Attachment-H_-_NOCA_Fab_Pricing_form.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
NOCA_WAYSIDES Federal contract opportunity
Solicitation number
140P2125R0046
Issued by
Department of the Interior National Park Service

About this file

The file is a contractor cost/pricing sheet (Attachment-H) for the National Park Service solicitation 140P2125R0046, detailing a fabrication project for NOCA Waysides. The comprehensive pricing form breaks down costs across multiple categories including project management, layouts, fabrication drawings, proofs/samples, exhibit structures, display objects, graphic panels, and installation. The document includes detailed line-item pricing for materials and labor, with specific quantities and unit costs for elements such as custom bases (72" x 24" and 18" x 12"), graphic panels, stone tool replicas, and installation requirements.

The pricing sheet outlines labor costs for various specialist roles including Project Managers, Fabrication Detailers, Exhibit Specialists, and Graphics Specialists, with predetermined hourly rates ranging from $65 to $120 per hour. Travel and installation costs are also itemized, including expenses for airfare, per diem, lodging, rental car, and miscellaneous equipment. The total project costs are structured to capture materials, labor, travel, and installation expenses, with line items for markup and additional project-specific requirements such as prototypes, samples, and specialized fabrication elements.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Est

NOCA: Contractor Cost/Pricing Sheet
Contractor Name:__________________
PROJECT MANAGEMENT$0.00
LAYOUTS & FABRICATION DRAWINGS$0.00
PROOFS/SAMPLES/PROTOTYPE$0.00
EXHIBIT STRUCTURES$0.00
DISPLAY OBJECTS & SPECIALTY$0.00
ELECTRICAL/ ELECTRONIC$0.00
GRAPHIC PANELS$0.00
AUDIO DESCRIPTION$0.00
PROJECT CLOSEOUT$0.00
SHIPPING$0.00Total Materials Cost$0.00
INSTALLATION$0.00Total Labor Hours$0.00
TRAVEL$0.00
TOTAL$0.00
Rounded to$0
PROJECT MANAGEMENT (excluding travel)
LABORhoursxrateamount
Project Managerhours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Project Management $0.00

Layouts and Fabrication Drawings
MATERIALS:qty.unitunit costamount
Miscellaneousjob$0.00

SUBTOTAL MATERIALS $0.00

TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Fabrication Detailerhours @$0.00
$0.00

TOTAL ALL LABOR $0.00

TOTAL Fabrication Drawings $0.00

Proofs/Samples/Mock-ups/Prototypes
MATERIALS:qty.unitunit costamount
Sample Materials2sets$0.00
Printed Proofs24ea$0.00main panels plus overbars but only 009 and not 010
Prototype - stone tool with labels1ea$0.00
$0.00
$0.00
SUBTOTAL MATERIALS$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Exhibit Specialist - Fabricationhours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Samples $0.00

Exhibit Structures/Bases
MATERIALS:qty.unitunit costamount
72" x 24" custom low profile, in ground3ea$0.00
18" x 12" custom rail mount5ea$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
SUBTOTAL MATERIALS$0.00

TOTAL ALL MATERIALS $0.00

LABORhoursxrateamount
Exhibit Specialist - Fabrication (8 bases)hours @$0.00
$0.00
TOTAL ALL LABOR$0.00

TOTAL Exhibit Structures $0.00

Display Objects and Specialty Elements
MATERIALS:qty.unitunit costamount
EX003Stone tool replica with labels (bronze-infused resin)1ea$0.00
resin/bronze powder1$0.00
misc.$0.00
$0.00
$0.00
$0.00
SUBTOTAL MATERIALSea$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Exhibit Specialist - Fabricationhours @$0.00
Model Makerhours @$0.00
$0.00
TOTAL ALL LABOR$0.00

TOTAL DO and SE $0.00

Electrical/Electronic
MATERIALS:qty.unitunit costamount
$0.00
SUBTOTAL, AV EQUIPMENT$0.00
MARK-UP on materials15percent$0.00

TOTAL ALL MATERIALS $0.00

LABORhoursxrateamount
Exhibit Specialist - Electricalhours @$90.00$0.00

TOTAL ALL LABOR $0.00

TOTAL Electrical/Mechanical/AV $0.00

Graphic Panels
MATERIALS:qty.unitdig outputamount
72" x 24" double-sided aluminum3ea$0.00
18" x12" double-sided aluminum5ea$0.00
24" x 36" double-sided aluminum2ea$0.00
72" x ~10" x 0.5" single-sides aluminum (custom shape)3ea$0.00
ea$0.00
ea$0.00
ea$0.00
$0.00
$0.00
$0.00
SUBTOTAL MATERIALS$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Graphics Supervisorhours @$0.00
Graphics Specialist (13 panels)hours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Graphics $0.00

Audio Description
MATERIALS:qty.unitunit costamount
Misc.0ea$25.00$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materials15percent$0.00

TOTAL ALL MATERIALS $0.00

LABORxrateamount
Audio Describer (_exhibits x 2 hrs)0hours @$80.00$0.00

TOTAL ALL LABOR $0.00

TOTAL Conservation $0.00

PROJECT CLOSEOUT
MATERIALS:qty.unitunit costamount
$0.00

SUBTOTAL MATERIALS $0.00

TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Project Managerhours @$0.00
TOTAL ALL LABOR$0.00

TOTAL Project Closeout $0.00

SHIPPING
MATERIALS:qty.unitunit costamount
Packing1job @$0.00
Shipping1job @$0.00

TOTAL MATERIALS $0.00

LABORhoursxrateamount
Exhibit Specialist - Fabricationhours @$0.00

TOTAL ALL LABOR $0.00

Total Shipping $0.00

INSTALLATION and removal

MATERIALS:qty.unitunit costamount
air farejob @$1200.00$0.00
per diemdays @$69.00$0.00
Lodgingdays @$215.00$0.00
Rental car and gasdays @$150.00$0.00

Misc. concrete, weights, and equipment rental job @ $3000.00 $0.00

TOTAL MATERIALS 4 crew $0.00

LABOR (_exhibits to install; __ to remove)hoursxrateamount
Project Manager (4 hours to remove/install/4 people)hours @$120.00$0.00
Exhibit Spec - Fabricatorhours @$90.00$0.00
Exhibit Spec - Fabricatorhours @$90.00$0.00
Exhibit Spec - laborerhours @$65.00$0.00

TOTAL ALL LABOR $0.00

Total Installation $0.00

TRAVEL
Post Award with PM and audio describer
MATERIALS:qty.unitunit costamount
air farejob @$1200.00$0.00
per diemdays @$69.00$0.00
lodgingdays @$142.00$0.00
Rental car and gasdays @$150.00$0.00
Misc.job @$100.00$0.00

TOTAL MATERIALS 0 team $0.00

LABORhoursxrateamount
Project Managerhours @$120.00$0.00
Audio Describerhours @$110.00$0.00
hours @$110.00$0.00
$0.00
TOTAL ALL LABOR$0.00

Total Travel $0.00

File details come from the government source that posted it. Updated .