Attachment J.4 - Quality Assurance Surveillance Plan (QASP).docx

DOCX document 2 MB Posted

Attached to
National Centers for Environmental Information (NCEI) Northeast Regional Weather Records Center (NRWRC)
Solicitation number
1332KP26R0025
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for NOAA's National Centers for Environmental Information Regional Weather Records Centers Support Services contract, effective March 26, 2026. The QASP establishes systematic quality assurance methods and performance metrics for a performance-based Indefinite Delivery Indefinite Quantity (IDIQ) contract with a base period of 12 months plus four optional 12-month periods. The contract requires the contractor to provide regional weather records center support services, with core requirements (Task Order 1) on a Fixed Price basis. Key government personnel include Contracting Officer Audrey Hogg (240-621-1966, Audrey.Hogg@noaa.gov), Contracting Officer's Representative Sarah Morison (828-271-4657, Sarah.Morison@noaa.gov), and Program Technical Lead Tamara Houston (828-271-4266, Tamara.Houston@noaa.gov).

The QASP identifies nine core deliverables subject to 100% inspection with specific performance standards: Environmental Monitoring Reports, Quarterly Progress Reports, Weather-Related Impact and Outlook Summaries, Summary List of User Needs, Inventory of Products and Services, Prioritized List of User Needs, Workshops, Workshop Reports, and Transition Plans. All deliverables must meet a 99% on-time delivery standard and 100% content accuracy requirement. Surveillance methods include partner feedback, monthly director meetings, random monitoring, and Contractor Performance Assessment Report System (CPARS) evaluations. Performance ratings range from Exceptional to Unsatisfactory, with Contract Discrepancy Reports (CDRs) initiated for unacceptable performance. The contractor must perform all project management functions including contract, technical, personnel, administrative, and logistical management necessary to execute the total effort required.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA’s National Centers for Environmental Information (NCEI) Regional Weather Records Centers (RWRC) Support Services Quality Assurance Surveillance Plan (QASP) Version – March 26, 2026 For: Regional Weather Records Centers Contracts Contract Number: < upon award, enter contract number> Contract Description: Regional Weather Records Centers Contractor’s name: < upon award, enter contractor name > (hereafter referred to as the contractor).

1. PURPOSE.

This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance-based Indefinite Delivery Indefinite Quantity (IDIQ) contract and in subsequent additional work requirements issued thereunder. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.

This contract requirement is for contractor regional weather records centers support services to NOAA’s National Centers for Environmental Information. The resulting vehicle will be a performance-based IDIQ with the core requirements (Task Order 1) being FFP. This contract is for a base period of 12 months with four, 12 month, option periods. A properly executed QASP will assist the Government in achieving the objectives of this procurement.

The Contractor shall perform all Project Management functions including contract, technical, personnel, administrative, logistical, quality, business, and other management functions that are necessary to execute the total effort required by this PWS.

2. GOVERNMENT ROLES AND RESPONSIBILITIES.

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Audrey Hogg Organization or Agency: Satellite and Information Acquisition Division Telephone: 240-621-1966 Email: Audrey.Hogg@noaa.gov

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR shall provide this documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.

Assigned COR: Sarah Morison Telephone: 828-271-4657 Email: Sarah.Morison@noaa.gov

c. Other Key Government Personnel – Tamara Houston Title: Program Technical Lead Telephone: 828-271-4266 Email: Tamara.Houston@noaa.gov

3. CONTRACTOR REPRESENTATIVES:

The following employees of the contractor serve as the contractor’s representatives for this contract.

a. Director - <upon award, enter name> Telephone: <enter number> Email: <enter address>

4. PERFORMANCE STANDARDS.

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets, or does not meet these standards.

The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL) in Section 7 of this document.

5. INCENTIVES.

Not Applicable.

6. METHODS OF QUALITY ASSURANCE SURVEILLANCE.

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

Partner Feedback - The Program Manager and/or Technical Lead shall obtain feedback from NCEI’s Partners in the region and appropriate federal and state partners who routinely engage with the contractor on activities covered by the contract. This feedback will be provided to the COR, who will create a summary of all formally received feedback.

Director Meetings – The Program Manager and/or Technical Lead and COR shall meet with the RWRC Directors on a monthly basis. This level of monitoring shall promote accountability regarding the deliverables in the contract. The COR shall document the dates and agenda for the meetings, which will be provided by the Program.

Random Monitoring - The random monitoring shall be performed by the COR.

Contractor Performance Assessment Report System (CPARS) – The Government will evaluate the Quality of Service; Schedule; Cost Control, Business Relations, Management, and other important areas. As this information may affect future source selections throughout the Government, annual evaluations will be used appropriately as a complementary performance oversight and communication tool with the QASP.

QASP - The Quality Assurance Surveillance Plan, Section 7, shall be used by the Government in the technical administration of this QASP.

Regardless of the surveillance method, the COR shall always contact the Regional Weather Records Center Director when a defect is identified and inform the director of the specifics of the problem. The COR, with assistance from the CO, if needed, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.

Additionally, surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the CO’s actions.

7. QUALITY ASSURANCE SURVEILLANCE PLAN TABLE

Performance Requirements Summary

Section 4.1 and 4.2: Base and Regional Services Requirements

Required Service (Tasks)
Performance Standards
Acceptable Quality Level
Method of Surveillance

Provide Environmental Monitoring Reports On-time delivery Content Accuracy 99% on Time Data is 100% accurate 100% inspection

Provide Quarterly Progress Reports
On-time reporting

Content Accuracy 99% on Time Data is 100% accurate 100% inspection

Provide Support Weather-Related Impact and Outlook Summaries
On-time reporting

Content Accuracy 99% on Time Data is 100% accurate 100% inspection

Provide Summary List of User Needs
On-time reporting

Content Accuracy 99% on Time Data is 100% accurate 100% inspection

Maintain and Deliver Inventory of products and services Maintain and Deliver Inventory Information Content Accuracy 99% on Time Data is 100% accurate 100% inspection

Maintain and Deliver Prioritized List of User Needs Prioritized List of User Needs Content Accuracy 99% on Time Data is 100% accurate 100% inspection

Organize and Conduct Workshop(s)
Held on-time [100% on-time]

100% on Time

100% inspection

Develop and Deliver Summary Workshop Report(s) On-time delivery Content Accuracy 100% on Time Data is 100% accurate 100% inspection

Develop and Maintain a Transition Plan On-time delivery Content Accuracy 100% on Time Data is 100% accurate 100% inspection

All PWS tasks will be assessed focusing on the following:

Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., systems down-time), discuss causes, and assess the effectiveness of contractor corrective actions.

Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small dis-advantaged and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.

Other Important Areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.

8. RATINGS.

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

EXCEPTIONAL:
Performance significantly exceeds contract requirements to the Government’s benefit.
VERY GOOD:
Performance exceeds contract requirements to the Government’s benefit.
SATISFACTORY:
Performance meets contractual requirements.
MARGINAL:
Performance does not meet some contractual requirements.
UNSATISFACTORY:
Performance does not meet most contractual requirements.

9. DOCUMENTING PERFORMANCE.

a. ACCEPTABLE PERFORMANCE.

The Government routinely meets with the contractor and provides feedback on positive performance in those interactions, and via CPARS.

b. UNACCEPTABLE PERFORMANCE.

When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager or on-site representative. A CDR template is attached to this QASP.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other contractual actions deemed necessary by the CO.

10. FREQUENCY OF MEASUREMENT.

a. Frequency of Measurement.

See Table in Section 7.

b. Frequency of Performance Assessment The COR shall provide an interim written CPARS assessment annually, and a final written assessment at the end of the contract.

Prepared by: Sarah Morison

Signature - Contracting Officer’s Representative Date

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

CONTRACT DISCREPANCY REPORT (CDR)

1. Contract Number: <insert number>

2. To: (Contractor Program Manager, Task Manager or on-site representative) <insert name>

3. FROM: (Name of COR) <insert name>

4. Date and time observed discrepancy:

5. Discrepancy or Problem:

<Describe in detail, including reference to contract requirement. Identify any attachments.>

6. Corrective Action Plan:

A written corrective action plan < is / is not > required.

< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this

CDR. >

Prepared by: <Enter COR’s name>

_______________________________________________________
Signature - Contracting Officer’s RepresentativeDate

Received by:

Signature - Contractor Program Manager, Task Manager or Date On-site representative

The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.

Regional Weather Records Center Contract(s), April 2026
Page 1 of 2