Attachment IV Schedule pages.pdf

PDF 113 KB Posted

Attached to
Arkansas Direct Supply Natural Gas Requirement
Solicitation number
SPE60420R0405
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Line Item DWCF: No Installation

Address

City State

Zip

CenterPoint Energy, ARKLA

82,670 38,500 44,170

Location

0 0 0 Jun Jul Aug Sep Oct Nov Dec

42,230 24,820 17,410 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

5,740 5,950 6,100 7,030 7,800 9,610

40,440 13,680 26,760 Jan Feb Mar Apr May

10,200 8,130 8,430 7,180 6,500

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Summer: Winter:

Overage & Shortage Volume Pricing

Publication Location Methodology Include Adj. Factor Overage Treatment

Summer Volumes Winter Volumes

Shortage Treatment Summer Volumes

Winter Volumes

Note #1

Note #2

Note #4

Schedule Page By Line Item Detail

John L McClellan Memorial Hospital

Installation Address

John L McClellan Memorial Hospital DODAAC /

FEDAAC:

FP4460

4300 W. 7th St.

Little Rock

AR

72205-0000

Notes No

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Solicitation Parameters

Period Beginning

Year 2019 Annual Totals Summer Totals Winter Totals

Delivery Point Telemetered Rate Class City Gate Yes LCS-1 TSO

Alternate Fuel Type Percent Load Limits on Use None 0%

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2021 Annual Totals Summer Totals Winter Totals

Year 2020 Annual Totals Summer Totals Winter Totals

Period Ending Publication SIP Delivery Option Delivery Type

Adjustment Factor:

04/01/20 05/31/21 INSIDE FERC'S Enable Gas Transmission (2) Full Requirements/Pool. Firm

Current account number 6942616-1.

The Contractor is required to perform contractor consolidated billing in accordance with the statement of work. All pipeline capacity charges and LDC transportation charges will be billed as a pass through to the customer except for the fuel loss on the pipeline. The pipeline fuel loss on CEGT Pipeline will be included in the Contractor's adjustment factor.

The John L McClellan Memorial Hospital and the Eugene J Towbin Healthcare Center are known as the Central Arkansas Veteran's Healthcare System (CAVHS) and are agreggated.

Note #3

Line Item DWCF: No Installation

Address

City State

Zip

CenterPoint Energy, ARKLA

105,980 36,840 69,140

Location

0 0 0 Jun Jul Aug Sep Oct Nov Dec

47,040 20,910 26,130 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

4,580 4,720 4,870 6,740 11,160 14,970

58,940 15,930 43,010 Jan Feb Mar Apr May

16,660 13,450 12,900 9,780 6,150

Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

0 0 0 0 0 0 0 0 0 0 0 0

Summer: Winter:

Overage & Shortage Volume Pricing

Publication Location Methodology Include Adj. Factor Overage Treatment

Summer Volumes Winter Volumes

Shortage Treatment Summer Volumes

Winter Volumes

Note #1

Note #2

Note #4

Schedule Page By Line Item Detail

Eugene J Towbin Healthcare Center

Installation Address

Eugene J Towbin Healthcare Center DODAAC /

FEDAAC:

FP4460

220 Ft. Roots Dr.

North Little Rock

AR

72114-0000

Notes No

Utility Account Information

LDC or Pipeline

Total Contract Total Summer (Dths) Total Winter (Dths)

Solicitation Parameters

Period Beginning

Year 2019 Annual Totals Summer Totals Winter Totals

Delivery Point Telemetered Rate Class City Gate Yes LCS-1 TSO

Alternate Fuel Type Percent Load Limits on Use None 0%

Estimated Usage Information (All volumes expressed in Dths)

City Gate

Year 2021 Annual Totals Summer Totals Winter Totals

Year 2020 Annual Totals Summer Totals Winter Totals

Period Ending Publication SIP Delivery Option Delivery Type

Adjustment Factor:

04/01/20 05/31/21 INSIDE FERC'S Enable Gas Transmission (2) Full Requirements/Pool. Firm

Current account number 6942370-5

The Contractor is required to perform contractor consolidated billing in accordance with the statement of work. All pipeline capacity charges and LDC transportation charges will be billed as a pass through to the customer except for the fuel loss on the pipeline. The pipeline fuel loss on CEGT Pipeline will be included in the Contractor's adjustment factor.

The John L McClellan Memorial Hospital and the Eugene J Towbin Healthcare Center are known as the Central Arkansas Veteran's Healthcare System (CAVHS) and are agreggated.

Note #3

File details come from the government source that posted it. Updated .