This is a Statement of Work (SOW) for Ship's Service Diesel Generator (SSDG) Resilient Mount Replacement and Heat Exchanger Maintenance for the USS ARLINGTON LPD-24, identified under SSP TPPC-LPD24-MARMC28-CN01.

The contractor is required to supply and deliver four categories of parts to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, Norfolk, VA 23511, by November 2, 2027 or as soon as possible. The required materials include: 20 gaskets (Part # 174-7792), 110 mount assemblies (Part # 180-1483), 660 bolts (Part # 7X-0386), and 40 single fuel injector gasket kits (Part # 479-1622). All materials must comply with specifications referenced in work spec items 311-21-002 through 311-25-008, with specific drawing numbers and technical manual references provided for each part. Shipping terms are FOB Destination with all shipping costs included in the quoted price, and the product shall be accepted and inspected at the destination. The contractor must notify Allison Harding (allison.k.harding.civ@us.navy.mil, (757) 967-6077) and Gary Seibel (gary.b.seibel2.civ@us.navy.mil, (757) 967-6076) with shipment date and tracking information upon delivery.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

Statement of Work

USS ARLINGTON LPD-24

SSP: TPPC-LPD24-MARMC28-CN01

Title: Ship’s Service Diesel Generator (SSDG) Resilient Mount Replacement & Heat Exchanger

Maintenance

Work Spec Items: 311-21-002, 311-21-003, 311-21-008, 311-22-002, 311-22-003, 311-22-008, 311-23-

002, 311-23-003, 311-23-008, 311-24-002, 311-24-003, 311-24-008, 311-25-002, 311-25-003, 311-25-

1.0. INTRODUCTION

1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1 be delivered to DLA Distribution Norfolk RMC PROJ, Bunker

Hill Towaway Bldg. X136, and Norfolk, VA 23511.

2.0. GENERAL REQUIREMENTS

2.1. The Contractor shall supply and deliver the material listed in 2.1.1 through 2.1.4 complying with the following specifications:

SOW

Para no.

QTY NAME OF

PART/DESCRIPTION

Part # / NSN DRAWING #

TECH MANUAL

PIECE NO.

2.1.1 20 EA GASKET 174-7792 EATP 20-0003 Rev B N/A

2.1.2 110 EA MOUNT ASSY 180-1483 S9311-D1-MMC-020 Rev 3 Table 8-3-7

2.1.3 660 EA BOLT 7X-0386 S9311-D1-MMC-020 Rev 3 Table 8-3-3

2.1.4 40 EA SINGLE FUEL INJECTOR

GASKET KIT

479-1622 EATP 20-0036 Rev C N/A

2.2 All material to be in accordance with reference 2.2 and 2.8 of work spec items 311-21-002, 311-21-

003, 311-21-008, 311-22-002, 311-22-003, 311-22-008, 311-23-002, 311-23-003, 311-23-008, 311-24-

002, 311-24-003, 311-24-008, 311-25-002, 311-25-003, 311-25-008

2.3 Required Date of Delivery: 11/2/2027 or best possible.

3.0. DELIVERY / ACCEPTANCE

3.1. Delivery shall be made to the following address:

DLA Distribution Norfolk RMC PROJ

Bunker Hill Towaway Bldg. X136

Norfolk, VA 23511

Primary: Mr. Cunningham

Phone: (757) 278-8148 RIC 17H

3.2. Shipping terms shall be FOB Destination. The product shall be accepted and inspected at FOB

Destination. Shipping cost shall be included in the quote.

2 | P a g e

4.0 MATERIAL SHIPMENT NOTIFICATION

4.1 Notification of date and tracking information to be provided to the following upon shipment of material:

4.1.1. Allison Harding, allison.k.harding.civ@us.navy.mil, phone (757) 967-6077

4.1.2. Gary Seibel, gary.b.seibel2.civ@us.navy.mil, phone (757) 967-6076 mailto:allison.k.harding.civ@us.navy.mil mailto:gary.b.seibel2.civ@us.navy.mil

File details come from the government source that posted it. Updated .