day marking and night lighting must be maintained during all construction. The Contractor must provide all necessary power for the temporary obstruction lights until the building is accepted by Government.
1.05 HAZARDOUS MATERIAL CERTIFICATION:
A. Contractor must provide letters of certification for the project certifying no asbestos was used.
B. Contractor must provide letters of certification for the project certifying only lead-free paint, plumbing and flashing was used.
1.06 CONSTRUCTION LIMITS:
The contractor must confine operations, activities, storage of materials and employee parking within the areas shown on drawings SAT-D-FOTS-C001. This is mandatory and no deviations from this requirement must be allowed without written permission from the Contracting Officer.
1.07 SECURITY REQUIREMENTS:
A. PERSONNEL LIST:
Contractor must provide the Resident Engineer with a list of contractor’s personnel who will require access to the site. The list must be kept current during project work.
B. SECURITY INVESTIGATION:
Contractor’s personnel may be subject to security investigation by the FAA. Upon request by the Resident Engineer, the contractor must promptly complete all security forms provided by the Resident Engineer.
C. RIGHT TO SEARCH:
Current procedures at FAA facilities include the “right to search.” If in the judgment of the FAA, a reason to search a vehicle or person exists, such search will be made.
PART 2.00 PRODUCTS
2.01 MATERIALS:
Materials must be as specified in the various sections of these specifications. PART 3.00 EXECUTION [Not Used]
CSA 2755 01040-1
01040 PROJECT ADMINISTRATION
PART 1.00 GENERAL
1.01 WORK INCLUDED:
The Contractor must perform all administrative functions as necessary to ascertain that the work conforms to the Construction Documents.
1.02 RELATED WORK COVERED ELSEWHERE:
Summary of Work Section 01010 Special Provisions Section 01030 Job Management Section 01041 Cleaning Section 01710
1.03 SUBMITTALS: [Not Used]
1.04 STANDARDS AND REFERENCES:
A. GENERAL SERVICES ADMINISTRATION (GSA):
Fed-Std. 795 "Uniform Federal Accessibility Standards"
B. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA):
29 CFR Part 1910 "Safety and Health Standard"
1.05 JOB CONDITIONS:
A. DIVISION OF WORK:
1. No attempt has been made to divide the drawings into areas of responsibility for the various trades. It must be the Contractor's sole responsibility to divide the work among his sub-contractors, and he must be fully responsible for the coordination of any trade used on the project.
2. The division of specification into areas of similar types of work is not intended to represent a division of work between trades or sub-contractors, but merely for convenience in reading specifications or drawings. Separation of specifications into sections or representation of like work on the drawings must not make the Government an arbiter to establish subcontract limits between the Contractor, his sub-contractors or between different trades and sub-contractors.
CSA 2755 01040-2
B. SUBCONTRACTOR'S QUALIFICATIONS:
1. Any trade employed on this project must be capable of demonstrating, by written proof, his experience and ability to perform the work satisfactorily. He must have adequate manpower for the task assigned and must be financially capable of producing the assigned tasks. The General Contractor must have written proof of the qualifications of all its Subcontractors, and on request make this information available to the Contracting Officer or his representative.
1.06 GUARANTEES:
Material and equipment furnished by the various manufacturers must be warranted in writing for a period of one (1) year, or unless noted otherwise elsewhere in contract documents, or industry standard for the material specified, whichever is greater.
1.07 DRAWINGS AND SPECIFICATIONS:
A. The Government will issue four (4) sets of drawings and specifications to the Contractor.
Contractor must print any additional copies as he deems necessary for the execution of the work at no additional cost to the Government.
B. Generally the electrical drawings and any drawings relating to piping are schematic only and dimensions must be followed without regard to scale. Drawings show the general arrangement and the extent of the work. Exact location and equipment arrangement must be determined by the physical dimensions of the equipment actually furnished, by shop drawings, detailed dimensioned drawings.
1.08 PROJECT MEETINGS:
Contractor must schedule bi-weekly coordination meetings with the Contracting Officer to discuss conditions that affect the execution of the work. The Contracting Officer may invite local FAA personnel, airport officials or any representatives as deemed necessary.
Contractor must provide the location for the meetings and take minutes of these meetings and dispense to concerned individuals. Contractor must provide at the meetings a rolling three (3) week schedule.
PART 2.00 PRODUCTS [Not Used]
PART 3.00 EXECUTION
3.01 PROJECT INFORMATION REQUESTS:
Contractor must use the procedures listed herein for obtaining project information. When Contractor finds it necessary to request additional information or interpretations of the Contract Documents, he must request clarification in writing, using the forms or format determined by the Contracting Officer.
3.02 MATERIALS CONTAINING ASBESTOS:
No material or product which contains asbestos in any form may be used in this project.
CSA 2755 01040-3
3.03 LEAD FREE PAINT, PLUMBING AND FLASHING:
Only lead-free paint, plumbing and flashing may be used in this project.
3.04 NOTIFICATIONS:
Contractor must give the Contracting Officer ten (10) calendar days advance notice of the beginning of each major stage of construction. The Contractor must notify the Contracting Officer in writing ten (10) calendar days in advance of any testing required by specifications or drawings, or which is required by law, ordinance, or public authority.
Notification must state the date, time and place where such testing will be conducted.
CSA 2755 01041-1
01041 JOB MANAGEMENT
PART 1.00 GENERAL
1.01 WORK INCLUDED:
Contractor must perform the administrative job related requirements necessary for the proper conduct of the work as indicated in this section and to comply with the General Conditions.
1.02 RELATED WORK COVERED ELSEWHERE:
Project Administration Section 01040 Submittals Section 01300 Quality Control Section 01400 Temporary Facilities Section 01510
1.03 POLLUTION CONTROL:
A. Take necessary precautions to prevent contamination of soil or atmosphere by the discharge of noxious substances resulting from construction operations. Provide equipment and personnel and perform emergency measures necessary to contain any spillage.
B. If contamination of the soil does occur, excavate contaminated soil and dispose of at an off-site location. Fill resulting excavations with suitable backfill and compact to the density of the surrounding undisturbed soil.
C. Take measures to prevent dispersal of pollutants into the atmosphere. Do not dump or otherwise discharge obnoxious or harmful fluids into drains or sewers.
PART 2.00 PRODUCTS
2.01 MATERIALS:
Materials must be in accordance with the requirements of the individual sections.
PART 3.00 EXECUTION
3.01 FIELD MEASUREMENTS:
Contractor is responsible for making complete field measurements. Check all dimensions at the job site for components requiring fit to surrounding conditions. Check shop drawings and indicate the actual dimension available at all locations.
3.02 SAFETY REQUIREMENTS:
A. Contractor is solely responsible for the safety and welfare of workmen on the project and the general public around the construction site. Take precautions to adequately safeguard the safety of all persons on or near the site. Comply with the regulations of the "Occupational Safety and Health Standards", and other safety regulations.
CSA 2755 01041-2
B. Provide and maintain barricades, guard rails, covered walkways, and other protective devices necessary to warn and protect the workmen and general public from hazards at the construction site. Maintain barricades around open ditches. Provide barricades at roads and passageways at dangerous conditions. Provide flares or flashing lights at such barriers at night. All barricades and protective devices must comply with safety requirements and insurance carrier's requirements.
3.03 FIRE PROTECTION:
A. Maintain fire extinguishers at construction site in sufficient number to adequately protect the structures during construction. Provide at least one fire extinguisher at each construction office. Provide at least one fire extinguisher for welders or other trades using open flames in the execution of their work.
B. Maintain the telephone number of the local fire department. Keep number posted conspicuously near telephone.
3.04 DISRUPTION TO SERVICES:
A. Disruption to existing utilities, piping, or electrical services must be held to a minimum.
Contractor must carefully plan work in a manner that such disruptions are coordinated with the Contracting Officer. Any operation which requires shut down of some portion of the facilities operation must be in compliance with Section 01030 SPECIAL
PROVISIONS.
B. Storm sewers and sanitary sewers must be maintained in service at all times. In the event that it becomes necessary to disrupt one of the utilities, provide temporary service around the construction or otherwise construct the structure in a manner that the flow is not curtailed.
3.05 MAINTENANCE OF WATER:
A. Contractor must prepare a Storm Water Management Plan and submit to Contracting Officer for approval. After discussion and modifications, Contractor must conform to detailed outline as approved. Contractor must manage water at the job site at all times during construction, and must furnish all equipment and perform any operations required to remove water from any part of the construction area as necessary to permit the proper installation of the work. The Storm Water Management plan must contain, as a minimum, the following information:
1. SITE DESCRIPTION:
a) Project Location
b) Nature of construction Activity
c) Sequence of Major Activities
d) Estimate of Total Site Area and Disturbed Area
e) Estimate of Run-off Coefficient
f) Information on Soil Types
g) Receiving Waters
CSA 2755 01041-3
2. MEASURES AND CONTROLS:
a) Erosion and Sediment Controls
1) Structural Controls
2) Soil Stabilization
b) Storm Water Management Controls
c) Other Controls
1) Dust Control
2) Waste Disposal
3) Sanitary/Septic Facilities On Site
4) Water Source
3. IMPLEMENTATION:
a) Posting locations for the Storm Water Management Plan
b) Designated individual responsible for implementation and maintenance of Measures and Controls
c) Maintenance and Repair Schedule
B. If necessary, provide well points or any other acceptable method to remove water.
Maintain excavations entirely clear of water during installation of piping, duct banks or construction of footing. Fresh concrete must be adequately protected from injury resulting from ground water or the handling or disposal of water.
C. Contractor must direct the water away from the site in a manner that prevents re-occurrence or that causes water to run onto adjacent property. Drainage ditches must be approved by the Contracting Officer. In the event that water from this site results in flooding or other damage to adjacent property, Contractor must be responsible for repair damage or make payment to the affected land Owner.
D. Maintain ditches and embankments necessary to protect open trenches or other excavations. Provide pumps to maintain excavations free of water. In the event water table must be lowered to maintain excavations in a dry condition, Contractor must provide well points or other procedures necessary and must operate such pumps until backfill has been completed. Lower water level 2 feet below trench level.
3.06 HAUL ROUTE:
Haul route must be established by RE/local FAA, coordinated with Airport authorities and in accordance with city/county regulations. Contractor must dispose of excess earth removed from excavations and not required for backfill or embankments. Earth must be removed from the site in a reasonable time after excavation work is complete. Contractor must haul excess earth from the construction site and dispose at disposal site at no additional cost to the Government. The Contractor must provide a wheel wash for all vehicles exiting the construction site onto paved areas.
CSA 2755 01041-4
3.07 BLASTING:
No blasting will be permitted at this site.
3.08 WEATHER PROTECTION:
A. STRUCTURE:
The Contractor must provide and maintain weather protection to protect work from damage by elements.
B. WALL OPENINGS:
As required by weather conditions, temporary weather closures must be installed, maintained and subsequently removed at exterior walls, parapets, columns and roof construction. These closures must be installed at the conclusion of each working period affecting such cuts and must be maintained in weather-tight condition until work is resumed and completed. They must be subject to approval and direction of the Contracting Officer.
3.09 SLEEVES AND EQUIPMENT BASE:
A. The Contractor must furnish and install temporary watertight closures for sleeve openings below grade. Such closures must remain in place until pipe installation in sleeves is completed and made watertight.
B. The Contractor must coordinate the sizes, locations, and installation of all sleeves, curbs, pitch pockets, and equipment bases in a time and manner to avoid any hindrance to work of other trades. In the event that sleeves, inserts, and any imbedded items are to placed in concrete, the Contractor must form required openings in the work and must be held responsible for any subsequent related cutting and patching.
3.10 ORDER OF PRECEDENCE:
Contractor must coordinate work in a manner to avoid conflicts or interferences between trades and layout work in advance of installation to ascertain location of the various systems and arrangement of piping and equipment. The Contractor must be responsible to coordinate all work and take action as necessary to avoid conflicts between the works of various trades. Establish the exact locations of equipment based on actual dimensions of the items to be installed.
3.11 INITIAL MAINTENANCE:
A. All equipment must be maintained by the Contractor until the project is turned over to the Government.
CSA 2755 01060-1
01060 REGULATORY REQUIREMENTS
PART 1.00 GENERAL
1.01 CODES AND CRITERION:
All work, construction activities and material pertinent to this contract must comply with codes now in existence and the latest edition of the following:
A. Uniform Building Code
B. National Electrical Code including Uniform Administrative Code Provisions
C. Occupational Safety and Health Administration Asbestos Standards
D. National Emission Standard for Hazardous Pollutants
1.02 ENVIRONMENTAL PROTECTION:
Any other provision to the contrary notwithstanding, the Contractor, in carrying out work under this contract, must at all times comply with all applicable state and federal air and water quality standards; with all pollution control laws; and with such rules, regulations and directives as may be lawfully issued by a local, state or federal agency having within its jurisdiction the protection of the environment in the area surrounding the confines of this contract. In addition, the Contractor must comply with all directives given the Engineer in implementation of the letter and intent of FAA Advisory Circular Systems order 1320.46D 150/5370, entitled Airport Construction Controls to Prevent Air and Water Pollution.
PART 2.00 PRODUCTS [NOT USED]
PART 3.00 EXECUTION [NOT USED]
CSA 2755 01080-1
01080 IDENTIFICATION SYSTEMS
PART 1.00 GENERAL
1.01 WORK INCLUDED
Contractor must furnish labor, materials, equipment and incidentals necessary to install identifying devices for the following:
A. Electrical Equipment and Boxes B. Fiber Optic Cable
1.02 RELATED WORK COVERED ELSEWHERE:
Project Administration Section 01040 Job Management Section 01041 Submittals Section 01300 Electrical Systems Division 16000
1.03 QUALITY ASSURANCE: [Not Used]
1.04 SUBMITTALS:
Submittals must be in accordance with Section 01300, SUBMITTALS and must include:
1. Product data sheets for identifying devices
2. A list of where devices are to be installed, and the data to be included on each identifying device.
1.05 STANDARDS AND REFERENCES: [Not Used]
1.06 DELIVERY AND STORAGE:
Tags and devices must be stored inside storage sheds protected from the weather until installed.
1.07 GUARANTEES:
PART 2.00 PRODUCTS Identifying devices installed in wet locations or areas subject to moisture must be guaranteed by the manufacturer to be weather resistant for a period of one
(1) year after installation or industry standard.
CSA 2755 01080-2
2.01 MATERIALS:
A. PIPING IDENTIFICATION: [Not Used]
B. EQUIPMENT NAMEPLATE:
Engraved plastic plaque, approximately 3/4-inch x 2 1/2 inches in size. Plaque must be 1/16-inch-thick having beveled edges and drilled with two (2) mounting holes when attached by screws. Lettering must be approximately 3/16 inches high.
Text to include equipment mark and equipment description [Example: EXHAUST FAN EF-5). Identification label on nameplate must correspond to a typewritten legend included in the O&M Manual which includes the following:
1. Equipment identifier
2. Manufacturer's model number
3. Brief description of function
4. Reference to shop drawings, parts lists, or other data included in the O&M
Manual.
PART 3.00 EXECUTION
3.01 PREPARATION:
Prior to installing identification devices, install piping complete with valves in place.
Piping specified to be insulated must be covered and complete. Mount electrical components, including electrical control devices. Piping must be dry and free of oil, grease, or other contaminants. Insulation must be completely dry.
3.02 INSTALLATION:
A. Install pipe label on piping of every description exposed to view, in any location inside buildings or structures, or in underground vaults, pump stations, basements, pipe chases or other exposed locations.
B. Install a minimum of one (1) label in each area or room and additional labels at spacings not to exceed 25' feet. Position labels so that lettering is visible from the front of piping at floor level. Label size must be adequate so that lettering is legible from floor level. Where several pipes run parallel to each other, install labels in rows with uniform spacings. Where pipes continue around a corner within a room or structure, labels must be installed at each straight run which exceeds 5'-0" in length.
C. Identification text on labels must name the fluid flowing inside the pipe, and labels must be color-coded in accordance with ANSI Standards. Labels must also include an arrow indicating the direction of flow.
CSA 2755 01080-3
3.03 VALVE IDENTIFICATION: [Not Used]
3.03 EQUIPMENT IDENTIFICATION:
A. Provide an equipment identifier on each separate piece of equipment, including process equipment, HVAC equipment, plumbing equipment (other than plumbing fixtures), and electrical equipment. Provide nameplate for each separate piece of electrical equipment, including panelboards, switchgear, starters, disconnects, control devices and control panels and as identified in Section 16010 GENERAL REQUIREMENTS FOR ELECTRICAL WORK. Provide name tags for each separate switch, starter, contactor, or other compartment on electrical switchgear.
B. Lettering on nameplates must be engraved into plates and must correspond to the identifying marks. Install nameplates prominently on equipment not occurring in occupied spaces. Install nameplates on the inside covers of lighting panelboards.
Install nameplates on all other equipment centered and at the top of equipment.
Nameplates must not be installed in a location that interferes with operation of the equipment.
C. Attach nameplates to exterior equipment with two (2) 3/8" inch No. 3 round head or No. 4 sheet metal screws. Interior plaque may be attached by screws, except where fasteners are not appropriate, then use the adhesion method.
3.04 SPECIAL ELECTRICAL OUTLETS:
A. Provide a nameplate for every special electrical outlet. The nameplate must be white letters on red background, and must specify the outlet's voltage and ampere rating. The nameplate on special outlets must have an appropriate warning. Lettering must be 1/8 inch high. Overall plate size must be approximately 3/4" inch x 2 1/2" inches.
B. Provide nameplates on the following:
240 outlets: voltage and ampere rating
3.05 SCHEDULES:
A. Prepare a schedule showing equipment tags. Schedule must be typed and include each appropriate identification. Submit the schedule to the Contracting Officer for approval.
B. Marking, and color on pipe labels must conform with ANSI A13.1 and the following schedule. Pipe labels must have the full name, and an abbreviation.
PIPING STENCIL LEGEND BAND COLOR
Refrigeration Suction
CSA 2755 01080-4
Refrigeration Liquid RS
RL
Yellow Yellow
CSA 2755 01090-1
01090 REFERENCE STANDARDS
PART 1.00 GENERAL
1.01 REQUIREMENTS INCLUDED:
Abbreviations and acronyms in Contract Documents to identify reference standards.
1.02 QUALITY ASSURANCE:
A. APPLICATION:
When a standard is specified by reference, comply with requirements and recommendations stated in that standard, except when requirements are modified by the Contract Documents, or applicable codes which establish stricter standards.
B. PUBLICATION DATE:
The publication in is effect on the bid date, except when a specific publication date is specified.
1.03 ABBREVIATIONS, NAMES AND ADDRESSED OF ORGANIZATIONS:
AASHTO American Association of State Highway and Transportation Officials Washington, DC
ACI American Concrete Institute Detroit, MI
AI Asphalt Institute College Park, MD
AISC American Institute of Steel Construction New York, NY
AISI American Iron and Steel Institute Washington, DC
ANSI American National Standards Institute New York, NY
ASTM American Society for Testing and Materials Philadelphia, PA
AWWA American Water Works Association Denver, CO
AWS American Welding Society Miami, FL
CSA 2755 01090-2
CDA Copper Development Association New York, NY
CRSI Concrete Reinforcing Steel Institute Chicago, IL
FM Factory Mutual System Norwood, MA
FAA Federal Aviation Administration
FS Federal Specification General Services Administration Specifications and Consumer Information Distribution Section (WFSIS) Washington, DC
NEMA National Electrical Manufacturer’s Association Washington, DC
NFPA National Fire Protection Association Boston, MA
NSWWA National Solid Wastes Management Association Washington, DC
PCA Portland Cement Association Skokie, IL
PS Product Standard US Department of Commerce Washington, DC
SIGMA Sealed Insulating Glass Manufacturing Association Chicago, IL
UL Underwriters’ Laboratories, Inc.
Northbrook, IL
PART 2.00 PRODUCTS [NOT USED]
CSA 2755 01300-1
01300 SUBMITTALS
PART 1.00 GENERAL
1.01 WORK INCLUDED:
Contractor must furnish submittals as required by the individual sections of the specifications in accordance with this Section.
1.02 QUALITY ASSURANCE:
A. Submittals, including shop drawings, are the Contractor's sole responsibility. Carefully examine submittals to ascertain that all provisions of the specifications have been complied with.
B. Submit descriptive data, certificates, performance data, test results and other information necessary to ascertain the quality of the component and its suitability for the purpose intended. The Contractor must make, without cost to the Government, any change or adjustment in correcting work resulting from the use of such optional material or construction in conformity with the contract requirements.
1.03 SUBMITTALS:
A. Submittals must adhere to the procedures outlined herein. Submittals must be complete or they will be returned without review. Do not submit partial or incomplete information. Shop drawings are drawings, submitted to the Government by the Contractor, showing in detail (1) the proposed fabrication and assembly of structural elements, and (2) the installation (i.e., fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions of the work required by the contract.
The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.
B. Submittals must be accompanied by an original and one copy of transmittal letter which identifies the content of the submittals.
C. The Contractor must submit a minimum of four (4) sets of shop drawings and/or brochures, or other submittals. Two (2) sets of shop drawings will be returned to the Contractor.
D. Submit color charts for every item requiring color, texture or finish selection. Color charts and samples must be submitted at one time. No color will be selected until all material selections are submitted. Contractor must review the drawings and specifications, ascertain items that require color selection and submit data not less than within thirty (30) days prior to first need. Subsequent to receipt of color samples the Contracting Officer will select colors, and issue color selections for all products.
E. Contractor must submit asbestos certification letters for all materials.
CSA 2755 01300-2
1.04 SAMPLES:
A. Submit samples where indicated in the specification as requested by the Contracting Officer.
B. Submit two (2) samples whenever samples are requested. Samples will be accompanied by descriptive data, specifications and certificates where necessary.
1.05 JOB CONDITIONS:
A. Submittal data must demonstrate that the proposed material and equipment is in compliance with the design criteria and the requirements of the Contract Documents.
Submittals and shop drawings must provide a record of the materials and equipment incorporated into the project and must provide information for maintenance and repairs.
B. Contractor must coordinate all shop drawings, and review for accuracy, completeness, and compliance with contract requirements and must indicate its approval thereon as evidence of such coordination and review. The Contractor must take complete and accurate field measurements for any item which must fit to field conditions. Include these dimensions on the submittals, indicating that the measurements represent actual dimensions obtained at the site.
C. Any submittal that does not contain Contractor's approval stamp will be returned without processing. Contractor must affix a rubber stamp to each submittal stating that he has reviewed the submittal and included any necessary corrections, and is satisfied that the material contained therein is in compliance with the Contract Documents. Contractor must affix to each submittal the project identification, the sheet number of the drawing which identifies the area which the shop drawing represents and the specification paragraph identification where the item is specified. The stamp must have the following information:
Name of Project:
Contract No.
Contractor's Name.
Project No. Submittal No.
Drawing No. Spec. Ref.
This shop drawing has been reviewed and determined to be in compliance with the Contract Documents, including Plans and Specifications, as modified by Addenda, Change Orders, and Field Orders as of the date of this submittal.
Contractor's Signature: Date:
D. Contractor is responsible to coordinate the submittals between the various trades. When a proposed component requires modification to some other part of the project, the Contractor must also include the revision or modifications necessary to incorporate the proposed item.
CSA 2755 01300-3
E. The Contracting Officer will indicate approval or disapproval of the shop drawings, and if not approved as submitted, must indicate the Government's reasons therefore. Any work done before such approval must be at the Contractor's risk. Approval by the Contracting Officer must not relieve the Contractor from responsibility for any errors or omissions in such submittals, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved in accordance with below. After submittals have been approved, no substitutions will be permitted without written approval by the Contracting Officer.
1.06 SUBMITTALS DEFINITIONS:
For the purpose of defining the meaning of scheduled submittals, the following descriptions must apply:
A. Certified Test Reports (CTR) - A report prepared by an approved testing agency giving results of tests performed on products to indicate their compliance with the specifications. (Refer to Section 01400, QUALITY CONTROL).
B. Certification of Local Field Service (CLS) - A certified letter stating that field service is available from a factory or supplier approved service organization located within a 300-mile radius of the project site. List names, addresses, and telephone numbers of approved service organizations on or attach to the certificate.
C. Extended Service Agreement (ESA) - A contract to provide maintenance beyond that required to fulfill requirements for warranty repairs, or to perform routine maintenance for a definite period of time beyond the warranty period. Issue the service agreement in the name of the Owner.
D. Certification of Adequacy of Design (CAD) - A certified letter from the manufacturer of the equipment stating that they have designed the equipment to be structurally stable and to withstand all imposed loads without deformation, failure, or adverse effects to the performance and operational requirements of the unit. The letter must state the mechanical and electrical equipment is adequately sized to be fully operational for the conditions specified or normally encountered by the product's intended use.
E. Certification of Applicator/Subcontractor (CSQ) - A certified letter stating that the Applicator or Subcontractor proposed to perform a specified function is duly designated as factory authorized and trained for the application of the specified product.
F. Record Data (RD) - General information including character, style and product data sheets, wiring diagrams, and other data normally available as published material by manufacturer.
G. Equipment Installation Report (EIR) - A report by the manufacturer's representative, or installed stating that equipment has been installed in accordance with manufacturer's requirements and has been operated or otherwise tested and found to fulfill the requirements of the Contract Documents, and functions properly. Include copies of Test Report Forms as required by the Contracting Officer.
CSA 2755 01300-4
H. Shop drawings: As used in this section, drawings, schedules, diagrams, and other data prepared specifically for this Contract, by the Contractor or through the Contractor by way of a subcontractor, manufacturer, supplier, distributor, or other lower tier contractor, to illustrate a portion of the work.
I. Product data: Preprinted material such as illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer's descriptive literature, catalog data, and other data to illustrate a portion of the work, but not prepared exclusively for this Contract.
J. Samples: Physical examples of products, materials, equipment, assemblies, or workmanship that are physically identical to a portion of the work, illustrating a portion of the work or establishing standards for evaluating the appearance of the finished work or both.
K. Administrative submittals: Data presented for reviews and approval to ensure that the administrative requirements of the project are adequately met but not to ensure directly that the work is in accordance with the design concept and in compliance with the Contract documents.
1.07 SUBMITTAL CLASSIFICATION:
Submittals are classified as follows:
A. GOVERNMENT APPROVED:
Governmental approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer. Within the terms of the Contract Clause entitled "Specifications and Drawings for Construction," they are considered to be "shop drawings."
B. INFORMATION ONLY:
All submittals not requiring Government approval will be for information only. They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.08 APPROVED SUBMITTALS:
The Contracting Officer's approval of submittals must not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory. Approval will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work. After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
CSA 2755 01300-5
1.09 DISAPPROVED SUBMITTALS:
The Contractor must make all corrections required by the Contracting Officer and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal.
If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, a notice in accordance with the Contract Clause "Changes" must be given promptly to the Contracting Officer.
1.10 WITHHOLDING OF PAYMENT:
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
1.11 CONTRACTOR’S RESPONSIBILITIES:
A. Determine and verify field measurements, materials, field construction criteria; review each submittal; and check and coordinate each submittal with requirements of the work and Contract documents.
B. Transmit submittals to the Government in orderly sequence, in accordance with the Submittal Register, and to prevent delays in the work, delays to the Government, or delays to separate contractors.
C. Advise the Contracting Officer of variation, as required by the paragraph entitled "Variations."
D. Correct and resubmit submittal as directed by the approving authority. When resubmitting disapproved transmittals or transmittals noted for resubmittal, the Contractor must provide a copy of that previously submitted transmittal including all reviewer comments for use by the approving authority. Direct specific attention, in writing or on resubmitted submittal, to revisions not requested by the approving authority on previous submissions.
E. Furnish additional copies of submittals when requested by the Contracting Officer, to a limit of 20 copies per submittals.
F. Complete work which must be accomplished as a basis of a submittal in time to allow the submittal to occur as scheduled.
G. Ensure no work has begun until submittals for that work have been returned as "approved," or "approved as noted" [or "approved except as noted; resubmission not required"], except to the extent that a portion of the work must be accomplished as a basis of the submittal.
1.12 GOVERNMENT’S RESPONSIBILITIES:
The Government will:
A. Note the date on which the submittal was received from the Contractor, on each submittal.
B. Review submittals for approval within the scheduling period specified and only for conformance with project design concepts and compliance with the Contract documents.
CSA 2755 01300-6
C. Identify returned submittals with one of the actions defined in the paragraph entitled "Actions Possible" and with markings appropriate for the action indicated.
1. Actions Possible - Submittals will be returned with one of the following notations:
a) Submittals marked "approved as submitted" authorize the Contractor to proceed with the work covered.
b) Submittals marked "approved as noted" authorize the Contractor to proceed with the work as noted provided the Contractor takes no exception to the notations.
c) Submittals marked "disapproved" indicate the submittal is incomplete or does not comply with the design concept or the requirements of the Contract documents and must be resubmitted with appropriate changes.
No work must proceed for this item until the resubmittal is approved.
1.13 FORMAT OF SUBMITTALS:
A. TRANSMITTAL FORM:
Transmit each submittal, except sample installations and sample panels, to the office of the approving authority. Transmit submittals with a transmittal form prescribed by the Contracting Officer and standard for the project. The transmittal form must identify the Contractor, indicate the date of the submittal, and include information prescribed by the transmittal form and required in the paragraph entitled "Identifying Submittals." Process transmittal forms to record actions regarding sample panels and sample installations.
B. IDENTIFYING SUBMITTALS:
Identify submittals, except sample panel and sample installation, with the following information permanently adhered to or noted on each separate component of each submittal and noted on the transmittal form. Mark each copy of each submittal identically, with the following:
1. Project title and location.
2. Construction Contract number.
3. The section number of the specification section by which the submittal is required.
4. The submittal description (SD) number of each component of the submittal.
5. When a resubmission, an alphabetic suffix on the submittal description, for example, 10A, to indicate the resubmission.
6. The name, address, and telephone number of the subcontractor, supplier, manufacturer and any other second tier contractor associated with the submittal.
7. Product identification and location in project.
CSA 2755 01300-7
8. SALIENT CHARACTERISTICS must BE HIGHLIGHTED (BUBBLE, UNDERLINING, POINTER, COLOR, ETC...) FOR READILY AND
QUICK INDENTIFICTION FOR APPROVAL.
C. FORMAT FOR PRODUCT DATA:
1. Present product data submittals for each section as a complete, bound volume.
Include a table of contents listing page and catalog item numbers for product data.
2. Indicate, by prominent notation, each product which is being submitted; indicate the specification section number and paragraph number to which it pertains.
3. Supplement product data with material prepared for the project to satisfy submittal requirements for which product data does not exist. Identify this material as developed specifically for the project.
CI. FORMAT FOR SHOP DRAWINGS:
1. Shop drawings must not be less than A4 (297 x 210 mm) (8 1/2 by 11 inches) nor more than AO (1189 x 841 mm) (30 x 42 inches).
2. Present A4 (297 x 210 mm) (8 1/2 x 11 inches) sized shop drawings as a part of the bound volume for the submittals required by the section. Present larger drawings in sets.
3. Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to the information required in the paragraph entitled "Identifying Submittals."
4. Dimension drawings, except diagrams and schematic drawings; prepare drawings demonstrating interface with other trades to scale. Identify materials and products for work shown.
CII. FORMAT OF SAMPLES:
1. Furnish samples in the sizes below, unless otherwise specified or unless the manufacturer has prepackaged samples of approximately the same size as specified:
a) Sample of Equipment or Device: Full size.
b) Sample of Materials Less Than 2 by 3 inches: Built up to A4 8 1/2 by 11 inches.
c) Sample of Materials Exceeding A4 8 1/2 by 11 inches: Cut down to A4 (8 1/2 by 11 inches and adequate to indicate color, texture, and material variations.
d) Sample of Linear Devices or Materials: 10-inch length or length to be supplied, if less than 10 inches. Examples of linear devices or materials are conduit and handrails.
CSA 2755 01300-8
e) Sample of Non-Solid Materials: Pint. Examples of non-solid materials are sand and paint.
f) Color Selection Samples: 2 inches by 4 inches.
g) Sample Panel: 4 by 4 feet.
h)…