Attachment J-7 Cost Estimate Table Template.pdf

PDF 328 KB Posted

Attached to
Medium Unmanned Surface Vessel (MUSV) Family of Systems (FoS) program- Request for Prototype Proposal
Solicitation number
N00024-26-R-6326
Issued by

About this file

This document is a pricing template attachment for a federal contract opportunity related to Medium Unmanned Surface Vessel (MUSV) services. The file provides standardized Rough Order of Magnitude (ROM) pricing tables that contractors must complete for two distinct service models, with all pricing reported in 2026 U.S. Dollars (thousands) and hours rounded to the nearest tenth.

Model 1 presents two contractual approaches: a CO/CO (Contractor-Owned/Contractor-Operated) scenario with annual rate and FFP (Firm Fixed Price) purchase options, and a Government Purchase scenario with annual recurring autonomy licenses and FFP vessel purchases. Both models include two operational scenarios (1,250 and 2,500 operational days per year) with Option Years 4 and 5. The CO/CO model requires reporting of vessel costs, insurance, software licensing, operations and sustainment (O&S) rates, and total vessel pricing. Model 2 addresses block buy scenarios for quantities of 5 and 10 vessels, requiring detailed cost breakdowns by labor hours, labor costs, materials, other direct costs (ODC), and total costs, along with annual recurring autonomy license fees and FFP vessel purchase prices. Instructions mandate that all data include prime and subcontractor work at full cost including direct/indirect expenses, profit, and fees. Contractors must enter "0" for null amounts and cannot leave fields blank. Fuel pricing, CONUS/OCONUS travel, and dispatch/recovery costs are explicitly excluded from reporting requirements.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-7

Rough Order of Magnitude (ROM) Pricing Tables for

Medium Unmanned Surface Vessel (MUSV)

March 2026

Version 1.0

MUSV ROM Pricing Tables Instructions

1. The contractor shall complete each reporting section below.

2. Hours and cost data reported must include all work performed by both Prime and

Subcontractors at price (i.e., including direct/indirect costs, Profit/Loss or Fee)

3. Report all hours throughout this form rounded to the nearest tenth. Enter “0” (zero) for items with null amounts; do not leave items blank.

4. Report all pricing throughout this form in 2026 U.S. Dollars thousands, rounded to the nearest tenth. Enter “0” (zero) for items with null amounts; do not leave items blank.

5. Fuel pricing should not be included

6. CONUS and OCONUS Travel as well as Dispatch and Recover pricing should not be included

Model 1 CO/CO

Annual Rate ($k)

FFP Purchase

($k)

Scenario

Vessel Insurance Software Licensing

O&S Rate Total

Vessel

1,250 Operational Days per Year

Option Year 4

Option Year 5

2,500 Operational Days per Year

Model 1 Government Purchase Annual Recurring FFP Purchase ($k)

Scenario Autonomy ($k) License Vessel 1,250 Operational Days per Year

2,500 Operational Days per Year

Model 2

Annual Recurring Autonomy ($k) License

FFP Purchase ($k)

Vessel

Block Buy Quantity 5 Quantity 10

Model 2

Total Cost ($k) Annual Recurring

Labor Hours Labor Material

ODC

Total

Autonomy ($k) License

Block Buy Quantity 5 Quantity 10

File details come from the government source that posted it. Updated .