Attachment I - Pricing Table.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Elevator/Handicap Lift Maintenance & Repair
Solicitation number
W51AA124Q0061
Issued by

About this file

This document is an Attachment I - Pricing Table for Solicitation W51AA1-24-Q-0061 Elevator/Handicap Lift Maintenance and Repair.

The solicitation is for bimonthly preventative maintenance, annual state inspections, and on-call repairs for 20 elevators and 10 handicap lifts located at Tobyhanna Army Depot. The Pricing Table includes Contract Line Item Numbers (CLINs) for the base year and two option years, with fixed-price and time-and-materials pricing for the required services. Offerors are instructed to fill in the hourly labor rate for on-call repairs and the bimonthly maintenance pricing per elevator/lift. The total evaluated price for each year will be used for evaluation purposes. The solicitation also includes a requirement for triennial hydraulic testing in Option Year 2. This Pricing Table is to be submitted as part of the offeror's proposal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Table

Attachment I - Pricing Table for Solicitation W51AA1-24-Q-0061
Elevator / Handicap Lift Maintenance and Repair
**This attachment shall be submitted as part of the offeror's proposal.
Contract Line
Number (CLIN)DescriptionQuantityUnitUnit PriceTotal Price
CLIN 0001Base YearFFPElevator Preventative Maintenance*6Lot$0.00$0.00A Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement(PWS). This price shall also be included on the SF 1449. This requirement is for six inspections per year. *Unit Price will be taken from Preventative Maintenance Pricing Sheet.
CLIN 0002Base YearT&MOn-Call Repairs40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled on-call repairs to the elevators and lifts. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 0003Base YearFFPAnnual State Inspection1Lot$0.00Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will occur once per year.
Total Evaluated Price for the Base Year$0.00
CLIN 1001Option Year 1FFPElevator Preventative Maintenance*6Lot$0.00$0.00A Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) thePerformance Work Statement(PWS). This price shall also be included on the SF 1449. This requirement is for six inspections per year. *Unit Price will be taken from Preventative Maintenance Pricing Sheet.
CLIN 1002Option Year 1T&MOn-Call Repairs40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled on-call repairs to the elevators and lifts. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 1003Option Year 1FFPAnnual State Inspection1Lot$0.00Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will occur once per year.
Total Evaluated Price for Option Year 1$0.00
CLIN 2001Option Year 2FFPElevator Preventative Maintenance*6Lot$0.00$0.00A Firm Fixed Price for Preventative Maintenance to be performed In Accordance With (IAW) the Performance Work Statement(PWS). This price shall also be included on the SF 1449. This requirement is for six inspections per year. *Unit Price will be taken from Preventative Maintenance Pricing Sheet.
CLIN 2002Option Year 2T&MOn-Call Repairs40Hours$0.00Enter the fully burdened rate for each hour of labor utilized performing unscheduled on-call repairs to the elevators and lifts. This CLIN shall be evaluated as a part of the Total Evaluated Price (TEP). Labor rates proposed will be the labor rate authorized to be charged against this CLIN. Do not include pricing for materials. Materials are reimbursed on a cost basis.
CLIN 2003Option Year 2FFPAnnual State Inspection1Lot$0.00Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will occur once per year.
CLIN 2004Option Year 2FFPTriennial Hydraulic Testing1Lot$0.00Accordance With (IAW) the Performance Work Statement (PWS). This price shall also be included on the SF 1449. This requirement will occur once in Option Year 2.
Total Evaluated Price for the Option Year 2$0.00
CLIN 3001Option to Extend Services (FAR 52.217-8)FFP6-Month Option to Extend Services1Lot$0.00$0.00
TOTAL EVALAUATED PRICE >>>>>>>>>>>>>>>>$0.00
Entries are required in the Green Shaded cells.

Enter an HOURLY LABOR RATE for performing ALL approved minor repairs IAW PWS Paragraph 5.5 (On-Call Repairs). The hours estimated for the emergency/unscheduled services is strictly for use in evaluating offers and will not restrict or obligate the Government to a specified number of hours in any way.

REMINDER: Service Contract Labor Standards. FAR 37.107 and 41 USC Chapter 67, Service Contract Labor Standards, provides for minimum wages and fringe benefits as well as other conditions of work under certain types of service contracts. Service Contract Labor Standards are applicable to this acquisition (Reference Attachment III Wage Determinations).

TOTAL EVALUATED PRICE - This price will be used for "EVALUATION PURPOSES ONLY" as it includes an estimate for time and materials for Unscheduled/Emergency Repairs. All funding for minor repairs will be approved by the Contracting Officer Representative (COR) prior to commencement of any work.

Instructions: Offerors are instructed to fill in the green shaded cells. This pricing shall also be populated on the signed SF 1449.

Preventative Maintenance

Bimonthly Elevator Maintenance
Elevator IDS/NLocationEquipment TypeMFRMechCapacityBimonthly maintenance- Base YearBimonthly maintenance- Option Year 1Bimonthly maintenance- Option Year 2
1A-E1US661280BLDG. 1A - NORTH ENTRANCEPassengerDelawareElectric2500 lbs.
1A-E2US661281BLDG. 1A - EAST CORRIDORPassengerDelawareElectric5000 lbs.
1A-E4US248432BLDG. 1A - SOUTH CORRIDORPassengerSchindlerHydraulic4000 lbs.
1A-E5US661279BLDG. 1A - NORTH CORRIDORPassengerDelawareElectric2500 lbs.
1A-E6US456074BLDG. 1A - A.T.E. ROOM (WEST CORRIDOR)PassengerEndura 461IAHydraulic4500 lbs.
1A-L1BLDG. 1A - TOOL CRIBMaterial OnlyC.I.P. Inc.Electric500 lbs.
1BB4-E1US248439BLDG. 1B - BAY 4PassengerCemcoHydraulic2500 lbs.
1BB5-E1US248435BLDG. 1B - BAY 5PassengerCemcoHydraulic2500 lbs.
1CB6-E1US248437BLDG. 1B - BAY 6PassengerCemcoHydraulic2500 lbs.
1CB1-E1US248436BLDG. 1C - BAY 1PassengerCemcoHydraulic2500 lbs.
1E-L1US259898BLDG. 1E - PLATING SHOPMaterial OnlyP FlowMTL3000 lbs.
1E-L2BLDG. 1E - PAINT SHOPMaterial OnlyC.I.P. Inc.Electric2000 lbs.
4B6-E1US259897BLDG. 4 - BAY 6Material OnlyP FlowHydraulic1000 lbs.
11E-E1US248443BLDG. 11PassengerThyssenHydraulic2100 lbs.
12-E1US333880BLDG. 12 (TMDE)PassengerEnduraHydraulic2500 lbs.
31-L1BLDG. 31Material OnlyP FlowGear Box750 lbs.
72-E1US248441BLDG. 72PassengerCemcoHydraulic3500 lbs.
72A-E1US257609BLDG. 72AMaterial OnlyP FlowMTL1000 lbs.
73-E1US248442BLDG. 73PassengerCemcoHydraulic3500 lbs.
89-E1US248438BLDG. 89PassengerCemcoHydraulic2500 lbs.
Total Bimonthly Maintenance Price$ - 0$ - 0$ - 0

File details come from the government source that posted it. Updated .