Attachment_H_-_PPS_and_PCS_Maintenance_Recommendation_.pdf
PDF 333 KB Posted
- Solicitation number
- Y22-177
- Issued by
- Orange County, Orlando City, Florida
About this file
This document is Attachment H from the Orange County Utilities Department, specifically detailing maintenance recommendations for Private Pump Stations (PPS) and Private Collection Systems (PCS). The attachment provides a comprehensive maintenance recommendations checklist with frequency guidelines for monthly, quarterly, semi-annual, and annual maintenance activities for utility infrastructure.
The maintenance checklist includes critical tasks such as securing pump stations, maintaining alarm systems, inspecting and verifying pump operations, checking electrical components, cleaning wet wells and sewer lines, and documenting maintenance activities. Key maintenance requirements include properly securing facilities, trimming landscaping to ensure alarm visibility, verifying pump functionality, recording motor run times, inspecting valves and pressure gauges, and ensuring electrical cable lines are free from tangles. The document notes that semi-annual or annual frequency may be appropriate for pump stations in excellent operating conditions, with the understanding that more frequent inspections might be necessary for stations receiving higher quantities of waste.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT H
ORANGE COUNTY UTILITIES
STANDARDS AND CONSTRUCTION SPECIFICATIONS MANUAL
APPENDIX A STANDARD DRAWINGS GENERAL
DATE: February 11, 2011 PUMP STATION CONTROL PANEL (240V) FIGURE A413-1
FRONT & PLAN VIEW
CONTROL PANEL-----
S.S. PIPE CAP
(TYP)
SS BOLTS
(TYP) ----------
316 S.S. METER BASE
WITH BY-PASS ____ ___,___"'�cl=.lfr""i;g-Tgf-i=='i#� 2" SCH 80 PVC ------�_us;;.d.j
SEAL OFF-TYPE ESYR c/=1.........-lil.J.Sl.==:!5� MOTOR CONDUCTOR FROM CONDUIT 2" SCH 80 CONTROL PVC (SEE NOTE #1) --4=l-lH-1
SCADA PANEL
(FUTURE)
ICONTROL PANEL g
SCADA PANEL
(FUTURE) VIEW A-A
1-1/2" MIN MOUNTING BRACKET
WITH PROTECTIVE CAP
SEE NOTE#4
RIGID ALUMINUM
PANEL
i--=--,i}c-,11-,-,1 \---�- PIPE (SCH 40)
CONTROL CONDUIT
2" SCH 80 PVC FINISHED
:::::::::::::;;;;:;=.:;:1 ���������N�I �
GRADE
2" SCH 80 PVC
SWEEP ELBOWS MINIMUM 2"
SCH80PVC--------'
INCOMING POWER FROM UTILITY POINT
OF SERVICE (MINIMUM 2" SCH 80 PVC)
5 OHM MAX. GROUND RODS
(10' LONG MINIMUM, 2 EACH, 10' APART)
FRONT VIEW
PANEL INSTALLATION NOTES:
ENCASED IN CONCRETE
(12 0 TYP)
1" SCH 80 PVC TO ANTENNA POLE
1. PUMP MOTOR CONDUIT SHALL BE SIZE TO ACCOMODATE 40% CONDUIT FILL. MINIMUM CONDUIT SIZE TO
BE 2" SCH 80 PVC.
2. POWER SUPPLY SHALL BE UNDERGROUND ON THE LIFT STATION SITE AND SHALL BE 3-PHASE, FROM A
3-PHASE SOURCE ONLY. 100 AMP SERVICE MINIMUM.
3. AN ELECTRICAL GROUNDING SYSTEM SHALL BE INSTALLED AS PER THE NATIONAL ELECTRICAL CODE, LOCAL CODES AND ORDINANCES. AN UNDERGROUND PERIMETER CABLE GROUNDING SYSTEM SHALL BE INSTALLED WITH CONNECTIONS TO AT LEAST WET WELL COVER, VALVE VAULT COVER, CONTROL PANELS, GENERATOR, UTILITY COMPANY TRANSFORMER, MANUAL DISCONNECT SWITCH AND METAL
FENCE. REFER TO GROUNDING DETAILS.
4. THE STATION NAME, UTILITIES I.D. NUMBER AND ADDRESS SHALL BE AFFIXED TO THE FRONT OF THE
· METERGABINET:
5. ALL MOUNTING HARDWARE & BRACKETS AND ELECTRICAL ENCLOSURES SHALL BE 316 STAINLESS
STEEL.
6. ON A 4-WIRE, DELTA SYSTEM, THE HIGH-LEG SHALL BE IDENTIFIED WITH ORANGE COLOR TAPE AT ALL CONNECTION POINTS AND SHALL BE LOCATED ON THE "B" PHASE AT THE LINE SIDE OF THE MAIN
DISCONNECT.
7. THE SCADA PANEL IS TO SHOWN FOR INFORMATION ONLY AND WILL BE INSTALLED IN THE FUTURE (BY
OTHERS).
File details come from the government source that posted it. Updated .