ATTACHMENT L-1 PRICING TEMPLATES 6-21-2021 FINAL.xlsx
XLSX spreadsheet 98 KB Posted
- Solicitation number
- 50310221R0014
- Issued by
-
Securities and Exchange Commission
About this file
This document contains pricing templates for an indefinite delivery, indefinite quantity (IDIQ) contract solicitation from the Securities and Exchange Commission (SEC). The SEC seeks to award at least one but no more than eight IDIQ contracts to provide non-personal commercial enterprise services including quantitative data collection, qualitative research, research-related technical support, program management support, and related offerings. The IDIQ contracts would include a base period of one year with nine option years and have a combined maximum value of $10 million. Offerors must complete the labor rate tables for the base year through each option period for all proposed labor categories, and provide pricing for two sample tasks using the same labor categories for the base year and each option period. Pricing is required for labor, other direct costs up to stated ceilings, and travel.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ BASE Labor Rates
| SECURITIES AND EXCHANGE COMMISSION | Solicitation No. | 50310221R0014 |
| Offeror | ||
| Date |
OIAD POSITIER
| BASE PERIOD AWARD THROUGH 12 MONTHS (exact dates will be established at award) | |||
| ASSUME 30 SEPTEMBER 2021 IS START DATE | |||
| LABOR RATES TABLE | |||
| (Insert Proposed Work Category and complete table as appropriate) | |||
| SEC Labor Category | Proposed Labor Category | Hourly Labor Rate | |
| (On-site) | Hourly Labor Rate (Off-site) |
| Office Director |
| Senior researcher |
| Senior sampling statistician |
| Senior systems analyst |
| Researcher |
| Survey researcher |
| Sampling statistician |
| Systems analyst |
| Technical Analyst |
| Research analyst 1 |
| Survey/sampling specialist |
| Survey Director |
| Senior programmer |
| Research assistant/ programmer |
| Survey associate |
| Survey supervisor |
| Field interviewer (on- call) |
| Regular On-Site Staff |
| Regular Off-Site Staff |
| Intermittent Staff |
| Financial Management |
*NOTE: OFFERORS SHALL USE THE SEC PROVIDED LABOR CATEGORIES AS A STARTING POINT FOR THEIR LABOR CATEGORY PROPOSALS. OFFERORS SHALL PROPOSE ADDITIONAL LABOR CATEGORIES THAT MAY BE NEEDED IN SUPPORT OF THE IDIQ AND THE 2 PROVIDED SAMPLE TASKS TO ENSURE ALL POSIBLE LABOR CATEGORIES WILL BE INCLUDED IN THE RESULTANT IDIQ CONTRACT.
ATTACHMENT L-1 PRICING TEMPLATES
IDIQ Opt Yr 1 Labor Rates
| SECURITIES AND EXCHANGE COMMISSION | Solicitation No. | 50310221R0014 |
| Offeror | ||
| Date |
OIAD POSITIER
| OPTION YEAR 1 THROUGH 12 MONTHS (exact dates will be established at award) | |||
| ASSUME 30 SEPTEMBER 2022 IS START DATE | |||
| LABOR RATES TABLE | |||
| (Insert Proposed Work Category and complete table as appropriate) | |||
| SEC Labor Category | Proposed Labor Category | Hourly Labor Rate | |
| (On-site) | Hourly Labor Rate (Off-site) |
| Office Director |
| Senior researcher |
| Senior sampling statistician |
| Senior systems analyst |
| Researcher |
| Survey researcher |
| Sampling statistician |
| Systems analyst |
| Technical Analyst |
| Research analyst 1 |
| Survey/sampling specialist |
| Survey Director |
| Senior programmer |
| Research assistant/ programmer |
| Survey associate |
| Survey supervisor |
| Field interviewer (on- call) |
| Regular On-Site Staff |
| Regular Off-Site Staff |
| Intermittent Staff |
| Financial Management |
*NOTE: OFFERORS SHALL USE THE SEC PROVIDED LABOR CATEGORIES AS A STARTING POINT FOR THEIR LABOR CATEGORY PROPOSALS. OFFERORS SHALL PROPOSE ADDITIONAL LABOR CATEGORIES THAT MAY BE NEEDED IN SUPPORT OF THE IDIQ AND THE 2 PROVIDED SAMPLE TASKS TO ENSURE ALL POSIBLE LABOR CATEGORIES WILL BE INCLUDED IN THE RESULTANT IDIQ CONTRACT.
IDIQ Opt Yr 2 Labor Rates
| SECURITIES AND EXCHANGE COMMISSION | Solicitation No. | 50310221R0014 |
| Offeror | ||
| Date |
OIAD POSITIER
| OPTION YEAR 2 THROUGH 12 MONTHS (exact dates will be established at award) | |||
| ASSUME 30 SEPTEMBER 2023 IS START DATE | |||
| LABOR RATES TABLE | |||
| (Insert Proposed Work Category and complete table as appropriate) | |||
| SEC Labor Category | Proposed Labor Category | Hourly Labor Rate | |
| (On-site) | Hourly Labor Rate (Off-site) |
| Office Director |
| Senior researcher |
| Senior sampling statistician |
| Senior systems analyst |
| Researcher |
| Survey researcher |
| Sampling statistician |
| Systems analyst |
| Technical Analyst |
| Research analyst 1 |
| Survey/sampling specialist |
| Survey Director |
| Senior programmer |
| Research assistant/ programmer |
| Survey associate |
| Survey supervisor |
| Field interviewer (on- call) |
| Regular On-Site Staff |
| Regular Off-Site Staff |
| Intermittent Staff |
| Financial Management |
*NOTE: OFFERORS SHALL USE THE SEC PROVIDED LABOR CATEGORIES AS A STARTING POINT FOR THEIR LABOR CATEGORY PROPOSALS. OFFERORS SHALL PROPOSE ADDITIONAL LABOR CATEGORIES THAT MAY BE NEEDED IN SUPPORT OF THE IDIQ AND THE 2 PROVIDED SAMPLE TASKS TO ENSURE ALL POSIBLE LABOR CATEGORIES WILL BE INCLUDED IN THE RESULTANT IDIQ CONTRACT.
IDIQ Opt Yr 3 Labor Rates
| SECURITIES AND EXCHANGE COMMISSION | Solicitation No. | 50310221R0014 |
| Offeror | ||
| Date |
OIAD POSITIER
| OPTION YEAR 3 THROUGH 12 MONTHS (exact dates will be established at award) | |||
| ASSUME 30 SEPTEMBER 2024 IS START DATE | |||
| LABOR RATES TABLE | |||
| (Insert Proposed Work Category and complete table as appropriate) | |||
| SEC Labor Category | Proposed Labor Category | Hourly Labor Rate | |
| (On-site) | Hourly Labor Rate (Off-site) |
| Office Director |
| Senior researcher |
| Senior sampling statistician |
| Senior systems analyst |
| Researcher |
| Survey researcher |
| Sampling statistician |
| Systems analyst |
| Technical Analyst |
| Research analyst 1 |
| Survey/sampling specialist |
| Survey Director |
| Senior programmer |
| Research assistant/ programmer |
| Survey associate |
| Survey supervisor |
| Field interviewer (on- call) |
| Regular On-Site Staff |
| Regular Off-Site Staff |
| Intermittent Staff |
| Financial Management |
*NOTE: OFFERORS SHALL USE THE SEC PROVIDED LABOR CATEGORIES AS A STARTING POINT FOR THEIR LABOR CATEGORY PROPOSALS. OFFERORS SHALL PROPOSE ADDITIONAL LABOR CATEGORIES THAT MAY BE NEEDED IN SUPPORT OF THE IDIQ AND THE 2 PROVIDED SAMPLE TASKS TO ENSURE ALL POSIBLE LABOR CATEGORIES WILL BE INCLUDED IN THE RESULTANT IDIQ CONTRACT.
IDIQ Opt Yr 4 Labor Rates
| SECURITIES AND EXCHANGE COMMISSION | Solicitation No. | 50310221R0014 |
| Offeror | ||
| Date |
OIAD POSITIER
| OPTION YEAR 4 THROUGH 12 MONTHS (exact dates will be established at award) | |||
| ASSUME 30 SEPTEMBER 2025 IS START DATE | |||
| LABOR RATES TABLE | |||
| (Insert Proposed Work Category and complete table as appropriate) | |||
| SEC Labor Category | Proposed Labor Category | Hourly Labor Rate | |
| (On-site) | Hourly Labor Rate (Off-site) |
| Office Director |
| Senior researcher |
| Senior sampling statistician |
| Senior systems analyst |
| Researcher |
| Survey researcher |
| Sampling statistician |
| Systems analyst |
| Technical Analyst |
| Research analyst 1 |
| Survey/sampling specialist |
| Survey Director |
| Senior programmer |
| Research assistant/ programmer |
| Survey associate |
| Survey supervisor |
| Field interviewer (on- call) |
| Regular On-Site Staff |
| Regular Off-Site Staff |
| Intermittent Staff |
| Financial Management |
*NOTE: OFFERORS SHALL USE THE SEC PROVIDED LABOR CATEGORIES AS A STARTING POINT FOR THEIR LABOR CATEGORY PROPOSALS. OFFERORS SHALL PROPOSE ADDITIONAL LABOR CATEGORIES THAT MAY BE NEEDED IN SUPPORT OF THE IDIQ AND THE 2 PROVIDED SAMPLE TASKS TO ENSURE ALL POSIBLE LABOR CATEGORIES WILL BE INCLUDED IN THE RESULTANT IDIQ CONTRACT.
IDIQ Opt Yr 5 Labor Rates
| SECURITIES AND EXCHANGE COMMISSION | Solicitation No. | 50310221R0014 |
| Offeror | ||
| Date |
OIAD POSITIER
| OPTION YEAR 5 AWARD THROUGH 12 MONTHS (exact dates will be established at award) | |||
| ASSUME 30 SEPTEMBER 2026 IS START DATE | |||
| LABOR RATES TABLE | |||
| (Insert Proposed Work Category and complete table as appropriate) | |||
| SEC Labor Category | Proposed Labor Category | Hourly Labor Rate | |
| (On-site) | Hourly Labor Rate (Off-site) |
| Office Director |
| Senior researcher |
| Senior sampling statistician |
| Senior systems analyst |
| Researcher |
| Survey researcher |
| Sampling statistician |
| Systems analyst |
| Technical Analyst |
| Research analyst 1 |
| Survey/sampling specialist |
| Survey Director |
| Senior programmer |
| Research assistant/ programmer |
| Survey associate |
| Survey supervisor |
| Field interviewer (on- call) |
| Regular On-Site Staff |
| Regular Off-Site Staff |
| Intermittent Staff |
| Financial Management |
*NOTE: OFFERORS SHALL USE THE SEC PROVIDED LABOR CATEGORIES AS A STARTING POINT FOR THEIR LABOR CATEGORY PROPOSALS. OFFERORS SHALL PROPOSE ADDITIONAL LABOR CATEGORIES THAT MAY BE NEEDED IN SUPPORT OF THE IDIQ AND THE 2 PROVIDED SAMPLE TASKS TO ENSURE ALL POSIBLE LABOR CATEGORIES WILL BE INCLUDED IN THE RESULTANT IDIQ CONTRACT.
ATTACHMENT L-1 PRICING TEMPLATES
IDIQ Opt Yr 6 Labor Rates
| SECURITIES AND EXCHANGE COMMISSION | Solicitation No. | 50310221R0014 |
| Offeror | ||
| Date |
OIAD POSITIER
| OPTION YEAR 6 THROUGH 12 MONTHS (exact dates will be established at award) | |||
| ASSUME 30 SEPTEMBER 2027 IS START DATE | |||
| LABOR RATES TABLE | |||
| (Insert Proposed Work Category and complete table as appropriate) | |||
| SEC Labor Category | Proposed Labor Category | Hourly Labor Rate | |
| (On-site) | Hourly Labor Rate (Off-site) |
| Office Director |
| Senior researcher |
| Senior sampling statistician |
| Senior systems analyst |
| Researcher |
| Survey researcher |
| Sampling statistician |
| Systems analyst |
| Technical Analyst |
| Research analyst 1 |
| Survey/sampling specialist |
| Survey Director |
| Senior programmer |
| Research assistant/ programmer |
| Survey associate |
| Survey supervisor |
| Field interviewer (on- call) |
| Regular On-Site Staff |
| Regular Off-Site Staff |
| Intermittent Staff |
| Financial Management |
*NOTE: OFFERORS SHALL USE THE SEC PROVIDED LABOR CATEGORIES AS A STARTING POINT FOR THEIR LABOR CATEGORY PROPOSALS. OFFERORS SHALL PROPOSE ADDITIONAL LABOR CATEGORIES THAT MAY BE NEEDED IN SUPPORT OF THE IDIQ AND THE 2 PROVIDED SAMPLE TASKS TO ENSURE ALL POSIBLE LABOR CATEGORIES WILL BE INCLUDED IN THE RESULTANT IDIQ CONTRACT.
IDIQ Opt Yr 7 Labor Rates
| SECURITIES AND EXCHANGE COMMISSION | Solicitation No. | 50310221R0014 |
| Offeror | ||
| Date |
OIAD POSITIER
| OPTION YEAR 7 THROUGH 12 MONTHS (exact dates will be established at award) | |||
| ASSUME 30 SEPTEMBER 2028 IS START DATE | |||
| LABOR RATES TABLE | |||
| (Insert Proposed Work Category and complete table as appropriate) | |||
| SEC Labor Category | Proposed Labor Category | Hourly Labor Rate | |
| (On-site) | Hourly Labor Rate (Off-site) |
| Office Director |
| Senior researcher |
| Senior sampling statistician |
| Senior systems analyst |
| Researcher |
| Survey researcher |
| Sampling statistician |
| Systems analyst |
| Technical Analyst |
| Research analyst 1 |
| Survey/sampling specialist |
| Survey Director |
| Senior programmer |
| Research assistant/ programmer |
| Survey associate |
| Survey supervisor |
| Field interviewer (on- call) |
| Regular On-Site Staff |
| Regular Off-Site Staff |
| Intermittent Staff |
| Financial Management |
*NOTE: OFFERORS SHALL USE THE SEC PROVIDED LABOR CATEGORIES AS A STARTING POINT FOR THEIR LABOR CATEGORY PROPOSALS. OFFERORS SHALL PROPOSE ADDITIONAL LABOR CATEGORIES THAT MAY BE NEEDED IN SUPPORT OF THE IDIQ AND THE 2 PROVIDED SAMPLE TASKS TO ENSURE ALL POSIBLE LABOR CATEGORIES WILL BE INCLUDED IN THE RESULTANT IDIQ CONTRACT.
IDIQ Opt Yr 8 Labor Rates
| SECURITIES AND EXCHANGE COMMISSION | Solicitation No. | 50310221R0014 |
| Offeror | ||
| Date |
OIAD POSITIER
| OPTION YEAR 8 THROUGH 12 MONTHS (exact dates will be established at award) | |||
| ASSUME 30 SEPTEMBER 2029 IS START DATE | |||
| LABOR RATES TABLE | |||
| (Insert Proposed Work Category and complete table as appropriate) | |||
| SEC Labor Category | Proposed Labor Category | Hourly Labor Rate | |
| (On-site) | Hourly Labor Rate (Off-site) |
| Office Director |
| Senior researcher |
| Senior sampling statistician |
| Senior systems analyst |
| Researcher |
| Survey researcher |
| Sampling statistician |
| Systems analyst |
| Technical Analyst |
| Research analyst 1 |
| Survey/sampling specialist |
| Survey Director |
| Senior programmer |
| Research assistant/ programmer |
| Survey associate |
| Survey supervisor |
| Field interviewer (on- call) |
| Regular On-Site Staff |
| Regular Off-Site Staff |
| Intermittent Staff |
| Financial Management |
*NOTE: OFFERORS SHALL USE THE SEC PROVIDED LABOR CATEGORIES AS A STARTING POINT FOR THEIR LABOR CATEGORY PROPOSALS. OFFERORS SHALL PROPOSE ADDITIONAL LABOR CATEGORIES THAT MAY BE NEEDED IN SUPPORT OF THE IDIQ AND THE 2 PROVIDED SAMPLE TASKS TO ENSURE ALL POSIBLE LABOR CATEGORIES WILL BE INCLUDED IN THE RESULTANT IDIQ CONTRACT.
IDIQ Opt Yr 9 Labor Rates
| SECURITIES AND EXCHANGE COMMISSION | Solicitation No. | 50310221R0014 |
| Offeror | ||
| Date |
OIAD POSITIER
| OPTION YEAR 9 THROUGH 12 MONTHS (exact dates will be established at award) | |||
| ASSUME 30 SEPTEMBER 2030 IS START DATE | |||
| LABOR RATES TABLE | |||
| (Insert Proposed Work Category and complete table as appropriate) | |||
| SEC Labor Category | Proposed Labor Category | Hourly Labor Rate | |
| (On-site) | Hourly Labor Rate (Off-site) |
| Office Director |
| Senior researcher |
| Senior sampling statistician |
| Senior systems analyst |
| Researcher |
| Survey researcher |
| Sampling statistician |
| Systems analyst |
| Technical Analyst |
| Research analyst 1 |
| Survey/sampling specialist |
| Survey Director |
| Senior programmer |
| Research assistant/ programmer |
| Survey associate |
| Survey supervisor |
| Field interviewer (on- call) |
| Regular On-Site Staff |
| Regular Off-Site Staff |
| Intermittent Staff |
| Financial Management |
*NOTE: OFFERORS SHALL USE THE SEC PROVIDED LABOR CATEGORIES AS A STARTING POINT FOR THEIR LABOR CATEGORY PROPOSALS. OFFERORS SHALL PROPOSE ADDITIONAL LABOR CATEGORIES THAT MAY BE NEEDED IN SUPPORT OF THE IDIQ AND THE 2 PROVIDED SAMPLE TASKS TO ENSURE ALL POSIBLE LABOR CATEGORIES WILL BE INCLUDED IN THE RESULTANT IDIQ CONTRACT.
IDIQ Materials & Indirects
| Materials & Indirects | ||||
| G&A to be applied to: | Base Period | Option Period | ||
| 1 | Option Period | |||
| 2 | Option Period | |||
| 3 | Option Period |
| ODCs |
| Travel |
| Subcontract Handling |
Sample Task 1 Pricing Base
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 1 Base Year | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2021 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 1 Base Year | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2021 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL ESTIMATED HOURS* | 11740 | ||
| Other Direct Costs (ODCs) NTE** | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
Total Estimated Base Year Price
| *The SEC estimates that it will take vendors 11,740 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. |
| *ODCs shall not exceed the Government's estimate. |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 1 Pricing Opt 1
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 1 Option Year 1 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2022 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 1 Option Year 1 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2022 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL ESTIMATED HOURS* | 11740 | ||
| Other Direct Costs (ODCs) NTE** | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 1 Price | |
| *The SEC estimates that it will take vendors 11,740 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 1 Pricing Opt 2
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 1 Option Year 2 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2023 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 1 Option Year 2 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2023 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL ESTIMATED HOURS* | 11740 | ||
| Other Direct Costs (ODCs) NTE** | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
Total Estimated Option Year 2 Price
| *The SEC estimates that it will take vendors 11,740 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. |
| **ODCs shall not exceed the Government's estimate. |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 1 Pricing Opt 3
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 1 Option Year 3 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2024 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 1 Option Year 3 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2024 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL ESTIMATED HOURS* | 11740 | ||
| Other Direct Costs (ODCs) NTE** | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
Total Estimated Option Year 3 Price
| *The SEC estimates that it will take vendors 11,740 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. |
| **ODCs shall not exceed the Government's estimate. |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 1 Pricing Opt 4
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 1 Option Year 4 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2025 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 1 Option Year 4 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2025 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL ESTIMATED HOURS* | 11740 | ||
| Other Direct Costs (ODCs) NTE** | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 4 Price | |
| *The SEC estimates that it will take vendors 11,740 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 1 Pricing Opt 5
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 1 Option Year 5 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2026 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 1 Option Year 1 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2022 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL ESTIMATED HOURS* | 11740 | ||
| Other Direct Costs (ODCs) NTE** | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 1 Price | |
| *The SEC estimates that it will take vendors 11,740 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 1 Pricing Opt 6
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 1 Option Year 6 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2027 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 1 Option Year 2 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2023 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL ESTIMATED HOURS* | 11740 | ||
| Other Direct Costs (ODCs) NTE** | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
Total Estimated Option Year 2 Price
| *The SEC estimates that it will take vendors 11,740 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. |
| **ODCs shall not exceed the Government's estimate. |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 1 Pricing Opt 7
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 1 Option Year 7 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2028 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 1 Option Year 3 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2024 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL ESTIMATED HOURS* | 11740 | ||
| Other Direct Costs (ODCs) NTE** | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
Total Estimated Option Year 3 Price
| *The SEC estimates that it will take vendors 11,740 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. |
| **ODCs shall not exceed the Government's estimate. |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 1 Pricing Opt 8
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 1 Option Year 8 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2029 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 1 Option Year 4 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2025 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL ESTIMATED HOURS* | 11740 | ||
| Other Direct Costs (ODCs) NTE** | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 4 Price | |
| *The SEC estimates that it will take vendors 11,740 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 1 Pricing Opt 9
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 1 Option Year 9 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2030 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 1 Option Year 4 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2025 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL ESTIMATED HOURS* | 11740 | ||
| Other Direct Costs (ODCs) NTE** | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 4 Price | |
| *The SEC estimates that it will take vendors 11,740 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 2 Pricing Base
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 2 Base Year | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2021 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 2 Base Year | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2021 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL LABOR HOURS** | 7870 | ||
| Other Direct Costs (ODCs) NTE*** | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Base Year Price | |
| *The SEC estimates that it will take vendors 7870 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 2 Pricing Opt 1
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 2 Option Year 1 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2022 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 2 Option Year 1 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2022 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL LABOR HOURS** | 7870 | ||
| Other Direct Costs (ODCs) NTE | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 1 Price | |
| *The SEC estimates that it will take vendors 7870 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 2 Pricing Opt 2
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 2 Option Year 2 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2023 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 2 Option Year 2 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2023 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL LABOR HOURS** | 7870 | ||
| Other Direct Costs (ODCs) NTE | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 2 Price | |
| *The SEC estimates that it will take vendors 7870 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 2 Pricing Opt 3
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 2 Option Year 3 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2024 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 2 Option Year 3 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2024 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL LABOR HOURS** | 7870 | ||
| Other Direct Costs (ODCs) NTE | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 3 Price | |
| *The SEC estimates that it will take vendors 7870 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 2 Pricing Opt 4
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 2 Option Year 4 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2025 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 2 Option Year 4 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2025 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL LABOR HOURS** | 7870 | ||
| Other Direct Costs (ODCs) NTE | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 4 Price | |
| *The SEC estimates that it will take vendors 7870 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 2 Pricing Opt 5
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 2 Option Year 5 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2026 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 2 Base Year | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2021 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL LABOR HOURS** | 7870 | ||
| Other Direct Costs (ODCs) NTE*** | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Base Year Price | |
| *The SEC estimates that it will take vendors 7870 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 2 Pricing Opt 6
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 2 Option Year 6 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2027 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 2 Option Year 1 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2022 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL LABOR HOURS** | 7870 | ||
| Other Direct Costs (ODCs) NTE | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 1 Price | |
| *The SEC estimates that it will take vendors 7870 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 2 Pricing Opt 7
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 2 Option Year 7 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2028 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 2 Option Year 2 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2023 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL LABOR HOURS** | 7870 | ||
| Other Direct Costs (ODCs) NTE | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 2 Price | |
| *The SEC estimates that it will take vendors 7870 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 2 Pricing Opt 8
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 2 Option Year 8 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2029 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 2 Option Year 3 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2024 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL LABOR HOURS** | 7870 | ||
| Other Direct Costs (ODCs) NTE | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 3 Price | |
| *The SEC estimates that it will take vendors 7870 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
Sample Task 2 Pricing Opt 9
SAMPLE TASK PRICING TEMPLATE
Table 1 - Labor Categories and Rate Table
| Sample Task 2 Option Year 9 | |||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2030 Award for Sample Tasks 1 and 2) | |||
| Labor Category | Prime/Sub | IDIQ Rate | Discounted Hourly Rate |
Table 2 - Total Price Table
| Sample Task 2 Option Year 4 | |||||
| Period of Performance: Date of Award - One-Year (Assume a September 30, 2025 Award for Sample Tasks 1 and 2) | |||||
| Labor Category | Prime/Sub | Estimated Hours | IDIQ Discounted Rate | ||
| (if applicable) | Total |
| TOTAL LABOR HOURS** | 7870 | ||
| Other Direct Costs (ODCs) NTE | ODC Total | $ 166,000.00 | |
| Travel NTE | Travel Total |
| Total Estimated Option Year 4 Price | |
| *The SEC estimates that it will take vendors 7870 hours to complete Sample Task 1 each year. Offerors shall use this estimate to complete its price proposal. | |
| **ODCs shall not exceed the Government's estimate. | |
| ***NOTE: OFFERORS SHALL PROVIDE PRICING FOR SAMPLE TASKS 1 AND 2 USING THE FORMAT ON THIS SHEET AND SHALL USE THE LABOR CATEGORIES THAT ARE ALSO PROPOSED IN ITS IDIQ LABOR RATE TABLES FOR THE BASE AND OPTION YEARS (ALL IDIQ LABOR CATEGORIES DO NOT NEED TO BE USED) |
File details come from the government source that posted it. Updated .