Attachment-H_-_NOCA_Fab_Pricing_form.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- NOCA_WAYSIDES Federal contract opportunity
- Solicitation number
- 140P2125R0046
About this file
The file is a contractor cost/pricing sheet (Attachment-H) for the National Park Service solicitation 140P2125R0046, detailing a fabrication project for NOCA Waysides. The comprehensive pricing form breaks down costs across multiple categories including project management, layouts, fabrication drawings, proofs/samples, exhibit structures, display objects, graphic panels, and installation. The document includes detailed line-item pricing for materials and labor, with specific quantities and unit costs for elements such as custom bases (72" x 24" and 18" x 12"), graphic panels, stone tool replicas, and installation requirements.
The pricing sheet outlines labor costs for various specialist roles including Project Managers, Fabrication Detailers, Exhibit Specialists, and Graphics Specialists, with predetermined hourly rates ranging from $65 to $120 per hour. Travel and installation costs are also itemized, including expenses for airfare, per diem, lodging, rental car, and miscellaneous equipment. The total project costs are structured to capture materials, labor, travel, and installation expenses, with line items for markup and additional project-specific requirements such as prototypes, samples, and specialized fabrication elements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment-B_Programmatic_Accessibility_Guidelines.pdf | ||
| Attachment-C_WaysideGuide.pdf | ||
| Attachment-F_Wayside_Exhibits_File_Naming_and_Folder_Structure.pdf | ||
| Attachment-A_Wayside_Exhibit_Specifications.pdf | ||
| Sol_140P2125R0046.pdf | ||
| Attachment-E_VIS_Manual.pdf | ||
| Attachment-D_Panels.pdf | ||
| Attachment-G_NOCA_Fabrication_Drawings-Design_Intent.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Est
| NOCA: Contractor Cost/Pricing Sheet | ||||||
| Contractor Name: | __________________ | |||||
| PROJECT MANAGEMENT | $0.00 | |||||
| LAYOUTS & FABRICATION DRAWINGS | $0.00 | |||||
| PROOFS/SAMPLES/PROTOTYPE | $0.00 | |||||
| EXHIBIT STRUCTURES | $0.00 | |||||
| DISPLAY OBJECTS & SPECIALTY | $0.00 | |||||
| ELECTRICAL/ ELECTRONIC | $0.00 | |||||
| GRAPHIC PANELS | $0.00 | |||||
| AUDIO DESCRIPTION | $0.00 | |||||
| PROJECT CLOSEOUT | $0.00 | |||||
| SHIPPING | $0.00 | Total Materials Cost | $0.00 | |||
| INSTALLATION | $0.00 | Total Labor Hours | $0.00 | |||
| TRAVEL | $0.00 | |||||
| TOTAL | $0.00 | |||||
| Rounded to | $0 |
| PROJECT MANAGEMENT (excluding travel) | |||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| Layouts and Fabrication Drawings | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Miscellaneous | job | $0.00 |
SUBTOTAL MATERIALS $0.00
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount |
| Fabrication Detailer | hours @ | $0.00 |
| $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Fabrication Drawings $0.00
| Proofs/Samples/Mock-ups/Prototypes | ||||||
| MATERIALS: | qty. | unit | unit cost | amount | ||
| Sample Materials | 2 | sets | $0.00 | |||
| Printed Proofs | 24 | ea | $0.00 | main panels plus overbars but only 009 and not 010 | ||
| Prototype - stone tool with labels | 1 | ea | $0.00 | |||
| $0.00 | ||||||
| $0.00 | ||||||
| SUBTOTAL MATERIALS | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Exhibit Specialist - Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Samples $0.00
| Exhibit Structures/Bases | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| 72" x 24" custom low profile, in ground | 3 | ea | $0.00 | ||
| 18" x 12" custom rail mount | 5 | ea | $0.00 | ||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| SUBTOTAL MATERIALS | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Exhibit Specialist - Fabrication (8 bases) | hours @ | $0.00 | |||
| $0.00 | |||||
| TOTAL ALL LABOR | $0.00 |
TOTAL Exhibit Structures $0.00
| Display Objects and Specialty Elements | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| EX003 | Stone tool replica with labels (bronze-infused resin) | 1 | ea | $0.00 | |
| resin/bronze powder | 1 | $0.00 | |||
| misc. | $0.00 | ||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| SUBTOTAL MATERIALS | ea | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Exhibit Specialist - Fabrication | hours @ | $0.00 | |||
| Model Maker | hours @ | $0.00 | |||
| $0.00 | |||||
| TOTAL ALL LABOR | $0.00 |
TOTAL DO and SE $0.00
| Electrical/Electronic | ||||
| MATERIALS: | qty. | unit | unit cost | amount |
| $0.00 |
| SUBTOTAL, AV EQUIPMENT | $0.00 | ||
| MARK-UP on materials | 15 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Exhibit Specialist - Electrical | hours @ | $90.00 | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Electrical/Mechanical/AV $0.00
| Graphic Panels | |||||
| MATERIALS: | qty. | unit | dig output | amount | |
| 72" x 24" double-sided aluminum | 3 | ea | $0.00 | ||
| 18" x12" double-sided aluminum | 5 | ea | $0.00 | ||
| 24" x 36" double-sided aluminum | 2 | ea | $0.00 | ||
| 72" x ~10" x 0.5" single-sides aluminum (custom shape) | 3 | ea | $0.00 | ||
| ea | $0.00 | ||||
| ea | $0.00 | ||||
| ea | $0.00 | ||||
| $0.00 | |||||
| $0.00 | |||||
| $0.00 | |||||
| SUBTOTAL MATERIALS | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Graphics Supervisor | hours @ | $0.00 | |||
| Graphics Specialist (13 panels) | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Graphics $0.00
| Audio Description | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Misc. | 0 | ea | $25.00 | $0.00 | |
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | 15 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | x | rate | amount | ||
| Audio Describer (_exhibits x 2 hrs) | 0 | hours @ | $80.00 | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Conservation $0.00
| PROJECT CLOSEOUT | ||||
| MATERIALS: | qty. | unit | unit cost | amount |
| $0.00 |
SUBTOTAL MATERIALS $0.00
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Project Closeout $0.00
| SHIPPING | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Packing | 1 | job @ | $0.00 | ||
| Shipping | 1 | job @ | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Exhibit Specialist - Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
INSTALLATION and removal
| MATERIALS: | qty. | unit | unit cost | amount | |
| air fare | job @ | $1200.00 | $0.00 | ||
| per diem | days @ | $69.00 | $0.00 | ||
| Lodging | days @ | $215.00 | $0.00 | ||
| Rental car and gas | days @ | $150.00 | $0.00 |
Misc. concrete, weights, and equipment rental job @ $3000.00 $0.00
TOTAL MATERIALS 4 crew $0.00
| LABOR (_exhibits to install; __ to remove) | hours | x | rate | amount | |
| Project Manager (4 hours to remove/install/4 people) | hours @ | $120.00 | $0.00 | ||
| Exhibit Spec - Fabricator | hours @ | $90.00 | $0.00 | ||
| Exhibit Spec - Fabricator | hours @ | $90.00 | $0.00 | ||
| Exhibit Spec - laborer | hours @ | $65.00 | $0.00 |
TOTAL ALL LABOR $0.00
Total Installation $0.00
| TRAVEL | |||||
| Post Award with PM and audio describer | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| air fare | job @ | $1200.00 | $0.00 | ||
| per diem | days @ | $69.00 | $0.00 | ||
| lodging | days @ | $142.00 | $0.00 | ||
| Rental car and gas | days @ | $150.00 | $0.00 | ||
| Misc. | job @ | $100.00 | $0.00 |
TOTAL MATERIALS 0 team $0.00
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $120.00 | $0.00 | ||
| Audio Describer | hours @ | $110.00 | $0.00 | ||
| hours @ | $110.00 | $0.00 | |||
| $0.00 | |||||
| TOTAL ALL LABOR | $0.00 |
Total Travel $0.00
File details come from the government source that posted it. Updated .