Attachment I - Invitation for Bids - HECO-12 - Additive Bid Item 2.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Fenwick Library Masonry Rehabilitation
- Solicitation number
- IFB-130124
- Issued by
- Fairfax County, Virginia
About this file
This is an Invitation for Bids form for George Mason University related to HECO-12, Additive Bid Item 2, which concerns the installation of a Lighting Protection System. The document requires contractors to submit a detailed price breakdown organized by specified categories and sub-categories using the provided bid form. The bid must match the Total Base Bid Amount that contractors enter into Mason's e-Builder System. The form does not specify project timelines, response deadlines, site visit requirements, bidder conferences, or contract term details.
The pricing structure requires contractors to itemize Taxes & Insurance as a percentage with corresponding dollar values and Contractor's Fee as a percentage with corresponding dollar values, with both components contributing to the Total Base Bid Amount for Additive Bid Item 2. The form currently displays a placeholder total of $0.00 and does not contain information regarding set-asides, incumbent contractors, funding sources, or other financial requirements beyond the itemized cost categories specified.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| GEORGE MASON UNIVERSITY |
| INVITATION FOR BID - HECO-12 FORM |
| Project No: | Date Submitted | ||
| Project Name: | Submitted By | ||
| Submitted By: | |||
| BIDDERS DO NOT MAKE ANY CHANGES TO THE FORMAT OF THIS FORM | |||
| SPEC SECTION | DESCRIPTION - Additive Bid Item 2: Lighting Protection System - Contractor is required to submit a detailed price broken down by each category including sub-categories utilizing the Invitation for Bid - HECO-12 Form that is required to match the Total Base Bid Amount for Additive Bid Item 2 as entered into Mason’s e-Builder System. | TOTAL VALUE |
Specification Section Description Sub-Section Description
| Taxes & Insurance | (enter percentage here = %; total dollar value in total value column | ||
| Contractor's Fee | (enter percentage here = %; total dollar value in total value column | ||
| TOTAL BASE BID AMOUNT FOR ADDITIVE BID ITEM 2 (must match total base bid amount as entered into Mason's e-Builder System) | $0.00 |