View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 12443923R0004 Daniel Boone National Forest IDIQ Road Maintenance Attachment No. 1

Daniel Boone N.F. IDIQ Road Maintenance

Schedule of Items – Cumberland District

Item No. Supplies/Services Unit Unit Price

Base Year

Option Year 1

Option Year 2

Option Year 3

Option Year 4

807(1) Excavator Hour

807(2) Backhoe Hour

807(3) Grader Hour

807(4) Crawler Tractor (Bulldozer) Hour

807(5) Dump Truck Day

807(6) Roller Day

807(7) Jumping Jack Day

811(1) Surface Maintenance Level 4 & 5 roads

Mile

811(2) Surface Maintenance Level 3 roads

811(3) Surface Maintenance Level 2

813(1) Spot Surfacing, Gradation per

KTC

Ton

814(1) Patching - Full-Depth Ton

814(2) Patching - Deep Ton

814(3) Patching - Thin Surface Ton

814(4) Patching - Cold Weather/Emergency

814(5) Sealing - Crack LF

814(6) Paved Surface Cleaning (Single Lane)

814(7) Paved Surface Cleaning (Double Lane)

832(1) Load, Haul, and Place Material Ton-

832(2) Load, Haul, and Place Material CY-Mile

833(1) 18-inch Aluminized Corrugated Metal Pipe

LF

833(2) 24-inch Aluminized Corrugated

833(3) Culvert Removal Each

833(4) Water-bar Installation Each

833(5) Water-bar Removal Each

833(6) Cross Ditch Installation Each

833(7) Cross Ditch Removal Each

833(8) Drivable Grade Dip Installation Each

834(1) Clean Ditches Mile

834(2) Clean & Recondition Culverts 24-in diameter and under

Each

834(3) Clean & Recondition Culverts Over 24-in through 48-in diameter

834(4) Clean & Recondition Culverts Over 48-in diameter

841(01) Establish vegetation Acres

841(02) Establish vegetation Mile

842(03) Establish vegetation Lump Sum

851(1) Brushing (ML 3-5) Mile

851(2) Brushing (ML 2) Mile

851(3) Danger Tree Removal Each

851(4) Hazard or Obstruction Removal Each

861(1) Maintain traffic gate Each

861(2) Remove gate Each

872(1) Install or Replace Single Post and Sign

Each

872(2) Install or Replace Double Post and Sign

872(3) Install or Replace Sign Each

872(4) Remove Sign Each

872(5) Remount Sign Each

872(6) Replace Marker Each

881(1) Mobilization Each

881(2) Equipment Moving Miles

Schedule of Items – London District

Year

Option Year 1

Option Year 2

Option Year 3

Option

807(2) Backhoe Hour

807(3) Grader Hour

807(4) Crawler Tractor (Bulldozer) Hour

807(5) Dump Truck Day

807(6) Roller Day

841(03) Establish vegetation Lump

861(2) Remove gate Each

872(1) Install or Replace Single Post and Sign

Each

872(2) Install or Replace Double Post and Sign

Schedule of Items – Stearns District

Year

Option Year 1

Option Year 2

Option Year 3

Option

807(2) Backhoe Hour

807(3) Grader Hour

807(4) Crawler Tractor (Bulldozer) Hour

807(5) Dump Truck Day

807(6) Roller Day

861(2) Remove gate Each

872(1) Install or Replace Single Post and Sign

Each

872(2) Install or Replace Double Post and Sign

Schedule of Items – Redbird District

Year

Option Year 1

Option Year 2

Option Year 3

Option

807(2) Backhoe Hour

807(3) Grader Hour

807(4) Crawler Tractor (Bulldozer) Hour

807(5) Dump Truck Day

807(6) Roller Day

861(2) Remove gate Each

872(1) Install or Replace Single Post and Sign

Each

872(2) Install or Replace Double Post and Sign

File details come from the government source that posted it. Updated .