ATTACHMENT_J-1_Work_spec_MSCOK 25-035_N6264925RKA01.docx
DOCX document 60 KB Posted
- Solicitation number
- N6264925RKA01
About this file
This document is a Corrective Maintenance Engineering Report for the USNS RICHARD E. BYRD (T-AKE 4) Voyage Repair Availability, detailing a comprehensive maintenance and repair project. The work specification (MSCOK 25-035) outlines multiple repair and maintenance tasks across six primary sections: General Services, Hull and Structural, Propulsion Machinery, Auxiliary Machinery, Habitability Outfitting, and Underway Replenishment Equipment.
Key repair items include replacing Crane No. 4 Climber Safety Cage, exterior deck and ladder preservation, bridge window replacement, charging pump discharge piping fabrication, central seawater pump repair, incinerator exhaust lagging repair, and sliding block removal and replacement. The solicitation (N6264925RKA01) is issued by the Department of the Navy Naval Supply Systems Command, requiring contractors to provide all labor, materials, tools, and equipment to complete the specified repair work. Offerors must submit an itemized price breakdown using the provided form, with all offers in US Dollars and including fully-burdened rates, fees, and profit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20250829_070517.jpg | JPG image | |
| 20250829_070630.jpg | JPG image | |
| 20250829_070623.jpg | JPG image | |
| ATTACHMENT_J-4_IRS_FORM_W_14_N62649RKA01.pdf | ||
| ATTACHMENT_J-3_Contractor_Data_Sheet_N6264925RKA01.pdf | ||
| Solicitation - N6264925RKA01.pdf | ||
| ATTACHMENT_J-2_Contractor_Price_Breakdown_N6264925RKA01.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Print Date:
05/24/2025
MSC Corrective Maintenance
Engineering Report
USNS BYRD
(TAKE 4)
MSCOK 25-035
2025-09-25 - VRA
WORK ITEM INDEX REPORT
| Item Number |
| Title |
| Category |
| SECTION 0000 |
| GENERAL SERVICES AND REQUIREMENTS |
| 0001 |
| General Requirements |
| NSP |
| 0002 |
| Technical and Manufacturers Representative |
| NSP |
| 0003 |
| Utilities and General Services |
| A |
| 0004 |
| Testing and Quality Assurance |
| NSP |
| 0005 |
| High Voltage Electrical Safety Procedure Requirements |
| NSP |
| 0013 |
| Project Management |
| NSP |
| SECTION 0100 |
| HULL AND STRUCTURAL |
| 0104 |
| Replace Crane No. 4 Climber Safety Cage |
| A |
| 0105 |
| Exterior Ladder Preservation |
| A |
| 0109 |
| Exterior Deck Preservation |
| A |
| 0110 |
| Scaffolding |
| A |
| 0158 |
| PORT_AND_STBD_FLIGHT_DECK_HATCH_REPAIR |
| A |
| SECTION 0200 |
| PROPULSION MACHINERY |
| 0210 |
| MMR_BRIDGE_CRANE_SADDLE_REPAIRS |
| A |
| SECTION 0500 |
| AUXILIARY MACHINERY |
| 0501 |
| Charging Pump Discharge Piping Fabrication |
| A |
| 0561 |
| Central_Seawater_Pump_REpair |
| A |
| 0584 |
| No_2_LTFW_Pump_Overhaul_Rev- |
| A |
| SECTION 0600 |
| HABITABILITY OUTFITTING AND FURNISHINGS |
| 0602 |
| Bridge Window Replacement |
| A |
| 0641 |
| INCINERATOR EXHAUST LAGGING REPAIR |
| A |
| 0645 |
| Griddle Replacement |
| A |
| 0659 |
| TAKE-CCSI-PILOT BOARDING EQUIPMENT AND |
| A |
| SECTION 1000 |
| UNDERWAY REPLENISHMENT EQUIPMENT |
| Page 1 of |
| 2 |
| Print Date: |
| 05/24/2025 |
MSC Corrective Maintenance
Engineering Report
| 1001 |
| REMOVE AND REPLACEMENT OF SLIDING BLOCK |
| A |
| 1002 |
| Preservation of ASD Air Module Backplate and Fixed Fairlead |
| A |
| Page 2 of |
| 2 |