ATTACHMENT - MSGR DRAWINGS.pdf
PDF 1 MB Posted
- Solicitation number
- 72066824Q00031
About this file
This document appears to be a set of technical drawings and specifications for the renovation and repair of the Marine Security Guard Residence (MSGR) at the US Embassy Residential Compound in Juba, South Sudan. The key details are:
The scope of work includes repairing existing interior non-bearing walls exhibiting large cracks using a ferrocement jacketing method. The work involves removing existing plaster, installing temporary bracing, preparing masonry surfaces, installing welded wire mesh, and applying ferrocement grout. Ancillary work includes protecting existing furniture/surfaces, controlling dust, and restoring the site. The contractor must obtain required permits, coordinate with the owner, and perform all work in accordance with relevant codes and standards.
This document is referenced in Solicitation Number 72066824Q00031 issued by USAID South Sudan to procure services for the renovation and repair of the MSGR. The solicitation seeks a contractor to execute the scope of work detailed in these drawings and specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOL 72066824Q00031 - MSGR REPAIRlp.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES
MARINE SECURITY GUARD RESIDENCE
US RESIDENTIAL COMPOUND, JUBA, SOUTH SUDAN
PROJECT
MARINE SECURITY GUARD RESIDENCE
(MSGR)
US RESIDENTIAL COMPOUND
JUBA, SOUTH SUDAN
FUNDER
USAID/SOUTH SUDAN
US EMBASSY COMPOUND
JUBA, SOUTH SUDAN
EMAIL: BAHROBAR@USAID.GOV
CONTACT: BAHRO BAR
STRUCTURAL ENGINEER
GREEN POWERED TECHNOLOGY
1310 N. COURTHOUSE RD, SUITE 610
ARLINGTON, VA 22201
EMAIL: MSISUL@GREENPWRD.COM
CONTACT: MATTHEW SISUL, P.E.
BUILDING CODES
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL EXISTING
BUILDING CODE
CLASSIFICATION OF WORK
REPAIR
CONSTRUCTION TYPE
TYPE II B
OCCUPANCY
R-2
PROJECT DATAPROJECT DIRECTORY
KEY PLAN
THE INTENT OF THIS PROJECT IS TO REPAIR EXISTING INTERIOR NONBEARING WALLS
EXHIBITING LARGE CRACKS. THE REPAIR METHOD IS FERROCEMENT JACKETING.
PROVIDE TEMPORARY LATERAL BRACING FOR THE INTERIOR NONBEARING WALLS
DURING REMOVAL OF EXISTING PLASTER AND INSTALLATION OF FERROCEMENT
JACKETING. TEMPORARILY REMOVE EXISTING CONDUIT AND FIXTURES WITHIN WORK
AREA. PROVIDE TEMPORARY SHORING OF CEILING UNDER ROOF TRUSSES WHERE
TRUSSES INCIDENTALLY BEAR ON INTERIOR WALLS BEING REPAIRED. THE
CONTRACTOR'S WORK SCOPE WILL INCLUDE, BUT WILL NOT BE LIMITED TO,
MOBILIZATION, PROTECTION OF EXISTING AREAS, DUST CONTROL, SHORING, PLASTER
REMOVAL, FERROCEMENT JACKETING, PAINTING, AND CLEANING.
ABBREVIATED SCOPE OF WORK
SCOPE OF WORK
THE INTENT OF THIS PROJECT IS TO REPAIR EXISTING
INTERIOR NONBEARING WALLS EXHIBITING LARGE CRACKS
AT THE MSGR. THE REPAIR METHOD IS FERROCEMENT
JACKETING. SEVEN MAJOR CRACKS WERE IDENTIFIED IN THE
SOUTHWEST SECTION OF THE BUILDING, IN THE COMMON
AREA, BEDROOM 1, PANTRY AND HALLWAYS CONNECTING
COMMON AREA WITH KITCHEN AND PANTRY. THE
CONTRACTOR'S WORK SCOPE WILL INCLUDE, BUT WILL NOT
NECESSARILY BE LIMITED TO THE FOLLOWING:
1. OBTAIN ALL RELEVANT THE BUILDING PERMIT ISSUED BY
THE US EMBASSY AND COMPLY WITH ALL APPLICABLE
LOCAL, NATIONAL, AND UNITED STATES CODES,
STANDARDS, AND REGULATIONS.
2. ESTABLISH AND MAINTAIN A SAFE CONSTRUCTION SITE
FOR WORKERS, AND FOR RESIDENTS AND GUESTS AT
THE PROPERTY.
3. VERIFY ALL INFORMATION PROVIDED IN THIS SET OF
DRAWINGS PRIOR TO STARTING WORK; REQUEST
CLARIFICATION AS NEEDED AND NOTIFY THE ENGINEER
OF ANY DISCREPANCIES.
4. INSTALL PROTECTIVE COVERINGS ON ALL FURNITURE,
WINDOWS, AND INTERIOR ELEMENTS AS WELL AS DUST
PROTECTION.
5. INSTALL BRACING AND SHORING ADJACENT TO
AFFECTED AREAS.
6. PREPARE SURFACES OF EXISTING MASONRY WALLS,
SAWCUT PLASTER AT EXTENTS OF WORK, REMOVE
PLASTER TO SURFACE OF MASONRY USING HAND
TOOLS.
7. CLEAN AND PREPARE MASONRY SURFACES
8. INSTALL FERROCEMENT JACKETING COMPRISING
WELDED WIRE MESH AFFIXED TO MASONRY WITH
MASONRY ANCHORS AND WASHERS. PLACE PLASTER
OVER MESH.
9. CLEAN AND PAINT ALL NEW PLASTER TO MATCH
EXISTING.
10. REMOVE EXCESS MATERIALS AND RESTORE THE SITE TO
ITS PRE-CONSTRUCTION CONDITION.
GENERAL NOTES
1. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
CONSTRUCTION SITE SAFETY, AS WELL AS THE MEANS
AND METHODS OF CONSTRUCTION, INCLUDING
TEMPORARY SHORING (AS REQUIRED).
2. THESE PLANS AND DETAILS WERE DEVELOPED FROM
LIMITED PROJECT SITE OBSERVATIONS. THE
CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND
NOTIFY THE ENGINEER OF ANY SIGNIFICANT
DISCREPANCIES BETWEEN THE CONSTRUCTION
DRAWINGS AND AS-BUILT CONDITIONS.
3. WHERE INDICATED, PLANS AND DETAILS ARE PROVIDED
FOR REFERENCE ONLY TO IDENTIFY LOCATIONS/SCOPES
OF WORK.
4. DETAIL CALL-OUTS ARE TYPICAL. WHAT IS SHOWN OR
REFERENCED TO AT A GIVEN LOCATION SHALL BE
PROVIDED AS THOUGH SHOWN THROUGHOUT UNLESS
OTHERWISE NOTED.
5. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS
GOVERN. IN CASE OF A CONFLICT, THE CONTRACTOR
SHALL NOTIFY THE ENGINEER.
6. ALL WORK SHALL CONFORM TO THE CONTRACT
DOCUMENTS, WHICH INCLUDE THE DRAWINGS AND ALL
ADDENDUMS OR MODIFICATIONS ISSUED BY THE
ENGINEER.
7. PERFORM ALL WORK IN ACCORDANCE WITH INDUSTRY
STANDARDS, MANUFACTURER REQUIREMENTS, CODES,
LAWS, ORDINANCES, RULES AND REGULATIONS OF
PUBLIC AUTHORITIES GOVERNING THE WORK. IN CASE
OF DISCREPANCIES, THE CONTRACTOR SHALL NOTIFY
THE ENGINEER BEFORE PROCEEDING.
8. THE CONTRACTOR SHALL VISIT THE PROJECT SITE AND
BE ACQUAINTED WITH ALL CONDITIONS RELATING TO
THE CONSTRUCTION OF THE PROJECT. THE
CONTRACTOR SHALL OBTAIN ALL FIELD MEASUREMENTS
REQUIRED FOR THE ACCURATE FABRICATION AND
INSTALLATION OF THE WORK.
9. THE CONTRACTOR SHALL EXAMINE, READ, AND BE
THOROUGHLY FAMILIAR WITH THE CONSTRUCTION
DOCUMENTS. SHOULD THE CONTRACTOR FIND
DISCREPANCIES OR OMISSIONS IN THE DRAWINGS
AND/OR NOTES, OR SHOULD THE CONTRACTOR BE IN
DOUBT AS TO THE INTENT OR MEANING OF ANY PARTS
OF THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR
SHALL REQUEST CLARIFICATION FROM THE ENGINEER
PRIOR TO PERFORMING THE WORK IN QUESTION.
10. THE CONTRACTOR SHALL SUBMIT REQUESTS FOR
SUBSTITUTIONS, REVISIONS, OR CHANGES TO THE
ENGINEER FOR REVIEW AND ACCEPTANCE PRIOR TO
PURCHASE, FABRICATION OR INSTALLATION.
11. THE CONTRACTOR SHALL OBTAIN ALL PERMITS AND
INSPECTIONS REQUIRED BY PUBLIC AUTHORITIES
GOVERNING THE WORK.
12. ALL WORK SHALL BE PERFORMED IN A SAFE AND
ORDERLY MANNER WITHOUT DAMAGE TO OTHER PARTS
OF THE PREMISES AND/OR ADJACENT PROPERTIES.
DAMAGE OR LOSS SHALL BE CORRECTED AND/OR
REPLACED BY THE CONTRACTOR AT NO COST TO THE
OWNER.
13. THE CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL
AND TEMPORARY BARRICADES AS REQUIRED DURING
CONSTRUCTION WHEN ROADWAYS AND/OR
RIGHT-OF-WAYS ARE BLOCKED DUE TO THE WORK. THE
CONTRACTOR SHALL MINIMIZE DISRUPTION TO TRAFFIC
FLOW FOR VEHICLES AND MAINTAIN SAFETY FOR
PEDESTRIANS AT THE PROJECT SITE.
14. THE CONTRACTOR SHALL COORDINATE WORK WITH THE
OWNER AND PROPERTY MANAGER, INCLUDING
SCHEDULING TIMES AND LOCATIONS FOR DELIVERIES,
BUILDING ACCESS, USE OF ELECTRICITY, AND USE OF
WATER. MINIMIZE DISTURBANCE OF BUILDING
FUNCTIONS AND OCCUPANTS.
15. WORK AREAS SHALL REMAIN SECURE THROUGHOUT
CONSTRUCTION. THE CONTRACTOR SHALL COORDINATE
WITH THE OWNER TO ENSURE SECURITY.
16. MAINTAIN EGRESS AND ACCESS TO THE PROPERTY IN
ACCORDANCE WITH CODES AND ORDINANCES.
17. THE SCOPE OF WORK OF THESE REPAIR DRAWINGS ARE
LIMITED TO THE AREAS AND CONDITIONS SHOWN, AND
SHALL NOT BE USED BEYOND ITS SPECIFIED PURPOSE.
18. INSTRUCTIONS FOR ACCESS TO SITE CAN BE FOUND IN
THE CONTRACTOR'S STATEMENT OF WORK.
19. CONTRACTOR TO PROVIDE PROTECTION OF EXISTING
FURNITURE AND SURFACES.
20. CONTRACTOR TO LIMIT DUST AND DEBRIS FROM ALL
PLASTER REMOVAL OPERATIONS BY USE OF BARRIERS
AND OTHER MEANS.
21. ALL MATERIALS STORED ON SITE ARE THE
RESPONSIBILITY OF THE CONTRACTOR. THE OWNER
WILL IDENTIFY LAYDOWN AREAS FOR THE
CONTRACTORS USE, HOWEVER, PROTECTION AND
SECURITY OF THE STORED MATERIAL IS THE
RESPONSIBILITY OF THE CONTRACTOR.
FERROCEMENT CONCRETE
1. ALL CONCRETE WORK SHALL COMPLY WITH "ACI 301:
SPECIFICATIONS FOR STRUCTURAL CONCRETE" LATEST
EDITION.
2. ALL CONCRETE REINFORCEMENT SHALL BE DETAILED,
FABRICATED, LABELED, SUPPORTED AND SPACED IN
FORMS AND SECURED IN PLACE IN ACCORDANCE WITH
THE PROCEDURES AND REQUIREMENTS OUTLINED IN
THE LATEST EDITION OF "ACI 318: BUILDING CODE
REQUIREMENTS FOR STRUCTURAL CONCRETE AND
COMMENTARY" AND 'SP-66: ACI DETAILING MANUAL."
3. UNLESS OTHERWISE NOTED, ALL CONCRETE SHALL BE
FERROCEMENT CONCRETE WITHOUT COARSE
AGGREGATE HAVING A MINIMUM ULTIMATE
COMPRESSIVE STRENGTH OF 2800 PSI AT 28 DAYS. THE
CONTRACTOR MAY BASE THEIR MIX DESIGN ON TYPE M
MORTAR WITH A RATIO OF CEMENT TO SAND TO BE 1:3.
4. CEMENT SHALL BE PORTLAND TYPE I OR SIMILAR.
5. THE MAXIMUM WATER CEMENT RATIO OF ALL CONCRETE
SHALL BE 0.4, U.N.O.
6. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A1064.
DEVELOPMENT LENGTHS OF REINFORCING (Ld, Ldh, OR Lda) SHALL BE DETERMINED IN ACCORDANCE WITH THE
REQUIREMENTS OF ACI 318, CHAPTER 12.
7. ALL MESH SUPPORTS SHALL BE GALVANIZED 10 X 75
STRONG-TIE TITEN HD SCREW ANCHOR, ZINC, OR
SIMILAR OR GRADE 55 ANCHOR. WASHERS 10 X 25 ASTM
F436.
8. REINFORCING MESH SHALL HAVE A MINIMUM CLEAR
COVER OF 10 AGAINST MASONRY AND 40 OUTSIDE FACE.
9. ALL REINFORCING SHALL BE HELD RIGIDLY AND
ACCURATELY IN PLACE, AND PROTECTED AGAINST
DISPLACEMENT BEFORE AND DURING PLACEMENT.
10. PRIOR TO THE START OF WORK, THE CONCRETE
CONTRACTOR SHALL COORDINATE AND DETERMINE
WITH THE OWNER ALL DIMENSIONS AND LOCATIONS OF
OPENINGS, ELECTRICAL CONDUIT, AND OTHER SIMILAR
ITEMS.
11. IF PIPES OR CONDUITS ARE TO BE REPLACED IN WALLS
THE GENERAL CONTRACTOR OR CONSTRUCTION
MANAGER, PRIOR TO THE START OF WORK, SHALL
SUBMIT TO THE ENGINEER FOR APPROVAL DRAWINGS
SHOWING THE SIZE, LOCATION (VERTICALLY AND
HORIZONTALLY) AND SPACING OF PIPES AND/OR
CONDUITS.
S-001 GENERAL NOTES
S-100 PLAN
S-300 ELEVATIONS
S-301 DETAIL
DRAWING INDEX
S-100
A B C
INFRASTRUCTURE FIELD SUPPORT II:
WORK ASSIGNMENT 03: SOUTH SUDAN
MARINE SECURITY GUARD RESIDENCE
100% DESIGN - CONSTRUCTION DOCUMENTS
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME:
REMARKS JANUARY 31, 2024
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
GENERAL NOTES
S-001
INFRASTRUCTURE FIELD SUPPORT II:WORK ASSIGNMENT 03: SOUTH SUDANMARINE SECURITY GUARD RESIDENCE 100% DESIGN - CONSTRUCTION DOCUMENTSDRAWING NO.REV.NO.DATE DRWNCHKD
DESIGNED BY:DRAWN BY:CROSS CHK'D BY:APPROVED BY:DATE:SHEET CHK'D BY: PROJECT NO.FILE NAME:REMARKS JANUARY 31, 2024 1310 N Courthouse Rd, Ste 610Arlington, VA 22201Ph: +1 703 829 6133
INFRASTRUCTURE FIELD SUPPORT II:WORK ASSIGNMENT 03: SOUTH SUDANMARINE SECURITY GUARD RESIDENCE 100% DESIGN - CONSTRUCTION DOCUMENTSDRAWING NO.REV.NO. DATE DRWNCHKD
DESIGNED BY:DRAWN BY:CROSS CHK'D BY:APPROVED BY:DATE:SHEET CHK'D BY: PROJECT NO.FILE NAME:REMARKS JANUARY 31, 2024 1310 N Courthouse Rd, Ste 610Arlington, VA 22201Ph: +1 703 829 6133
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
COMMON
AREA
BEDROOM 1
STORE
HALLWAY
HALLWAY
STORE
STORE
HALLWAY
A B
800 8001450570
1400740
S-300
S-300
S-300
S-300
KEY NOTES
1. INDICATES AREA OF VERTICAL FERROCEMENT JACKETING FROM
BOTTOM OF FLOOR TO CEILING ON EITHER SIDE OF WALL, EXCEPT
WHERE HEAVY ELECTRICAL CONDUIT IS FIXED IN PLACE.
2. INDICATES AREA OF VERTICAL FERROCEMENT JACKETING FROM
BOTTOM OF FLOOR TO CEILING ON SINGLE SIDE OF WALL. LIMIT
HEIGHT OF WORK TO BELOW WHERE HEAVY ELECTRICAL CONDUIT IS
FIXED IN PLACE. PROVIDE CONTINUOUS REINFORCEMENT AROUND
CORNERS.
3. ININDICATES AREA OF VERTICAL FERROCEMENT JACKETING FROM
BOTTOM OF FLOOR TO CEILING ON EITHER SIDE OF WALL, EXCEPT
WHERE HEAVY ELECTRICAL CONDUIT IS FIXED IN PLACE. WRAP
JACKETING AROUND OPENINGS AND CORNERS.
4. INDICATES LOCATION OF STEEL SECURITY DOOR TO BE REMOVED.
GENERAL NOTES:
1. ALL DIMENSIONS SHOWN ARE APPROXIMATY, CONTRACTOR SHALL
VERIFY ALL DIMENSIONS IN FIELD
2. CONTRACTOR SHALL TAKE CARE TO REMOVE EXISTING PLASTIC AND
PVC CONDUIT, SWITCHES AND OUTLETS PRIOR TO AND DURING
PLASTER REMOVAL AND REINSTALL AFTER PAINTING.
3. CONTRACTOR SHALL INSTALL VERTICAL SAWCUT JOINTS UP TO 20MM
DEEP ON EITHER SIDE OF FERROCEMENT JACKETING ONCE PLASTER
HAS SET AND PRIOR TO PAINTING.
4. CONTRACTOR TO PAINT ALL AREAS OF WORK TO MATCH EXISTING
PAINT OR AS DIRECTED BY THE CLIENT.
S-100
A B C
INFRASTRUCTURE FIELD SUPPORT II:
WORK ASSIGNMENT 03: SOUTH SUDAN
MARINE SECURITY GUARD RESIDENCE
100% DESIGN - CONSTRUCTION DOCUMENTS
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME:
REMARKS JANUARY 31, 2024
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
PLAN VIEW
S-100
Scale: 1:30
GROUND FLOOR PLAN1
KEY PLAN
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
300 890 2893 820 570
LIMIT ALL WORK TO AREA
BELOW STEEL CONDUIT
CLEAN AND REPLASTER OVER
CRACKS OUTSIDE OF FERROCEMENT
JACKETING AREA
NOTES:
ALL DIMENSIONS PROVIDED ARE
APPROXIMATE. CONTRACTOR SHALL
VERIFY ALL DIMENSIONS IN FIELD.
AREA OF FERROCEMENT
JACKETING
420 800 1060 800
1400740670
CLEAN AND
REPAIR CRACKS
STEEL SECURITY
DOOR TO BE
REMOVED.
800 1450 2570 570
LIMIT ALL WORK TO AREA
BELOW STEEL CONDUIT
CLEAN AND REPLASTER OVER
CRACKS OUTSIDE OF FERROCEMENT
JACKETING AREA
CLEAN AND
REPAIR CRACK 45
STEEL SECURITY
DOOR TO BE
REMOVED.
INFRASTRUCTURE FIELD SUPPORT II:
WORK ASSIGNMENT 03: SOUTH SUDAN
MARINE SECURITY GUARD RESIDENCE
100% DESIGN - CONSTRUCTION DOCUMENTS
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME:
REMARKS JANUARY 31, 2024
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
ELEVATIONS
S-300
Scale: 1:20 INTERIOR WALL ELEVATION1 Scale: 1:20
INTERIOR WALL ELEVATION2
Scale: 1:20 INTERIOR WALL ELEVATION4Scale: 1:20
INTERIOR WALL ELEVATION3
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
200 LAP
EACH SIDE 40mm THICK
FERROCEMENT
JACKET MASONRY
REINFORCEMENT
50x50 x GAUGE 10
GALVANIZED
WIRE MESH,
10mm FROM
FACE OF WALL
10MM MASONRY
SCREW WITH 10x25
WASHERS
300 O.C. EACH WAY
CONSTRUCTION SEQUENCE:
1. INSTALL BRACING, SHORING, AND SURFACE PROTECTION
2. REMOVE PLASTIC / PVC CONDUIT AND FIXTURES.
3. REMOVE PLASTER
4. INSTALL FERROCEMENT JACKETING
5. SAW CUT VERTICAL JOINTS ON EITHER SIDE OF AREAS OF
WORK
6. PAINT SURFACES TO MATCH EXISTING
FERROCEMENT JACKETING NOTES:
1. UPON COMPLETION OF PLASTER REMOVALS, MASONRY
WALLS SHALL BE CLEANED OF ALL LOOSE MATERIAL.
2. GAPS IN THE MASONRY WALL SHALL BE FILLED WITH NEW
MASONRY AND NON-SHRINK GROUT.
3. AREAS OF EXCESSIVE MORTAR LOSS SHALL BE REPOINTED.
4. CONTRACTOR TO INSTALL WELDED WIRE MESH (50X50 X
GAUGE 10)
5. WIRE MESH SHALL BE AFFIXED WITH 10 Ø x 75 STRONG TIE
TITEN HD SCREW ANCHOR, ZINC, OR SIMILAR WITH 10 X 25
HARDENED GALVANIZED WASHER. WIRE MESH SHALL BE
INSTALLED 10 AWAY FROM FACE OF MASONRY WALL.
6. FERROCEMENT GROUT SHALL BE PLACED OVER MESH, 20
COVER MINIMUM. MAXIMUM TOTAL THICKNESS SHALL BE NO
GREATER THAN 40.
VA
R
IE
S
PE
R
P
LA
N
VARIES PER PLAN
INFRASTRUCTURE FIELD SUPPORT II:
WORK ASSIGNMENT 03: SOUTH SUDAN
MARINE SECURITY GUARD RESIDENCE
100% DESIGN - CONSTRUCTION DOCUMENTS
DRAWING NO.
REV.NO. DATE DRWN CHKD
DESIGNED BY:
DRAWN BY:
CROSS CHK'D BY:
APPROVED BY:
DATE:
SHEET CHK'D BY:
PROJECT NO.
FILE NAME:
REMARKS JANUARY 31, 2024
1310 N Courthouse Rd, Ste 610 Arlington, VA 22201 Ph: +1 703 829 6133
DETAILS
S-301
Scale: 1:16
REPAIR DETAIL1
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| Sheets and Views |
| MSGR Layout-S-001 |
| MSGR Layout-S-100 |
| MSGR Layout-S-300 |
| MSGR Layout-S-301 |
File details come from the government source that posted it. Updated .