- AH-64E V4 Apache L7 Maintenance Training Devices
- Solicitation number
- ApacheRFI0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BETA SAM RFI June 2 SBdoc.doc | DOC document | |
| Attachment J-4 Government Furnished Information 1 June 2020.pdf | ||
| AH-64 Apache L7 V4 SOW Updated June 2 2020.docx | DOCX document | |
| J-1 attachment L7 Performance Specification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Phase 2 L7 build-Base contract L7 full build-Options 1, 2 and 3
Legacy device; MPSU and additional Crash
Damaged assets provided for production/integration effort.
Legacy device; MPSU and additional Crash
Damaged assets provided for production/integration effort.
The following modeled components are provided as GFE: Modeled AH-64E main transmission assembly; modeled left and right AH-64E nose gearboxes; modeled Fire Control Radar assembly;
modeled M-TADS assembly, modeled MSPU assembly; modeled RCEFS tank. All other 64E/V4 components are to be modeled under the phase 2 contract.
The following modeled components are provided as GFE: Modeled AH-64E main transmission assembly; modeled left and right AH-64E nose gearboxes; modeled Fire Control Radar assembly;
modeled M-TADS assembly, modeled MSPU assembly; modeled RCEFS tank. All other 64E/V4 components are to be modeled under the phase 2 contract.
Device fuselage disassembled, cleaned, and inspected for re-use with landing gear attached and false struts installed
Needs to be completed
The fuselage has been prepped, primed, and painted to a 75% completion Needs to be completed
AH-64 Delta to Echo and V4 structural modifications of the fuselage are completed Needs to be completed
Wire harnesses are clamped in with connector terminations at 50% complete Needs to be completed
Simulation power distribution system installation at 50% complete Needs to be completed
8 Wings and Vertical Stabilator are installed Needs to be completed
Hydraulics and Flight Control systems installation at 75% complete Needs to be completed
LRU modification and manufacturing are at 30% complete Needs to be completed
Attachment J-3
GSA L7 production effort Phase 2 start point/Full build start point spec sheet