About this file

This Statement of Work (SOW) details a one-year emergency generator service contract with four option years for the TTFVRU Emergency Backup Generator. Pacific Power Group will provide full-service preventive maintenance and load testing, including comprehensive generator servicing and performance verification. Specific vendor responsibilities include changing oil and filters, replacing oil sensors, securing an electrical permit from the Washington State Department of Labor and Industries, conducting a 1.5-hour load bank test, and submitting generator performance reports.

The service requires two technicians to perform on-site operations during the load test, with a focus on ensuring mission-critical facility operations. The full-service maintenance includes replacing oil, oil filters, fuel filters, air filters, and three oil sensors (pressure, pre-alarm, and shutdown). At the conclusion of service, the vendor will provide both a Generator maintenance report and a Load test report to document the generator's operational status and performance.

View the file

Other files for this federal contract opportunity

Other files attached to Annual Generator Services and Load Testing, newest first.
File Type Posted
20250902_082326.jpg JPG image
20250902_081012.jpg JPG image
questions.pdf PDF
20250902_081006.jpg JPG image
1000000239.jpg JPG image
Statement of Work Generator service.pdf PDF
1232SA25Q0244 Terms and Conditions.pdf PDF
Attachment II Wage Determination 2015-5543 Rev 25 Date May 30 2025.pdf PDF
Attachment III Past Performance Questionnaire PPQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Title: Service Emergency Generator Contract One year plus four option years

Objective: Full service and load test on TTFVRU Emergency Backup Generator-Mission Critical for Facility Operations

Approach:

Pacific Power Group will perform a full-service PM and 1.5hr. load test and permit. To ensure correct generator operation. The full service includes oil. Oil filters, fuel filters and air filters. At the time of service, the oil pre alarm and shutdown oil sensor will be provided and replaced. The load test will be conducted for at least one and a half hours. A Generator maintenance report and Load test report will be supplied at the conclusion of the service. Two Technicians are required for line of site operation during load test. Technicians will also replace the three-oil sensors, Pressure, Alarm and Shutdown sensors. one time repair!

The Vendor Agrees To:

1. Changing the oil, oil filter, fuel filters and air filters.

2. Replacing the oil pressure, pre alarm, and shutdown sensor.

3. Secure Electrical permit from the Washington State Dept. of Labor and Industries for the connection of the load bank.

4. Conducting a 1.5 hr. load bank test.

5. Submit reports on generator performance.