Attachment K.2 - Dyess-Fac 5220 (Tank 5220)Post Repairs-FINAL-2019.pdf
PDF 2 MB Posted
- Attached to
- POL Tank Inspection, Dyess AFB, TX
- Solicitation number
- W9128F22Q0084
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11/13/2019
US AArmy Corps
US Ar
AP
Rep s of Enginee rmy Co Omah
| PI | 653 | O |
| pair | Ins |
Dyes Faci Tan rs Center of
(USA
Octo
| rps | of | E |
| ha | Distr |
Out‐of‐S spection
| ss | AFB, | T |
| ility | 522 | |
| nk | # | 522 |
| f | Expertise | f |
| ACE | POL‐TCX | |
| ober | 1, | 2019 |
Enginee ict Service n Repor
TX
for Petroleu X) ers rt um, Oils and Lubricants
API 6
Tabl
C.
653 Repair In le of Conten
TANK REPA
1. Install N
2. Repair T
3. Replace
4. Repair R
5. Repair I
6. Repair L
7. Repair I
8. Repair T
9. Repair M
10. Provide
11. Repair S
12. Provide
13. Repair F
14. Repair W
15. Remove
16. Repair E
17. Repair L
18. Repair H
19. Repair T
20. Provide
21. Perform
22. Provide
23. Provide nspection Re nts
IRS
New Second B
Tank Coating e Roof Gasket
Roof Vents ...
Internal Issu
Low Suction
Internal Rece
Thermal Reli
Manways an e Fixed Roof H
Stilling Wells e New Mecha
Floating Pan
Water Draw-e AFFF Syste
Exterior Pipe
Low-Low Lev
High-High Le
Tank Ground e High Point V m Hydrostatic e Tank Strapp e API 653 Ins eport
Bottom gs..……………… t Seals e Piping
Piping eipt Piping … ief Piping d Install New
Handrail s anical Tape G
-off System ...
m……………… e Supports.… vel Alarms… evel Alarms… ding……………
Vent…………… c Test………… ping Chart…… spections…… w 36” Manwa
Gauge ay
D
Dyess AFB, T
TX
……………….7
………………15
………………16
Tank This
The
Man 1.
Othe 2.
3.
4.
5.
6.
7.
8.
9.
653 Repair In k 5220 was in tank report tank is in su ndatory Repa Install New er Repairs a Repair Tan Replace Fi Repair Fix Repair Inte Repair Low Repair Inte Repair The Repair Ma
0. Provide Fix
1. Repair Stil
2. Provide Ne
3. Repair Flo
4. Repair Wa
5. Remove AF
6. Repair Ext
7. Repair Lev
8. Repair Hig
9. Repair Tan
0. Provide Hi
1. Perform H
2. Provide Ta
3. Provide AP nspection Re nspected on is an Append uitable cond airs:
w Second Bot and Mainten nk Coatings xed Roof Sea ed Roof Circu ernal Issue P w Suction Pip ernal Receip ermal Relief nways and In xed Roof Per lling Wells ew Mechanic ating Pan ater Draw-Of FFF System terior Pipe Su vel Alarms gh Level alarm nk Grounding igh Point Ven ydrostatic T ank Strappin PI 653 Inspec eport
SUITA
Out‐of‐Ser
October 1, 2 dix to the ori dition for re ttom:
nance:
als ulation Vents
Piping ping t Piping Piping nstall New 3 rimeter Guar cal Tape Gaug ff System upports ms g nt est g Chart ction Report
STORAGE T
| ABILITY | FOR | |
| rvice | API | 65 |
Dyes
019. An API iginal API 65 turn to serv s
6” Manway rdrail ge t
TANK NO. 52
| R | SERVICE | M |
| 3 | Tank | Insp |
| ss | AFB, | Texa |
653 Repair I 3 tank repor vice. All man
MEMORANDU
pection and as
Inspection w rt.
ndatory rep
D
UM
Repair was performe pairs have b
Dyess AFB, T ed by Stephen een comple
TX
n Hollenzer.
eted.
Insp
The n thickn
The n
This
STD
PREV
API O
API I
RECO
Base due p
The t is du 653.
Prep
Steph
API-6
Inter
API 6
653 Repair In pection Inter next In-Servic ness measur next Out-of-S storage tank 653, [Fifth] E
VIOUS INSPE
Out-of-Servic In-Service (E
OMMENDED
d on the last prior to May tank was put e 10 years fr pared by:
hen Hollenze 653 Inspecto rspec, LLC 653 Certified nspection Re rvals ce Inspection ements shou ervice inspec k suitability f Edition, Nove
ECTION DATE
ce (Internal) External) Insp
D FUTURE INS
API-653 Out 2022 in acco t back into se rom the date er or d Inspector N eport n should occu uld occur in M ction should for service ev ember 2014.
ES
Inspection D pection Date
SPECTION:
t-of-Service i ordance with ervice on Oct the tank is p
No. 80182 ur in May 20 May 2032 [13 occur in 10 y valuation has
Date: 5/11/2 : 1/27/2015 inspection re h API Standar tober 30, 201 put back in se
22 [3 years], 3 years] in ac years from th s been comp eport, the nex rd 653.
19. The next O ervice ( Octob
, and the nex ccordance w he date the t leted in acco xt external in
Out-of-Servi ber 30, 2029
D xt In-Service with API 653.
tank is put ba ordance with nspection by ce inspection
9) in accorda
Dyess AFB, T
Inspection w ack In-Servic h the requirem y a certified in n by a certifi ance with API
TX
with UT ce.
ments of API nspector is ed inspector I Standard
I r
A.
653 Repair In
. TANK REP
1. In
OB
nspection Re
PAIRS
nstall New S
BSERVATION
A new 5/16 accordance installation slope, and a eport
Second Botto N:
-inch thick c with the DoD of the new s new sand la om one-down, la D Standard D econd bottom ayer was prov ap-welded ta Design AW78 m in in accor vided in acco ank bottom w 8-24-27. The rdance with A ordance with
D with a center existing she
API 653. The h UFGS 33 56
Dyess AFB, T r sump was in ll was slotted e bottom mai 6 13.15.
TX
nstalled in d for the intained a 2%%
API 6653 Repair In
2. Re
OB
OB
nspection Re epair Tank C
SERVATION
The exterior accordance
SERVATION
The interior accordance eport
Coatings N:
r tank was co with UFGS 0
N:
r tank was co with UFGS 0 oated to satis 09 97 13.27 a oated to satis 09 97 13.17 a sfy any areas and all local, s sfy any areas and all local, s s indicated in state, and fed indicated in state, and fed
D n the API 653 deral require n the API 653 deral require
Dyess AFB, T
3 inspection ements.
3 inspection r ements.
TX
report in report in
3. Re
OB
4. Re
OB
nspection Re eplace Roof
BSERVATION
New seals w epair Roof V
SERVATION
Four new h visual insp drawing. R to the mid-eport
Gasket Seal N:
were installe
Vents N:
hinged circul ection of the emovable sa
-rail elevation s ed on the two ation vents a floating roo afety chain an n.
o (2) 30-inch along the per f seals in acc nd attachmen h x 30-inch ac rimeter of th cordance wit nts for the ro
D ccess hatche he fixed roof w th Dawson Fe oof inspectio
Dyess AFB, T s on the fixed were installe ederal’s appr n hatches we
TX
d roof.
ed to allow fo roved design ere attached or n
5. Re
OB
6. Re
OB
nspection Re epair Intern
BSERVATION
The 18-inch all the criter supports wi design draw epair Low Su
BSERVATION
New interio Dawson Fed accordance eport al Issue Pip N:
h internal issu ria described ith Teflon coa wing.
uction Pipin N:
r pipe suppo deral’s appro with API 653 ing ue piping wa d in Dawson F ated U-bolts ng orts for the 4 oved design d 3 Figure 9.13 as reconfigur Federal’s app were installe
-inch low su drawing. The 3.
red to extend proved desig ed in accorda ction line we e location of t
D d half the rad gn drawing. T ance with Da ere installed the pipe supp
Dyess AFB, T dius of the tan Two new adj awson Feder in accordanc port re-pads
TX
nk and meets ustable pipe ral’s approve ce with s are in s e d
OB
7. Re
OB
nspection Re
BSERVATION
External 4-i double-bloc approved de of inspection epair Intern
BSERVATION
The internal design draw with Dawso accordance eport
N:
nch piping w ck and bleed esign drawin n.
al Receipt P N:
l 8-inch prod wing. New int n Federal’s a with API 653 was installed plug valve in
ng. The pipe s
Piping duct receipt p terior pipe su approved des 3 Figure 9.13 connecting t n accordance supports for piping was re upports for t sign drawing the low sucti e with UFGS 3 the external econfigured the 8-inch rec
g. The locatio
D ion line to th 33 52 43.13 a l piping was to meet Daw ceipt line we on of the pipe
Dyess AFB, T e issue line i and Dawson not complete wson Federal ere installed e support re-
TX
ncluding a Federal’s e at the time
’s approved in accordanc -pads are in ce
8. Re
OB
9. Re
OB
nspection Re epair Therm
SERVATION
The thermal been reconf epair Manwa
SERVATION
The tank wa apart, and o inspection/m was installe eport mal Relief Pip N:
l relief piping figured to me ays and Inst N:
as reconfigur ne 36-inch m maintenance d to allow a m ping g for the 18-i eet DoD Stan tall New 36” red with two manhole loca
e. The interm means to saf inch issue, 4-dard and Da
” Manway
36-inch she ated above th mediate platfo fely remove t
-inch low suc awson Federa ll manholes a he IFR on Hig orm was exte the upper ma
D ction, and 18 al’s approved along the firs gh legs to acc ended, and a anhole.
Dyess AFB, T
8-inch receip d design draw st course 180 cess the top o a roller suppo
TX
pt lines have wing.
0 degrees of the IFR for ort I-beam r
10. Pr
OB
nspection Re rovide Fixed
SERVATION
A roof perim approved de eport d Roof Handr N:
meter guardr esign drawin rail rail was insta ng and OSHA alled on the fi standards.
fixed roof. Th
D he guard rail
Dyess AFB, T meets Daws
TX
on Federal’s
11. Re
OB
nspection Re epair Stilling
SERVATION
The base of ATG water p design draw ladder was r accordance eport g Wells N:
the stilling w probe gauge wing with re-reconfigured with API 653 wells for the A well inside t pads in acco d to meet Daw 3 Figure 9.13
ATG gauge w the tank were rdance with wson Federa well, sample g e modified to API 653 Figu al’s approved
D gauge well, m o meet Daws ure 9.13. The d design draw
Dyess AFB, T manual gauge son Federal’s e base of the wing, with th
TX
e well, and s approved internal he re-pad in
12. Pr
OB
nspection Re rovide New M
SERVATION
The existing The MTG tap eport
Mechanical N:
g MTG was re pe guide is co
Tape Gauge emoved, and onnected to e a new (Vare the IFR and m ec 2500 Auto meets Dawso
D omatic Tank G on Federal’s
Dyess AFB, T
Gauge) MTG approved de
TX
was installe esign drawin d.
ng.
13. Re
OB
14. Re
OB
nspection Re epair Floatin
SERVATION
The IFR was double wipe
UFGS 33 56.
epair Water
SERVATION
The water d approved de eport ng Pan N:
s replaced wi er seals at the .13.13 and th
Draw‐Off Sy N:
draw-off syst esign drawin ith a new (Pe e periphery a he floating pa ystem em was reco ng and API-65 etrex) alumin and IFR appu an manufactu onfigured and 53.
num honey-c urtenance se urer’s instru d meets the c
D combed inter eals were ins uctions.
criteria listed
Dyess AFB, T rnal floating talled in acco d in Dawson
TX
roof. The ordance with
Federal’s h
15. Re
OB
16. Re
OB
nspection Re emove AFFF
SERVATION
The AFFF Sy in accordan epair Exterio
SERVATION
The externa eport
System N:
ystem was re ce with API-6 or Pipe Supp N:
al pipe suppo emoved, and 653.
ports orts were in t the old nozz the process o zles were rem of being reco
D moved and p nfigured at t
Dyess AFB, T atch plates w the time of in
TX
were installed nspection.
d
17. Re
OB
18. Re
OB
nspection Re epair the Low
SERVATION
The low and approved de epair the Hig
SERVATION
The high & h approved de eport w & Low‐Lo N:
d low-low lev esign drawin gh & High‐H N:
high-high lev esign drawin ow Level Ala vel alarm ass ng and API-65
High Level Al vel alarm ass ng and API-65 arms sembly was r 53.
larms embly was r 53.
reconfigured reconfigured
D and meets D and meets D
Dyess AFB, T
Dawson Fede
Dawson Fede
TX
eral’s eral’s
19. Re
OB
20. Pr
OB
nspection Re epair Tank G
SERVATION
The existing welded conn and API-653 rovide High
SERVATION
A high point eport Grounding N:
g bolted grou nections. The 3.
Point Vent N:
t vent with a unding conne e tank’s grou lockable bal ections were unding lugs m ll valve was i removed an meet Dawson installed on t
D nd replaced w n Federal’s ap the 18-inch p
Dyess AFB, T with exotherm pproved desi product line.
TX
mically ign drawing
21. Pe
OB
22. Pr
OB
23. Pr
OB
nspection Re erform Hydr
SERVATION
Site personn installation.
rovide Tank
SERVATION
Strapping ch rovide API 6
SERVATION
The previou eport rostatic Test N:
nel stated a h
Strapping C N:
harts were n
53 Inspectio N:
us out-of-serv t hydrostatic te
N
Chart ot available a
N ons vice inspecti
N est was perfo
No Photo at the time o
No Photo on report wa
No Photo ormed after t of inspection.
as provided b
D the completi before arriva
Dyess AFB, T ion of the tan al to the jobs
TX
nk bottom ite.
1. B
653 Repair In
Bottom Layo nspection Re
APPEN
out eport
DIX A: ENGIINEERING DRAWINGS
DDyess AFB, TTX
Bottom Layout [1 of 1] Tank # 5220
US Air Force - Dyess AFB; Dyess AFB, TX
InterSpec, LLC.
10/1/2019 N/A N/A
A - 30" Sump B - 1" Water Draw Off C - 8" Receipt D - 18" Issue E - 4" Low Suction
F - Ladder with 20" x 40" Repad
- Gauge Wells
- Anti Rotation
- IFR Legs
- Pipe Supports
ER
-U
S A
IR
FO
R
C E - D
Y
ESS A
FB
-D
Y
ESS A
FB
, TX
-TA
N
K -5220-O
C
TO
B
ER
/2019
Description:
Remarks/Legend:
Drawing Title:
Owner:
Drawn By:
Date: Rev. No.: Scale:
Modified By: InterSpec, LLC.
IN
TER
SPEC
, LLC
-PR
O
PR
IETA
RY
IN
FO
R
M
ATIO
N
-FO
R O
FFIC
IA
L U
SE O
N
LY
A
B
C
D
E
F
File details come from the government source that posted it. Updated .