Attachment No. 1 Schedule of Items.pdf
PDF 541 KB Posted
- Solicitation number
- 12443923R0004
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 12443923R0004 Daniel Boone National Forest IDIQ Road Maintenance Attachment No. 1
Daniel Boone N.F. IDIQ Road Maintenance
Schedule of Items – Cumberland District
Item No. Supplies/Services Unit Unit Price
Base Year
Option Year 1
Option Year 2
Option Year 3
Option Year 4
807(1) Excavator Hour
807(2) Backhoe Hour
807(3) Grader Hour
807(4) Crawler Tractor (Bulldozer) Hour
807(5) Dump Truck Day
807(6) Roller Day
807(7) Jumping Jack Day
811(1) Surface Maintenance Level 4 & 5 roads
Mile
811(2) Surface Maintenance Level 3 roads
811(3) Surface Maintenance Level 2
813(1) Spot Surfacing, Gradation per
KTC
Ton
814(1) Patching - Full-Depth Ton
814(2) Patching - Deep Ton
814(3) Patching - Thin Surface Ton
814(4) Patching - Cold Weather/Emergency
814(5) Sealing - Crack LF
814(6) Paved Surface Cleaning (Single Lane)
814(7) Paved Surface Cleaning (Double Lane)
832(1) Load, Haul, and Place Material Ton-
832(2) Load, Haul, and Place Material CY-Mile
833(1) 18-inch Aluminized Corrugated Metal Pipe
LF
833(2) 24-inch Aluminized Corrugated
833(3) Culvert Removal Each
833(4) Water-bar Installation Each
833(5) Water-bar Removal Each
833(6) Cross Ditch Installation Each
833(7) Cross Ditch Removal Each
833(8) Drivable Grade Dip Installation Each
834(1) Clean Ditches Mile
834(2) Clean & Recondition Culverts 24-in diameter and under
Each
834(3) Clean & Recondition Culverts Over 24-in through 48-in diameter
834(4) Clean & Recondition Culverts Over 48-in diameter
841(01) Establish vegetation Acres
841(02) Establish vegetation Mile
842(03) Establish vegetation Lump Sum
851(1) Brushing (ML 3-5) Mile
851(2) Brushing (ML 2) Mile
851(3) Danger Tree Removal Each
851(4) Hazard or Obstruction Removal Each
861(1) Maintain traffic gate Each
861(2) Remove gate Each
872(1) Install or Replace Single Post and Sign
Each
872(2) Install or Replace Double Post and Sign
872(3) Install or Replace Sign Each
872(4) Remove Sign Each
872(5) Remount Sign Each
872(6) Replace Marker Each
881(1) Mobilization Each
881(2) Equipment Moving Miles
Schedule of Items – London District
Year
Option Year 1
Option Year 2
Option Year 3
Option
807(2) Backhoe Hour
807(3) Grader Hour
807(4) Crawler Tractor (Bulldozer) Hour
807(5) Dump Truck Day
807(6) Roller Day
841(03) Establish vegetation Lump
861(2) Remove gate Each
872(1) Install or Replace Single Post and Sign
Each
872(2) Install or Replace Double Post and Sign
Schedule of Items – Stearns District
Year
Option Year 1
Option Year 2
Option Year 3
Option
807(2) Backhoe Hour
807(3) Grader Hour
807(4) Crawler Tractor (Bulldozer) Hour
807(5) Dump Truck Day
807(6) Roller Day
861(2) Remove gate Each
872(1) Install or Replace Single Post and Sign
Each
872(2) Install or Replace Double Post and Sign
Schedule of Items – Redbird District
Year
Option Year 1
Option Year 2
Option Year 3
Option
807(2) Backhoe Hour
807(3) Grader Hour
807(4) Crawler Tractor (Bulldozer) Hour
807(5) Dump Truck Day
807(6) Roller Day
861(2) Remove gate Each
872(1) Install or Replace Single Post and Sign
Each
872(2) Install or Replace Double Post and Sign
File details come from the government source that posted it. Updated .