US Army Corps of Engineers Omaha District
API 653 In-Service Inspection Report
Ft Hood, Texas Facility Number 7066
US Army Corps of Engineers Center of Expertise for Petroleum, Oils and Lubricants
(USACE POL-MCX)
20 May 2020
API 653 In-Service Inspection Report Ft Hood, TX
Table of Contents
ACRONYMS AND ABBREVIATIONS
GENERAL SUMMARY
INSPECTION DATE
STATE REGULATIONS
PREVIOUS INSPECTION DATES
RECOMMENDED FUTURE INSPECTION DATES (CALCULATIONS SHALL BE PROVIDED)
GENERAL TANK INFORMATION
A. GENERAL PROJECT INFORMATION
1. API 653 Inspection
2. Site Information
B. TANK INSPECTION COMMENTS
1. Tank Construction
2. Tank Foundation
3. Tank Bottom
4. Tank Shell
5. Tank Appurtenances
6. Tank Coating
7. Tank Piping System
8. Fire Protection System
9. Secondary Containment
10. Cathodic Protection
C. FINDINGS AND RECOMMENDATIONS
1. MANDATORY REPAIRS per API 653, UFC 3-460-01, or AW 78-24-27 Standards
2. REQUIRED REPAIRS to Fully Comply with API 653, UFC 3-460-01, or AW 78-24-27 Standards
3. RECOMMENDED REPAIRS as Part of Regular Maintenance
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
SHELL SETTLEMENT SURVEY
SHELL LAYOUT DRAWING
ROOF LAYOUT DRAWING
NEXT INSPECTION
APPENDIX B: 3-D DOCUMENTATION AND ANALYSIS
OUT OF PLUMBNESS (VERTICALLY)
ISOLATED SHELL DISTORTION
APPENDIX D: API 653 CHECKLISTS FOR TANK INSPECTIONS
APPENDIX E: PHOTOGRAPHS
API STANDARD 653
recommends that this document containing valuable historical information be retained
For the life of this tank.
ACRONYMS AND ABBREVIATIONS
API American Petroleum Institute
ASME American Society of Mechanical Engineers
ASNT American Society of Non-Destructive Testing
ATG Automatic Tank Gauge
BBL Barrel
CFR Code of Federal Regulations
CP Cathodic Protection
DFT Dry Film Thickness
HLA High Level Alarm
HLCS High Level Control Shutoff
HHLA High-High Level Alarm
LLA Low Level Alarm
LLLA Low-Low Level Alarm
MFL Magnetic Flux Leakage
MT Magnetic Particle Testing
NACE National Association of Corrosion Engineers
NDT Non-Destructive Testing
NFPA National Fire Protection Association
PSI Pounds per Square Inch
PT Penetrant Testing
P/V Pressure/Vacuum
RP Recommended Practice
PST Product Saver Tank
RT Radiography Testing
TML Thickness Measurement Location
TRV Thermal Relief Valve
UFC Unified Facilities Criteria
UFGS Unified Facilities Guide Specifications
ULS Ultra Low Sulfur
UT Ultrasonic Testing
VT Visual Testing
GENERAL SUMMARY
Tank 7066 is located at Ft Hood, Texas and is a welded, steel, vertical aboveground jet fuel (JP-8) storage tank. The tank was built per API 650 9th edition in 1998 and the manufacturer is Pittsburg Tank and Tower Co, Inc. Tank 7066 is 22’ in diameter and 22.17’ tall with a maximum liquid level of 19' high per the certified strapping chart. The In-service inspection was performed May 20, 2020, and the results of this inspection will provide recommendations for repairs and upgrades which are required to comply with applicable industry and military standards. The testing and inspection was performed in accordance with the applicable sections of the Fifth Edition of API 653. Contained in this report is a detailed account of the tank inspection, a summary of the non-destructive testing, and the conclusions derived from the inspection and testing.
INSPECTION DATE
API In-Service (Internal) Inspection Date: 20 May 2020
Equipment Used:
Manufacturer: Dakota Ultrasonic’s Model Number: CMX DL Calibration Method: Zeroing Procedure, Multi-step Thickness gauge
Inspectors:
John Hester API 653/NDE level II Kyle O’Dell EIT
STATE REGULATIONS
State Regulation for API In-Service Tank Inspections N/A State Regulation for API Out-of-Service Tank Inspections 20 Years
NOTE: If there are no state regulations for tank inspections then N/A shall reside in-place of the number of years between inspections. If state regulations reside, the recommended future inspections dates shall be based on whichever is more stringent between the API inspector’s calculations and the State regulations.
PREVIOUS INSPECTION DATES
API Out-of-Service (Internal) Inspection Date: 22 May 2008 API In-Service (External) Inspection Date: 20 May 2020
RECOMMENDED FUTURE INSPECTION DATES (CALCULATIONS SHALL BE PROVIDED)
API Out-of-Service (Internal) Inspection Date: 22 May 2028 API In-Service (External) Inspection Date: 20 May 2025 Ultrasonic Thickness Testing (UT) 22 May 2023
John Hester Hasan Daysal, P.E.
Project Manager/Inspector Engineer Robert and Company Robert and Company API 653 No. 88616 API 653 No. 27811 STI/SP001 No. AST-2092 ASNT NDT Level II No. 164397
GENERAL TANK INFORMATION
ITEM DESCRIPTION
Owner U.S. Army Location Ft Hood Facility Number 7066 Tank Number 7066 State / Country Texas City Killeen Inspection Date 20 May 2020 Tank Manufacturer Pittsburg Tank and Tower Co, Inc.
Design Standard API 650 9th Edition (per previous report) Date of Construction 1998 Tank Contents Jet Fuel/JP-8 Tank Serial Number N/A Tank Diameter 22’ Shell Height 20.1’ Product Height 19’ Tank Capacity 1190 BBL (per data plate) Foundation Concrete ringwall
Construction
Bottom Lap welded w/ Annular ring Shell Butt welded steel plates Floating Roof Aluminum floating pan Fixed Roof Lap welded steel plates
Material
Bottom A36 Shell A36 Floating Roof Aluminum Fixed Roof A36
Cathodic Protection Data not available
Interior Coating System Thin film epoxy (per previous repor)
Exterior Coating System Appears to be standard epoxy-polyurethane 100% of exterior Surfaces.
Level Gauging Mechanical tape gauge, ENRAF.
Overfill Protection HLA, HHLA, LLA, LLLA Piping Receipt 6” Carbon Steel Issue 6” Carbon Steel Low Suction 4” Carbon Steel Water Draw-Off 1” Carbon Steel Level Alarms High Level Alarm (HLA) / Low Level Alarm(LLA)
Type of Internal Floating Roof Aluminum Honeycomb with a Double wiper seal
A. GENERAL PROJECT INFORMATION
1. API 653 Inspection An In-Service API 653 inspection was performed 20 May 2020 on Tank 7066. Results of this inspection identified recommended repairs and upgrades required to comply with API 650/653, UFC 3-460-01, 3-460-03, AW 78-24-27 and industry standards.
2. Site Information The airport is based inside the south end of the Fort Hood Military Reservation. The base was named after a Killeen native who was a pilot of a B-25 bomber on the famous Doolittle Raid on Tokyo in 1942. He was killed later in World War II flying combat missions.
B. TANK INSPECTION COMMENTS
1. Tank Construction Tank 7066 is located at Ft Hood, Texas and is a welded, steel, vertical aboveground jet fuel (JP-8) storage tank. The tank was built per API 650 in 1998 and the manufacturer is Pittsburg Tank and Tower Co, Inc.. Tank 7066 is 22’ in diameter and has a maximum liquid level of 19' high per the certified strapping chart. There is a nameplate on the tank.
2. Tank Foundation The tank is supported on a Concrete ringwall. The ringwall does not have underside leak detection “telltales” in its perimeter. The tank is anchored to the ringwall. The bottom-to-ringwall seal is in a minor state of deterioration. A settlement evaluation was performed during the inspection. Signs of settlement were noted. See Appendix A for settlement results.
3. Tank Bottom The tank bottom is of cone-down construction with a 22’ diameter. The tank has secondary containment under the bottom.
4. Tank Shell The tank shell is equipped with two eight foot and one 4 foot butt-welded steel shell courses. There are two 36” manways on the tank. Manways have a weld spacing between their reinforcing plates and the adjacent anchor block less than that required by API 650, Para. 5.7.3. Such practice results in areas of increased stress concentration and possible accelerated corrosion. Visual (VT) inspection of these manway / nozzle details and the surrounding welds did not identify any such corrosion at this time. Continue to monitor this area at future inspection intervals.
https://en.wikipedia.org/wiki/Fort_Hood https://en.wikipedia.org/wiki/Doolittle_Raid
5. Tank Appurtenances
a. Internal Floating Roof
The floating roof consists of aluminum honeycomb sandwich panels.
b. Geodesic Dome Roof
N/A
c. Gauging The tank is provided with an ENRAF gauging system, 8” gauging hatch for manual gauging, Varec model 2500 tape gauge for monitoring liquid level from the ground.
d. Level Alarms
The tank is provided with independent shell mounted High-Level alarm (HLA), High-High level alarm (HHLA), an independent low level alarm (LLA), and Low-Low level alarm
(LLLA).
e. Stairs and Platforms The tank is provided with a staircase with an upper platform for roof access. The tank has ladder access attached to tank.
f. Grounding and Bonding The tank is equipped with three (3) grounding lugs attached to the tank shell. These types of grounding connections do not meet DOD standards.
6. Tank Coating The exterior coating of the shell is in satisfactory condition.
7. Tank Piping System All nozzles are adequately reinforced. The manway repads do not have required spacing at the chime weld. All piping with repads have weep holes that are in an incorrect position.
8. Fire Protection System Full contact Internal Floating Roof
9. Secondary Containment Tank 7066 is located within a concrete containment dike. A leak test was performed on the containment dike drainage system. The leak test revealed that the drainage system is liquid-tight with no indications of seepage. Secondary containment exceeds the requirements of UFC 3-460-01.
𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 𝑠𝑠𝑠𝑠𝑠𝑠𝑐𝑐𝑠𝑠𝑐𝑐𝑠𝑠𝑐𝑐𝑠𝑠𝑠𝑠𝑐𝑐 = (108′ × 36.333′ × 2.91666′)− (36.333′ × . 666′ ×. 58333′)
= 11,431 𝑓𝑓𝑐𝑐3 = 2,036 𝑏𝑏𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑏𝑏𝑠𝑠
1 𝑓𝑓𝑠𝑠𝑠𝑠𝑐𝑐 𝑠𝑠𝑠𝑠𝑠𝑠𝑟𝑟𝑠𝑠𝑐𝑐𝑐𝑐𝑠𝑠𝑠𝑠 𝑠𝑠𝑓𝑓 𝑤𝑤𝑠𝑠𝑏𝑏𝑏𝑏 = 108′ × 36.333′ × 1.0′ = 3,924𝑓𝑓𝑐𝑐3 = 699 𝑏𝑏𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑏𝑏𝑠𝑠
𝑇𝑇𝑠𝑠𝑠𝑠𝑇𝑇 𝑠𝑠ℎ𝑠𝑠𝑟𝑟𝑏𝑏𝑠𝑠 𝑏𝑏𝑠𝑠 𝑠𝑠𝑐𝑐𝑠𝑠𝑏𝑏𝑏𝑏𝑠𝑠𝑠𝑠 𝑐𝑐ℎ𝑠𝑠𝑠𝑠 = 11,431 𝑓𝑓𝑐𝑐3 − 3,924 𝑓𝑓𝑐𝑐3 = 7,507 𝑓𝑓𝑐𝑐3 = 1,337 𝑏𝑏𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑏𝑏𝑠𝑠
10. Cathodic Protection No data received from Ft Hood or on previous reports of type installed.
C. FINDINGS AND RECOMMENDATIONS
1. MANDATORY REPAIRS per API 653, UFC 3-460-01, or AW 78-24-27 Standards Mandatory repairs represent items that require immediate attention, in order to prevent imminent risk to system operators, equipment integrity, or the adjacent environment. The tank should remain out of service until these repairs are completed.
No mandatory repairs are required for continued service.
2. REQUIRED REPAIRS to Fully Comply with API 653, UFC 3-460-01, or AW 78-24-27 Standards Recommended repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment. These items may be required by Federal, State and Local Codes or by Military Criteria.
a. Title: Add NFPA Label
OBSERVATION: TANK 90198 DOES NOT HAVE THE REQUIRED NFPA LABEL
REFERENCE: AW-78-24-28, UFC 3-460-01
RECOMMENDATION: INSTALL NFPA LABEL
b. Title Install 2 inch DBB valve on product recovery tank OBSERVATION: WATER DRAW OFF DOES NOT HAVE THE REQUIRED TWO INCH DOUBLE BLOCK AND BLEED
VALVE AND HAS GALVANIZED LINE INSTALLED
REFERENCE: AW-78-24-28
RECOMMENDATION: REMOVE 1INCH VALVE AND INSTALL A TWO INCH DOUBLE BLOCK AND BLEED PLUG
VALVE AND NEW PIPING TO THE PRODUCT RECOVERY TANK
3. RECOMMENDED REPAIRS as Part of Regular Maintenance Recommended repairs represent items that should be addressed in a timely manner in order to prevent future potential risks to system operators, equipment integrity, or the adjacent environment.
a. Title: Receipt Line Remove sight glass
OBSERVATION: THERMAL RELIEF SIGHT GLASS INSTALLED
REFERENCE: AW-78-24-28
RECOMMENDATION: REMOVE SIGHT GLASS RMMR FYF-PND-116LL
b. Title: Issue Line Remove sight glass
OBSERVATION: THERMAL RELIEF SIGHT GLASS INSTALLED
REFERENCE: AW-78-24-28
RECOMMENDATION: REMOVE SIGHT GLASS RMMR FYF-PND-116LL
APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS
SHELL SETTLEMENT SURVEY
SHELL LAYOUT DRAWING
ROOF LAYOUT DRAWING
NEXT INSPECTION
APPENDIX B: 3-D DOCUMENTATION AND ANALYSIS
OUT OF PLUMBNESS (VERTICALLY)
The tank was checked by using laser measurements taken from fixed locations at 8 points around tank from chime weld to the roof weld. The Tank’s plumbness is in satisfactory condition at this time.
ISOLATED SHELL DISTORTION
There was no significant shell distortion noted at this time.
APPENDIX D: API 653 CHECKLISTS FOR TANK INSPECTIONS
Tank In-Service Inspection Checklist
Item Completed
X C.1.1 Foundation
Measure foundation levelness and bottom elevations (see Annex B for extent of measurements). X C.1.1.1 Concrete Ring a Inspect for broken concrete, spalling, and cracks, particularly under backup bars used in welding butt-welded annular rings under the shell. X b Inspect drain openings in ring, back of water draw basins and top surface of ring for indications of bottom leakage. X c Inspect for cavities under foundation and vegetation against bottom of tank. X d Check that runoff rainwater from the shell drains away from tank. X e Check for settlement around perimeter of tank. X
C.1.1.2 Asphalt a Check for settling of tank into asphalt base which would direct runoff rain water under the tank instead of away from it. N/A b Look for areas where leaching of oil has left rock filler exposed, which indicates hydrocarbon leakage. N/A C.1.1.3 Oiled Dirt or Sand
Check for settlement into the base which would direct runoff rain water under the tank rather than away from it. N/A
C.1.1.4 Rock
Presence of crushed rock under the steel bottom usually results in severe underside corrosion. Make a note to do additional bottom plate examination (ultrasonic, hammer testing, or turning of coupons) when the tank is out of service.
N/A
C.1.1.5 Site Drainage a Check site for drainage away from the tank and associated piping and manifolds. X b Check operating condition of the dike drains. X
C.1.1.6 Housekeeping Inspect the area for buildup of trash, vegetation, and other inflammables buildup. X
C.1.1.7 Cathodic Protection Review cathodic protection potential readings. N/A
C.1.2 Shells C.1.2.1 External Visual Inspection a Visually inspect for paint failures, pitting, and corrosion. X b Clean off the bottom angle area and inspect for corrosion and thinning on plate and weld. X c Inspect the bottom-to-foundation seal, if any. X
C.1.2.2 Internal (Floating Roof Tank) Visually inspect for grooving, corrosion, pitting, and coating failures. N/A
C.1.2.3 Riveted Shell Inspection a Inspect external surface for rivet and seam leaks. N/A b Locate leaks by sketch or photo (location will be lost when shell is abrasive cleaned for painting). N/A c Inspect rivets for corrosion loss and wear. N/A
Tank In-Service Inspection Checklist Continued
Item Completed
X d Inspect vertical seams to see if they have been full fillet lap-welded to increase joint efficiency. N/A e If no record exists of vertical riveted seams, dimension and sketch (or photograph) the rivet pattern: number of rows, rivet size, pitch length, and note whether the joint is butt-riveted or lap-riveted.
N/A
C.1.2.4 Wind Girder (Floating Roof Tanks) a Inspect wind girder and handrail for corrosion damage (paint failure, pitting, corrosion product buildup), especially where it occurs at tack-welded junction, and for broken welds. N/A b Check support welds to shell for pitting, especially on shell plates. N/A c Note whether supports have reinforcing pads welded to shell. N/A
C.1.3 Shell Appurtenances C.1.3.1 Manways and Nozzles a Inspect for cracks or signs of leakage on weld joint at nozzles, manways, and reinforcing plates. X b Inspect for shell plate dimpling around nozzles, caused by excessive pipe deflection. X c Inspect for flange leaks and leaks around bolting. X d Inspect sealing of insulation around manways and nozzles. X e Check for inadequate manway flange and cover thickness on mixer manways. X
C.1.3.2 Tank Piping Manifolds a Inspect manifold piping, flanges, and valves for leaks. X b Inspect fire fighting system components. X c Check for anchored piping which would be hazardous to the tank shell or bottom connections during earth movement. X d Check for adequate thermal pressure relief of piping to the tank. X e Check operation of regulators for tanks with purge gas systems. X f Check sample connections for leaks and for proper valve operation. X g Check for damage and test the accuracy of temperature indicators. X h Check welds on shell-mounted davit clips above valves 6 in. and larger. X
C.1.3.3 Autogauge System a Inspect autogauge tape guide and lower sheave housing (floating swings) for leaks. X b Inspect autogauge head for damage. X c Bump the checker on autogauge head for proper movement of tape. X d Identify size and construction material of autogauge tape guide (floating roof tanks). X e Ask operator if tape tends to hang up during tank roof movement (floating roof tanks). X f Compare actual product level to the reading on the autogauge (maximum variation is 2 in.). X g On floating roof tanks, when the roof is in the lowest position, check that no more than two ft of tape are exposed at the end of the tape guide. X h Inspect condition of board and legibility of board-type autogauges. X i Test freedom of movement of marker and float. X
C.1.3.4 Shell-Mounted Sample Station a Inspect sample lines for function of valves and plugging of lines, including drain or return-to-tank line. N/A b Check circulation pump for leaks and operating problems. N/A Tank In-Service Inspection Checklist Continued
Item Completed
X c Test bracing and supports for sample lines and equipment. N/A
C.1.3.5 Heater (Shell Manway Mounted)
Inspect condensate drain for presence of oil indicating leakage. N/A C.1.3.6 Mixer a Inspect for proper mounting flange and support. N/A b Inspect for leakage. N/A c Inspect condition of power lines and connections to mixer. N/A
C.1.3.7 Swing Lines: Winch Operation a Nonfloating. Raise, then lower the swing line with the winch, and check for cable tightness to confirm that swing line lowered properly. N/A b Floating. With tank half full or more, lower the swing line, then let out cable and check if swing has pulled cable tight, indicating that the winch is operating properly. N/A c Indicator. Check that the indicator moves in the proper direction: Floating swing line indicators show a lower level as cable is wound up on the winch. Non-floating swing line indicators show the opposite.
N/A
C.1.3.8 Swing Lines: External Guide System
Check for leaks at threaded and flanged joints. N/A C.1.3.9 Swing Lines: Identify Ballast Varying Need
Check for significant difference in stock specific gravity. N/A C.1.3.10 Swing Lines: Cable Material and Condition a For non stainless steel cable, check for corrosion over entire length. N/A b All cable: check for wear or fraying. N/A
C.1.3.11 Swing Lines: Product Sample Comparison
Check for water or gravity differences that would indicate a leaking swing joint. N/A
C.1.3.12 Swing Lines: Target
Target should indicate direction of swing opening (up or down) and height above bottom where suction will be lost with swing on bottom support. N/A
C.1.4 Roofs
C.1.4.1 Deck Plate Internal Corrosion
For safety, before accessing the roof, check with ultrasonic instrument or lightly use a ball peen hammer to test the deck plate near the edge of the roof for thinning. (Corrosion normally attacks the deck plate at the edge of a fixed roof and at the rafters in the center of the roof first.)
X
C.1.4.2 Deck Plate External Corrosion
Visually inspect for paint failure, holes, pitting, and corrosion product on the roof deck. X C.1.4.3 Roof Deck Drainage
Look for indication of standing water. (Significant sagging of fixed roof deck indicates potential rafter failure. Large standing water areas on a floating roof indicate inadequate drainage design or, if to one side, a nonlevel roof with possible leaking pontoons.)
X
Tank In-Service Inspection Checklist Continued
Item Completed
X C.1.4.4 Level of Floating Roof
At several locations, measure distance from roof rim to a horizontal weld seam above the roof. A variance in the readings indicates a nonlevel roof with possible shell out-of-round, out-of-plumb, leaking pontoons, or hang-up. On small diameter tanks, an unlevel condition can indicate unequal loading at that level.
X
C.1.4.5 Gas Test Internal Floating Roof
Test for explosive gas on top of the internal floating roof. Readings could indicate a leaking roof, leaking seal system, or inadequate ventilation of the area above the internal floating roof. N/A
C.1.4.6 Roof Insulation a Visually inspect for cracks or leaks in the insulation weather coat where runoff rain water could penetrate the insulation. N/A b Inspect for wet insulation under the weather coat. N/A c Remove small test sections of insulation and check roof deck for corrosion and holes near the edge of the insulated area. N/A
C.1.4.7 Floating Roof Seal Systems a Inspect the condition of the seal, measure and record maximum rim spaces and seal to- shell gaps around the full roof circumference at the level of inspection. X
NOTE Inspection of the seal and measurement of the rim spaces and seal-to-shell gaps at more than one level may be necessary to more fully determine if any problems exist at other levels of tank operation).
b Measure and record annular space at 30-ft spacing (minimum of four quadrants) around roof and record. Measurements should be taken in directly opposite pairs. N/A
1) _______ _______ Opposite pair 1. N/A
2) _______ _______ Opposite pair 2. N/A c Check if seal fabric on primary shoe seals is pulling shoes away from shell (fabric not wide enough). N/A d Inspect fabric for deterioration, holes, tears, and cracks. N/A e Inspect visible metallic parts for corrosion and wear. X f Inspect for openings in seals that would permit vapor emissions. X g Inspect for protruding bolt or rivet heads against the shell. X h Pull both primary and secondary seal systems back all around the shell to check their operation. X i Inspect secondary seals for signs of buckling or indications that their angle with the shell is too shallow. X j Inspect wedge-type wiper seals for flexibility, resilience, cracks, and tears. X C.1.5 Roof Appurtenances
C.1.5.1 Sample Hatch a Inspect condition and functioning of sample hatch cover. X b On tanks governed by Air Quality Monitoring District rules, check for the condition of seal inside hatch cover. X c Check for corrosion and plugging on thief and gauge hatch cover. X d Where sample hatch is used to reel gauge stock level, check for marker and tab stating hold-off distance. X e Check for reinforcing pad where sample hatch pipe penetrates the roof deck. X
Completed
X f On floating roof sample hatch and recoil systems, inspect operation of recoil reel and condition of rope. N/A g Test operation of system. N/A h On ultra clean stocks such as JP4, check for presence and condition of protective coating or liner inside sample hatch (preventing rust from pipe getting into sample). N/A
C.1.5.2 Gauge Well a Inspect visible portion of the gauge well for thinning, size of slots, and cover condition. X b Check for a hold-off distance marker and tab with hold-off distance (legible). X c On floating roofs, inspect condition of roof guide for gauge well, particularly the condition of the rollers for grooving. N/A d If accessible, check the distance from the gauge well pipe to the tank shell at different levels. N/A e If tank has a gauge well washer, check valve for leakage and for presence of a bull plug or blind flange. N/A
C.1.5.3 Fixed Roof Scaffold Support
Inspect scaffold support for corrosion, wear, and structural soundness. X C.1.5.4 Autogauge: Inspection Hatch and Guides (Fixed Roof) a Check the hatch for corrosion and missing bolts. X b Look for corrosion on the tape guide’s and float guide’s wire anchors. X
C.1.5.5 Autogauge: Float Well Cover a Inspect for corrosion. X b Check tape cable for wear or fraying caused by rubbing on the cover. X
C.1.5.6 Sample Hatch (Internal Floating Roof) a Check overall conditions. X b When equipped with a fabric seal, check for automatic sealing after sampling. N/A c When equipped with a recoil reel opening device, check for proper operations. N/A
C.1.5.7 Roof-mounted Vents (Internal Floating Roof)
Check condition of screens, locking and pivot pins. X C.1.5.8 Gauging Platform Drip Ring
On fixed roof tanks with drip rings under the gauging platform or sampling area, inspect for plugged drain return to the tank. N/A
C.1.5.9 Emergency Roof Drains
Inspect vapor plugs for emergency drain: that seal fabric discs are slightly smaller than the pipe ID and that fabric seal is above the liquid level. N/A
C.1.5.10 Removable Roof Leg Racks
Check for leg racks on roof. N/A C.1.5.11 Vacuum Breakers
Report size, number, and type of vacuum breakers. Inspect vacuum breakers. If high legs are set, check for setting of mechanical breaker in high leg position. X
C.1.5.12 Rim Vents a Check condition of the screen on the rim vent cover. X
Completed
X b Check for plating off or removal of rim vents where jurisdictional rules do not permit removal. X
C.1.5.13 Pontoon Inspection Hatches a Open pontoon inspection hatch covers and visually check inside for pontoon leakage. N/A b Test for explosive gas (an indicator of vapor space leaks). N/A c If pontoon hatches are equipped with locked down coves, check for vent tubes. Check that vent tubes are not plugged up. Inspect lock-down devices for condition and operation. N/A
C.1.6.1 Access ways
See Tank Out-of-service Inspection Checklist, Item C.2.12. N/A
NOTES:
APPENDIX E: PHOTOGRAPHS
E.1: North View E.2: East View
E.3: South View E.4: West View
E.5: Varec manual tank gauge E.6: 6” Receipt line
E.7: Pressure relief E.8: Name Plate
E.9: Water Draw E.10: 6” Issue line
E.11: 4” Pump-out E.12: Reference manway
E.13: Secondary manway E.14: Sample Hatch
E.15: ENRAF E.16: Center Vent
E.17: Center Vent Screen E.18: Typical ground
E.19: Rim Vent E.20: Low/Low Low Level
E.21: High/High High Level E.22: Fire Protection
E.23: Fire Protection injection Point E.24: Top view
E.25: Top Manway E.26: Tiedown
E.27: Containment Drain Valve E.28: Fire Protection
| ACRONYMS AND ABBREVIATIONS |
| GENERAL SUMMARY |
| INSPECTION DATE |
| STATE REGULATIONS |
| PREVIOUS INSPECTION DATES |
| RECOMMENDED FUTURE INSPECTION DATES (CALCULATIONS SHALL BE PROVIDED) |
| GENERAL TANK INFORMATION |
| A. GENERAL PROJECT INFORMATION |
| 1. API 653 Inspection |
| 2. Site Information |
| B. TANK INSPECTION COMMENTS |
| 1. Tank Construction |
| 2. Tank Foundation |
| 3. Tank Bottom |
| 4. Tank Shell |
| 5. Tank Appurtenances |
| 6. Tank Coating |
| 7. Tank Piping System |
| 8. Fire Protection System |
| 9. Secondary Containment |
| 10. Cathodic Protection |
| C. FINDINGS AND RECOMMENDATIONS |
| 1. MANDATORY REPAIRS per API 653, UFC 3-460-01, or AW 78-24-27 Standards |
| 2. REQUIRED REPAIRS to Fully Comply with API 653, UFC 3-460-01, or AW 78-24-27 Standards |
| a. Title: Add NFPA Label |
| b. Title Install 2 inch DBB valve on product recovery tank |
| 3. RECOMMENDED REPAIRS as Part of Regular Maintenance |
| a. Title: Receipt Line Remove sight glass |
| b. Title: Issue Line Remove sight glass |
| APPENDIX A: ENGINEERING CALCULATIONS AND DRAWINGS |
| SHELL SETTLEMENT SURVEY |
| SHELL LAYOUT DRAWING |
| ROOF LAYOUT DRAWING |
| NEXT INSPECTION |
| APPENDIX B: 3-D DOCUMENTATION AND ANALYSIS |
| OUT OF PLUMBNESS (VERTICALLY) |
| ISOLATED SHELL DISTORTION |
| APPENDIX D: API 653 CHECKLISTS FOR TANK INSPECTIONS |
| APPENDIX E: PHOTOGRAPHS |