Attachment J.2 - Cost Proposal Template.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Resurface SATF Asphalt Traction Test Pad
- Solicitation number
- 693JJ924R000026
About this file
This document is a Cost Proposal Template for a federal contract opportunity related to a project to resurface the asphalt traction test surface at the National Highway Traffic Safety Administration's (NHTSA) San Angelo Test Facility (SATF).
The solicitation, numbered 693JJ924R000026, is for a project to replace the existing asphalt UTQG traction test surface at the SATF located on Goodfellow Air Force Base in San Angelo, Texas. The objective is to replace the surface with a durable material that meets the tire test surface specifications in 49 C.F.R. 575.104. The work may include identifying a suitable asphalt mix, removing the existing surface, placing a new surface, and repainting the required lines. The Government contemplates awarding a Cost Plus Fixed-Fee type contract with a period of performance not to exceed 24 months. The response date for this solicitation is July 15, 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task Breakout
| COST ELEMENTS | Total FTEs | TASK C.4.1 | TASK C.4.2 | TASK C.4.3 | Total | ||||||||||||||
| Hours | Rates | Total | Hours | Rates | Total | Hours | Rates | Total | Hours | Rates | Total | Hours | Rates | Total | Hours | Rates | Total | ||
| COST ELEMENTS |
| Labor Categories | ||||||||||||||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | ERROR:#REF! | $0.00 | ERROR:#REF! | ||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | ERROR:#REF! | $0.00 | ERROR:#REF! | ||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | ERROR:#REF! | $0.00 | ERROR:#REF! | ||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | ERROR:#REF! | $0.00 | ERROR:#REF! | ||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | ERROR:#REF! | $0.00 | ERROR:#REF! | ||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | ERROR:#REF! | $0.00 | ERROR:#REF! | ||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | ERROR:#REF! | $0.00 | ERROR:#REF! | ||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | ERROR:#REF! | $0.00 | ERROR:#REF! | ||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | ERROR:#REF! | $0.00 | ERROR:#REF! | ||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | ERROR:#REF! | $0.00 | ERROR:#REF! | ||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | ERROR:#REF! | $0.00 | ERROR:#REF! | ||||
| $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | $0.00 | $0 | ERROR:#REF! | $0.00 | ERROR:#REF! | ||||
| Subtotal Direct Labor | 0 | $0 | 0 | $0 | $0 | 0 | $0 | $0 | ERROR:#REF! | ERROR:#REF! |
Fringe Benefits (NA)
Total Direct Labor $0 $0 $0 $0 $0 ERROR:#REF!
| Travel (See separate schedule) | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| SUBCONTRACTORS | ||||||||||||
| Subcontractor Name | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| Subcontractor Name | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| Subcontractor Name | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| Subcontractor Name | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| Subcontractor Name | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| Subcontractor Name | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| Subcontractor Name | $0 | $0 | $0 | $0 | $0 | $0 | ||||||
| Total Subcontractor | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 |
Other Direct Costs (See separate schedule) $0 $0 $0 $0 $0 $0
SUBTOTAL ALL DIRECT COSTS $0 $0 $0 $0 $0 ERROR:#REF!
Indirect Costs Rate (at ______ %) (Only on ODC's) $0 $0 $0 $0 $0 ERROR:#REF!
SUBTOTAL COSTS $0 $0 $0 $0 $0 ERROR:#REF!
Total Cost $0 $0 $0 $0 $0 ERROR:#REF!
Offerors can add more columns as necessary to incorpotate all tasks.
&"-,Bold"NHTSA RFP 693JJ919R000090 TITLE: Low Cost Pedestrian Safety Zones Demonstrations
COST PROPOSAL TEMPLATE (T&M)
Attachment J.1&"-,Regular"&10
Price Schedule
SECTION C - STATEMENT OF OBJECTIVES
TOTAL ESTIMATED CONTRACT COST: TBD
| LABOR CATEGORIES | ESTIMATED LEVEL OF EFFORT | FIXED LOADED HOURLY RATES | TOTAL PRICE |
| (HOURS) |
TOTAL DIRECT LABOR
File details come from the government source that posted it. Updated .