This Statement of Work (SOW) details a contract for CIF Pallet Rack Repair at Fort Jackson, SC, scheduled for completion by 01 July 2025. The project requires the contractor to procure, stage, transport, deliver, uninstall, and reinstall 74 damaged rack upright frames and 12 horizontal Rolled Beams at Building 2450 Marion Ave., with work to be performed between 0700-1700 hours Monday through Friday within a 14-calendar day period.
Specific work requirements include removing and replacing rack system frames that are 18 feet high and 42 inches deep, color frost green with deflectors, for a 6190 Pound Capacity system. The contractor must provide all labor and equipment, comply with OSHA safety regulations, and wear required personal protective equipment. Security measures are extensive, including personnel background checks, installation access control, and physical security protocols. The government will remove pallets from the work area and expects the contractor to coordinate activities and identify a work coordinator.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .