This sole source justification memorandum is for maintenance support services for AT&T-owned copper cable facilities at various Department of the Navy locations in Pensacola, Florida. The services include maintaining a legacy telecommunications system until the government can award a contract to replace the system. Only AT&T currently maintains the legacy system, as other carriers have eliminated usage. The period of performance is from September 22, 2022 through contract completion, with an anticipated dollar value over $250,000. The justification for restricting competition is that AT&T is the only source that can provide the required maintenance for the legacy system until it is upgraded, to ensure continuity of critical telecommunications operations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0018923Q00810001.pdf | ||
| Attachment I Third party letter and verification email_Redacted.pdf | ||
| SAP CI Sole Source Justification CBL Maint_Redacted.pdf | ||
| N0018923Q0081.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Ver 2.0 (01 June 2018)
Date: _21 April 2022___
MEMORANDUM
Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER
THE SIMPLIFIED ACQUISITION THRESHOLD
Ref: (a) Previous Contract Number(
I. BACKGROUND:
1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
1. Provide a description of the item or service required, to include
a) the name of the required source or brand name
AT&T NETWORK
b) the required delivery date/period of performance and
POP START DATE 22 September 2022
c) its intended use.
MAINTENANCE SUPPORT FOR AT&T OWNED COPPER CABLE FACILITIES IN VARIOUS
DON LOCATIONS IN PENSACOLA FLORIDA
2. List the source(s) or known vendor(s) who are able to provide the above described item or service.
__AT&T NETWORK SERVICES_____________________________________________
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED
ON THE FOLLOWING (select all that apply):
A. _____ Only one responsible source (select all that apply):
1. _____ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.
a. Explain what is subject to the restrictive rights.
2 Ver 2.0 (01 June 2018)
b. If drawings are included, who is identified as “owning” the drawings.
2. _____ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.
a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
b. Identify the distributors / authorized technical representatives for the item or service.
Provide evidence of the licensing or OEM certification agreement as an attachment to this document.
3. __XX__ OTHER REASON:
a. _____ CRITICAL EQUIPMENT: The required item is critical equipment, the failure of which poses a hazard to the operational system, the crew, or the environment.
i. Explanation on how requirement and intended purpose is critical:
b. _____ STANDARDIZATION / BRAND NAME: only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.
i. Identify Make / Model Number(s): ___________________
ii. Identify other systems with this Make / Model:
c. _____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.
i. Identify Make / Model of existing equipment:
ii. Describe how the equipment must be compatible with the existing configuration.
d. _XX__ OTHER:
3 Ver 2.0 (01 June 2018)
_CURRENT SYSTEM IS A LEGACY SYSTEM THAT ALL OTHER CARRIERS
HAVE ELIMINATED FROM USAGE. CURRENTLY THE ONLY SOURCE THAT
MAINTAINS THE SYSTEM IS AT&T. PREVIOUS CONTRACT WAS AWARDED
WITH INTENTION TO EXERCISE OPTION PERIODS, HOWEVER AS RESULT OF
LEGACY SYSTEM IT IS ANTICIPATED THAT CABLES AND PLANT WILL BE
UPGRADED AND CURRENT SYSTEMS WILL BE OBSOLETE. AS RESULT
OPTIONS WERE NOT INCLUDED WITH THE ANTICIPATION OF
REPLACEMENT. AT THIS TIME THERE IS NOT AN ALTERNATIVE IN PLACE
AND UNTL AWARD IS MADE TO REPLACE SYSTEM, TO MAINTAIN
CONTINUITY OF OPERATIONS THE GOVERNMENT HAS NO ALTERNATIVE
BUT TO UTILIZE LEGACY SYSTEM TILL UPGRADE TAKES PLACE.___
4. _____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified: ______________________________
b. Required delivery date / Period of Performance: _____________________________
c. If the difference between a. and b. is more than one week, explain the delay in submitting t he requirement.
d. Estimated production lead time: ______________________________
e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)
f. CASREP Number: _________________________________________
IV. ANTICIPATED DOLLAR VALUE OF
4 Ver 2.0 (01 June 2018)
V. CERTIFICATIONS AND APPROVALS:
Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.