Attachment II QASP 23R0011 Post Wide Flooring Replacement 13 June 2023.pdf
PDF 429 KB Posted
- Attached to
- Post Wide Flooring and Replacement
- Solicitation number
- W9124C23R0011
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a firm fixed price contract to provide post-wide flooring replacement services at Fort Jackson in South Carolina. The contractor will remove and dispose of all asbestos-containing materials and install new flooring in various buildings as requested by the government. The contract term is for one year with surveillance conducted by the Contracting Officer's Representative (COR) on a monthly basis using checklists to evaluate the contractor's compliance with requirements for asbestos abatement plans, employee licensing, disposal documentation, and manpower reporting. The QASP outlines procedures for conducting inspections, addressing non-conformances, accepting deliverables, and reporting performance in the Contractor Performance Assessment Reporting System. It provides templates for the surveillance schedule, checklists, and discrepancy reports to document the results of the government's quality assurance oversight.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
For
POST WIDE FLOORING CONTRACT
W9124C-23-D-XXXX
02 JUNE 2022
Cheryl Todd Susan Coates
Contracting Officer Contracting Officer’s Representative
Mission & Installation Contracting Command Fort Jackson, SC
TABLE OF CONTENTS
Subject Page Number
1. Overview
2. Description of Services
3. Roles and Responsibilities
4. Contract Quality Requirements
5. Government Surveillance
6. Non-Conforming Performance
7. Deduct Plan
8. Data Analysis
9. Acceptance of Services
10. COR Status Report
11. Contractor Performance Assessment Reporting System (CPARS)
12. Combating Trafficking In Persons
13. COR/Quality Assurance Surveillance Files
14. QASP Changes
1. Overview.
1.0 1.1. Purpose. This Quality Assurance Surveillance Plan (QASP) is a Government developed document used to ensure that the Government receives quality services and pays only for conforming services actually provided. The objective of this IDIQ contract is to acquire Post
Wide Flooring at Ft. Jackson, SC, as defined in this Performance Work Statement (PWS), Part 5.
Government-furnished property and services for those items specified in the PWS are exempt from this QASP. The Contractor shall perform to the standards specified in Post Wide Flooring
PWS.
This Quality Assurance Surveillance Plan (QASP) identifies the methods and procedures the
Government will use to ensure it receives the services to the desired standard, as identified in the
PWS.
1.2. Intent. The intent of this QASP is to:
1) Ensure Contractor performance meets or exceeds contract terms, conditions, and specifications
2) Hold the Contractor accountable for quality control
3) Encourage the Contractor to take appropriate steps to control and improve quality
4) Ensure all sections of FAR 46 are applied as required and applicable
Accordingly, the Government will perform surveillance on the contract in accordance with this
QASP but reserves the right to monitor the contract in any manner necessary, at any time necessary, and at all places necessary to ensure that the services rendered conform to contract requirements. The Government also reserves the right to perform quality assurance at the
Subcontractor level, and at the contractor's place of business. Sub-contract service providers shall be accountable to the Contractor who, in turn is responsible to the Government. Resolution of non-conforming services discovered at the Subcontractor level will be addressed with the prime Contractor. The Government will not exercise any supervisory controls over the contract service providers performing the services herein.
2. Description of Services.
2.1. Scope of Work. The contractor shall The Contractor shall provide all necessary general and specialized tools, equipment, parts, and supplies required to remove and replace flooring in various buildings, on Fort Jackson, SC. The contractor shall provide South Carolina Department of Health and Environmental Control (SCDHEC) authorized and licensed abatement contract personnel as required. The contractor SHALL comply with regulations in all regards of ACM removal and shall comply with all rules and regulations applicable to the inspection, management, abatement, and disposal of regulated asbestos containing material and enforced by the Environmental Protection Agency and SCDHEC. A copy of the DHEC regulations is available at http://www.scdhec.gov/environment/baq/regulatory.aspx.
2.2. Type of Contract. The government will award an Indefinite Delivery Indefinite Quantity
(IDIQ) contract.
http://www.scdhec.gov/environment/baq/regulatory.aspx
3. Roles and Responsibilities. The following provides a synopsis for the roles and their respective authority during the performance of the contract:
3.1. Government.
3.1.1. Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract. In the event the Contractor effects any such change at the direction of any person other than the KO, the change will be considered to have been made without authority, and solely at the risk of the Contractor. No changes in, or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes.
3.1.2. Contracting Officer’s Representative (COR). The COR will monitor all technical and performance aspects of the contract and assist the (KO) in contract administration. The COR is authorized to perform the following functions:
• Assure that the Contractor performs the technical requirements of the contract.
• Perform inspections necessary in connection with contract performance.
• Maintain written and oral communications with the Contractor concerning technical and performance aspects of the contract.
• Issue written interpretations of technical requirements, including Government drawings, designs, and specifications.
• Monitor Contractor's performance and documents and notifies both the Contracting
Officer and Contractor of all deficiencies.
• Coordinate availability of Government furnished property.
• Provide site entry of Contractor.
ACC and MICC do not use other acronyms to refer to and describe a COR. Terms such as the
“COTR, “Onsite COR”, “TM”, etc. will not be used. Some personnel may be assigned as
Alternate CORs, but other than a statement to that effect and what actions the KO expects that
ACOR to take in the absence of the primary COR, there is no difference between a COR an
Alternate COR, or other government surveillance personnel assigned to conduct contract oversight. Throughout the remainder of this QASP, the term “COR’ will be used to refer to all government surveillance personnel assigned to monitor the contractor’s performance on this contract.
A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially regarding changes in cost, price, or delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
The Contracting Officer shall use the DoD Procurement Integrated Enterprise Environment
(PIEE) Tool to electronically track COR nominations, appointments, terminations, and training certifications for each COR appointed to conduct oversight on this contract. The COR will upload their surveillance documents, such as Monthly Status Reports (MSR), COR trip reports, correspondence with the contractor, and other miscellaneous documents into the PIEE Tool within their online PIEE Profile for this contract. The PIEE Tool is available within the WAWF suite of tools at https://piee.eb.mil/.
3.1.2.1 Alternate Contracting Officer’s Representative (ACOR). The Alternate COR is an employee of the U.S. Government provided by the Requiring Activities (RA) and appointed by the Contracting Officer to provide additional surveillance personnel in monitoring and documenting the contractor’s performance. These alternate surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR training and experience requirements and are appointed by the contracting officer as Alternate CORs (ACOR) in the PIEE Tool. This term will apply to other government surveillance personnel as defined in Army Regulation 70-13, paragraph 2-2 g.
3.2. Contractor.
3.2.1. Contract Manager. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 7:30 a.m. to 4:15 p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. List of Contract Manager and
Alternate shall be provided within 10 days of contract award. Qualifications for all key personnel are listed below:
For quick access, the contact information for the performance of this QASP is provided:
Government Personnel:
Table 1; Key Positions for Contract Administration
Title Name Phone e-mail
Contracting Officer
COR/ACOR
Contractor Personnel:
Title Name Phone e-mail
Contract Manager
Alternate Contract Mgr
4. Contract Quality Requirements.
4.1. Contractor’s Quality Control Plan/Program (QCP). The Government will evaluate the adequacy of the Contractor’s Quality Control Plan (QCP) performance under this contract in accordance with this QASP.
The Contractor’s quality control program is how he assures himself that all work complies with the requirement of the contract PWS. It is essential that Government Surveillance Personnel understand that Quality Control (QC) is the responsibility of the contractor, and not the government.
As such, the government will focus their efforts on validating if the contractor is maintaining an adequate quality control inspection system that ensures the contractor maintains evidence that services provided conform to contract quality requirements. The Contractor shall provide inspection data to the Government on request for validation.
The Contractor’s QCP shall include a process that can identify, prevent, and ensure non-recurrence of defective services. See Attachment 7.
4.2. Government Quality Assurance. This QASP describes what the Government will do to ensure that the Contractor has performed in accordance with the performance standards within the PWS.
This QASP describes:
• How the performance standards will be applied:
o The Performance Standard for each requirement in the PWS will be applied as prescribed in the PWS. Ensure that each Performance requirement within the PWS includes a Measurable performance standard in terms of quality, timeliness, or quantity.
o Ensure the method of assessing contractor performance against performance standards is included in this QASP.
o Ensure each Performance Requirement includes an acceptable quality limit (AQL).
AQL is the worst tolerable performance that is still considered acceptable.
For example, if “the contractor shall provide personnel support within 2 hours”, the AQL may be:
+ or - (+/-) 15 minutes. See attachment 8, QASP Surveillance Item Requirements
• Which performance elements will be surveilled (Surveillance Checklist, attachment 4) o All performance activities will be surveilled through-out the Period of Performance, using a risk-based approach to selecting Checklist items from Attachment 8, List of
Contractor Requirements. The selected items will be populated on the Monthly
Checklist during performance of a delivery order and placed on the Surveillance
Schedule for each period surveilled.
• When the surveillance will be scheduled (Surveillance Schedule, attachment 3) o A sample of Checklist items will be selected from Attachment 8, List of Contractor
Requirements. These selected items for each month during the period of a delivery order will be placed on the Surveillance Checklist and scheduled surveillance on the
Monthly Schedule. Surveillance may be scheduled on a daily, weekly, or monthly frequency. However, each contractor requirement must be audited for compliance prior to invoice payment being made.
• The Acceptable Quality Limit (AQL) o The AQL will be determined by the Requiring Activity, i.e., the COR, and referenced in attachment 8, QASP Surveillance Item Requirements for each Performance requirement.
• The nature of Government contract quality assurance actions that include the number of observations made and the number and type of defects (defect rate) o Personnel conducting contractor performance surveillance will use attachment 4, Surveillance Checklist, or equivalent to answer the Performance question asked, and provide comments in the area provided on the checklist. These comments and metrics from the Checklist will be included on each MSR submitted during the Period of
Performance.
5. Government Surveillance.
5.1. Methods of Surveillance. The following Methods of Surveillance may be utilized in monitoring the Contractors’ performance:
NOTE: The performance items selected for surveillance in this QASP should NOT be the same as those listed in the Performance Requirements Summary (PRS). The PRS is a stand-alone document that illustrates to the contractor the few, most salient items the government wishes the contractor to be aware of. The PRS is contained in the contract Performance Work Statement
(PWS). This QASP shall not be provided to the contractor. See DA Pamphlet 5-20, para 8-5 (a).
See Attachment 1 for PRS items.
• 100% Inspection will be reserved for the highest risk areas where consequence of failure may affect life or limb, or there is likelihood of mission failure.
• Random Sampling Will be used when a service is performed on a frequent basis and a statistically valid sample can be selected for audit. This is most appropriate method for frequently recurring tasks.
• Periodic Inspection Will be used when planned sampling of a service is at a specific predetermined date and time. This is most appropriate for tasks that occur infrequently, yet on a scheduled basis.
• Customer Feedback. Not a valid method of surveillance, but a good indicator of areas where surveillance should be conducted or intensified.
The DA Form 5477, Customer Complaint Record, Attachment 2, will be placed at convenient locations for the end user of these services, and made available to document/record all complaints. The COR will collect the Customer Complaints each surveillance cycle and investigate for validity ASAP.
The following procedures will be followed when a complaint is received.
1. The COR/ACOR will investigate to determine the validity of the complaint.
2. If the complaint is determined to be invalid, the COR will inform the person who submitted the complaint of the reason(s) as soon as practical.
3. For validated complaints that are true contractual non-conformances, the procedures in paragraph 6 below will be applied.
4. A Customer Complaint Log will be used to document each validated customer complaint and attached to the COR Monthly Surveillance Report in the PIEE Tool
5.1.1 Surveillance Procedure:
Examples:
a. SAMPLE 1: The COR will evaluate the Contractor’s performance against the
Performance Standards established in the delivery order. Evaluations will be to the extent practical to assure the contractor provides quality services IAW the requirements of the contract.
b. SAMPLE 2: The COR will perform random inspections before, during, or after the contractor’s Contract Manager’s scheduled inspections. If the COR discovers a deficiency(s), the COR will immediately notify the Contractor Manager for re-performance of the service to ensure compliance. If the standards are not met or if the
Contractor Manager refuses to correct an identified deficiency, the COR will notify the contracting officer for appropriate action in accordance with the appropriate inspection of services clause.
1. NOTE: Once the contractors QCP is received the QASP should be updated to include how the COR will verify compliance to the contractor quality management systems per their QCP (I.E., make a checklist of things that will be reviewed or verify/validate using one of their checklist(s).
2. The COR will take a contractor identified discrepancy and evaluate the contractors follow-up/root cause analysis, corrective and preventive actions.
5.2. Surveillance Schedule. A Surveillance Schedule (Attachment 3) will be created as needed utilizing the DA 5475, COR Surveillance Schedule, or locally generated equivalent. The schedule is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized
Government personnel. Each Month’s Surveillance Schedule will be completed at the beginning of each month of activity during the Period of Performance (PoP) of the delivery order to schedule surveillance activity. Completed Surveillance Schedules will be filed in the online
Procurement Integrated Enterprise Environment (PIEE) (https://piee.eb.mil/) file for this contract, either as an attachment to Monthly COR Status Report (MSR) or uploaded separately in the Miscellaneous Documents Section of the CORs’ PIEE file.
5.3. Surveillance Checklists. A Surveillance Checklist (Attachment 4) will be created as needed utilizing the DA 5476, COR Surveillance Checklist, or locally generated equivalent. The
Checklist is “FOR OFFICIAL USE ONLY” and is not releasable to anyone other than authorized
Government personnel. Each Month’s Surveillance Checklist will be completed with the
Surveillance Schedule. Completed Surveillance Checklist will be filed in the online Procurement
Integrated Enterprise Environment (PIEE) (https://piee.eb.mil/) file for this contract, either as an attachment to Monthly COR Status Report (MSR) or uploaded separately in the Miscellaneous
Documents Section of the CORs’ PIEE file.
Surveillance checklist items will be selected from the List of Contractor Requirements, Attachment 7
5.4. Surveillance Documentation. Each months’ Completed Surveillance Documentation, to include the Monthly Surveillance Report (MSR) must be filed in the online Procurement
Integrated Enterprise Environment (PIEE); (https://piee.eb.mil/) file for this contract, either as an attachment to MSR, or uploaded separately in the Miscellaneous Documents Section of the
CORs’ online PIEE file.
6. Non-Conforming Performance. A Non-conformance occurs when the Contractor fails to meet the terms, conditions and/or specifications of the Contract/Task Order. All instances of non-conformance must be documented by the COR. The COR will provide the details of the non-conformance using the Contract Discrepancy Report (CDR), DA Form 5479, Attachment 5, to the KO, who will notify the Contractor of each nonconformance occurrence, unless the KO has authorized the COR to submit directly to the contractor and copy the KO. Resolution of any non-conformance discovered at the Subcontractor level will be addressed with the prime
Contractor.
Non-conformances are classified as either: Level I (Minor); Level II (Major); or Level III
(Critical).
6.1. Level I (Minor). Level I non-conformance is not likely to materially reduce the usability of services for their intended purpose or is a departure from established standards having little bearing on completing the contract requirement. Minor non-conformances can usually be corrected on the spot and can be issued to the Contractor through either a verbal or written
Contract Discrepancy Report (CDR). However, the Government is required to document verbal
Level I CDRs. The COR may issue verbal Level I CDRs directly to the appropriate level of
Contractor management. The COR will notify the KO as soon as practical when a verbal Level I
CDR is issued and document them in their Monthly Reports. If the non-conformance cannot be corrected on the spot, the Contractor shall be given a suspense date to correct the deficiency.
The KO will issue, and sign written Level I CDRs, Attachment 5.
6.2. Level II (Major). Level II non-conformance is likely to result in failure of the services to meet contract requirements. Also, repeated discrepancies, a large number of documented Level I
CDRs and trends indicating failure of the Contractor’s quality control program can be classified as Level II CDRs. The KO issues all Level II CDRs in writing, Attachment 5. The COR will notify the KO as soon as practical when a major non-conformance is identified.
6.3. Level III (Critical). Level III non-conformances result in hazardous or unsafe conditions due to the way the services are performed; prevent or impact a vital agency mission as a result of performance; or are for repeated or uncorrected Level II CDRs. The Contracting Office Director or Deputy Director issues written Level III CDRs. The COR is responsible for notifying the KO immediately upon discovery of a critical non-conformance.
6.4. Documenting CDRs. The COR will provide the details of the non-conformance using the
Contract Discrepancy Report, DA Form 5479, Attachment 5. If the Requiring activity prefers to issue a locally developed CDR, documentation must include as a minimum: the Contract or Task
Order number; reference to the specific contract requirement; the specific discrepancy to the requirement; where it was discovered; the date and time it was discovered; Contractor representative who was notified; and the suspense date for Contractor response/corrective action.
6.5. Tracking and Resolving CDRs. All CDRs, verbal and written, regardless of issuer will be included in the COR’s Monthly Report. The COR and KO shall track CDRs to ensure the
Contractor identifies and takes appropriate corrective action to the root cause and the specific non-conformance is corrected within the required timeline. The KO will make a final written determination of the Government’s remedies if the non-conformance is not corrected by the
Contractor after receiving notice and a reasonable opportunity to correct the work. IAW MICC
Desk Book (24 June 2016), 46.102 Policy.
7. Deduct Plan. This acquisition does not include a Deduct Plan.
8. Data Analysis. Data Analysis will be performed to identify trends in cost, schedule and/or performance risks. The results of Data Analysis will be documented in COR Monthly Status
Reports (MSR) and may be used to make adjustments to surveillance schedules and/or checklist items to increase or decrease surveillance, based on performance trends. Negative trends noted using Government data/observations could result in issuing the Contractor a Contract
Discrepancy Report. Trends noted using Contractor data will not result in a CDR unless the
Contractor has not addressed the negative trend. QASP changes based on Data Analysis will be coordinated with the Contracting Officer for approval.
9. Acceptance of Services. When all services have been deemed acceptable and there is documented, objective, quality evidence to support acceptable performance, the COR will accept the services provided and authorize payment to the Contractor. Acceptance and payment will be made by approving the Contractor’s Receiving Reports in Wide Area Workflow at https://piee.eb.mil/ as an iRAPT Inspector, and/or Acceptor.
10. COR Status Report. COR Status Reports, or Monthly Status Reports (MSR) will be submitted monthly, as needed, to the Contracting Officer via the PIEE Tool. MSR reports must be uploaded into the PIEE Tool, using the “Smart Form” Monthly Surveillance Report. MSR reports will be due NLT the 10th day of the month following the month of surveillance. COR
Status Reports will provide a synopsis of the Contractors performance for the inclusive dates of the report. The synopsis must contain a summary of surveillances performed, Customer
Feedback if any, CDRs if any, an analysis of the Contractors performance, recommended adjustments to surveillance schedules, and any other pertinent contract information IAW FAR
46.104, and the COR Appointment Letter. Completed Surveillance Checklists and CDRs, if any, will be included as attachments to COR Status Reports, or referenced in the MSR for that month and uploaded separately in the Miscellaneous Documents Section of the CORs’ Online PIEE file for this contract. See para 4.2.
11. Contractor Performance Assessment Reporting System (CPARS). Documented surveillance data (COR Status Reports, Completed Surveillance Checklists, Customer Feedback and CDRs, if any) will be used to support CPARS ratings. CPARS will be completed in accordance with AFARS, Subpart 5142.15 – Contractor Performance Information.
12. Combating Trafficking In Persons (CTIP). In accordance with PGI 222.17 and FAR
52.222-50, the KO will be notified immediately of any information from any source that alleges a Contractor employee, subcontractor and/or subcontractor employee has engaged in conduct that violates the United States Government “zero” tolerance policy regarding trafficking in persons.
13. COR/Quality Assurance Surveillance Files. The official COR/Quality Assurance
Surveillance File will be maintained in the on-line PIEE Tool, IAW DoDI 5000.72, and DFARS
PFI 201.602-2.
14. QASP Changes. This QASP is a living document and, as such, may be changed as needed based on Data Analysis (trends), contract modifications by the KO, etc. The COR will send any recommended changes to the Contracting Officer for approval and the Contracting Officer must approve all changes.
COR’S Signature Block Date
Contracting Officer’s Signature Block Date
Attachments:
1. Performance Requirements Summary (PRS), DA Form 5473
2. Customer Complaint Record, DA Form 5477
3. Surveillance Schedule, DA Form 5475
4. Surveillance Checklist(s)
5. Contract Discrepancy Report, DA Form 5479
6. Contract Discrepancy Log
7. List of Contractor Requirements
8. QASP Surveillance Item Requirements
DOCUMENT REVISION HISTORY
This QASP is a living document and, as such, may be changed as needed based on Data Analysis
(trends), contract modifications, etc. The COR will send any recommended changes to the
Contracting Officer for approval and the Contracting Officer must approve all changes.
Version
Effective Date Originator Summary of Changes
1.0 COR NAME
Attachment 1
Contract/Task Order Performance Requirements Summary
(PRS)
Performance Objective
Standard Performance Threshold
Method of Surveillance
PRS # 1.
The contractor shall remove and replace f looring as requested by the government.
Para 5.1
Contractor shall remove old flooring product and install selected flooring product
100% Compliance
100% Inspection
PRS #2.
Contractor shall provide COR approved asbestos abatement plan, approved permit issued by DHEC, list of all employees engaged in the ACM removal and copies of their licenses/certificates.
Para 5.6
Contractor shall provide all documentation prior to start of project.
100% Compliance
100% Inspection
PRS #3.
Contractor shall remove and dispose of all asbestos containing material associated with project.
Para 5.8
Contractor shall comply with all SCDHEC regulations during abatement/removal
100% Compliance
100% Inspection
PRS #4
The contractor shall provide copies of the bill of lading/ship tickets to the COR showing acceptance from the landfill where ACM was disposed.
Para 5.9
Provide copies NLT 10 calendar day after disposal
100%
Attachment 2
Customer Complaint Record, DA Form 5477
DA FORM 5477
Attachment 3
Surveillance Schedule, DA Form 5475
You will need to develop a monthly schedule for conducting surveillance. You can use this form. The date you are going to conduct surveillance would go in the far left column. You would list the PWS, paragraph number for the task you are going to surveil on the top line.
DA FORM 5475
Attachment 4
Surveillance Checklist(s)
DA 5476 Surv
Checklist.pdf
MICC COR
Surveillance Checklist Template (Sept 2016).xlsx
The COR will develop a monthly Checklist for conducting surveillance. The COR may use either of the forms attached. The COR will list the PWS requirements that ARE NOT listed as PRS requirements in the
PWS as a pool of surveillance items for each month of surveillance activity you conduct. See attachment
COR SURVEILLANCE CHECKLIST Template
COR Inspection Checklist & Data Report (Fixed Firm Price Contract) Period Of Performance:
Contractor: From:
Contract Number: To:
Service Provided:
Meeting Contract Requirements? COR Name:
Date: YES No
Comments:
Comments summary, to include, positive trends, negative trends, concerns, customer comments, and any additional COR comments:
To populate the checklist, find in the PWS: "The Contractor Shall...”, Then, make that requirement a checklist item by converting the requirement to a question: “Did the contractor…"
Each "Yes" can be graded as a 1, and each NO graded as a 0. Once the checklist is complete, the COR may generate a quantifiable performance rating using these numbers as metrics.
8, List of Contractor Requirements Each month, select the performance requirements you will evaluate from that list.
Attachment 5
Contract Discrepancy Report, DA Form 5479
DA FORM 5479
Attachment 6
Contract Discrepancy Log
Blank COR CDR Log
2016 MICC Master.xlsx
Attachment 7
List of Contractor Requirements
MICC QASP List of
Contractor Shall Checklist Items 2016.xlsx
Attachment 8
QASP Surveillance Item Requirements
Performance Objective
Standard Performance Threshold
Method of Surveillance
The contractor shall remove and replace f looring as requested by the government Para 5.1
Contractor shall remove old flooring product and install selected flooring product
100%
COR approved asbestos abatement plan, approved permit issued by DHEC, list of all employees engaged in the ACM removal and copies of their licenses/certificates.
Para 5.6 all documentation prior to start of project.
100%
Contractor shall remove and dispose of all asbestos containing material associated with project.
Para 5.8
Contractor shall comply with all SCDHEC regulations during abatement/removal
100%
The contractor shall provide copies of the bill of lading/ship tickets to the COR showing acceptance from the landfill where ACM was disposed.
Para 5.9
Provide copies NLT 10 calendar day after disposal
100%
Contracting Manpower Reporting
PWS 5.32
NLT 31 October of each contract year
100%
File details come from the government source that posted it. Updated .