Attachment J - Special Instructions and information ROOFING.pdf
PDF 217 KB Posted
- Attached to
- Richmond Partial Seismic Rehabilitation
- Solicitation number
- 148319
- Issued by
- Multnomah County, Oregon
About this file
This document is Special Instructions and Information for a Roofing project issued by Portland Public Schools in Oregon. The file outlines mandatory documentation and deliverables that the awarded contractor must provide to the district, including contractor applications for payment, change requests, submittal registers, project schedules with four-week intervals, project closeout checklists, file naming conventions, and a project email address for all communications. Additionally, the contractor must submit information to support the district's Energy Trust of Oregon incentive application, including a letter describing existing roof insulation conditions, total square footage of roof being replaced, the R-value of new insulation, and a final invoice with a line item itemizing insulation costs. Items one through three must be submitted within 30 days of construction commencement, while the final invoice must be provided prior to retention billing with insulation costs clearly separated as a line item on the contractor's Schedule of Values.
The document includes specific language required in contractor submissions to the Energy Trust of Oregon, which must reference the square footage and location of the roofing project and detail whether existing insulation was water-damaged or absent. The instructions emphasize the integration of business equity and workforce equity considerations, with contractors required to acknowledge receipt of a Career Learning Welcome Letter. No pricing information, set-asides, or contract terms are specified in this attachment, as it functions as an administrative guidance document for post-award execution rather than a bidding or procurement document.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidders
The following documents will be provided electronically to the awarded contractor prior to the pre-construction conference. These documents are for use as part of, and integral to this project.
1. Contractor Application for Payment
2. Change Request
3. Submittal Register
4. 4/3 week short interval schedule
5. Project Close out checklist
6. File Naming Conventions
7. Project email address. All project email communication shall be cc’ed to this email address.
8. Project permit tracking template
9. Business Equity, Workforce Equity, and Career Learning Welcome Letter
Additionally, the contractor shall provide the following information for the Districts Energy Trust of Oregon incentives.
1. Letter from contractor describing the existing condition of the insulation (i.e. no existing insulation, water damaged insulation, etc.)
a. Letter shall also stipulate “Portland Public Schools is adding R-30 insulation to ____ SF of roofing at ______ School. The existing roof insulation was water damaged.” (Or….There was no existing roof insulation.)
2. Total square footage of roof being replaced.
3. R-value of new insulation.
4. Final invoice at the end of the project with a line item broken out for insulation costs.
Items 1 – 3 are required within 30 days of commencement of the construction, Item 4 is required as a line item on the contractors SOV as well as made available at the end of the project prior to retention billing.
Thank you
Attachment J