ATTACHMENT_J-1_Work Spec_SING-025-25_N6264925RKA02.pdf

PDF 266 KB Posted

Attached to
USS CURTIS WILBUR (DDG-54) CASREP SUPPORTS
Solicitation number
N6264925RKA02
Issued by

About this file

This document is a Navy Ship Repair Specification for Crane and Rigging Services for the USS Curtis Wilbur (DDG 54) in Busan, South Korea, scheduled for 09-13 September 2025. The specification requires a contractor to provide a 100-ton crane with one operator, one signal man, and two riggers for a total of 4 man-days, supporting the rigging of three specific pieces of equipment: a Reverse Osmosis High Pressure Pump, a Seawater Circulating Cooling Pump, and an Electronic Cooling Water Skid Pump and Motor Assembly. The work will be performed across multiple ship locations including Engine Room Number One, Generator Room Number 3, Auxiliary Machinery Room Number One, Pier Side, Flight Deck, and Forecastle.

The contractor must ensure daily safety inspections are performed according to host nation safety standards, provide certifications for crane and rigging equipment safety, conduct pre-use equipment inspections, and submit documentation to the Navy Supervisor. Specific crane requirements include having an anti-two-block device, boom hoist disconnect mechanism, and meeting SAE load stability standards. The rigging services involve removing old equipment, installing new equipment, and assisting ship's force with positioning. All documentation must be submitted within three days of repair completion, and the work is governed by U.S. International Traffic in Arms Regulation (ITAR) with strict export control provisions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

SRF DET SINGAPORE (NMD)

USS CURTIS WILBUR (DDG 54)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: SING-025-25

INCLUDES ALL CHANGES THROUGH 8/29/2025

Period of Performance: 09 - 13 Sep 2025 Location: Busan, South Korea

INDEX

SHIP: USS CURTIS WILBUR (DDG 54) SING-025-25

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-25 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 09/29/2023 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 09/29/2023 Original

009-03 Toxic and Hazardous Substance; control 09/29/2023 Original

009-04 Quality Management System; provide 03/13/2024 CH-1

009-05 Temporary Access; accomplish 09/29/2023 Original

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

09/29/2023 Original

009-07 Confined Space Entry, and Certification; accomplish 09/29/2023 Original

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 09/29/2023 Original

009-10 Asbestos-Containing Material (ACM); control 09/29/2023 Original

009-18 Mine Warfare Ships Magnetic Material; control 09/29/2023 Original

009-19 Provisioning Technical Documentation (PTD); provide 09/29/2023 Original

009-20 Government Property; control 03/13/2024 CH-1

009-21 Alteration Verification, Logistic and Technical Data; provide 09/29/2023 Original

009-23 Interference; remove and install 09/29/2023 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/29/2023 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/29/2023 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for

Commercial Equipment/Component; accomplish

09/29/2023 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a

Naval Facility; provide

09/29/2023 Original

009-60 Schedule and Associated Report for CNO Availability; provide and manage 09/29/2023 Original

009-61 Shipboard Use of Fluorocarbons; control 09/29/2023 Original

009-67 Integrated Total Ship Testing; manage 09/05/2023 Original

009-69 Heavy Weather/Mooring Plan; provide 09/29/2023 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

09/29/2023 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 09/29/2023 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

09/29/2023 Original

009-74 Occupational, Safety and Health Plan; accomplish 09/29/2023 Original

009-80 Ship Facility; maintain 09/05/2023 Original

009-81 Compartment Closeout; accomplish 09/29/2023 Original

009-82 Installation of Equal Component Vice Specified Component; report 09/29/2023 Original

009-84 Threaded Fastener Requirement; accomplish 09/05/2023 Original

009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify

09/18/2023 Original

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

09/29/2023 Original

009-99 Ship Departure Report; provide 09/29/2023 Original

Page 1 of 3 EXECUTING WORK

ITEM_NO. TITLE CHANGE DATE CHANGE

009-100 Ship's Stability; maintain 09/05/2023 Original

009-101 Ship Transit and Berthing; accomplish 09/29/2023 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/29/2023 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/29/2023 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/29/2023 Original

009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 10/01/2023 Original

009-117 Combat Systems, Light-Off Suport; provide 09/29/2023 Original

009-118 CG Deck Loading; accomplish 09/29/2023 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 09/06/2023 Original

009-122 Temporary Padeye; install and remove 08/23/2023 Original

009-125 Boat 65 Feet (20meters) Long and Less; accomplish 09/06/2023 Original

009-126 Schedule Model Review (SMR); accomplish 10/01/2023 Original

Page 2 of 3 EXECUTING WORK

ITEM NO. TITLE

Crane and Rigging Service; provide993-11-001

Page 3 of 3 EXECUTING WORK

SHIP: USS CURTIS WILBUR (DDG 54) ITEM NO: 993-11-001

COAR: 26 PCN: EM04-L030

CF01-L026

EM01-4304

CMP: NONE

PLANNER: MARCOS, FRANK

SSP: SING-025-25 1 of 4 ITEM NO: 993-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Crane and Rigging Service; provide

1.2 Location of Work:

1.2.1 Engine Room Number One, (4-174-0-E)

1.2.2 Generator Room Number 3, (3-370-0-E)

1.2.3 Auxiliary Machinery Room Number One, (4-126-0-E)

1.2.4 Pier Side

1.2.5 Flight Deck

1.2.6 Forecastle

1.3 Identification:

1.3.1 Quantity (One EA), Reverse Osmosis High Pressure Pump, MFR:

FMC Technologies Inc., MFR DWG: 6777143 Rev E, MFR. ID: MO8-16-CN,

40.5 GPM, 1,200 PSI, APL: 01A990011. Weight 550 LBS

1.3.2 Quantity (One EA), Pump Assembly, SSGTG No. 3 Seawater

Circulating Cooling Pump, Centrifugal, 180 GPM, 35PSI, 3577 RPM MCC VLT, MFR: Carver Pump Company Inc., MFR ID: 9N-3500-10, MIL-P-17840, APL: 017030718. Weight 475 LBS

1.3.3 Quantity (One EA), HD-1140/SPY-1D Electronic Cooling Water Skid Pump and Motor Assembly, Part Number 6127264. Weight 850 LBS

2. REFERENCES:

2.1 NAVSEA Standard Items, (FY25)

2.2 29 CFR Part 1910, Occupational Safety and Health Standards

2.3 29 CFR Part 1915, Occupational Safety and Health Standards for Shipyard Employment

2.4 NAVFAC P-307, Management of Weight Handling Equipment

3. REQUIREMENTS:

(V)(G) "INSPECT CRANE"

3.1 Provide (One EA) 100-ton crane with one operator, one signal man, and 2 riggers for total of 4 man days in support of rigging equipment identified in 1.3 located 1.2. Exact dates of crane use will be as directed by the SUPERVISOR.

3.1.1 Ensure all daily safety inspections are performed in

accordance with appropriate host nation safety standards and retain the current documentation of inspections. Documents must be kept on site. Document on Enclosure One. See Note 4.2.

3.1.1.1 Crane must be capable of handling materials from 1.2.4

SHIP: USS CURTIS WILBUR (DDG 54)

SSP: SING-025-25 2 of 4 ITEM NO: 993-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

to the farthest outboard point of the ship.

3.1.1.2 Perform daily pre-use inspections and testing on all

load hoisting and lowering mechanisms, boom hoisting and lowering mechanisms, swinging mechanisms, traveling mechanisms (if to be used that day), and safety devices.

3.1.1.3 Cranes that have to be re-rated must be in accordance with SAE Recommended Practice, Crane Load Stability Test Code J765 and documentation maintained on site.

3.1.1.4 Have an operational anti-two-block device or a two-block damage prevention feature for all points of two-blocking.

3.1.1.5 Have a boom hoist disconnect, shutoff, or hydraulic

relief to automatically stop the boom hoist when the boom reaches a predetermined high angle.

3.1.1.6 The contractor shall provide certification that the

crane conforms to the appropriate host nation safety standards.

Document on Enclosure One.

3.2 Provide rigging services with certified rigging tools and chain falls to support rigging old and new equipment identified in 1.3 located in 1.2, using 2.2 through 2.4 as guidance.

3.2.1 The contractor shall provide certification that the rigging equipment conform to the appropriate host nation safety standards.

Document on Enclosure One.

3.2.2 Submit one legible copy, in hard copy or approved

transferrable media, a report to the SUPERVISOR that all lifting and handling materials have been inspected, tested, and are safe for use.

Document on Enclosure One.

3.2.3 Contractor will conduct walk through of rigging staging area with SUPERVISOR to identify interference that must be removed for accomplishment of 3.2.

3.2.4 Rig equipment identified in 1.3.1 to 1.2.4, as directed by the

SUPERVISOR.

3.2.5 Rig old equipment identified in 1.3.2 from 1.2.2 to 1.2.5 and new equipment from 1.2.6 to 1.2.2, as directed by the SUPERVISOR.

3.2.5.1 Assist Ship's Force in rigging up and positioning the new equipment to the foundation, as directed by the SUPERVISOR.

3.2.6 Rig old equipment identified in 1.3.3 from 1.2.1 to 1.2.4 and new equipment from 1.2.4 to 1.2.1, as directed by the SUPERVISOR.

3.2.6.1 Assist Ship's Force in rigging up and positioning the new equipment to the foundation, as directed by the SUPERVISOR.

3.3 Submit one legible copy, in hard copy or approved transferrable media, of Enclosure One to the SUPERVISOR within 3 days of repair completion. Document on Enclosure One.

4. NOTES:

4.1 NAVSEA Standard Items are available at:

https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/

SSP: SING-025-25 3 of 4 ITEM NO: 993-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4.2 Enclosure One is a Test and Inspection Verification Sheet (TIVS).

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SSP: SING-025-25 4 of 4 ITEM NO: 993-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR).

This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Enclosure (One) TEST AND INSPECTION VERIFICATION SHEET (TIVS) PARAGRAPH REQUIREMENT/COMPONENT IDENTIFICATION RESULTS ACTIVITY SIGNATURE/PRINTED NAME

KTR

3.1.1

(V)(G) “INSPECT CRANE”

Ensure all daily safety inspections are performed in accordance with appropriate host nation safety standards and retain the current documentation of inspections. Documents must be kept on site.

SAT / UNSAT

Date/Time:

___________________ SRF

KTR

3.1.1.6 The contractor shall provide certification that

the crane conforms to the appropriate host nation safety standards.

Date/Time:

___________________ SRF

KTR

3.2.1 The contractor shall provide certification that the rigging equipment conform to the appropriate host nation safety standards.

Date/Time:

___________________ SRF

KTR

3.2.2

Submit one legible copy, in hard copy or approved transferrable media, a report to the

SUPERVISOR that all lifting and handling materials have been inspected, tested, and are safe for use.

Date/Time:

___________________ SRF

KTR

3.3

Submit one legible copy, in hard copy or approved transferrable media, of Enclosure One to the SUPERVISOR within 3 days of repair completion.

Date/Time:

___________________ SRF

Work Completed:

Sign: ____________________________ Print: _________________________ Date: _______________ Project Manager

File details come from the government source that posted it. Updated .