This document is a Guidelines for Using the Unit Price Guide for construction services at RAF Lakenheath, RAF Mildenhall, and RAF Feltwell, published by The Gordian Group in 2021.
The guide establishes the basis for unit pricing on construction tasks organized by Work Groups aligned with the National Schedule of Rates (NSR) and New Rules of Measurement (NRM). Labour rates include adjustments to Construction Industry Joint Council (CIJC) and Joint Industrial Boards (JIB) annual awards and are calculated per the Code of Estimating Procedure standards. Material costs are sourced from main industry suppliers and include delivery, consumables, accessories, shop drawings, and waste allowances. Equipment and plant costs derive from HSS and A-Plant 2019 hire rates and include delivery, return, and operating expenses. Unit rates represent complete, in-place construction including all labour, materials, equipment, fasteners (except substantial mounting materials), and testing, calibration, and balancing required for proper installation. Demolition rates include labour, equipment, and material for complete removal and clean-up; the cost of disposal is reimbursed at unit rates.
The Coefficients included in the unit rates encompass business costs (overhead, profit, subcontractor overhead and profit, taxes, wage adjustments, financing, and business risks), construction-related costs (CDM compliance, site establishment, offloading, permits, drawings, photographs, engineering services, temporary utilities, safety signage, security, noise control, waste allowances, scaffolding up to 1.5 metres, dust containment, testing and commissioning, protection and cleaning, and final project clean-up). The document specifies that contractors must review and analyze unit rates and calculate coefficients prior to bidding; compensation is calculated as Published Unit Rate × Quantity × Appropriate Coefficient, with no additional payments permitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for Information - SABER- 23July2026.pdf | ||
| Attachment II Guidelines for using the Unit Price Guide.pdf | ||
| SABER 2.0 Statement of Work_V1_23July26.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
copyright © 2021 The Gordian Group, Inc.
RAF LAKENHEATH, RAF MILDENHALL, and RAF FELTWELL Page 00 - 1
Guidelines for Using the Unit Price Guide
Item Coding and Headings þ The Unit Price Guide is based on the National Schedule of Rates (NSR), which are organized into Work Groups corresponding to those in the New Rules of Measurement (NRM) as published by the Royal Institute of Chartered Surveyors’ (RICS).
The Basis of the Unit Rates:
þ The rates are designed to reflect the actual work that is undertaken and are based on direct labour, plant, and material national list prices. Refer to NSR Guidance Notes, Section 3.2
Labour Rates:
þ Rates include setting out; measuring and cutting to fit; performing the task; disposal of excess material.
þ Labour rates include adjustments to the annual awards announced by the Construction Industry Joint Council (CIJC) and by the Joint Industrial Boards (JIB) for Plumbing & Mechanical Engineering Services and for the Electrical Contracting Industry.
Detailed calculations of all allowances added to the basic rates of wages for craftsmen and labourers are given in the tables located in the Building Guidance Notes Preamble, Section 2.9.1. Refer to NSR Guidance Notes, Section 2.9.1 þ The labour rates have been calculated in accordance with the principles given in the Code of Estimating Procedure published by The Chartered Institute of Building. Refer to NSR Guidance Notes, Section 2.9.1 þ Labour costs are based on workers familiar with and skilled in the performance of the work.
Equipment & Plant Costs:
þ For work that requires the use of equipment or plant, that cost is included in the unit rate.
þ As main national providers to the industry, most of the Plant prices have been obtained from HSS or A- Plant 2019 directory of hire rates. The Plant rates include delivery and return but not for any minimum period of hire except where explicitly stated. Refer to NSR Guidance Notes, Section 2.9.3 þ The equipment and plant cost included in the rates is only for the minimum amount of equipment and plant necessary for the standard installation of the task. Additional plant is allowed with approval from the Owner.
þ Plant costs include all operating expenses such as fuel, electricity, lubricants, etc.
MATERIAL COSTS:
þ All material prices included in the NSR are sourced from the main suppliers in the industry. The list prices of materials, are then used in the calculation of the unit rates (See Building Guidance Notes Preamble, Section 2.9.2 Appendix 3 – Table E: Material Price Supplier List). Refer to NSR Guidance Notes, Section 2.9.2 þ Material costs include the cost of the material, delivery, and all consumables and accessories integral to the installation.
þ Material costs include manufacturer's and/or fabricator's shop drawings.
þ Rates include Material Waste Allowances. These allowances are set out in Table F in the Building Guidance Notes Preamble, Section 2.9.2.1 Refer to NSR Guidance Notes, Section 2.9.2
Complete and In-Place Construction:
þ Unit rates are for complete and in-place construction and include all Labour, equipment/ plant, and material required to complete the task as described in the NSR.
þ Unit rates include all fasteners such as anchor bolts, lag bolts, screws, adhesive, wedge anchors, expansion bolts, roofing clips (excluding hurricane clips) that are required. Fasteners listed separately in the CTC are for use with Owner furnished material and equipment or relocating or reinstalling existing material and equipment.
þ Unit rates exclude more substantial mounting material such as threaded rod or angle iron unless the task description states otherwise.
þ Unit rates for doors and windows, duct work, plumbing fixtures, seamless floors, countertops, flashing, pitch pockets, skylights, curbs, roofing, etc.
excludes sealant and caulking unless stated otherwise in the unit rate.
RAF LAKENHEATH, RAF MILDENHALL, and RAF FELTWELL
Guidelines for Using the Unit Price Guide þ Unit rates include testing, calibration, balancing and the like required to ensure proper installation, construction and performance (e.g. compaction test for backfill, balancing of heating ventilation and air conditioning, pneumatic or hydrostatic testing, soaping of joints, disinfection and flushing, others as required). The above applies to installation of new materials only. Use of owner supplied materials, equipment or tying into existing equipment/piping may justify testing, balancing, etc.
Demolition:
þ Unit rates for demolition include all Labour, equipment and material required for the complete removal of the items; clean-up of the area.
þ The cost of disposal of excavated material will be reimbursed at the unit rates.
þ “Demolishing” includes removing incidental items where if the item being demolished is attached to another item being removed and can be removed as one item, then that item shall not be priced as a separate demolition task, unless the component alone must be demolished to accomplish the task (e.g. demolition of pipe includes pipe fittings unless the fitting must be demolished separately to accomplish the task; demolition of a wood door includes hinges, hardware, closures, kick plates, etc.).
þ The rates contained in the National Schedules do not include any costs associated with working with asbestos. When carrying out work on asbestos based materials, the Contractor shall comply with the Control of Asbestos Regulations 2012 and any subsequent amendments, rules, Approved Code of Practice (ACOP) or guidance. Refer to NSR Guidance Notes, Section 2.6.3 þ The description "reinstall" includes the cleaning and installation of the existing item.
þ Salvageable materials remain the property of the Owner and shall be turned over as directed when specified in the Job Order.
The Coeffciients Include:
*Refer to NSR Guidance Notes, Section 3.3
BUSINESS COSTS:
þ Overhead costs, including, unless specifically excluded in the Contract Documents, but not limited to;
• Cost to setup and operate an office facility at each base Refer to Statement of Work, Article 1
• Head office overhead
• Complying with preliminaries particulars, conditions of contract and preambles *
• insurance, general bonding*, and indemnification
• project meetings, training, management and supervision
• Travelling time where applicable *
• mobilization and close-out for the contract and each Job Order
• project office staff and management
• Permit to work * þ Profit.
þ Subcontractor's overhead and profit.
þ All taxes for which a waiver is not available including material sales tax and equipment rental.
þ Employee or Subcontractor’s wage rates that exceed the labour rates in the schedule including adjustments.
þ Disbursements arising from the employment of work people. * þ Compliance with Regulations / Safety Health and Welfare regulations and policies / CDM Regulations þ Cost of financing the work.
þ Business risks such as the risk of a lower than expected volume of work, smaller than anticipated Job Orders, poor Subcontractor performance, and inflation or material cost fluctuations.
CONSTRUCTION RELATED COSTS:
þ Compliance with Construction Design and
Management (CDM) Regulations 2015. Refer to NSR Guidance Notes, Section 2.6.1 þ Any site establishment costs necessary including temporary telephones. *
RAF LAKENHEATH, RAF MILDENHALL, and RAF FELTWELL Page 00 - 3
Guidelines for Using the Unit Price Guide þ Off-loading, manhandling and transport and delivery of materials and plant. * þ Setting out and checking for dimensions. * þ Services required to obtain filings and permits. Any filing or permitting fees shall be paid by the Contractor and reimbursed to the Contractor on a dollar-for-dollar basis.
þ Records and drawings including preparation and modification of proposals, sketches, drawings, submittals, as-built drawings, CADD drawings, microfilm, and other project records.
þ Contractor provided photographs, both digital and film, for quality control purposes or as requested by owner.
þ Incidental engineering and architectural services.
þ Office trailer and portable toilets for Contractor’s use.
þ Construction vehicles such as pick-up trucks, utility trucks, vans, flat bed trucks, tractors, trailers, etc.
þ Temporary utility costs.
þ Storage devices or items such as gang boxes and containers for Contractor's hand tools and materials.
þ Hand tools and equipment where not included in Schedule of Description and Prices. * þ Temporary works.
þ Basic safety and warning signage, minor barricades (e.g., construction tape, etc.) and personnel safety equipment (e.g., hard hats, safety harnesses with lifeline or cabling, protective clothing, safety glasses, face shields, etc.).
þ All necessary security precautions. * þ Control of noise. * þ Square cutting and excess waste where different from the allowance included in the unit rates * including roofing, drywall, VCT, carpet, wall covering, ceiling tile, pipe, conduit, siding, concrete, etc. This list is not intended to be all inclusive, but descriptive of the types of construction materials that are typically sold in standard lengths, sizes and weights.
þ Scaffolding – temporary staging up to 1.5 metres and ladders for access to buildings of not more than 2 stories in height. * Where more complex forms of scaffolding are required, sub-contract rates should be used. 6.4 A44 þ Sealing, windows, and openings with plastic to contain construction dust and debris within the work area.
þ Earthing / inspection testing and commissioning of the works, * þ Protection, drying, and cleaning. * þ Final professional project clean-up.
þ Working in extreme temperatures (below or above normal) or adverse conditions such as excessive rain, wind, sleet or snow.
þ Costs resulting from inadequate supply of building materials, fuel, electricity, or skilled Labour.
þ Costs resulting from productivity loss.
þ Differences in project size; complexity and location.
þ Adjustment to standard specification requirements notified to tenderers and/or variations for local conditions. * þ All workmanship to conform to British Board of Agreement Specification. Refer to NSR Guidance Notes, Section 6.3 þ All costs for other than discreet items of work specifically required to complete a particular Job Order.
PRICE VARIATIONS:
þ Contractors may find differences in Labour, and material costs due to certain economic factors.
Variations in Labour cost can also result from Labour efficiency, Labour restrictions, working conditions and local work rules. Variations in material costs can also result from the quantity of material purchased, the existing relationship with suppliers, and because the materials have been discontinued or have become obsolete.
þ While diligent effort is made to provide accurate and reliable up-to-date pricing, it is the responsibility of the Contractor to review and analyze the Unit Rates, and to calculate their Coefficients accordingly, prior to bidding.
GENERAL COSTS:
RAF LAKENHEATH, RAF MILDENHALL, and RAF FELTWELL
Guidelines for Using the Unit Price Guide þ This list is not exhaustive and is intended to provide general examples of cost items to be included in the Contractor's Coefficient as defined in the Contract.
þ The only compensation to be paid to a Contractor for the unit rate tasks will be:
Published X Quantity X Appropriate Unit Rate Coefficient þ No additional payments of any kind whatsoever will be made. All costs not included in the Unit Rates must be part of the Coefficients.
General Interpretations:
WORKING HEIGHT:
þ Rates include scaffolding up to 1.5 metres above the finished floor or stationary working surface.
þ Motorized access platforms are not included in the rates. Motorized access platforms are only allowed with prior agreement from the Owner.
FIELD ENGINEERING:
þ Surveying tasks shall be used only when the Owner requests the Contractor to perform topographic surveys, property line surveys or to establish horizontal and vertical controls. If the Owner provides horizontal and vertical control points within or adjacent to the project site, any other surveying required to complete the work is considered construction staking or layout and the cost thereof is included in the appropriate task.
TESTING:
þ Contractor will be paid for testing existing material, as required by the technical specifications and as directed by the Owner (record tests) at the unit price for the appropriate task. The cost of process quality control testing routinely performed by the Contractor is included in the Unit Rates for the individual tasks.
MISCELLANEOUS:
þ For the purpose of calculating the quantity of a task, quantities are calculated on a per physical location or building address basis. The quantity so determined shall be used for the task, unless the task states otherwise.
þ Whenever there are alternative tasks that may be selected to complete work the Contractor shall select the most practical and economical methods available þ Whenever a proprietary brand names are used the identification is intended to establish a standard. Any item of another manufacturer or vendor which performs satisfactorily the duties imposed by the general design may be considered equally acceptable provided that, in the opinion of the Owner, the material, article or equipment so proposed is an equivalent and is of equal quality, substance and function. The Contractor shall not provide, furnish or install any proposed material, article or equipment without the prior written approval of the Owner. The burden of proof and all costs related thereto concerning the equivalent "or equal" nature of the substitute item, whether approved or disapproved, shall be borne by the Contractor. Refer to NSR Guidance Notes, Section 6.2
SPECIFICATIONS:
þ Specifications for tasks shall be interpreted as follows: All Labour, material, equipment, spare parts, services, and work required by a specification shall be considered part of the unit rate, unless the task description or technical specifications state otherwise.
Useful Information:
UNIT OF MEASURE DEFINITIONS:
ITEM – is an entire item; EACH- (1) for each item;
M – Metre; LM – Linear Metre;
M2 – Square Metre; M3 – Cubic Metre;
NR – Number; PAIR – 2;
PER METRE – (1) metre; PR – Pair;
SET – Complete Package; T – Metric Tonnes
CONVERSIONS:
1 Acre = 43,560 Square Feet = 4046.8 Square Meters
1 Board Foot = 12” x 12” x 1” = 144 Cubic Inches
RAF LAKENHEATH, RAF MILDENHALL, and RAF FELTWELL Page 00 - 5
Guidelines for Using the Unit Price Guide
1 Centimeter = 0.3937 Inches = 0.0328 Feet
1 Cubic Foot = 0.03704 Cubic Yards = 0.02832 Cubic Meters
1 Cubic Meter = 1.3080 Cubic Yards = 35.3147 Cubic Feet
1 Cubic Yard = 27 Cubic Feet = 0.7646 Cubic Meters
1 Foot = 12 Inches = 0.3048 Meters
1 Inch = 2.54 Centimeters = 0.0254 Meters
1 Kilogram = 2.2046 Pounds
1 Kilometer = 0.6214 Miles = 3280 Feet
1 Meter = 100 Centimeters = 3.2808 Feet
1 Mile = 5280 Feet = 1.6093 Kilometers
1 Pound = 0.4536 Kilograms
1 Square Foot = 144 Square Inches = .0929 Square Meters
1 Square Meter = 1.1960 Square Yards = 10.7639 Square Feet
1 Square Yard = 9 Square Feet = 0.8361 Square Meters
1 Ton = 2000 Pounds = 907.185 Kilograms
1 Yard = 3 Feet = 0.9144 Meters
Sheet Metal Thickness (inches)
Gage No.
Steel Sheet
Galvanized Steel Sheet
Stainless Steel Sheet
Aluminum Sheet
10 .135 .138 .141 11 .120 .123 .125 12 .105 .108 .109 13 .090 .093 .094 .072 14 .075 .079 .078 .064 15 .067 .071 .070 .057 16 .060 .064 .063 .051 17 .054 .058 .056 .045 18 .048 .052 .050 .040 19 .042 .046 .044 .036 20 .036 .040 .038 .032 21 .033 .037 .034 .028
22 .030 .034 .031 .025 23 .027 .031 .028 .023 24 .024 .028 .025 .020
25 .021 .025 .022 .018 26 .018 .022 .019 .017
STANDARD GEOMETRY:
Circle
• Circumference = 2 π radius = π diameter
• Area = π radius2 = π (diameter2 / 4) Cylinder
• Volume = (π radius2)height
• Surface Area = 2 π radius2+(2 π radius)height
Sphere
• Volume = (4 π radius3) / 3
• Surface Area = 4 π radius2 π = 3.14159
United Inch
• The industry standard for measuring windows is the
United Inch or UI. The UI is determined by adding the width and the height in inches.
TRADEMARKS
þ Gordian JOC Solution, JOC Complete
Solution, JOC Complete Solution Plus, Construction Task Catalog®, eGordian, ezIQC, The Standard for Job Order Contracting and 6 Phase Development and Implementation Process are either registered trademarks or trademarks of The Gordian Group, Inc. The names of actual companies and products mentioned herein may be the trademarks of their respective owners.
File details come from the government source that posted it. Updated .