Z2DA--Project No. 539-CSI-207 - Prepare Site for MRI. Federal contract opportunity
Solicitation number
36C25024B0100
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document appears to be a set of drawings and specifications for a renovation project at a Department of Veterans Affairs (VA) medical center in Cincinnati, Ohio. The project involves the preparation of a site to install a new Magnetic Resonance Imaging (MRI) system.

The key details include:

  • Project Number: 539-CSI-207
  • Project Title: VA Cincinnati MRI Site Prep
  • Location: 3200 Vine Street, Cincinnati, OH 45220
  • Scope: Renovation of approximately 930 square feet on the second and third floors to accommodate the new MRI system, including a control room, MRI scanning room, and support spaces.
  • Architectural, mechanical, and electrical drawings are provided.
  • The project is fully sprinklered and complies with NFPA 101 Life Safety Code and other applicable codes and standards.
  • The solicitation number is 36C25024B0100, and the federal agency is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 10.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Project No. 539-CSI-207 - Prepare Site for MRI., newest first.
File Type Posted
36C25024B0100 0005.docx DOCX document
Addendum 1.pdf PDF
36C25024B0100 0004.docx DOCX document
36C25024B0100 0003.docx DOCX document
36C25024B0100 0002.docx DOCX document
36C25024B0100 0001.docx DOCX document
Attachment V- RFI Form.pdf PDF
Attachment II - Specs.pdf PDF
Attachment I - DBA WD.pdf PDF
36C25024B0100_1.docx DOCX document
Attachment IV - EMR Form.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UPUP

UP

UP EXTERIOR ELEVATION

INTERIOR ELEVATION

SECTION/DETAIL NUMBER

DRAWING NUMBER

EQUIPMENT TAG

COLUMN GRID

NOTE

WINDOW OPENING

DOOR OPENING

ROOM NAME

ROOM NUMBER

WALL TYPE

CEILING HEIGHT

FINISH DESIGNATION

X

10'-8"

X

X

XX.X-X

XX

X

1/A101

X

A101

XX

TOILET ACCESSORY TAGX SIGNAGE TAG

A101

SIM

X

AREA OF WORK

SECOND FLOOR

RM# A2001, A2001A, A2007

Ludlow Ave.

C lif to n A v e

CINCINNATI

STATE

TECH.

Hopple St.

M.L.K. Dr.

McMillan St.

UNIV. OF

CINCINNATI

W.H.T Rd.

VAMC

3200 VINE ST.

M.L.K. Dr.

V in e

S t.

ZOO

Jefferson A ve.

UNIV.

HOSPITAL

Mitchell Ave.

R ea di ng

R d.

V ic to ry

P kw

y. XAVIER

UNIV.

AREA OF WORK

THIRD FLOOR ROOF

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

VA Project No.

RDC/JPA Project No.

Department of Veterans Affairs Medical Center

HEAPY ENGINEERING

MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY

1400 WEST DOROTHY LANE

DAYTON, OH 45409

937.224.0861 P

ARCHITECTURE PLANNING INTERIOR DESIGN

524 FERNWOOD AVENUE

ALTAMONTE SPRINGS, FLORIDA 32701

407.830.6522 P

RDC / JOHN POE ARCHITECTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

TERRACON CONSULTING, INC.

ENVIRONMENTAL

611 LUNKEN PARK DRIVE

CINCINNATI, OH 45226

513.321.5816 P

/1

/2

:0

:5

P

M

VA Cincinnati MRI Site Prep

05/30/2023

COVER SHEET

G001

JWDF

539-CSI-207

Cincinnati, OH

VA Cincinnati MRI Site Prep

3200 Vine Street Cincinnati, OH 45220 PROJECT #: 539-CSI-207

Bid Documents 22006.00

G001 COVER SHEET

G100 CODE DATA

A101 NEW WORK PLAN SECOND FLOOR

A102 NEW WORK PLAN THIRD FLOOR

A401 INTERIOR ELEVATIONS AND DETAILS

AF101 FINISH PLANS AND DETAILS

M001 ABBREVIATIONS, LEGEND & DRAWING INDEX

M101 PARTIAL SECOND FLOOR PLAN - REMOVALS AND NEW WORK

M102 PARTIAL THIRD FLOOR PLAN - REMOVALS AND NEW WORK

E001 ABBREVIATIONS, LEGEND & DRAWING INDEX

E100 ELECTRICAL PARTIAL FLOOR PLANS

GENERAL CONSTRUCTION NOTES

7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO

BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE

SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT

THROUGH FINISHED OPENINGS.

8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,

HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS

AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT

DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL

WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.

9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS

SPECIFICALLY NOTED OTHERWISE. iF NO FINISH IS INDICATED AT A

PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS

INDICATED AT SIMILAR CONDITIONS.

10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL

SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE

THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE

NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR

SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.

11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED

WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF

THE WALL.

12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO

AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER

RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS

RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS

IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY

FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.

* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE

CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).

1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,

INTERNATIONAL BUILDING CODE, AND OTHER COES AS IDENTIFIED IN VHA

PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE

ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,

TECHNICAL INFORMATION LIBRRARY WEBSITE.

2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND

DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13

WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS

TECHNICAL INFORMATION LIBRARY WEBSITE.

3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT

EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED

WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.

4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH

ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT

ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.

5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF

NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO

REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT

SURFACES TO REMAIN.

6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND

DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW

MATERIALS.

DRAWING INDEX

N.T.S.Scale:

KEY PLAN - SECOND FLOOR

N.T.S.Scale:

VICINITY MAP

N

N

N.T.S.Scale:

KEYPLAN - THIRD FLOORN

Revisions Date

0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4

1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5

1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3

2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3

Means of Egress

Existing Wall to Remain

New Wall

CODE LEGEND

MRI ROOM

A2001A

CONTROL

ROOM

A2001

MRI

SCANNING RM

A2023

SYSTEM

COMPONENT

RM

A2001B

MRI

COMPONENT

A2007

CORRIDOR

C-2-11

CORRIDOR

C-2-11

EMS

A2025

Area of Renovation - 930 sf

Smoke Compartment - 8,680 sf

Travel Distance to Exit:

Max. Allowable = 200' per 19.2.5.7.3.3 (B,2) Actual = 151'

Travel Distance to Exit Access Corridor Max. Allowable = 100' per 19.2.5.7.3.3 (A) Actual = 86'

Access to Exit Stair

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1

/2

:0

:5

P

M

VA Cincinnati MRI Site Prep

05/30/2023

CODE DATA

G100

JWDF

539-CSI-207

Cincinnati, OH

Bid Documents 22006.00

N.T.S.Scale:

LIFE SAFETY PLAN - PARTIAL SECOND FLOOR

Code: NFPA 101 Life Safety Code (2021 Edition)

Construction Type: Type I (222)

Occupancy: Health Care Occupancy

Height: Partial 1 story renovation to existing 4 story building

Area of Work: 930 SF - MRI Room, Control Room, MRI Component Room

Protection: Fully Suppressed

Chapter 4 - General

• 4.4.2.2 -Prescriptive-based life safety design meeting the requirements of Chapters 1 thru 3, Sections 4.5 thru 4.8, and

Chapters 6 thru 43 of this Code shall be deemed to satisfy the provisions of Sections 4.1 and 4.2.

• 4.4.2.3 -Where req’ts in Chapters 11 thru 43 differ from req’ts in Chapters 1 thru 4 and 6 thru 10, the req’ts of Chapters 11 thru

43 shall govern.

• 4.6.1.1 -The authority having jurisdiction (AHJ) shall determine whether the provisions of this Code are met.

• 4.6.7.1 -Rehabilitation category per 43.2.2.1.2 Renovation.

Chapter - 6 Classification of Occupancy and Hazard of Content

• 6.1.5 - Health Care Occupancy

• 6.2.2.1 -Hazard classification = Ordinary

Chapter 7 - Means of Egress

• 7.1.3.1 - Exit Access Corridors: 1/2 hr. fire rating is required for corridor walls per 19.3.6.2.2 (NO CHANGE)

• 7.3.1.2 – Occupant Load:

Second Floor (Renovation):

HC - Inpatient treatment Dept: 760 sf @ 240 sf/occ = 4 occup (NO CHANGE in area or occupant load) Storage: 170 sf @ 300 sf/occ = 1 occup (NO CHANGE in area or occupant load) Total: 930 sf

• 7.3.2.2 – Max. projection within means of egress on ea. side: 4-1/2” (38” hgt. max.).

• 7.3.3.1 – Egress capacity (Health Care, sprinklered): (NO CHANGE in occupant load & egress capacity)

Table 7.3.3.1- Stairs = .3” per occup; Level components and ramps = .2” per occup.

• 7.4.1.2 – Min. number of means of egress from any story = 2.

(1) Occupant load >500 and <1,000 = 3 exits minimum. (NO CHANGE)

Chapter 8 - Features of Fire Protection:

• Table 8.3.3.2.2 – Min Fire Protection for Openings in Fire-rated Assemblies:

Component Walls Fire Drs Vision Panel (size) FR Vision Panel FR Window Vert. shafts 2 hr 1-1/2 hr Max tested D-H-90 NP (stairs, exits):

Fire Barriers: 2 hr 1-1/2 hr Max tested D-H-90 NP

1 hr 3/4 hr Max tested D-H-45 3/4 hr Smoke Barriers: 1 hr 1/3 hr Max tested D-20 3/4 hr

1/2 hr 1/3 hr Max tested D-20 1/3 hr Smoke Part'ns: 1 hr 1/3 hr Max tested D-20 3/4 hr

1/2 hr 1/3 hr Max tested D-20 1/3 hr

• 8.3.4.2.1 – Firestop Systems – Penetrations that pass thru a fire barrier shall be protected by a firestop system or device.

• 8.3.4.2.2 – The firestop system or device shall be tested in accordance with ASTM E814 or UL 1479.

• 8.3.4.8 – Openings thru fire barriers for air-handling ductwork or air movement shall be protected per 9.2.1.

• 8.4.1 - Smoke Partitions shall limit the transfer of smoke.

• 8.5.1 - Smoke Barriers shall restrict the transfer of smoke and have 1/2 hour fire resistance rating per 19.3.7.3 (1 hour provided).

• 8.5.3 - Fire Barriers that meet requirements of Section 8.5 shall be permitted to be used as a smoke barrier.

Chapter 9 - Building Service and Fire Protection Equipment

• 9.6.1.3 – Fire Alarm System req’d for life safety shall be per NFPA 70 (2020) and 72 (2019).

• 9.6.3.1 – Occupant notification shall be provided per 9.6.3 and 19.3.4.3.1.

• 9.6.3.5 – Where permitted by Chapters 11 thru 43, a positive alarm sequence shall be permitted per NFPA 72 (2019) (See 19.3.4.3).

• 9.6.4.1 – Emergency Forces notification req’d per 9.6.4 and 19.3.4.3.2.1.

• 9.6.5.1 – Emergency Control functions shall be installed per NFPA 72 (2019) as req’d per 9.6.5 and 19.3.4.4.

• 9.6.8.1 – Alarm annunciation is required per 9.6.8.

• 9.7.1.1 – Supervised automatic sprinkler system as req’d by 9.7.1 and 19.3.5.3 and shall comply with NFPA 13 (2019).

• 9.9 - Portable fire extinguishers shall be selected, installed, inspected, and maintained per NFPA 10 (2018).

Chapter 10 – Interior Finish, Contents, and Furnishings

• 10.2.2- Interior Finish Classification Limitations

Table A.10.2.2 - Interior Finish Classification Limitations: Health Care (Existing) Exit Access Corridors: Class A or B.

Other Spaces: Class A or B.

• 10.2.3.1.1 - Interior wall and ceiling finish materials shall be classified in accordance with NFPA 286 and comply with 10.2.3.2.

• 10.2.3.1.2 - Materials tested in accordance with 10.2.3.1.1 and complying with 10.2.3.2 shall also be considered to comply with the requirements of Class A in accordance with 10.2.3.3.

• 10.2.3.3 – Wall and Ceiling – Classifications characteristics:

(1) Class A: Flame spread: 0-25; Smoke dev.: 0-450.

(2) Class B: Flame spread: 26-75; Smoke dev.: 0-450.

(3) Class C: Flame spread: 76-200; Smoke dev.: 0-450.

• 10.2.3.3.1 – Existing interior finish exempt from smoke dev. criteria.

• 10.2.7.2 – Floor finish other than carpet: Min. Rad flux: .1 W/ cm².

• 10.2.8.1 – Wall and Ceiling finishes, where sprinkled:

Class C permitted in any location where Class B is req’d.

Class B permitted in any location where Class A is req’d.

• 10.2.8.2 – Floor finishes, where sprinkled:

Class II permitted in any location where Class I is req’d.

Provisions of 10.2.7.2 shall apply where Class II is req’d.

Chapter 19 - Existing Health Care Occupancies

• 19.1.1.1.4 - The area of work is an existing hospital and therefore falls under Chapter 19.

• 19.1.6.1 - Construction Type Limitations (Table 19.1.6.1): Type II (222), sprinklered, no story limitations.

• 19.1.7 - Occupant Load per Table 7.3.1.2. (NO CHANGE)

• 19.2.3.4 - Existing corridors required for exit access in hospitals shall be not less than 4 feet in clear width serving patient sleeping rooms. Actual: 8-0" (NO CHANGE).

• 19.2.5.3 - Dead end corridors shall not exceed 30’.

• 19.2.5.4 - Every corridor shall have access to not less than two approved exits without passing through any intervening spaces other than corridors or lobbies.

• 19.2.5.6.4 - Rooms within suites per 19.2.5.7 shall not be required to have an exit access door leading directly to an exit access corridor.

• 19.2.5.7.1.2 - Suite Separation – Suites shall be separated from remainder of the building by walls and doors (0-hr smoke partitions).

• 19.2.5.7.3.3 - Patient Care Non-Sleeping Suite Travel Distance

(A) Travel distance between any point in patient care non-sleeping suite and an exit access corridor: 100' (NO CHANGE)

(B) Travel distance between any point in non-sleeping suite and an exit: 200' (w/ sprinkler system). (NO CHANGE)

• 19.3.4.1 - Health care occupancies shall be provided with a fire alarm system per Section 9.6.

• 19.3.5.3 - Building containing hospitals shall be protected throughout by approved, supervised automatic sprinkler systems per

Section 9.7.

• 19.3.5.12 - Portable fire extinguishers shall be provided in all health care occupancies per Section 9.9.

• 19.3.6.2.2 - Corridor walls shall have min. 1/2 hour fire resistance rating. (NO CHANGE)

• 19.3.6.2.3 - Corridor walls shall form a barrier to limit the transfer of smoke but are not required to be smoke barriers or smoke partitions.

• 19.3.6.3.1 - Corridor doors shall be doors constructed to resist the passage of smoke.

Chapter 43 - Building Rehabilitation

• 43.1.2.1 - Any building undergoing repair, renovation, modification, or reconstruction shall comply with both of the following:

(1) Req'ts of the applicable existing occupancy chapters (Chapter 19).

(2) Req'ts of the applicable secton of this Chapter (Sections 43.4).

• 43.4.1.3 - Renovations, General Req'ts: All new work shall comply with the req'ts of other sections of this Code applicable to existing construction.

N

S

S

MRI ROOM

A2001A

CONTROL

ROOM

A2001

MRI

SCANNING RM

A2023

SYSTEM

COMPONENT

RM

A2001B

MRI

COMPONENT

A2007

CORRIDOR

C-2-11

CORRIDOR

C-2-11

CORRIDOR

C-2-11

EMS

A2025

SPECIAL

PROCEDURES

A2015

AVAIL.

A2021

S.P. CONTROL

A2009

A

2.092.09

2.192.19

2.09

2.012.012.012.01

2.10

2.09

2.09

A401

A

A401

2.562.56

2.04

2.09

2.012.012.012.01

CONTROL

ROOM

A2001

MRI ROOM

A2001A

MRI

COMPONENT

A2007

SPECIAL

PROCEDURES

A2015

MRI

SCANNING RM

A2023

SYSTEM

COMPONENT

RM

A2001B

EMS

A2025

S.P. CONTROL

A2009

AVAIL.

A2021

CORRIDOR

C-2-11

CORRIDOR

C-2-11

CORRIDOR

C-2-11

CHASE

2.05

2.062.06

2.022.02

2.022.022.022.02

REFLECTED CEILING PLAN LEGEND

Recessed downlight fixture

Supply Air Diffuser

Return Air Grille

2' x 4' light fixture

2' x 2' acoustical ceiling tile

Gypsum board / portland cement plaster ceiling / soffit - painted

Sprinkler head

SpeakerS

2' x 2' light fixture

AREA OF WORK

SECOND FLOOR

RM# A2001, A2001A, A2007

N

DEMOLITION LEGEND

Wall to be Demolished

Existing Wall to Remain

Area out of scope.

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/3

/2

:0

:2

A

M

VA Cincinnati MRI Site Prep

05/30/2023

NEW WORK PLAN SECOND FLOOR

A101

JWDF

539-CSI-207

Cincinnati, OH

Bid Documents 22006.00

A. Verify all conditions in the field prior to fabrication, erection, and construction.

B. Protect existing structure as required during all phases of construction.

C. Coordinate contractor access to all phases of construction, deliveries, and debris removal with the C.O.R. See General Requirements.

D. Maximum time limit of 2 days from when existing chiller unit is taken offline and the new chiller unit is operational. Contractor to coordinate and schedule roof top equipment work accordingly to meet time constraint.

E. Interior finish work to occur following MRI equipment upgrade while magnet is offline.

2.01 No floor or wall work this room.

2.02 No ceiling work this room.

2.04 Existing floor finish to remain. Protect in place during construction.

2.05 Existing gypsum board ceiling/soffit to remain. Protect in place and repair any damage during construction.

2.06 Existing suspended ceiling system, fixtures, and devices to remain.

2.09 Existing casework to remain. Protect in place during construction.

2.10 Existing plumbing fixture to remain.

2.19 Existing equipment to remain. Protect in place. Verify the boundaries of the equipment where it contacts the floor.

2.56 Remove existing sheet vinyl floor finish and rubber base. Prep floor to receive new finishes.

PLAN NOTES

GENERAL NOTES

Scale: 1/4" = 1'-0"1

NEW WORK PLAN - SECOND FLOOR

N

Scale: 1/4" = 1'-0"2

REFLECTED CEILING PLAN - SECOND FLOOR

N

A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.

B. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.

C. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.

GENERAL DEMOLITION NOTES

KEY PLAN - SECOND FLOOR

UPUP

UP

UP

AREA OF WORK

STEP #1

2.22

2.23

2.21

2.19

2.19

2.19

2.19

2.19

1/2" / 12"

1/2" / 12"

/2

/4

" / 1

/4

" / 1

7.02

/2

2.142.14

N

2.19

2.19

2.19

2.19

2.19

2.23

AREA OF WORK

STEP #2

1/2" / 12"

1/2" / 12"

/2

/4

" / 1

/4

" / 1

/2

7.02

23.06

7.04

23.05

23.05

23.05

7.04

7.04

7.04

23.06

2.24

2.19

2.19

2.19

2.19

2.19

1/2" / 12"

1/2" / 12"

/2

/4

" / 1

/4

" / 1

/2

7.02

AREA OF WORK

STEP #3

DEMOLITION LEGEND

Wall to be Demolished

Existing Wall to Remain

Area out of scope.

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/3

/2

:1

:4

A

M

VA Cincinnati MRI Site Prep

05/30/2023

NEW WORK PLAN THIRD FLOOR

A102

JWDF

539-CSI-207

Cincinnati, OH

Bid Documents 22006.00

Scale: 1/4" = 1'-0"1

PARTIAL THIRD FLOOR ROOF - STEP #1

N

2.14 Remove existing support curbs/rails.

2.19 Existing equipment to remain. Protect in place. Verify the boundaries of the equipment where it contacts the floor.

2.21 Remove and salvage existing precast paver ballast for

reinstallation.

2.22 Remove existing ballasted EPDM membrane and tapered

polyiso roof insulation to concrete deck below as required to install new equipment support curbs. See Mechanical Drawings.

2.23 Maintain existing operational chiller unit and support curbs until new chiller unit is installed. See Mechanical Drawings.

2.24 Remove existing chiller unit and support curbs.

7.02 Existing roof drains to remain.

7.04 Install and repair existing EPDM roofing and tapered insulation.

Align and maintain existing roof slopes. Reinstall salvaged precast paver ballast.

23.05 Install new equipment support curbs. See Mechanical

Drawings.

23.06 New chiller unit (Owner-provided, Contractor-installed). See Mechanical Drawings.

ROOF PLAN NOTES

KEY PLAN - THIRD FLOOR

Area of Work- Third Floor Roof

Scale: 1/4" = 1'-0"2

PARTIAL THIRD FLOOR ROOF - STEP #2

Scale: 1/4" = 1'-0"3

PARTIAL THIRD FLOOR ROOF - STEP #3

N

N

A. Verify all conditions in the field prior to fabrication, erection, and construction.

B. Protect existing structure as required during all phases of construction.

C. Coordinate contractor access to all phases of construction, deliveries, and debris removal with the C.O.R. See General Requirements.

D. Maximum time limit of 2 days from when existing chiller unit is taken offline and the new chiller unit is operational. Contractor to coordinate and schedule roof top equipment work accordingly to meet time constraint.

E. Interior finish work to occur following MRI equipment upgrade while magnet is offline.

GENERAL NOTES

Keynote

Material Finish

SYMBOL LEGEND

WSF-1

2.09

2.11

2.11

2.09 2.09

WSF-1

2.11

2.11P-2

WSF-1

2.09

2.09 2.112.11

WSF-1

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1

/2

:0

:3

P

M

VA Cincinnati MRI Site Prep

05/30/2023

INTERIOR ELEVATIONS AND

DETAILS

A401

JWDF

539-CSI-207

Cincinnati, OH

Bid Documents 22006.00

A. See sheet 2.A807/2.A808/2.A809 for Floor Finish Plan.

B. See sheet 2.A711/2.A712 for Casework Details.

C. See sheet 2.A801 for Room Finish Schedule.

D. See sheet 2.A801 for Finish Materials Legend.

E. Provide tile substrate as follows: All shower stalls, Bathing Suite #220 will receive Cementious backer units. All Bathrooms, Restrooms, HAC will receive Water-resistant gyp. board. Kitchen, fireplace surond will receive Gyp. board.

2.09 Existing casework to remain. Protect in place during

construction.

2.11 Existing wall and base cabinets to remain. Protect in place during construction.

ELEVATION NOTES

GENERAL INT. ELEVATION NOTES

Scale: 1/4" = 1'-0"1 A2001A - MRI Room South

Scale: 1/4" = 1'-0"2 A2001A - MRI Room West1

Scale: 1/4" = 1'-0"3 A2001A - MRI Room North

Scale: 1/4" = 1'-0"4 A2001A - MRI Room East

MRI ROOM

A2001A

CONTROL

ROOM

A2001

MRI

COMPONENT

A2007

MRI

SCANNING RM

A2023

SYSTEM

COMPONENT

RM

A2001B

P-2

2.012.012.012.01

2.01

MRI ROOM

A2001A

CONTROL

ROOM

A2001

MRI

COMPONENT

A2007

MRI

SCANNING RM

A2023

SYSTEM

COMPONENT

RM

A2001B

WSF-1

VCT-1

2.19

2.012.012.012.01

2.01

2.04

JASON

H.

ROSS

2118221

IO

HO

FOET

A T

S

R E G I S

E T

R

ED RA

C H

TI

E C T

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

/1

/2

:0

:3

P

M

VA Cincinnati MRI Site Prep

05/30/2023

FINISH PLANS AND DETAILS

AF101

BMDF

539-CSI-207

Cincinnati, OH

Bid Documents 22006.00

A. All walls to be painted P-1 unless noted otherwise.

2.01 No floor or wall work this room.

2.04 Existing floor finish to remain. Protect in place during construction.

2.19 Existing equipment to remain. Protect in place. Verify the boundaries of the equipment where it contacts the floor.

PLAN NOTES

GENERAL FINISH PLAN NOTES

Scale: 1/4" = 1'-0"2

WALL FINISH PLAN

Scale: 1/4" = 1'-0"1

FLOOR FINISH PLAN

FINISH LEGEND

FINISH CATEGORY CODE FINISH TYPE MANUFACTURER PRODUCT / COLOR COMMENTS

06 41 16 PLASTIC LAMINATE FACED ARCHITECTURAL CABINETS

06 41 16 PLASTIC LAMINATE FACED

ARCHITECTURAL CABINETS

PL-1 PLASTIC LAMINATE

(CASEWORK)

- EXISTING TO REMAIN

09 51 00 ACOUSTICAL CEILINGS

09 51 00 ACOUSTICAL CEILINGS ACT-1 EXISTING TO REMAIN

09 65 16 RESILIENT SHEET FLOORING

09 65 16 RESILIENT SHEET FLOORING WSF-1 WELDED SHEET FLOORING MANNINGTON BIOSPEC MD- Fawn 15419, 6" Integral Cove Base

09 65 19 VINYL COMPOSITION TILE

09 65 19 VINYL COMPOSITION TILE VCT-1 VINYL COMPOSITION TILE - EXISTING TO REMAIN

09 91 00 PAINTING

09 91 00 PAINTING P-1 PAINT (FIELD) BENJAMIN MOORE 981 WIND'S BREATH GLOSS LEVEL 4; SATIN

09 91 00 PAINTING P-2 PAINT (ACCENT) BENJAMIN MOORE CSP-685 STAINED GLASS GLOSS LEVEL 4; SATIN

12 36 61 SOLID SURFACE COUNTERTOPS

12 36 61 SOLID SURFACE COUNTERTOPS SS-1 SOLID SURFACE

(COUNTERTOPS)

- EXISTING TO REMAIN

NN

UPUP

UP

UP

Tectonic Copyright 2007

NOTE: ALL SYMBOLS AND ABBREVIATIONS

ARE SUBJECT TO MODIFICATIONS

ON OTHER DRAWINGS.

ALL SYMBOLS OR ABBREVIATIONS

MIGHT NOT NECESSARILY BE USED ON

THIS PROJECT.

ABBREVIATIONS

AC - AIR COMPRESSOR OR AIR CONDITIONER

ACCU - AIR COOLED CONDENSING UNIT

AD - ACCESS DOOR OR AREA DRAIN

ADJ - ADJUSTABLE

AFF - ABOVE FINISHED FLOOR

AFG - ABOVE FINISHED GRADE

AFMS - AIR FLOW MEASURING STATION

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

ATC - AUTOMATIC TEMPERATURE CONTROL

(SYNONYMOUS WITH BAS)

BAS - BUILDING AUTOMATION SYSTEM

BDD - BACK DRAFT DAMPER

BFP - BACKFLOW PREVENTER

BLDG - BUILDING

BOB - BOTTOM OF BEAM

BOD - BOTTOM OF DUCT

BOE - BOTTOM OF EQUIPMENT

BOF - BOTTOM OF FOOTING

BOG - BOTTOM OF GRILLE

BOP - BOTTOM OF PIPE

BOT - BOTTOM

BTU - BRITISH THERMAL UNIT

BTUH - BRITISH THERMAL UNIT PER HOUR

CBD - COUNTER BALANCED BACKDRAFT DAMPER

CFCI - CONTRACTOR FURNISHED CONTRACTOR

INSTALLED

CFM - CUBIC FEET PER MINUTE

CHS - CHILLED WATER SUPPLY

CHR - CHILLED WATER RETURN

CHGR - CHILLED WATER GLYCOL SOLUTION RETURN

CHGS - CHILLED WATER GLYCOL SOLUTION SUPPLY

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

CO - CLEAN OUT

CO2 - CARBON DIOXIDE

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

CTR - CENTER

CU - COPPER

CW - COLD WATER

CWR - CONDENSER WATER RETURN

CWS - CONDENSER WATER SUPPLY

D - DRAIN LINE

DB - DRY BULB

DDC - DIRECT DIGITAL CONTROLS

DI - DEIONIZED WATER

DIA - DIAMETER

DIM - DIMENSION

DN - DOWN

DWG - DRAWING

EA - EACH OR EXHAUST AIR

EAT - ENTERING AIR TEMPERATURE

EC - ELECTRICAL CONTRACTOR (DIVISION 26)

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATOR

EQUIP - EQUIPMENT

ET - EXPANSION TANK

ETR - EXISTING TO REMAIN

EQS - EQUIPMENT SUPPLIER

EWT - ENTERING WATER TEMPERATURE

EXH - EXHAUST

EXP - EXPANSION

EXT - EXTERIOR

EX - EXISTING

FD - FLOOR DRAIN

FF - FINISHED FLOOR ELEVATION

FLR - FLOOR

FOB - FLAT ON BOTTOM

FOF - FUEL OIL FLOW

FOG - FUEL OIL GAUGE

FOR - FUEL OIL RETURN

FOS - FUEL OIL SUPPLY

FOT - FLAT ON TOP

FPM - FEET PER MINUTE

FSC - FIRE SUPPRESSION CONTRACTOR (DIVISION 21)

FT - FEET

FTG - FOOTING

G - GAS OR NATURAL GAS

GA - GAUGE

GAL - GALLON

GALV - GALVANIZED

GC - GENERAL TRADES CONTRACTOR

GPM - GALLONS PER MINUTE

HB - HOSE BIBB

HC - HVAC CONTRACTOR (DIVISION 23)

HD - HUB DRAIN

HG - REFRIGERANT HOT GAS

HP - HORSEPOWER

HPC - HIGH PRESSURE CONDENSATE RETURN

HPS - HIGH PRESSURE STEAM SUPPLY

HR - HOUR

HT - HEAT TRACE

HTR - HEATER

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

HW - HOT WATER

HWR - HEATING HOT WATER RETURN

HWS - HEATING HOT WATER SUPPLY

ID - INSIDE DIAMETER

INV - INVERT ELEVATION

IN - INCHES

KEC - KITCHEN EQUIPMENT CONTRACTOR

L - LENGTH

LAT - LEAVING AIR TEMPERATURE

LAV - LAVATORY

LBS - POUNDS

LPC - LOW PRESSURE CONDENSATE RETURN

LPS - LOW PRESSURE STEAM SUPPLY

LWT - LEAVING WATER TEMPERATURE

MAX - MAXIMUM

MDD - MOTORIZED DAMPER

MEZZ - MEZZANINE

MFR - MANUFACTURER

MH - MANHOLE

MIN - MINIMUM OR MINUTE

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

MPC - MEDIUM PRESSURE CONDENSATE

RETURN

MPS - MEDIUM PRESSURE STEAM SUPPLY

MU - WATER MAKE-UP

N/C - NORMALLY CLOSED

NIC - NOT IN CONTRACT

N/O - NORMALLY OPEN

NOM - NOMINAL

NPT - NATIONAL PIPE THREAD

NTS - NOT TO SCALE

OA - OUTDOOR AIR

OBD - OPPOSED BLADE DAMPER

OD - OUTSIDE DIAMETER

OFCI - OWNER FURNISHED CONTRACTOR

INSTALLED

OFOI - OWNER FURNISHED OWNER INSTALLED

P - PROPANE GAS

PC - PLUMBING CONTRACTOR (DIVISION 22)

OR PUMPED CONDENSATE RETURN

PLBG - PLUMBING

PRESS - PRESSURE

PRV - PRESSURE REGULATING VALVE

PSF - POUNDS PER SQUARE FOOT

PSI - POUNDS PER SQUARE INCH

PSIG - POUNDS PER SQUARE INCH GAUGE

RA - RETURN AIR

RAD - RADIUS

RCP - REFLECTED CEILING PLAN

RD - ROOF DRAIN

REC - RECESSED

REQD - REQUIRED

RI - ROUGH IN

RL - REFRIGERANT LIQUID

ROS - REVERSE OSMOSIS WATER SUPPLY

ROR - REVERSE OSMOSIS WATER RETURN

RPM - REVOLUTIONS PER MINUTE

RS - REFRIGERANT SUCTION

S - SPRINKLER (WET)

SA - SUPPLY AIR

SAN - SANITARY OR SANITARY DRAIN

SCH - SCHEDULE

SCW - SOFT COLD WATER

SHT - SHEET

SPEC - SPECIFICATIONS

SQ - SQUARE

SR - SUPPLY RISER

SRV - SAFETY RELIEF VALVE

SS - STAINLESS STEEL

STD - STANDARD

STM - STORM OR STORM DRAINAGE

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

TEMP - TEMPERATURE

TOB - TOP OF BEAM

TOD - TOP OF DUCT

TOE - TOP OF EQUIPMENT

TOF - TOP OF FOOTING

TOJ - TOP OF JOIST

TOP - TOP OF PIPE

TOS - TOP OF SLAB OR TOP OF STEEL

TYP - TYPICAL

UNO - UNLESS NOTED OTHERWISE

V - VENT

VAC - VACUUM

VEL - VELOCITY

VFD - VARIABLE FREQUENCY DRIVE

(ADJUSTABLE FREQUENCY

MOTOR CONTROLLER)

VIB - VALVE IN BOX

VOL - VOLUME

VTR - VENT THROUGH ROOF

VR - VENT RISER

W/ - WITH

W/O - WITHOUT

WB - WET BULB

WCO - WALL CLEANOUT

GENERAL FLOOR PLAN NOTES

PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN UNLESS

NOTED OTHERWISE.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

A1

EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER DESIGNATIONS

REFER TO SCHEDULES.

H1 H1OR EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO

SCHEDULES.

H2

B

H2

RISER OR STACK NUMBER

DETAIL: B = DETAIL DESIGNATION

H2 = SHEET WHERE DETAIL IS LOCATED

SECTION: 1 = SECTION DESIGNATION

H2 = SHEET WHERE DETAIL IS LOCATED

A1 "UP TO" SYMBOL (ITEM ON FLOOR ABOVE)

APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF

EQUIPMENT, UNLESS NOTED OTHERWISE

10"

ELEV: 8' - 0"ELEV: 8' - 0"

TOD: 8' - 10"

BOD: 7' - 2"

20x20

20x20

APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF

DUCTWORK, UNLESS NOTED OTHERWISE

APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE OF PIPE,

UNLESS NOTED OTHERWISE

DL-1

UC-X DOOR UNDERCUT. X = HEIGHT OF UNDERCUT IN INCHES; 0.75 INCH

UNDERCUT IF NO HEIGHT IS NOTED. COORDINATE WITH GC.

DOOR LOUVER. 1 = SQUARE FEET OF LOUVER.

CONNECT TO EXISTING

HVAC PIPING DESIGNATIONS

CHILLED WATER SUPPLY PIPECHS

CONDENSER WATER SUPPLY PIPECWS

CONDENSER WATER RETURN PIPECWR

DRAIN LINE. PITCH IN DIRECTION INDICATEDD

HEATING HOT WATER SUPPLY PIPEHWS

HEATING HOT WATER RETURN PIPEHWR

WATER MAKE-UP PIPEMU

VENT PIPEV

REFRIGERANT LIQUID LINERL

REFRIGERANT SUCTION LINERS

EXPANSION TANK PIPEET

REFRIGERANT HOT GAS LINEHG

LOW PRESSURE CONDENSATE RETURN PIPELPC

LOW PRESSURE STEAM SUPPLY PIPELPS

MEDIUM PRESSURE CONDENSATE RETURN PIPEMPC

MEDIUM PRESSURE STEAM SUPPLY PIPEMPS

PUMPED CONDENSATE RETURN PIPEPC

HIGH PRESSURE CONDENSATE RETURN PIPEHPC

HIGH PRESSURE STEAM SUPPLY PIPEHPS

STEAM SUPPLY PIPE - NUMBER INDICATES P.S.I.G.10

MISC SYMBOLS

DUCTWORK SYMBOLS

ROUND BRANCH DUCTWORKCONICAL

FITTING

ACOUSTIC

FITTING

ACOUSTIC

FITTING

ADAD

D

R R

D

RECTANGULAR BRANCH DUCTWORK

SQUARE TEE WITH TURNING VANES

NOTE: ALL SQUARE ELBOWS IN

RECTANGULAR AND ROUND / OVAL

DUCTWORK SHALL BE PROVIDED WITH

TURNING VANES. REFER TO

SPECIFICATIONS FOR ADDITIONAL DETAILS.

EXISTING DUCTWORK TO REMOVED

RETURN AIR, RELIEF AIR, OR TRANSFER AIR

DUCTWORK. (UP AND DOWN) RADIUSED

OR SQUARE WITH TURNING VANES.

SUPPLY AIR OR OUTDOOR AIR DUCTWORK.

(UP AND DOWN) RADIUSED OR SQUARE

WITH TURNING VANES.

EXHAUST AIR DUCTWORK. (UP AND DOWN)

RADIUSED OR SQUARE WITH TURNING

VANES.

RECTANGULAR AND ROUND / OVAL

DUCTWORK RISE / DROP WITH 90° RADIUSED

OR SQUARE ELBOWS AND TURNING VANES.

RADIUS ELBOW

90° SQUARE ELBOW (WITH TURNING VANES)

NOTE: ALL SQUARE ELBOWS IN

RECTANGULAR AND ROUND DUCTWORK

SHALL BE PROVIDED WITH TURNING VANES.

ACCESS DOOR OR PANEL

DUCTWORK RISE IN DIRECTION OF AIR

FLOW

DUCTWORK DROP IN DIRECTION OF AIR

FLOW

DUCTWORK WITH ACOUSTICAL LINER.

LISTED DUCT SIZES ARE INSIDE CLEAR

DIMENSIONS.

RECTANGULAR ROUND / OVAL

FLEXIBLE DUCTWORK

FLEXIBLE CONNECTION

DUCTWORK CONSTRUCTED OF SPECIAL

MATERIAL AS NOTED

DIRECTION OF PITCH

RECTANGULAR DUCTWORK DIMENSIONS

(W x H)26x20

ROUND DUCTWORK DIMENSIONS (DIA)26ø

OVAL DUCTWORK DIMENSIONS (W x H)26x20 OV

DUCTWORK DEVICE SYMBOLS

WALL OR DUCTWORK MOUNTED AIR DEVICE. SG1 = DESIGNATION (REFER

TO AIR DEVICE SCHEDULE). 20x12 = DUCT CONNECTION SIZE (IN INCHES).

300 = REQUIRED CFM. 9'-0" = MOUNTING HEIGHT FROM FLOOR TO BOTTOM

OF GRILLE.

A3 10ø

MANUAL BALANCING DAMPER WITH LOCKING DEVICE

BDD = BACK DRAFT DAMPER

CBD = COUNTER-BALANCED BACK DRAFT DAMPER

SD = SMOKE DAMPER

FS = COMBINATION FIRE - SMOKE DAMPER

MDD = MOTORIZED DAMPER

AFMS = AIR FLOW MEASURING STATION

DUCT MOUNTED SMOKE DETECTOR. COORDINATE LOCATION.

HUMIDITY SENSOR - DUCT MOUNTED

SG1

20x12

BOG: 9'-0"

XXX

A-D

XX

H

SD

SP

AIR DEVICE. A3 = DESIGNATION (REFER TO FLOOR PLANS AND AIR DEVICE

SCHEDULE FOR VARIOUS DESIGNATIONS).

10ø = NECK SIZE (IN INCHES). 300 = REQUIRED CFM. ALL AIR DEVICE

DISCHARGE 4-WAY UNLESS NOTED WITH FLOW ARROWS. AIR DEVICE

SHOWN IS 2-WAY SIDE THROW. METHOD OF IDENTIFICATION ALSO APPLIES

TO OTHER CEILING MOUNTED AIR DEVICES.

FIRE DAMPER

A = TYPE (REFER TO FLOOR PLANS FOR VARIOUS TYPES)

D OR S = DYNAMIC OR STATIC

STATIC PRESSURE SENSOR - DUCT MOUNTED

C

CARBON DIOXIDE SENSOR - DUCT MOUNTED

S

TEMPERATURE SENSOR - DUCT MOUNTED

CHECK VALVE

T

P

FOB

FOT

SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR REQUIRED TYPE BASED ON

APPLICATIONS)

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

PRESSURE GAUGE

TEMPERATURE GAUGE OR THERMOMETER

VALVES AND FITTINGS

10"

TOE: 3' - 0"

BOE: 0' - 6"

CHILLED WATER GLYCOL SOLUTION RETURN PIPECHGR

CHILLED WATER GLYCOL SOLUTION SUPPLY PIPECHGS

CHILLED WATER RETURN PIPECHR

SQUARE THROAT / RADIUS HEEL

FITTINGS NOT ACCEPTABLE

PIPING SYMBOLS

DOUBLE LINE SINGLE LINE

BOTTOM CONNECTION (45°)

BRANCH TEE CONNECTION (NOTE:

BULLHEAD TEE'S ARE NOT PERMITTED)

DIRECTION OF PITCH

DROP

ELBOW DOWN

ELBOW UP

EXISTING PIPE TO BE REMOVED

EXISTING PIPE TO REMAIN

FLOW DIRECTION DESIGNATION

PUMP

RISE

TOP CONNECTION (45°)

TOP CONNECTION (90°)

BOTTOM CONNECTION (90°)

DD

RR

PIPE RISER

RADIUS'D BRANCH

RADIUS'D TEE

EXISTING DUCTWORK TO REMAIN

UNLESS NOTED OTHERWISE ON DRAWINGS,

15° MAX FOR DIVERGING, 30° MAX FOR

CONVERGING TRANSITION

EMERGENCY SHUTOFF STATION. 46" MOUNTING HEIGHT UNLESS NOTED OTHERWISE.

SPACE TEMPERATURE SENSOR / THERMOSTAT. WHEN WALL MOUNTED, MOUNTING

HEIGHT 46" TO MEET ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH

COORDINATE WITH ARCHITECT.

T

DP

DIFFERENTIAL PRESSURE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO

MEET ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH

ARCHITECT.

H

HUMIDITY SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA

REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH ARCHITECT.

CARBON DIOXIDE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA

REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH ARCHITECT.

C

CO

CARBON MONOXIDE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET

ADA REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH

ARCHITECT.

TEMPERATURE SENSOR. WHEN WALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA

REQUIREMENTS. WHEN MOUNTED NEXT TO WALL SWITCH COORDINATE WITH

ARCHITECT.

S

S TEMPERATURE SENSOR MOUNTED IN CEILING PLENUM.

STATIC PRESSURE SENSOR.SP

DRAIN VALVE WITH HOSE END CONNECTION

EXPANSION JOINT

MANUAL AIR VENT

AUTOMATIC AIR VENT

PRESSURE REDUCING VALVE

QUICK OPENING MANUAL VALVE

VACUUM BREAKER

NEEDLE VALVE

PRESSURE AND TEMPERATURE TEST PLUG

VACUUM GAUGE WITH STOP

END CAP

GLOBE VALVE

SHUTOFF VALVE AND BOX

SHUTOFF VALVE ON RISER

A

M

M

N

V

VB

SOLENOID VALVE

S

SAFETY RELIEF VALVE. FOR HYDRONIC SYSTEMS PIPE DISCHARGE AIR GAPPED TO

FLOOR DRAIN UNLESS NOTED OTHERWISE. FOR STEAM SYSTEMS PIPE DISCHARGE

TO OUTDOORS.

WATER METERM

PRESSURE GAUGE WITH COCK AND SIPHON LOOP

BI-METALIC STEAM TRAP AND DRIP ASSEMBLY

THERMOSTATIC STEAM TRAP AND DRIP ASSEMBLY

BM

TD

IB

FT

TS

FLOW METER

F

UNION

CLEANOUT

STRAINER

M

MODULATING 2 PORT AUTOMATIC CONTROL VALVE

M

MODULATING 3 PORT AUTOMATIC CONTROL VALVE

M

COMBINATION SHUTOFF AND BALANCING VALVE (REFER TO SPECIFICATIONS FOR

REQUIRED TYPE BASED ON APPLICATIONS)

STRAINER WITH A BLOW DOWN VALVE AND HOSE CONNECTION

AUTOMATIC FLOW CONTROLLER WITH P/T PLUG IN AND OUT

2 PORT AUTOMATIC CONTROL VALVE, 2-POSITION UNLESS SPECIFIED OTHERWISE

3 PORT AUTOMATIC CONTROL VALVE, 2-POSITION UNLESS SPECIFIED OTHERWISE

AUTOMATIC PRESSURE INDEPENDENT CONTROL VALVE

THERMODYNAMIC STEAM TRAP AND DRIP ASSEMBLY

INVERTED BUCKET STEAM TRAP AND DRIP ASSEMBLY

FLOAT AND THERMOSTATIC STEAM TRAP AND DRIP ASSEMBLY

AREA OF WORK

THIRD FLOOR ROOF

AREA OF WORK

SECOND FLOOR

RM# A2001, A2001A, A2007

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

STATE COA FIRM NO.

/2

/2

:3

:1

P

M

VA Cincinnati MRI Site Prep

05/30/2023

ABBREVIATIONS, LEGEND &

DRAWING INDEX

M001

MGNWJS

539-CSI-207

Cincinnati, OH

Bid Documents 22006.00

2022-05234

01528

DRAWING INDEX - MECHANICAL

SHEET NUMBER SHEET NAME

M001 ABBREVIATIONS, LEGEND & DRAWING INDEX

M101 PARTIAL SECOND FLOOR PLAN - REMOVALS AND NEW WORK

M102 PARTIAL THIRD FLOOR PLAN - REMOVALS AND NEW WORK

N.T.S.Scale:

KEY PLAN - THIRD FLOOR

N.T.S.Scale:

KEY PLAN - SECOND FLOOR

N

N

GENERAL NOTES

1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.

2. THE DRAWINGS AND SPECIFICATIONS SHALL BE CAREFULLY STUDIED DURING THE COURSE OF BIDDING AND CONSTRUCTION. ANY ERRORS, OMISSIONS OR DISCREPANCIES ENCOUNTERED SHALL BE REFERRED IMMEDIATELY TO THE ARCHITECT/ENGINEER FOR INTERPRETATION OR

CORRECTION, SO THAT MISUNDERSTANDINGS AT A LATER DATE MAY BE AVOIDED.

3. SITE VISIT(S) SHALL BE AS OUTLINED IN PROJECT SPECIFICATIONS.

4. INSULATE PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED IN THE PERFORMANCE OF WORK IN THIS PROJECT.

5. PROVIDE ALL ROOFING PENETRATION, REPAIR & REINFORCEMENT IN THE EXISTING BUILDING FOR WORK INDICATED. ENGAGE A ROOFING SUBCONTRACTOR TO PERFORM THE ROOFING WORK. THE EXISTING ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED AND RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR

SUCH INSTALLATION TO MAINTAIN THE EXISTING WARRANTY ON THE ROOF.

6. REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAWINGS FOR DETAILS OF BUILDING CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEMENT FOR WORK. THE VARIOUS DRAWINGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE USED JOINTLY AT ALL TIMES. REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS INDICATED ON THE DRAWINGS ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO EXECUTE THE WORK AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE CONTRACTING OFFICERS REPRESENTATIVE (COR) THRU THE CONTRACTING OFFICER

FOR CLARIFICATION BEFORE PROCEEDING.

7. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. SEE SPECIFICATIONS FOR MORE

SPECIFIC DETAILS ON RESPONSIBILITIES.

8. ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY.

9. COORDINATE ALL WORK WITH THE WORK OF OTHERS. KEEP INFORMED OF THE PROGRESS AND DETAIL DEVELOPMENT OF THE WORK OF OTHERS. COORDINATE AND EXPEDITE WORK WITH OTHERS SO THAT THE PROGRESS OF THE TOTAL WORK SHALL BE KEPT ON SCHEDULE.

10. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL GOVERNING CODES AND STANDARDS.

11. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON VISUAL OBSERVATION AND/OR AVAILABLE DRAWING INFORMATION, AND MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE

CONTRACTING OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.

12. FITTING OR PLACING WORK INTO OR ON THE WORK OF OTHERS CONSTITUTES ACCEPTANCE OF THE SUITABILITY OF THE WORK IN PLACE. IF THE WORK OF OTHERS IS NOT ACCEPTABLE, NOTIFY THE CONTRACTING OFFICERS REPRESENTATIVE (COR) FOR THE WORK TO BE CORRECTED. ANY NEW WORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW WORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING WORK INSTALLED IN UNSUITABLE

EXISTING CONDITIONS WILL BE CONSIDERED.

13. IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE COR. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. WORK MAY BE RESUMED ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE MATERIALS HAVE BEEN REMOVED OR

ENCAPSULATED AND THE AREA DECLARED SAFE.

14. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE DISTURBED

UNDER THIS WORK TO MATCH EXISTING.

15. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE PREMISES

AND DISPOSED OF PROPERLY BY THE CONTRACTOR.

16. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.

17. FIELD VERIFY EXISTING CONDITIONS, INCLUDING PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO PERFORMING WORK.

18. ALL EXISTING PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN ON REMOVAL PLAN(S) SHALL BE REMOVED. THE MAJORITY OF WORK TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTWORK, PIPING, ETC. THAT MAY NOT BE SHOWN BUT IS

ASSOCIATED WITH THE REMOVAL WORK.

19. ALL ABANDONED EXTRANEOUS PIPING, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.

Tectonic Copyright 2007

B

C

EMS

A2025

SYSTEM COMPONENT RM

A2001B

MRI SCANNING RM

A2023MRI COMPONENT

A2007

Room

CORRIDOR-2

C-2-11-2

AVAIL.

A2021

CORRIDOR-3

C-2-11-3

CORRIDOR-1

C-2-11-1

SPECIAL PROCEDURES

A2015

S.P. CONTROL

A2009

MRI ROOM

A2001A

CONTROL ROOM

A2001

G C

R G

C S

2" 2"

UP2"

UP2"

B

C

EMS

A2025

SYSTEM COMPONENT RM

A2001B

MRI SCANNING RM

A2023MRI COMPONENT

A2007

Room

CORRIDOR-2

C-2-11-2

AVAIL.

A2021

CORRIDOR-3

C-2-11-3

CORRIDOR-1

C-2-11-1

SPECIAL PROCEDURES

A2015

S.P. CONTROL

A2009

MRI ROOM

A2001A

CONTROL ROOM

A2001

G C

R G

C S

2" 2"

UP2"

UP2"

AREA OF WORK

SECOND FLOOR

RM# A2001, A2001A, A2007

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

STATE COA FIRM NO.

/2

/2

:3

:1

P

M

VA Cincinnati MRI Site Prep

05/30/2023

PARTIAL SECOND FLOOR PLAN -

REMOVALS AND NEW WORK

M101

MGNWJS

539-CSI-207

Cincinnati, OH

Bid Documents 22006.00

2022-05234

01528

Scale: 1/8" = 1'-0"2

PARTIAL SECOND FLOOR - NEW WORK

Scale: 1/8" = 1'-0"1

PARTIAL SECOND FLOOR - REMOVALS

N

N

PLAN NOTES:

1. EXISTING 1.5T MRI MACHINE BEING UPGRADED BY OTHERS. QUENCH VENT, ROOM

HVAC, ETC. ARE ALL EXISTING TO REMAIN.

2. REMOVE PIPING AS REQURED FOR INSTALLATION OF NEW COMPONENTS PER

SIEMENS AND HASKRIS INSTALLATION INSTRUCTIONS.

3. PROVIDE 27 GALLONS OF DEIONIZED WATER TO FILL THE SECONDARY WATER

CIRCUIT, PER HASKRIS INSTALLATION INSTRUCTIONS.

4. EXTEND 2" GLYCOL WATER PIPING TO NEW EQUIPMENT. PROVIDE ISOLATION BALL

VALVES, DRAIN VALVES, AND FLUSHING HOSE, PER HASKRIS INSTALLATION

INSTRUCTIONS. TERMINATE PIPING AT CABINETS WITH VIBRATION ISOLATORS.

5. DRAIN ENTIRE GLYCOL SYSTEM, FLUSH PIPING AND REFILL WITH A 40% PROPYLENE

GLYCOL MIXTURE, PER HASKRIS INSTALLATION INSTRUCTIONS. APPROXIMATE ROUTE

SHOWN. FIELD VERIFY.

6. MOUNT CHILLER REMOTE CONTROL PANEL FURNISHED BY HASKRIS. COORDINATE

EXACT LOACTION WITH SIEMENS AND VA. EXTEND WIRING TO CHILLER PER HASKRIS

INSTALLATION INSTRUCTIONS.

GENERAL NOTES:

A. SHUT DOWN OF EXISTING CHILLER AND STARTUP OF NEW CHILLER SHALL OCCUR OVER A

48 HOUR PERIOD. INSTALL NECESSARY EQUIPMENT PRIOR TO CHILLER REMOVAL IN

ORDER FOR SMOOTH AND TIMELY TRANSITION TO NEW CHILLER OPERATION.

UPUP

UP

UP

R

KRAUS

CHILLER

R

KRAUS

CHILLER

HASKRIS

R

KRAUS

CHILLER

HASKRIS

AREA OF WORK

THIRD FLOOR ROOF

LAG SCREW

4"x4"x1/4"

STEEL PLATE

FIBERGLASS INSULATION

INSULATION

ROOF

2x6 WOOD NAILER

ROOFING

ROOF DECK3

NOTES:

1. 18 GAUGE GALVANIZED STEEL COUNTER-FLASHING,

2. WELDED 14 GAUGE EQUIPMENT SUPPORT CURB, MEETING ASTM A-446, 525, 526 AND 527 REQUIREMENTS, WITH WELDED CORNERS WITH SEAMS JOINED BY CONTINUOUS WELDS. CURB SHALL BE INTERNALLY REINFORCED WITH BULKHEADS AND SPREADERS, 24" ON CENTER TO MEET LOAD RATING OF EQUIPMENT.

CURB TO EXTEND 6" BEYOND EQUIPMENT. REFER TO FLOOR PLANS FOR HEIGHT.

3. SECURE CURB TO ROOF WITH EXPANSION BOLTS (CONCRETE ROOF) OR RUST RESISTANT BOLTS

(METAL DECK AND BAR JOIST ROOF), 12" O.C.

P: 937-224-0861 www.heapy.com

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Office of Construction and Facilities Management

PROJECT NO.

STATE COA FIRM NO.

/2

/2

:3

:1

P

M

VA Cincinnati MRI Site Prep

05/30/2023

PARTIAL THIRD FLOOR PLAN -

REMOVALS AND NEW WORK

M102

MGNWJS

539-CSI-207

Cincinnati, OH

Bid Documents 22006.00

2022-05234

01528

Scale: 1/4" = 1'-0"1

PARTIAL THIRD FLOOR (ROOF)-HVAC-STEP 1

Scale: 1/4" = 1'-0"2

PARTIAL THIRD FLOOR (ROOF)-HVAC-STEP 2

Scale: 1/4" = 1'-0"3

PARTIAL THIRD FLOOR (ROOF)-HVAC-STEP 3

PLAN NOTES:

1. EXTEND NEW 2" GLYCOL WATER PIPING TO NEW CHILLER. COVER INSULATION WITH

TWO COATS OF WEATHER RESISTANT FINISH AS SPECIFIED.

2. REMOVE CHILLED WATER PIPING BACK TO POINT INDICATED FOR CONNECTION TO

NEW CHILLER IN STEP 3. NEW CHILLER SHALL BE INSTALLED AND HAVE POWER

PRIOR TO REMOVAL.

3. REMOVE EXISTING CHILLER ONCE NEW CHILLER IS OPERATIONAL.

4. REMOVE EQUIPMENT CURBS ONCE NEW CHILLER IS OPERATIONAL.

5. PROVIDE EQUIPMENT SUPPORT CURBS IN STEP 1 FOR CHILLER TO BE INSTALLED IN

STEP 2.

6. RECEIVE AND INSTALL HASKRIS MODEL OPC24 CHILLER FURNISHED BY SIEMENS.

7. EXISTING EXHAUST FAN TO REMAIN.

8. EXISTING CONDENSING UNIT TO REMAIN.

9. EXISTING PIPE PENETRATION ROOF CURB TO REMAIN.

10. PROVIDE ISOLATION BALL VALVES, PURGE VALVES (WITH ISOLATION BALL VALVES)

AND DRAIN VALVES, PER HASKRIS INSTALLATION INSTRUCTIONS. TERMINATE PIPING

AT CHILLER WITH VIBRATION ISOLATORS.

11. INTEGRATE CHILLER INTO HOSPITAL TRIDIUM NIAGARA AX CONTROLS SYSTEM VIA

BACNET FOR MONITORING ONLY. CONNECT TO CHILLER CONTROLLER LOCATED IN

HIGH VOLTAGE ELECTRIC BOX. TRIDIUM JACE LOCATED ON 4TH FLOOR ADJACENT TO

SERVICE ELEVATORS.

GENERAL NOTES:

A. SHUT DOWN OF EXISTING CHILLER AND STARTUP OF NEW CHILLER SHALL OCCUR OVER A

48 HOUR PERIOD. INSTALL NECESSARY EQUIPMENT PRIOR TO CHILLER REMOVAL IN

ORDER FOR SMOOTH AND TIMELY TRANSITION TO NEW CHILLER OPERATION.

B. COORDINATE RECEIPT OF, POTENTIAL STORAGE FOR, AND INSTALLATION

REQUIREMENTS FOR, NEW HASKRIS CHILLER WELL IN ADVANCE OF ANY SYSTEM SHUT

DOWNS.

N

N

N

N.T.S.Scale:

EQUIPMENT SUPPORT ROOF CURB

Revisions Date

VHACINReynoM Highlight

SWBD

METERING

SWBD

METERING

ELECTRICAL SYMBOLS

EXISTING OUTLET OR DEVICE TO REMAIN. MAINTAIN EXISTING CIRCUITING.

DASH SYMBOL INDICATES PARTICULAR OUTLET OR DEVICE TO BE REMOVED AND CIRCUITRY MADE CONTINUOUS WHERE

REQUIRED.

ELECTRICAL CONNECTION.

20A-125V SINGLE RECEPTACLE, NEMA 5-20R (18" MH UNLESS NOTED OTHERWISE).

SPECIAL PURPOSE RECEPTACLE. REFER TO NOTE ON PLAN.

20A-125V DOUBLE DUPLEX RECEPTACLE. NEMA 5-20R, (18" MH UNLESS NOTED OTHERWISE) TWO GANG ASSEMBLY.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R, WITH GROUND FAULT CIRCUIT INTERRUPTER (18" MH UNLESS NOTED

OTHERWISE).

20A-125V WEATHERPROOF DUPLEX RECEPTACLE, NEMA 5-20R (HORIZONTAL 18" MH UNLESS NOTED OTHERWISE) WITH

TAYMAC #MM420G EXTRA DUTY GRAY COVER, VERTICAL MOUNT.

20A-125V WEATHERPROOF DUPLEX RECEPTACLE, NEMA 5-20R WITH GROUND FAULT CIRCUIT INTERRUPTER (18" MH UNLESS NOTED OTHERWISE), WITH TAYMAC #MM420G EXTRA DUTY GRAY COVER, VERTICAL MOUNT.

JUNCTION BOX. SQUARE DEVICE INDICATES A CONNECTION TO CRITICAL POWER.

MULTI-OUTLET RECEPTACLES ASSEMBLY, NEMA 5-15R (SINGLE OUTLETS ON 18" CENTERS) (46" MH UNLESS NOTED

OTHERWISE).

DISCONNECT SWITCH.

MOTOR STARTER.

COMBINATION MOTOR STARTER AND DISCONNECT SWITCH.

ELECTRIC MOTOR.

ELECTRICAL PANEL OR SWITCHBOARD PER DRAWINGS.

GF

WP

WP/GF

J

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R (46" MH UNLESS NOTED OTHERWISE).

ABBREVIATIONS

AAP - AREA ALARM PANEL - MEDICAL GAS

ACC - ACCESS

ADJ - ADJUSTABLE

AF - ARC FAULT CIRCUIT INTERRUPTER

AFCI - ARC FAULT CIRCUIT INTERRUPTER

AFF - ABOVE FINISHED FLOOR TO BOTTOM OF ITEM

AFG - ABOVE FINISHED GRADE TO BOTTOM OF ITEM

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

ATS - AUTOMATIC TRANSFER SWITCH

BLDG - BUILDING

BOE - BOTTOM OF EQUIPMENT

BOT - BOTTOM

BTWN - BETWEEN

CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED

CKT - CIRCUIT

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

CORR - CORRIDOR

CTR - CENTER

D - DEPTH

DET - DETAIL

DIA - DIAMETER

DIM - DIMENSION

DIV - DIVISION

DN - DOWN

DWG - DRAWING

EA - EACH

EC - DIVISION 26 CONTRACTOR

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATION OR ELEVATOR

EM - EMERGENCY

EQ - EQUAL

EQS - EQUIPMENT SUPPLIER

EQUIP - EQUIPMENT

E/R - EXISTING TO BE RELOCATED

EX - EXISTING TO REMAIN

EXP - EXPANSION

EXT - EXTERIOR

FCE - FIRE CONTROL EQUIPMENT

FF - FINISHED FLOOR ELEVATION

FLR - FLOOR

FSC - DIVISION 21 CONTRACTOR

FT - FEET

FTG - FOOTING

GC - GENERAL CONTRACTOR

GF - GROUND FAULT CIRCUIT INTERRUPTER

GFCI - GROUND FAULT CIRCUIT INTERRUPTER

HC - DIVISION 23 CONTRACTOR

HP - HORSE POWER OR HIGH POINT

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

ID - INSIDE DIAMETER

IN - INCHES

KEC - KITCHEN EQUIPMENT CONTRACTOR

L - LENGTH

LBS - POUNDS

MAP - MASTER ALARM PANEL (MEDICAL GAS)

MAX - MAXIMUM

MEZZ - MEZZANINE

MFR - MANUFACTURER

MH - MANHOLE OR MOUNTING HEIGHT TO CENTER LINE OF ITEM

MIN - MINIMUM OR MINUTE

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

NIC - NOT IN CONTRACT

NOM - NOMINAL

NTS - NOT TO SCALE

OD - OUTSIDE DIAMETER

OFCI - OWNER FURNISHED CONTRACTOR INSTALLED

OFOI - OWNER FURNISHED OWNER INSTALLED

PC - DIVISION 22 CONTRACTOR

PLBG - PLUMBING

RAD - RADIUS

REC - RECESSED

REQD - REQUIRED

RI - ROUGH-IN

S - SURFACE MOUNTED

SC - SECURITY CONTRACTOR

SCH - SCHEDULE

SHT - SHEET

SMS - SECURITY MANAGEMENT SYSTEM

SPEC - SPECIFICATIONS

SQ - SQUARE

SS - STAINLESS STEEL

STD - STANDARD

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

TC - DIVISION 27 CONTRACTOR

TEMP - TEMPERATURE

TOE - TOP OF EQUIPMENT

TYP - TYPICAL

UNO - UNLESS NOTED OTHERWISE

VFD - VARIABLE FREQUENCY DRIVE

VOL - VOLUME

W/ - WITH

W/O - WITHOUT

WP - WEATHERPROOF

ZVC - ZONE VALVE CABINET

WIREMOLD RACEWAY, AS NOTED ON PLANS.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R WITH 2 INTEGRAL USB CHARGERS (18" MH UNLESS NOTED OTHERWISE).

NOTE: ALL SYMBOLS AND ABBREVIATIONS ARE SUBJECT

TO MODIFICATIONS ON OTHER DRAWINGS.

ALL SYMBOLS OR ABBREVIATIONS MIGHT NOT

NECESSARILY BE USED ON THIS PROJECT.

SQUARE DEVICE INDICATES A CONNECTION TO CRITICAL POWER. SPECIFICATION IS SAME AS RESPECTIVE ROUND DEVICE.

J

E2

B

E2

DETAIL: B = DETAIL DESIGNATION

E2 = SHEET WHERE DETAIL IS LOCATED

SECTION: 1 = SECTION DESIGNATION

E2 = SHEET WHERE SECTION IS LOCATED

PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN.

DETAIL NOTE.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .