Attachment H Supplementary Instruction to offerors.pdf
PDF 543 KB Posted
- Solicitation number
- N4008523R2755
About this file
This document is a bid schedule for a federal construction contract opportunity to replace a chiller and conduct mechanical room repairs at Building U-93 at Naval Station Norfolk in Virginia. The contract line items include a base price for the work under CLIN 0001AA, and additional line items for potential asbestos and lead remediation, and electric water heater replacement. CLINs 0001AB through 0001AG provide unit pricing for removal and disposal of unidentified asbestos containing materials like sealants, pipe insulation, and paint, as well as replacement of an electric water heater. Offerors are instructed to provide a total price for CLIN 0001AA and unit prices with extended totals for the additional line items 0001AB through 0001AG. The related federal contract opportunity is solicitation number N4008523R2755 from the Naval Facilities Engineering Command for the replacement of the chiller and mechanical room repairs at Building U-93 at Naval Station Norfolk.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
eProjects No: 1665967
BID SCHEDULE
U-93 REPLACE CHILLER AND MECHANICAL ROOM REPAIRS
At the
NAVAL STATION NORFOLK, VIRGINIA
DESIGNED BY:
NAVFAC MIDLANT
PUBLIC WORKS DEPARTMENT NORFOLK
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
9742 MARYLAND AVENUE
NORFOLK, VIRGINIA 23511-3095
BID SCHEDULE PREPARED BY:
Architectural: Eric Sunderland, R.A.
Civil: Luanette Roman-Lugo Structural: Kimberly Davis, P.E.
Mechanical: Lily Li, P.E.
Electrical: Matthew Hinson, P.E.
Project Management: James M. Smith, R.A.
BID SCHEDULE APPROVED BY:
Lead Discipline Branch Manager: James M Smith, R.A.
Design Director: James M Smith, R.A.
Engineering Director: Sean M Sweeney, P.E.
For Commander, NAVFAC MID-ATLANTIC:
Date: April 25, 2023
BUILDING U-93 – REPLACE CHILLER AND MECHANICAL ROOM REPAIRS eProject No: 1665967
NAVAL STATION NORFOLK, NORFOLK, VIRGINIA
PRICE PROPOSAL FORM
CLIN QUANTITY UNIT UNIT PRICE TOTAL PRICE
0001AA $
0001AB 50 LF _____ $
0001AC 20 EA _____ $
0001AD 100 LF ____ _ $
0001AE 25 LF ___ _ $
0001AF 100 SF $
0001AG 1 EA $
TOTAL FOR CLIN 0001 (CLIN 0001AA THRU 0001AG) $
BUILDING U-93 – REPLACE CHILLER AND MECHANICAL ROOM REPAIRS eProject No: 1665967
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 - BASE PRICE. Price includes the following:
CLIN 0001AA. Price for the entire work in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0001AB thru 0001AG.
CLIN DESCRIPTION TOTAL PRICE
FOR
CLIN 0001AA
0001AA Price for the entire work in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0001AB thru 0001AG.
The quantities in CLIN 0001AB thru CLIN 0001AG are additional quantities beyond those indicated in the contract drawings. These items will only be performed at the direction of the Contracting
Officer.
CLIN 0001AB. Price for the removal and disposal of unidentified asbestos containing sealants in accordance with the following schedule:
CLIN ITEM UNIT UNIT PRICE NO.
UNITS
TOTAL PRICE FOR
CLIN 0001AB (UNIT
PRICE X NO. UNITS)
0001AB Removal and disposal of unidentified asbestos containing sealants
Linear Feet
$__ __ 50 $_____
BUILDING U-93 – REPLACE CHILLER AND MECHANICAL ROOM REPAIRS eProject No: 1665967
CLIN 0001AC. Price for the removal and disposal of unidentified asbestos containing pipe elbow insulation in accordance with the following schedule:
TOTAL PRICE FOR
CLIN 0001AC (UNIT
PRICE X NO. UNITS)
0001AC Removal and Disposal of unidentified asbestos containing pipe elbow insulation.
Each $_____ 20 $_____
CLIN 0001AD. Price for the removal and disposal of unidentified asbestos containing pipe insulation up to 4" diameter in accordance with the following schedule:
TOTAL PRICE FOR
CLIN 0001AD (UNIT
PRICE X NO. UNITS)
0001AD Removal and Disposal of unidentified asbestos containing pipe insulation up to 4" diameter.
Linear
$_____ 100 $____
CLIN 0001AE. Price for the removal and disposal of unidentified asbestos containing pipe insulation
4" to 8" diameter in accordance with the following schedule:
TOTAL PRICE FOR
CLIN 0001AE (UNIT
PRICE X NO. UNITS)
0001AE Removal and Disposal of unidentified asbestos containing pipe insulation 4" to 8" diameter.
Linear
$_____ 25 $__ __
BUILDING U-93 – REPLACE CHILLER AND MECHANICAL ROOM REPAIRS eProject No: 1665967
CLIN 0001AF. Price for the removal and disposal of unidentified lead paint in accordance with the following schedule:
TOTAL PRICE FOR
CLIN 0001AF (UNIT
PRICE X NO. UNITS)
0001AF Removal and disposal of unidentified lead paint
Square
$_____ 100 $__ __
CLIN 0001AG. Price to replace electric water heater in accordance with the following schedule:
UNITS
TOTAL PRICE FOR
CLIN 0001AG (UNIT
PRICE X NO. UNITS)
0001AG Remove and replace
EWH-1
EA $_____ 1 $__ __
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items 0001AA thru 0001AG. For CLINs
0001AB thru 0001AG, enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
--End of Document--
U93_1665967_Bid Sched Cover
File details come from the government source that posted it. Updated .