About this file

This document provides details on 257 historical construction projects completed for the National Aeronautics and Space Administration Marshall Space Flight Center between April 2019 and June 2023. The projects range in cost from $2,564,137 to $855 and include renovations, repairs, and upgrades to buildings, facilities, and infrastructure at the center. Example project descriptions involve replacing roofs, installing lighting and HVAC systems, modifying electrical and plumbing, renovating offices and labs, repaving lots, and other general maintenance and improvement work. The related federal contract opportunity is solicitation number 80MSFC23R0008 for a Minor Construction Contract - V (MCC-V) to continue such general construction services on an as-needed basis.

View the file

Other files for this federal contract opportunity

Other files attached to Minor Construction Contract - V (MCC-V), newest first.
File Type Posted
AMENDMENT 0002 SF30.pdf PDF
AMENDMENT 0001 _Attachment_L-1_Offeror_Information_Form.pdf PDF
AMENDMENT 0001 SF30.pdf PDF
AMENDMENT 0001_ SF1442.pdf PDF
SF1442.pdf PDF
ATTACHMENT_L-3__Past_Performance_Questionnaire.pdf PDF
Minor Construction Contract V (MCC-V) TERMS.pdf PDF
ATTACHMENT_L-1_Offeror_Information_Form MCC V.pdf PDF
Attachment J-4 WAGE DETERMINATION.pdf PDF
ATTACHMENT_L-2__Past_Performance_Questionaire_Recipient_List.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FWRs Closed

Between 04/01/19 and 06/30/23

Project Type: CC

Total $$FWR # Start ClosedTitle

$24,487R000725256 9/16/2020 5/17/2021Install Pump for Tank #6

$11,904R000618165 3/25/2019 8/19/2019New LED Light Fixtures

$11,805R000714149 10/16/2019 1/2/2020Electrical Support for Systems Furniture Rms 167 & 227

$10,550R000567636 5/20/2019 7/31/2019Modify Ductwork Rm 101

$10,500R000643843 5/14/2019 7/31/2019Replace Locksets

$10,000R000749348 8/10/2020 1/28/2021Add Doorway Room 109A

$9,5744615165c 12/20/2018 7/1/2019Install Bottle Filler

$9,500R000611541 1/30/2019 4/25/2019Paint Handrails East Side B4663

$8,849R000582393 4/30/2019 9/26/2019Electrical Mods to Rm 1187B

$8,200R000706276 3/9/2020 6/19/2020Replace Sidewalk South of Bldg 4487

$7,370R000654454 8/6/2019 10/24/2019Install Window Shade Controls

$6,916R000652352 8/20/2019 7/23/2020Replace Doors in Room E-3

$6,308R000596278 2/6/2019 5/9/2019Concrete Pad for Argon Tank

$6,243R000565319 6/25/2019 11/7/2019Raised Floor Tile Replacement

$6,052R000589675 5/8/2019 7/31/2019Replace Exterior Door Frame & Door

$5,792R000644903 5/8/2019 7/31/2019Install Under Floor Receptacles

$4,990R000662801 7/23/2019 8/28/2019Install Concrete Ramp North of Bldg 4466

$4,300R000720937 10/29/2019 11/27/2019Paint Rooms 1210, 1211 & 1213

$3,980R000728559 3/2/2020 7/28/2020Electrical Mods to Room 1137

$3,450R000618164 3/25/2019 8/19/2019New LED Light Fixtures

$3,340R000694187 8/9/2019 8/28/2019Paint & Carpet Two Offices Rm 46B & 54

$3,190R000683964 7/14/2020 9/11/2020Repaint Floor Room 142A

$2,857R000581034 12/6/2018 4/10/2019Provide Power to Rm 115

$2,740R000740828 7/2/2020 10/8/2020Install Outlets at Rm 1103B

$2,473R000706533 11/7/2019 1/9/2020Power for Impact Test Facility

$2,458R000661404 4/9/2019 4/15/2019Paint Room 111

$2,365R000703448 12/3/2019 5/18/2020Install Breakers & Disconnects

$1,570R000722911 7/21/2020 9/11/2020Install GFE LED Light Fixtures

$1,290R000650560 7/23/2019 10/24/2019Install Frosting on Glass

$1,126R000731226 11/13/2019 5/18/2020Apply Anti-Slip Coating to Pavers on South Side of Courtyard

$1,080R000592438 3/12/2019 4/10/2019Install Bus Duct Switch

$855R000722638 10/28/2019 1/9/2020Install Outlet for Wall-Mounted TV

Total: $196,114Number of Projects: 32

Project Type: FWR

Total $$FWR # Start ClosedTitle

$2,564,1374404974 12/17/2015 6/7/2021Revitalize Bldg 4755 Electrical

$2,350,178R000486236 9/27/2018 11/19/2020Replace Roof + Lighting Protection

Wednesday, August 9, 2023 Page 1 of 7

$2,146,6054465402 9/22/2017 3/9/2020Install High Efficiency Boilers

$1,789,292R000553151 9/27/2018 1/13/2023Lightning Protection System Upgrades - Various Bldgs

$1,265,2314248722 9/24/2018 3/25/2022Replace Roof

$876,3564509114 6/11/2021 11/2/2022Parking Lot Lighting for 4600 Complex (4600, 4601, 4602)

$727,495R000789342 5/21/2021 12/6/2022Mods to 5th Floor Office Suite Bldg 4221

$696,800R000797165 5/4/2021 10/25/2022Replace Roofs & Install LPS

$607,3354702787 8/9/2017 10/24/2019Test Area 500 - Demo Buildings 4522, 4523, 4524, 4524A, 4525 & 4526

$469,797R000461590 4/17/2018 12/16/2020Install Heat Recovery Chiller

$421,568R000713269 9/22/2020 3/30/2022Install Potable Water Meters 18 Bldgs

$404,182R000525915 9/17/2018 1/27/2021Mods to Process Water Plant

$396,4024158357 9/26/2017 8/28/2019Demolish Building 4567

$394,478R000521561 9/18/2019 11/30/2021Reconfigure Security Fence and Gate at 4700 Complex

$394,078R000769576 7/30/2021 2/8/2023Utilities for Paint Booth

$334,4654397198 9/27/2018 3/25/2021Replace Roof Sections 001 & 002

$321,250R000726887 9/3/2020 12/7/2021Paint Above Ground Process Piping

$256,0843251628 9/17/2018 7/31/2019Replace Asphalt Pavement in Parking Lot

$246,1144195094 9/6/2018 1/2/2020Replace Pneumatic Actuators

$245,000R000855129 4/6/2022 1/24/20234205 EUS Lab Phase II

$237,3684385919 9/17/2020 11/8/2022Convert to LED Lighting, East Test Bay

$231,4673173618 8/23/2016 4/4/2019New Enclosure for Rooftop HVAC Unit

$229,287R000692485 9/12/2019 10/28/2020Prepare and Paint Exterior of Bldg 4653

$225,988R000772869 9/17/2020 3/22/2021Relocation of MAV Team to Bldg 4708

$222,4243744405 9/26/2017 4/24/2019Mods to 4th Floor

$222,005R000744416 7/31/2020 12/19/2022Static Transfer Switch

$199,820R000529813 9/15/2020 10/14/2021Renovate Restrooms

$187,456R000729104 8/20/2020 3/25/2021Asphalt Improvements

$175,416R000781573 7/9/2020 2/17/2021Construct Metal Shed in 4624 Laydown Yard

$173,4554195499 8/21/2018 2/6/2020Reseal Exterior Siding

$172,808R000756633 9/23/2020 4/14/2022Replace AHU006

$162,974R000667594 9/11/2019 1/29/2021Install Access Control Gate

$162,381R000581038 3/25/2020 12/21/2021Construct Explosive Containment Facility

$157,7884165963 9/28/2020 7/20/2021Demolish SOFI Booth

$155,7154173373 9/24/2018 2/27/2020Install LED Lights C Wing

$141,454R000484932 6/24/2019 3/16/2022Additional Cooling AB105

$138,798R000619928 9/24/2019 3/16/2021Modify Landscaping

$138,440R000838244 8/19/2021 8/22/2022Renovate Bldg 4306

$131,487R000650661 3/4/2020 1/19/2021Power Supply for Sump Pumps

$129,448R000611078 5/23/2019 12/5/2019Mods to NTP Lab

$124,5904268402 9/6/2018 10/3/2019Construct a Communications Duct Bank

$122,730R000735289 9/14/2020 2/25/2021UCS Infrastructure for CBM, 4220, 4221, 4260,4600, 4601

$121,019R000733933 9/22/2020 12/17/2021UCS Chilled Water Auto Failover

$116,820R000466963 5/9/2018 9/26/2019Replace Oxygen Monitoring System

$113,618R000868591 9/20/2021 4/21/2022Carpet & Paint Multiple Rms 1st Floor

$111,292R000652265 9/11/2019 10/6/2020Install Liebert Unit, Room 150

Wednesday, August 9, 2023 Page 2 of 7

$109,080R000603352 3/6/2019 9/12/2019Construct Bin Wall

$105,295R000577917 8/28/2018 12/5/2019HVAC Mods, Rm BC143D

$103,158R000910367 2/25/2022 1/13/2023Paint/Carpet SW Corner

$101,2115741032 5/2/2019 9/26/2019Mods to Room M101

$98,100R000928204 6/13/2022 2/8/2023Re-Route Potable Water

$97,8504435157 9/24/2018 11/14/2019Install New Parking Lot Lighting

$97,600R000827450 7/13/2021 7/14/2022Resurface Foam Roof

$89,9405361540 4/11/2019 11/14/2019Power to Communication Rooms

$89,893R000562823 8/13/2018 7/31/2019Construct Bin Walls

$87,495R000708978 3/26/2020 3/3/2021Paint East Side of Bldg

$87,183R000790662 5/18/2021 11/4/2021Epoxy Flooring for Clean Rm

$85,7054040510 12/3/2021 11/9/2022Mods to Campus Potable Water Meters

$85,644R000652259 9/18/2019 9/11/2020Electrical Modifications to Bldg 4207 Annex

$84,650R000634167 9/12/2019 10/8/2020New Conference Room

$84,223R000548531 8/8/2019 3/15/2021Reroute Chilled Water Line

$83,7904028567 9/25/2018 8/15/2019Minimum Humidity Levels BC Wing

$81,266R000730341 9/3/2020 8/31/2021Construct Wastewater Tank

$80,080R000646605 9/5/2019 6/16/2021Install Foundations

$79,260R000625225 7/15/2019 2/27/2020LED Fixtures for West High Bay

$78,873R000497983 8/2/2018 9/30/2019Asphalt Paving Improvements

$78,702R000877031 10/21/2021 6/28/2022Paint Corridors & Restrooms

$78,680R000733974 6/24/2021 9/27/2022 Replace DXAC 0002

$78,546R000766538 6/23/2021 7/21/2022Replace DXAC Unit

$78,3004717707 4/15/2019 9/26/2019Install Disconnect South High Bay

$70,730R000710006 5/22/2020 9/29/2020Paint Shop Floor

$69,595R000905697 8/11/2022 2/8/2023Install Electric Vehicle Charging Station

$68,850R000865002 1/7/2022 7/7/2022Install Lightning Protection System Bldgs 4672, 4630, 4539

$68,125R000676595 6/22/2020 10/28/2020Secondary Containment Coatings @ B4635-2&3

$66,682R000538121 5/17/2019 1/6/2020HVAC & Building Mods

$66,260R000552052 6/6/2019 12/4/2019Goes Tour Stop

$66,213R000826407 5/10/2021 10/4/2022Mods to Rm 119 for Photo Archive

$65,020R000869112 9/10/2021 2/24/2022Replace Epoxy Floor Rm 100

$65,000R000560313 9/6/2018 3/9/2020Replace CRU #3 Rm 112

$64,969R000734046 8/19/2020 11/4/2021Replace Valves and Actuators

$64,8144385918 9/11/2018 2/27/2020Replace East End Highbay Lights

$64,700R000763019 11/24/2020 6/8/2021Install New Oxygen Monitors at Bldgs. 4464 &

$63,971R000589357 7/8/2019 1/21/2020Install CRU in Room 111

$63,430R000736246 8/10/2020 11/30/2021Replace Catwalk Planks for Cranes

$61,000R000881177 2/10/2022 2/8/2023Install Bottle Fillers @ Bldg 4718 & 4718-1

$59,840R000650075 8/21/2019 1/27/2021Install Door & CRU Room 114

$59,6704017901 12/3/2020 10/27/2021Replace Meter at Bldg 4650

$58,788R000816441 5/11/2021 10/7/2022Finish Upgrades Bldg 4663

$58,200R000687093 9/17/2019 5/4/2021Utilities to Concept Laser Machine

$57,6005345385 7/9/2018 4/25/2019Mods to Room E180

$57,600R000819633 9/21/2021 3/10/2022Replace Lighting Fixtures Test Stand

Wednesday, August 9, 2023 Page 3 of 7

$56,050R000538742 8/13/2018 7/3/2019Raised Beds with Irrigation System

$55,938R000679707 3/10/2020 8/22/2022Update Mens Bathroom A Wing

$54,7344786313 3/30/2021 8/23/2022Install Guardrails Around & Stairs on Roof

$54,640R000790770 8/27/2020 1/7/2021Widen Gravel Road into Laydown Yard (4624)

$54,500R000851585 8/25/2021 3/25/2022Install Privacy Glass Windows Rm B202

$53,555R000630042 8/8/2019 7/9/2020Deactivate Bldgs 4557A, 4666A & 4666B

$53,146R000568512 8/14/2018 5/29/2019Construct Bin Wall

$52,959R000553934 9/26/2018 8/28/2019Utility Mods for Diamond Cutting Machine

$52,9504881715 9/27/2018 8/15/2019Mods to Four Rms

$52,416R000544115 9/6/2018 9/26/2019Replace Obsolete Electric Panels

$50,200R000562824 8/6/2018 5/29/2019Construct Bin Wall

$49,747R000703770 9/22/2020 1/13/2023Construct Concrete Pad & Plaza

$49,6984845164 12/4/2017 5/16/2019Convert Room 108A to Control Room

$49,670R000688318 11/8/2019 1/28/2020Provide Power to Shock Test Stand 400

$48,869R000726969 8/20/2020 5/14/2021Repaint Exterior of Bldg 4676

$48,416R000849697 8/27/2021 6/28/2022Install Automatic Doors East Entrance

$48,370R000491160 6/27/2018 4/25/2019Install Cage and Outlets

$47,700R000692716 8/5/2020 8/26/2021Replace Automatic Doors

$47,593R000905722 7/18/2022 2/8/2023Install Electric Vehicle Charging Station

$46,166R000602127 3/5/2019 7/31/2019Install New UCS Panels

$45,994R000682724 9/22/2020 9/13/2021Replace Rm 165 Lighting Fixtures

$45,980R000705186 6/7/2021 5/17/2022Carpet and Paint Main Corridor/Hallway

$45,4464764322 8/14/2018 5/29/2019Repair Sink Hole

$44,694R000567674 9/17/2019 10/31/2019Replace Rubber Padding at Daycare

$44,634R000871840 9/27/2021 12/7/2022Install Electric Vehicle Charging Station Bldg 4241 / 4250

$43,928R000465003 12/5/2017 5/9/2019Finish Upgrades to Cafeteria & Lobby

$42,644R000813756 9/9/2021 11/9/2022Walkway & Light Mods

$42,400R000725342 8/17/2020 6/29/2021Replace CRU Rm 10

$42,093R000853172 8/20/2021 3/16/2022Paint Hallways & Offices

$41,6155107185 3/7/2018 8/15/2019Electrical Mods

$41,280R000757915 6/29/2021 12/20/2021Install O2 Monitors Rm BC143

$41,160R000714246 9/10/2020 7/15/2021Install Water Bottle Fillers - Multiple Bldgs.

$40,757R000603386 8/5/2020 10/26/2021Install Nitrogen Vent Stack

$40,355R000480555 6/19/2018 4/25/2019Install Hot Water Temp Control Unit

$39,850R000679884 9/19/2019 3/3/2021Install Break Room Rm 1051

$39,664R000901637 4/13/2022 8/22/2022Utilities for Lunar Regolith

$38,675R000757327 4/23/2021 2/9/2022Replace Floor Tiles Various Locations Bldg 4207

$38,480R000736383 8/3/2020 2/25/2021Renovations to Data Center Area

$38,313R000748267 9/14/2020 9/14/2021Temperature Control Units for Rm 1178

$37,738R000692213 5/25/2021 4/26/2022Fire Protection for DED Booth

$37,688R000823427 3/22/2021 8/26/2021Mods to Rm 1109

$37,226R000810710 7/8/2021 10/4/2022Replace High Bay Curtain Rm 1110

$36,682R000622862 4/25/2019 10/31/2019Install Disconnect and Panels

$35,425R000758804 9/8/2020 9/13/2021Replace Oxygen Monitoring System

$34,699R000793588 9/3/2020 3/10/2022Modify and Replace Roll-Up Door Rm 165

$34,060R000672085 3/26/2020 3/30/2021Install PDU with B-Side Power

Wednesday, August 9, 2023 Page 4 of 7

$33,850R000503220 9/22/2020 1/25/2021Detach Spherical Vacuum Tank

$33,7482538269 8/20/2018 7/31/2019Recoat Exterior Walls

$33,676R000842108 7/1/2021 7/7/2022Install Flag Pole

$32,500R000906269 8/1/2022 1/24/2023Electrical Mods to Rms 1124 & 1126

$32,040R000609274 3/4/2019 10/31/2019Replace Roll Up Door

$31,800R000858234 8/11/2021 3/10/2022Renovate Room B32A for Closed Storage

$30,798R000794760 4/23/2021 3/10/2022Install PDU

$29,930R000698559 11/8/2019 1/21/2020Mods to Room 145

$29,800R000584741 4/15/2019 9/30/2019Replace Natural Gas Meter

$29,585R000788370 2/9/2021 10/21/2021Install New Egress Door

$29,504R000650433 7/23/2020 2/19/2021Replace Diesel Storage Tank

$29,460R000734367 3/1/2021 6/30/2021Access Ladder for AH20 & AH21

$29,075R000832927 5/6/2021 9/20/2021Install Carpet in Rm B107

$28,634R000830365 4/29/2021 12/7/2021Electrical Mods to Rm 1189

$28,4914958989 9/10/2018 7/31/2019South Parking Lot Lighting

$28,244R000865077 12/1/2021 6/7/2022Re-Stripe Parking Lots @ Various Bldgs 4203, $26,815R000711800 3/2/2020 3/29/2021Provide Power Feed Bldg 4699

$26,675R000503780 9/18/2019 2/11/2020Install Oxygen Deficiency Alarm

$26,354R000714366 9/24/2019 7/29/2020Replace Carpet and Paint in Hallways

$26,000R000865057 11/15/2021 6/30/2022Install Lightning Protection System

$25,525R000731100 9/16/2020 6/17/2021Install Smart Tint Room M203

$25,425R000613947 6/6/2019 8/28/2019Renovate Rooms 125 and 126

$24,490R000755700 9/14/2020 3/29/2021UCS Controls for Lift Station

$23,800R000794036 8/27/2020 11/19/2020Replace Glass and Glazing Bldgs. 4659 & 4661

$23,410R000714945 9/3/2020 8/31/2021Replace Parking Lot Lights

$23,251R000672129 1/31/2020 11/19/2020Install LED Lights in Annex

$22,740R000796838 3/11/2021 5/13/2021Install Epoxy Floor South High Bay

$21,373R000859898 9/27/2021 6/30/2022Install Air Compressor & Piping

$21,300R000830464 4/19/2021 7/19/2021Mods to Bldg 4485

$21,210R000702750 1/6/2020 8/23/2021Mods to Rm 105

$21,190R000662037 9/10/2019 7/8/2020Replace Natural Gas Meter

$21,000R000535536 2/13/2019 9/5/2019Removal of UPS, Transformers Rm 217

$21,000R000662114 9/10/2019 2/4/2020Replace Natural Gas Meter

$19,951R000470837 5/27/2021 3/1/2022Install Emergency Egress Lights

$19,710R000648999 8/8/2019 10/24/2019Install Bollards and Sidewalks

$19,413R000643494 8/6/2019 6/25/2020Mods to High Bay 119 for DED Booth

$19,400R000918250 7/12/2022 1/24/2023Install Shades 2nd Floor Corridor Windows

$19,200R000577913 6/3/2019 1/9/2020Replace Natural Gas Meter

$18,794R000611056 5/8/2019 9/26/2019Mods to Rooms 109 and 110

$18,773R000780077 7/31/2020 10/6/2020Install Door Locks

$18,310R000851082 7/12/2021 2/17/2022Mods to Rm 111A

$17,737R000831967 8/24/2021 12/6/2022Replace Door E101

$17,652R000660781 11/4/2019 2/27/2020Accessible Parking Upgrades

$17,240R000823865 5/18/2021 8/23/2021Utility Mods to Rm 1168

$17,213R000617619 8/24/2020 6/17/2021Install Cantilever Jib Crane

$16,800R000826518 5/17/2021 3/17/2022Install Security Wall in Rm 150A

Wednesday, August 9, 2023 Page 5 of 7

$16,632R000538747 9/17/2018 5/9/2019Asphalt Pavement

$16,431R000685687 9/19/2019 7/28/2020Mods to Conference Room 1054

$16,310R000883633 2/15/2022 6/7/2022Paint North Hallway 2nd Floor

$15,902R000880273 5/24/2022 12/6/2022Construct New Wall Rm 107

$15,890R000827198 5/6/2021 10/21/2021Mods to Construct Office A101

$15,797R000710324 7/31/2020 10/21/2020Install Industrial Water Pressure Sensors Bldgs.

4220, 4241,4557,4619,4718

$15,400R000858648 8/20/2021 12/21/2021Replace Carpet in Suite 3098

$14,890R000734139 9/1/2020 9/13/2021Sump Pump Upgrades

$14,500R000757830 9/2/2021 1/12/2022Concrete Footings for Wind Tunnel Piping

$14,215R000881175 1/7/2022 8/22/2022Install LED Lighting in Rms 1192 & 1196

$14,124R000587622 8/15/2019 11/18/2019Remove Floor Coating Room 105

$13,971R000797142 9/24/2021 2/9/2022Install UPS Panel Rm 121A

$13,816R000689603 8/19/2020 11/19/2020Install New Concrete Sidewalk Bldg 4619

$13,668R000857833 9/21/2021 12/17/2021Provide Power for T2 Pump

$13,634R000717624 7/6/2021 9/9/2021Remove Containment Area

$13,490R000513942 9/12/2018 4/9/2019Restripe Parking Lots - Various Bldgs

$13,200R000859658 9/15/2021 4/26/2022Install Bottle Filler/ Water Fountain System

$13,064R000881862 11/17/2021 6/15/2022Paint & Tint Windows Rm C260 & Corridor

$12,978R000501743 4/30/2018 5/16/2019Install Antenna Mast

$12,361R000892806 2/17/2022 2/8/2023Install Bottle Filler 2nd Floor

$12,210R000665057 9/17/2019 6/25/2020Paint E85 Fuel Tank

$12,120R000664359 9/17/2019 6/25/2020Paint Hallways and Conference Room

$11,651R000769569 9/1/2020 2/17/2021Install Industrial Water Line Rm 104

$11,490R000610483 9/19/2019 2/27/2020New Ground for Instrumentation

$11,430R000877248 1/7/2022 6/30/2022Install Safety Exits for Fence

$11,424R000889781 3/10/2022 8/23/2022Replace/Install Rubber Fenders NASA Docks

$11,394R000725129 3/26/2020 10/15/2020Install Plywood & Receptacles SLS Monitors A- Wing

$11,380R000916518 8/16/2022 12/7/2022Occupancy Sensors Suite 5300

$10,500R000831029 6/23/2021 11/30/2021Replace Flooring Rms 100, 109 & 115

$10,418R000688845 9/18/2019 5/18/2020Improve Drainage

$10,3713896663 3/19/2021 10/21/2021Fill in Flume Area around Bldg 4640

$10,350R000549433 8/20/2018 5/20/2019Smoking Shelter

$9,800R000833410 8/4/2021 12/22/2021Replace Flooring in Rm E179A

$9,750R000893708 12/20/2021 5/17/2022Paint/Patch Walls & Install Corner Guards Rm

$9,547R000915555 7/8/2022 11/8/2022Provide Power to Velo Printer

$9,350R000532265 6/6/2019 11/14/2019Replace Roll-Up Door

$8,859R000856128 8/25/2021 10/14/2021Utility Mods to Rm 114

$8,800R000619993 7/15/2019 12/10/2019Install Potable Water Source

$8,230R000909478 4/18/2022 7/7/2022Electrical Mods Room 137

$7,940R000673338 9/9/2019 1/9/2020Install Cable Chase Between Rooms 110 & 114

$7,882R000685333 3/12/2020 10/26/2020Install Sump Pumps in MH73

$7,854R000815577 3/9/2021 8/23/2021Remove & Replace Door Frame

$7,751R000544152 9/17/2018 11/14/2019Create Opening Between Rms 164C & 164E

$7,700R000654905 12/2/2019 5/18/2020Remove Closet Room 102

Wednesday, August 9, 2023 Page 6 of 7

$7,590R000677252 9/11/2019 2/3/2020Emergency Signs and Lights

$7,580R000851086 7/7/2021 3/1/2022Mods to Rm 108C

$7,490R000606778 7/10/2019 9/26/2019Restripe South Parking Lot

$7,359R000690190 2/5/2021 8/23/2021Restripe Parking Lot

$7,170R000846297 8/23/2021 12/10/2021Replace Carpet in Rms 1080, 1082 1082A

$7,111R000560822 9/18/2018 4/18/2019Electrical Mods to Rm 155

$6,310R000676024 9/24/2019 4/12/2021Soundproofing Rm 400

$5,992R000886225 2/14/2022 6/28/2022Install Floor Surface Treatment Rm 107

$5,805R000674454 8/26/2019 2/3/2020Provide Power for Cubicles

$5,700R000840020 4/27/2021 6/10/2021Install Outlets in Rms 1007 & 1102

$5,530R000690324 9/24/2019 5/18/2020Install Disconnect Box 4628C

$5,400R000935328 8/25/2022 12/19/2022Install Carpet in Rm 4301

$5,220R000797293 9/2/2021 11/30/2021Power for Furniture 407C

$4,870R000827455 5/14/2021 3/10/2022Drainage System for Rm 1166

$4,800R000840657 6/1/2021 8/23/2021Eletrical Mods in Rm A102

$4,710R000745158 8/28/2020 1/5/2021Provide Shade Controls

$4,370R000688275 9/11/2019 2/13/2020Electrical Mods Bldgs 4776 & 4777

$4,353R000928703 11/14/2022 12/19/2022Replace Outlets in Rm 140C

$4,1265201521 3/7/2018 5/29/2019Install Cage in High Bay

$3,851R000828628 5/13/2021 7/26/2021LED Lighting Replacement Rm 100

$3,693R000819536 5/26/2021 8/24/2021Power for Vacuum Pump

$3,670R000693093 10/21/2019 5/19/2020Electrical Mods in Room 1155

$3,490R000661670 8/26/2019 1/7/2020Replace Carpet with VCT Tile Room C136

$2,910R000666754 10/22/2019 2/27/2020Outlets for Countdown Clocks

$2,909R000690322 9/24/2019 2/6/2020Install Disconnect Box 4628D

$2,855R000837649 4/26/2021 7/21/2021Finish Upgrades Carpet & Paint Rm A103

$2,802R000890782 4/12/2022 7/14/2022Electrical Mods in Room 1167

$2,760R000687151 9/18/2019 2/4/2020Install Chain Link Fence

$2,476R000642274 9/24/2019 5/19/2020Install Chair Rail

$2,220R000824562 2/19/2021 4/13/2021Electrical Mods to Rm 100

Total: $28,563,755Number of Projects: 257