Attachment 2-Schedule of Items and Prices (1).pdf

PDF 986 KB Posted

Attached to
22-27 DHC-6 60 month Corrosion
Solicitation number
1305M222QNMAN0106
Issued by

View the file

Other files

File Type Posted
SF-30-Amendment 0001 (2).doc DOC document
FINAL RFQ_TwinOtter .doc DOC document
Attachment 3-Paint SOW.pdf PDF
Attachment I-SOW (1).pdf PDF
Attachment 5-Past Performance Questionnaire .pdf PDF
Attachment 4-Past Performance Information Form .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2-Schedule of Items and Prices

RFQ 1305M222QNMAN0106

Base Year Pricing 09/17/2022 through 09/16/2023

CLIN DESCRIPTION QUANTITY UNIT OF

MEASURE

UNIT

PRICE

TOTAL

AMOUNT

0001 Base Period Labor Complete the 60-month corrosion inspection for deHavilland DHC-6-300 Twin Otter in accordance with (IAW) manufacturer's corrosion prevention and control manual PSM 1-6-5 years 1-5 (per B.1 of the Statement of Work). This CLIN is on a fixed price basis.

1.00 JB

0002 Complete 30-month corrosion inspection for deHavilland DHC-6-300 Twin Otter in accordance with manufacturer's corrosion prevention and control manual PSM 1-6-5 and IAW inspection requirements manual PSM 1-6-7 (per B.3 in the Statement of Work). This CLIN is on a fixed price basis.

1.00 JB

0003 Scheduled and unscheduled maintenance, repairs, Inspections, and upgrades. (Per B.2 of Statement of Work)

Repaint complete aircraft Fixed Price

Perform EMMA #48 Non Equalized Program in accordance with PSM 1-6-7.

Fixed Price $_______

Perform SB 6/523 Primary Flight Control Cable replacement.

Fixed Price: $________

Complete Five year hydro of right and left engine fire bottles.

Fixed price: $________ Ultrasonic Inspection of Wing and Nacelles SB V6/0018A Fixed Price: $________ Replace both A-701 Reverse Current Relays.

Fixed Price: $_________

1.00 JB

Overhaul of Left and Right gear legs, refer to overhaul manual C6U1103 and SB V6/0016.

Fixed price: $________ FAR 91.411 Pitot, Static, Altimeter, Transponder, Recertification, and Compass Swing.

Fixed price: $__________ FAR 91.207 Paragraph D1-4 ELT inspection.

Fixed Price: $_________ Overhaul of left and right propeller assemblies.

Fixed Price: $_________ Hydrostatic check of oxygen bottle and overhaul or replacement of regulator.

Fixed Price: $_________

0004 Install/modify existing camera bay (per B.4 of Statement of Work)

1.00 JB

0005 Install dual Garmin 1060 G600TXi and dual Garmin 750 Xi avionics suite with associated systems and avionics for fleet standardization for DHC-6-300 Twin Otter (per B.5 of Statement of Work).

1.00 JB

0006 Over and Above discrepancies from initial inspection as well as any other scheduled or unscheduled maintenance, repairs, upgrades, and inspection – parts and labor. This CLIN is on a time and materials basis. The not-to-exceed (NTE) amount is determined by the Government at the time of award. The contractor exceeds the NTE amount at its own risk. Fully loaded labor rates include base rate, overhead, fringe benefits, general and administrative (G&A), each and every other item of expense, and profit.

Regular Labor: $_______ per hour Overtime Labor: $_______ per hour New Parts: Cost plus _____% markup Overhauled Parts: Cost plus ____% markup Supplies and Consumables: Cost plus _____% markup

1.00 JB

Year 1 Pricing 09/17/2023 through 09/16/2024

Complete the 60-month corrosion inspection for deHavilland DHC-6-300 Twin Otter in accordance with

(IAW) manufacturer's corrosion prevention and control manual PSM 1-6-5 years 1-5 (per B.1 of the Statement of Work). This CLIN is on a fixed price basis. Price:

Complete 30-month corrosion inspection for deHavilland DHC-6-300 Twin Otter in accordance with manufacturer's corrosion prevention and control manual PSM 1-6-5 and IAW inspection requirements manual PSM 1-6- 7 (per B.3 in the Statement of Work). This CLIN is on a fixed price basis. Price:

1.00 JB

Scheduled and unscheduled maintenance, repairs, inspections, and upgrades. (Per B.2 of Statement of Work) Repaint complete aircraft Fixed Price: $________ Perform EMMA #48 Non Equalized Program in accordance with PSM 1-6-7.

Fixed Price $__________ Perform SB 6/523 Primary Flight Control Cable replacement.

Fixed Price: $________ Complete Five year hydro of right and left engine fire bottles.

Fixed price: $________ Ultrasonic Inspection of Wing and Nacelles SB V6/0018A Fixed Price: $_________ Replace both A-701 Reverse Current Relays.

Fixed Price: $__________ Overhaul of Left and Right gear legs, refer to overhaul manual C6U1103 and SB V6/0016.

Fixed price: $________ FAR 91.411 Pitot, Static, Altimeter, Transponder, Recertification, and Compass Swing.

Fixed price: $__________ FAR 91.207 Paragraph D1-4 ELT inspection.

Fixed Price: $__________ Overhaul of left and right propeller assemblies.

Fixed Price: $____________

Hydrostatic check of oxygen bottle and overhaul or replacement of regulator.

Fixed Price: $___________

1004 Install/modify existing camera bay (per B.4 of Statement of Work) Fixed Price:

1.00 JB

1005 Over and Above discrepancies from initial inspection as well as any other scheduled or unscheduled maintenance, repairs, upgrades, and inspection – parts and labor. This CLIN is on a time and materials basis. The not-to-exceed (NTE) amount is determined by the Government at the time of award. The contractor exceeds the NTE amount at its own risk. Fully loaded labor rates include base rate, overhead, fringe benefits, general and administrative (G&A), each and every other item of expense, and profit.

Regular Labor: $_______ per hour Overtime Labor: $_______ per hour New Parts: Cost plus _____% markup Overhauled Parts: Cost plus ____% markup Supplies and Consumables: Cost plus _____% markup

1.00 JB

Year 2 Pricing 09/17/2024 through 09/16/2025 2001 Complete the 60-month corrosion inspection for deHavilland DHC-6-300 Twin Otter in accordance with (IAW) manufacturer's corrosion prevention and control manual PSM 1-6-5 years 1-5 (per B.1 of the Statementof Work). This CLIN is on a fixed price basis.

Price: $_______

1.00 JB

2002 Complete 30-month corrosion inspection for deHavilland DHC-6-300 Twin Otter in accordance with manufacturer's corrosion prevention and control manual PSM 1-6-5 and IAW inspection requirements manual PSM 1-6- 7 (per B.3 in the Statement of Work). This CLIN is on a fixed price basis.

Price: $_______

1.00 JB

2003 Scheduled and unscheduled maintenance, repairs, inspections, and upgrades. (Per B.2 of Statement of Work)

Repaint complete aircraft Fixed Price: $________ Perform EMMA #48 Non Equalized Program in accordance with PSM 1-6-7.

Fixed Price $__________ Perform SB 6/523 Primary Flight Control Cable replacement.

Fixed Price: $________ Complete Five year hydro of right and left engine fire bottles.

Fixed price: $________ Ultrasonic Inspection of Wing and Nacelles SB V6/0018A Fixed Price: $_________ Replace both A-701 Reverse Current Relays.

Fixed Price: $__________ Overhaul of Left and Right gear legs, refer to overhaul manual C6U1103 and SB V6/0016.

Fixed price: $________ FAR 91.411 Pitot, Static, Altimeter, Transponder, Recertification, and Compass Swing.

Fixed price: $__________ FAR 91.207 Paragraph D1-4 ELT inspection.

Fixed Price: $__________ Overhaul of left and right propeller assemblies.

Fixed Price: $____________ Hydrostatic check of oxygen bottle and overhaul or replacement of regulator.

Fixed Price: $___________

2004 Install/modify existing camera bay (per B.4 of Statement of Work) Fixed Price: $__________

1.00 JB

2005 Over and Above discrepancies from initial inspection as well as any other scheduled or unscheduled maintenance, repairs, upgrades, and inspection – parts and labor. This CLIN is on a time and materials basis. The not-to-exceed (NTE) amount is determined by the Government at the time of award. The contractor exceeds the NTE amount at its own risk. Fully loaded labor rates include base rate, overhead, fringe benefits,general and administrative (G&A), each and every other item of expense, and profit.

Regular Labor: $_______ per hour

Overtime Labor: $_______ per hour New Parts: Cost plus _____% markup Overhauled Parts: Cost plus ____% markup Supplies and Consumables: Cost plus _____% markup

Year 3 Pricing 09/17/2025 through 09/16/2026 3001 Complete the 60-month corrosion inspection for deHavilland DHC-6-300 Twin Otter in accordance with (IAW) manufacturer's corrosion prevention and control manual PSM 1-6-5 years 1-5 (per B.1 of the Statement of Work). This CLIN is on a fixed price basis.

Price: $_______

1.00 JB

3002 Complete 30-month corrosion inspection for deHavilland DHC-6-300 Twin Otter in accordance with manufacturer's corrosion prevention and control manual PSM 1-6-5 and IAW inspection requirements manual PSM 1-6- 7 (per B.3 in the Statement of Work). This CLIN is on a fixed price basis.

Price: $_______

1.00 JB

3003 Scheduled and unscheduled maintenance, repairs, inspections, and upgrades. (Per B.2 of Statement of Work)

Repaint complete aircraft Fixed Price: $________ Perform EMMA #48 Non Equalized Program in accordance with PSM 1-6-7.

Fixed Price $__________ Perform SB 6/523 Primary Flight Control Cable replacement.

Fixed Price: $________ Complete Five year hydro of right and left engine fire bottles.

Fixed price: $________ Ultrasonic Inspection of Wing and Nacelles SB V6/0018A Fixed Price: $_________ Replace both A-701 Reverse Current Relays.

Fixed Price: $__________ Overhaul of Left and Right gear legs, refer to overhaul manual C6U1103 and SB V6/0016.

Fixed price: $________ FAR 91.411 Pitot, Static, Altimeter, Transponder, Recertification, and Compass Swing.

Fixed price: $__________ FAR 91.207 Paragraph D1-4 ELT inspection.

Fixed Price: $__________ Overhaul of left and right propeller assemblies.

Fixed Price: $____________ Hydrostatic check of oxygen bottle and overhaul or replacement of regulator.

Fixed Price: $___________

3004 Over and Above discrepancies from initial inspection as well as any other scheduled or unscheduled maintenance, repairs, upgrades, and inspection – parts and labor. This CLIN is on a time and materials basis. The not-to-exceed (NTE) amount is determined by the Government at the time of award. The contractor exceeds the NTE amount at its own risk. Fully loaded labor rates include base rate, overhead, fringe benefits, general and administrative (G&A), each and every other item of expense, and profit.

Regular Labor: $_______ per hour Overtime Labor: $_______ per hour New Parts: Cost plus _____% markup Overhauled Parts: Cost plus ____% markup Supplies and Consumables: Cost plus _____% markup

1.00 JB

Year 4 Pricing 09/17/2026 through 09/16/2027 4001 Complete the 60-month corrosion inspection for deHavilland DHC-6-300 Twin Otter in accordance with (IAW) manufacturer's corrosion prevention and control manual PSM 1-6-5 years 1-5 (per B.1 of the Statement of Work). This CLIN is on a fixed price basis. Price: $_______

1.00 JB

4002 Complete 30-month corrosion inspection for deHavilland DHC-6-300 Twin Otter in accordance with manufacturer's corrosion prevention and control manual PSM 1-6-5 and IAW inspection requirements manual PSM 1-6-

7 (per B.3 in the Statement of Work). This CLIN is on a fixed price basis.

4003 Scheduled and unscheduled maintenance, repairs, inspections, and upgrades. (Per B.2 of Statement of Work) Repaint complete aircraft Fixed Price: $________ Perform EMMA #48 Non Equalized Program in accordance with PSM 1-6-7.

Fixed Price $__________ Perform SB 6/523 Primary Flight Control Cable replacement.

Fixed Price: $________ Complete Five year hydro of right and left engine fire bottles.

Fixed price: $________ Ultrasonic Inspection of Wing and Nacelles SB V6/0018A Fixed Price: $_________ Replace both A-701 Reverse Current Relays.

Fixed Price: $__________ Overhaul of Left and Right gear legs, refer to overhaul manual C6U1103 and SB V6/0016.

Fixed price: $________ FAR 91.411 Pitot, Static, Altimeter, Transponder, Recertification, and Compass Swing.

Fixed price: $__________ FAR 91.207 Paragraph D1-4 ELT inspection.

Fixed Price: $__________ Overhaul of left and right propeller assemblies.

Fixed Price: $____________ Hydrostatic check of oxygen bottle and overhaul or replacement of regulator.

Fixed Price: $___________

1.00 JB

4004 Over and Above discrepancies from initial inspection as well as any other scheduled or unscheduled maintenance, repairs, upgrades, and inspection – parts and labor. This CLIN is on a time and materials basis. The not-to-exceed (NTE) amount is determined by the Government at the time of award. The contractor exceeds the NTE amount at its own risk.

Fully loaded labor rates include base rate, overhead, fringe benefits, general and administrative (G&A), each and every other item of expense, and profit.

Regular Labor: $_______ per hour Overtime Labor: $_______ per hour New Parts: Cost plus _____% markup Overhauled Parts: Cost plus ____% markup Supplies and Consumables: Cost plus _____% markup

File details come from the government source that posted it. Updated .