DEPARTMENT OF COMMERCE (DOC)

NATIONAL OCEANIC ATMOSPHERIC ADMINISTRATION (NOAA)

OFFICE OF MARINE AND AVIATION OPERATIONS (OMAO)

AIRCRAFT OPERATIONS CENTER (AOC)

DHC-6-300 CORROSION INSPECTIONS AND RELATED MAINTENANCE

STATEMENT OF WORK

Introduction and Background The United States Department of Commerce (DOC), National Oceanic and Atmospheric Administration (NOAA), Office of Marine and Aviation Operations (OMAO), Aircraft Operations Center (AOC), based in Lakeland, FL, owns and operates four (4) deHavilland DHC- 6-300 Twin Otter aircraft (Federal Aviation Administration (FAA) registrations: N46RF (Serial Number (SN) 824), N48RF (SN 740), N56RF (SN 788), N57RF (SN 688)) in support of missions throughout the United States and Canada. This Statement of Work (SOW)is for the compliance of the Corrosion Inspection Packages of the Twin Otters and major modifications.

The anticipated ordering period includes a 60-month Corrosion Inspection Package (B.1), scheduled maintenance items found in (B.2) and Optional items, Camera Bay modification (B.4) on N57RF SN 688 with approximately 26,500 hours 25,500 cycles, as well as a NOAA defined 30 month Corrosion Inspection Package (B.3) for aircraft DHC-6-300 S/N 824, tail number N46RF with approximately 16,500 hours 12,000 cycles. The work scope of related maintenance items (B.2) may vary from year to year as requirements change.

A.1 Scope NOAA is seeking a Twin Otter Maintenance Facility. The Contractor shall comply with applicable Federal Aviation Regulation (FAR) and all aircraft manufacture’s requirements. The Contractor will provide all special tools, facilities, equipment, and certified technical staffing to perform tasks. The Contractor shall have performed an Initial Corrosion Inspection on a DHC-6- 300 IAW PSM 1-6-5 and completed SB 6/523 replacement of all primary flight control cable in the previous year before the award of the contract and each option year. Primary Contractor must be a FAA approved repair station, or equivalent Transport Canada Approved Maintenance Organization (AMO) if Canadian, for the airframe/power plant of the Twin Otter and the repair/installation of avionics equipment. Primary Contractor is required to be a Garmin service center Contractor must have a fixture to support fuselage while landing gear is removed for overhaul (estimated 4-5 weeks).

The Government shall be responsible for scheduling work against this contract. Once the aircraft arrives at the contractor’s facility, no work shall begin until the contractor has been issued a notice to proceed. The NOAA Contracting Officer Representative (COR) shall be responsible for reviewing the list of discrepancies/tear down inspection report and making a recommendation to the NOAA Contracting Officer (CO) to either accept or decline the contractor’s quote. The Contractor’s list of discrepancies/tear down inspection report shall include the extent of inspection and the condition found on all major components. The contractor shall comply with all outstanding service bulletins and airworthiness directives and provide any recommendations for maintenance which would prevent future failures, if applicable. The contractor shall not proceed with correcting any “over and above” discrepancies without the prior written approval of the CO. A Notice to Proceed (NTP) authorizing the contractor to correct the “over and above” discrepancies will be issued by the CO once the contractor’s proposed “over and above” discrepancy proposal has been approved by the CO.

The Contractor shall be responsible for providing AOC with all FAA and AOC required documentation (see below) for approval and return to service including but not limited to:

FAA Required Documentation:

• 8130-3/Form One/Certificate of Conformance

• Log book entry containing:

o Status of life limited components o Status of serialized components o Airworthiness Directives completed o Service Bulletins incorporated

AOC Required Documentation:

• Teardown Report for Engine and Serialized Components

• Final acceptance test run record

• Complete updated Service Bulletin record

The Contractor may be required to sub-contract out inspection, maintenance, overhaul, and repair work. The Government reserves the right to initiate, and approve or disapprove any sub-contractor.

A.2 Delivery Requirements: The Government is responsible for costs and logistics that are necessary to deliver the aircraft, or ship parts, to the Contractor’s facility. AOC and/or the flight crew shall notify the Contractor as soon as the need for service, inspection, and repair has been identified. Government owned parts, equipment, and property shall be returned to the Government. The cost of shipping the returnable shall be the responsibility of the Government.

A.3 Period of Performance: Due to mission requirements and the operational schedule of the NOAA Twin Otter fleet, the selected contractor shall comply with a turn-around time not to exceed 90 calendar days for the 60-month inspection and 21 calendar days for the 30-month inspection. This period begins when the aircraft is delivered to the selected Contractor’s facility or designated FBO and ends when the aircraft is ready to be picked up at the Contractor’s facility (for the 30-month inspection) or the selected paint shop after full re-paint (for the 60-month inspection). Should abnormal requirements and/or circumstances occur which would require an extension of this task order, the selected contractor shall immediately provide documentation to the CO and COR as to the reason and extent of the abnormal requirements and/or circumstances.

The selected Contractor shall also provide the best estimate of the extension required.

A.4 Quality Assurance: AOC may choose to have a representative witness any part of this contract. The Contractor shall keep the CO, and COR apprised of the progress and schedule.

AOC shall have access to the aircraft while it is located at the Contractor’s facility. AOC shall provide a representative and flight crew for final acceptance and test flights.

A.5 Insurance Against Loss or Damage to Government Property: The Contractor shall, at its own expense, provide and maintain hull liability insurance of not less than $2,500,000.00 to cover the aircraft on which this work will be performed. Before award of this contract, the Contractor shall provide to the Contracting Officer written documentation that the required insurance has been obtained. The policies evidencing the required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Governments interest shall not be effective:

- For such a period as the laws of the State in which this work is to be performed prescribe; or Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.

A.6 Parts, Discounts, and Warranties: The Contractor shall provide all replacement parts, materials, and consumables. However, the Government reserves the right to provide the same, if advantageous at any time during the contract. The Government will make the final determination on whether new, new surplus, overhauled, repaired, or serviceable parts will be installed on the aircraft. Parts and components in an “as removed” status shall not be installed on the aircraft. Any part or component that has not reached its recommended service life but fails inspection and needs to be replaced will be treated as an over and above. Since the Government cannot determine which parts or components if any meet this criteria, maintenance contractors shall provide the labor rate they will charge the government, per hour, for “over and above” discrepancies. Secondly, Contractors are asked to provide the cost plus percentage markup for replacement parts. Parts Manufacturer Approved (PMA) parts are acceptable. The Contractor shall provide the industry standard implied warranty on all products and service.

A.7 Submittal of Invoices: The Contractor shall submit all invoices via email to the COR and CO identified in the applicable contract task order. The Contractor shall list separately on each invoice all firm-fixed-price items and all “over and above” items. All “over and above” items shall clearly indicate that they were charged in accordance with the agreed upon rates per the contract. All invoices will be reviewed by the COR to determine that all items shown on the invoice have been received, accepted, and ready for invoice payment release.

B.1 Required Maintenance: Corrosion Inspection 60-Month The Contractor shall perform Initial Corrosion Inspection DHC-6-300 IAW PSM 1-6-5 to include but not limited to the flowing:

1. Remove all flight controls.

2. Remove main landing gear, gear teardown and build up. (Overhaul of both Left and Right Gear legs required. see B.2 (6)

3. Remove all interior.

4. Remove floors. Repaint floor boards before reinstall.

5. Remove complete fuel tunnel and components.

6. Remove all fuel bags and tape. New bags to be provided by Contractor.

7. Strip paint to bare metal on upper and lower wing surfaces in the exhaust paths. All seams will be resealed and all bare metal is to be spot primed for transit to paint shop.

8. Service Bulletins (SB) and Airworthiness Directives (AD) to be included due to overlapping of inspection Areas:

AD2019-10-05 SB V6/0062 Elevator and Rudder control cables STA 270.3

AD2018-04-02 SB V6/0022 Aileron cable at wing root AD2009-04-09 SB V6/541 Front Spar Adaptor inspection AD94-14-22 SB 6/512 Horizontal center hinge AD94-08-10 SB 6/492 Wing main spar lower cap angles AD89-24-06R1 SB 6/511 Elevator quadrant AD87-04-23 SB 6/474 Wing strut inspection AD80-03-08 SB 6/388 & 6/502 Inspection of post 502 Flight and Flap control rods AD80-13-11R2 SB 6/390 & 6/502 Inspection of post 502 Flight control rods

SB 6/454 Part A and Part B Tail adapter inspection SB 6/507 Aileron cut channel SB 6/509 & 6/386 Nacelle longeron inspection SB 6/513 & 6/438 Inspection horizontal attach bracket SB 6/521 Sta. 239 Inspection for cracks SB 6/528 Stay strut pin SB V6/0049 Corrosion inspection on wing to fuselage pin SB V6/0066 Aileron rib inspection

B.2 Scheduled and unscheduled maintenance, repairs, inspections, and upgrades, avionics upgrades, and avionics support to include but not limited to the following:

1. Repaint of complete aircraft along with Contractor’s choice and location of sub-contractor. Quote to include new Weight and Balance computation. Statement of Work for paint will be provided upon request.

2. Equal Maintenance for Maximum Availability (EMMA) #48 Non Equalized Program in accordance with PSM 1-6-7(IC) and the following Special inspections:

a. Wing & wing strut/ strut link attach bolts IAW PSM 1-6-7 part 2 SP2 items 5, 6, and 7

b. Wing Fail Safe inspection Sta. 152 IAW PSM 1-6-7 part 3 Page 16

c. Engine Nacelle Structure IAW PSM 1-6-7 part 3 Page 17.

3. Perform SB 6/523 Primary Flight Control Cable replacement.

Including replacement of elevator and rudder pulleys at Sta. 270.3

4. Complete Five year hydro of right and left engine fire bottles. New squibs with a manufacture date within six months to be installed on fire bottles.

5. Ultrasonic Inspection of Wing and Nacelles SB V6/0018A

6. Replace both A-701 Reverse Current Relays with new or overhauled units.

7. Overhaul of Left and Right gear legs, refer to overhaul manual C6U1103 and SB V6/0016. Any repairs required other than standard overhaul and minor cleaning of corrosion and repaint will be treated as an over and above item.

8. Perform Federal Aviation Regulations (FAR) 91.411 and 91.413 Pitot, Static, Altimeter, Transponder Recertification, ADS-B correlation, Compass Swing and (FAR) 91.207 Paragraph D-14 ELT inspection.

9. Overhaul Hartzell Propeller HC-B3TN-3DY/T10282NB

10. Hydrostatic check of oxygen bottle PN 80112-17 and overhaul or replacement of regulator PN 4110-110.

B.3 Corrosion Inspection 30-Month

The contractor shall perform a NOAA’s Aircraft Inspection Plan (AIP) Thirty month corrosion inspection IAW Corrosion Prevention and Control Manual PSM 1-6-5 Revision 5 dated 30 November 2010 and IAW Inspection Requirements Manual PSM 1-6-7

Revision 20 dated 30 November 2018. The inspections shall include, but not be limited to the following:

1. Corrosion task C57-10-01 Top Skin Adjacent to Nacelle, Ribs 5 to 9

2. Corrosion task C57-10-02 Lower Skins Adjacent to Nacelle, Ribs 5 to 9

3. Corrosion task C57-10-07 Hinge Arm Sta. 97.5

4. PSM 1-6-7 Part 2: Special Inspection Requirements SP2

a. Section D – Wings

i. Item 3 Wing Main Spar Lower Forward Cap Angle and Double

ii. Item 5 Wing Strut and Link Attaching Bolt

iii. Item 6 Wing to Fuselage Attaching Bolt or Links

iv. Item 10 Lower Wing Skin Sta. 185

v. Item 11 Lower Wing Skin Stringers and Aft Spar

vi. Item 12 Lower Wing Fitting Sta. 97.5 of cracks

b. Section E – Empennage

i. Item 4 Horizontal Stabilizer Center Hinge Arm AD94-14-22

5. Fuselage Frame Station Sta. 239 Inspection IAW SB 6/521

6. NOAA – AIP Equalized EMMA Inspection Program: EMMA 17

7. Aircraft Wash

8. Strip and paint of the exhaust flame track area on wing/nacelles/flaps for completion of C57-10-01 & C57-10-02 required.

a. Alodine, seam sealer, primer and topcoat paint IAW PSM 1-GEN-5 shall be included.

Any additional scheduled, unscheduled maintenance or upgrades shall be considered as over and above items.

B.4 Modification of Camera Bay. The current camera bay Sta. 281 – Sta. 321 shall be modified to match the camera bay in SN 740. SN 688, SN 788, and SN 824 all have similar camera bays that consist of one 19 5/8” diameter hole and two 5” dimeter a holes.

The bay in SN740 has one large opening 27.5” X 36” with seat track surrounding the bay at floor level used to secure equipment. Previously installed and approved under STC SA04311NY. This modification will be an optional item for the base year and the years following.

B.5 Support Dual Garmin 1060 G600TXI and Dual Garmin 750XI Avionics suite system and associated avionics for fleet standardization. The avionics upgrade involved the removal of the current Dual Garmin 530s, Dual Garmin 600s, and Garmin 330ES system and replacing them with Garmin Dual 750s with TAWS-B, 16-Watt Comm, and Chartview enablement, Dual 600TXI with Chart View and Video enablement, and a

GTX345R.

The timing of the support shall coincide with the 60-month Initial Corrosion Inspection as described in B.1.

This modification included the following list, but are not limited to:

2x GDU1060 G600TXI Black 010-01220-61 2x GTN 750 XI 010-020002-01 2x MD93H Clock 6420093-2 (PN 6420093-4 is acceptable replacement) 2x Chartview Enablement 010-008778-40 2x Database, North American 010-02044-10

2x Pitot Head DHCSC70024-5 Data Card TXI database 010-03716-10

Kit, Prod info, GDU700/1060 K00-00717-00 G500(H)/G600 TXI, Video 010-01477-4G G500/600 TXI Chart View 010-01477-40 Card, SD Installer Unlock 010-00769-60 Mark on Target Annunciator/Switch LED-41-11-HE-E2LYF TAWS-B Enablement 010-00878-01 16-Watt Comm Enablement 010-00878-04 GTX 345R Vert mount 010-01217-02 Diplexer, VOR/G/S CI-507

B.6 Over and Above Items.

Over and above discrepancies from corrosion inspections as well as any other scheduled or unscheduled maintenance, repairs, upgrades, and inspections.

The Contractor is responsible for documenting and reporting, at intervals acceptable to the CO all discrepancies found during the inspection. Discrepancies that are not a part of the inspection will be known as “over and above.” Corrective actions as a result of the inspection are considered “over and above” items. Any part or component that has not reached its recommended service life, but fails inspection and needs to be replaced, is considered an “over and above” item.

“Over and Above” discrepancy report must include (as a minimum):

• Description of each discrepancy found;

• Number of labor-hours per discipline required to complete each discrepancy;

• Hourly rate for personnel performing the work;

• Parts cost plus percentage markup, if any;

• Total dollar amount for the complete list of discrepancies.

The COR will be responsible for reviewing the list of “over and above” discrepancies and making a recommendation to the Contracting Officer, to either accept or decline the contractor’s proposal. The contractor shall not proceed with correcting any “over and above” discrepancies without prior approval from the Contracting Officer. The contractor shall bill all charges for “over and above” items on a separate invoice at the conclusion of repairs.

Funds for the “over and above” items will be specified at the time of task order award and included in the applicable Contract Line Item Number (CLIN). The dollar amount stated in the task order represents an estimated total, not to exceed amount to cover charges for the “over and above”. The Government will pay invoices for “over and above” services out of the funds allocated and authorized on these applicable CLINs.

This paragraph applies only to applicable “over and above” CLINs. It is not possible prior to contract award to accurately estimate the extent and duration of work or to anticipate costs for these CLINs with any reasonable degree of confidence. Time and materials provide for acquiring these services on the basis of direct labor hours and cost of materials.

Direct labor hours are at specified fixed hourly rates that include wages, overhead, general and administrative expenses, and profit. Cost of materials includes appropriate material handling cost as part of material costs. The price to be paid for material shall be based on an established catalog or list price in effect when material or other product is furnished, less all applicable discounts to the Government. In no event shall the price exceed the Contractor’s sales price to its most favored customer for the same item in like quantity, or the current market price, whichever is lower.