This document is a Fabrication - Design Intent document for wayside exhibits at the Diablo Lake Overlook in North Cascades National Park, prepared by Harpers Ferry Center in April 2025. The project involves designing and fabricating multiple interpretive exhibits, including three primary 72" x 24" in-ground exhibits, eight 18" x 12" rail-mounted exhibits, and two 24" x 36" orientation exhibits. Each exhibit will feature specific design requirements, such as powder-coated aluminum bases in NPS Dark Brown, custom aluminum graphic panels with specific angles and mounting specifications, and a unique tactile bronze-infused resin object (8.75" x 4") featuring a stone tool replica with raised lettering and braille.
The exhibits are designed to be fully accessible, adhering to multiple accessibility guidelines including the Programmatic Accessibility Guidelines, Americans with Disabilities Act, and Principles of Universal Design. The content focuses on the area's cultural and natural history, highlighting Indigenous perspectives, glacial changes, local ecology, and the complex interactions between human development and natural landscapes. The exhibits are intended for a diverse audience of park visitors, who typically spend 10-15 minutes at the overlook, and aim to provide multilayered, engaging interpretive information about the North Cascades region. The project is part of the National Park Service's efforts to update and improve interpretive materials at the Diablo Lake Overlook.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment-H_-_NOCA_Fab_Pricing_form.xlsx | XLSX spreadsheet | |
| Attachment-C_WaysideGuide.pdf | ||
| Attachment-F_Wayside_Exhibits_File_Naming_and_Folder_Structure.pdf | ||
| Attachment-A_Wayside_Exhibit_Specifications.pdf | ||
| Sol_140P2125R0046.pdf | ||
| Attachment-E_VIS_Manual.pdf | ||
| Attachment-D_Panels.pdf | ||
| Attachment-B_Programmatic_Accessibility_Guidelines.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Diablo Lake Overlook Wayside Exhibits National Park Service | Harpers Ferry Center | April 2025
North Cascades National Park Fabrication - Design Intent
Prepared by
Harpers Ferry Center
Project Team
Johanna Lombard Brad Sutton Chuck Dunkerly Denise Shultz Katy Hooper Brendan Oates
Attachment G
NOCA - Diablo Overlook Wayside Exhibits | FABRICATION - DESIGN INTENT | April 29, 2025 National Park Service | Harpers Ferry Center for Media Design | 2
Site Conditions
Diablo Lake Overlook (DLO) This scenic overlook is located within North Cascades National Park Service Complex (comprised of North Cascades National Park, Ross Lake National Recreation Area, and Lake Chelan National Recreation Area) along State Route 20. DLO is a popular destination and stopping point for visitors traveling through the park. While most park visitors stop at DLO, their stop is very short—just 10 to 15 minutes to use the restroom, stretch, take in the view, take a photo, and read wayside exhibits. Some visitors picnic and stay a little longer, but they are not the norm. During winter State Route 20 is closed to the east of DLO.
Site History Existing interpretive wayside exhibits at DLO were developed and installed at various points in history and do not maintain a consistent visual identity or interpretive approach. All existing waysides will be removed prior to the installation of new wayside exhibits. Park staff will complete all exhibit removal and installation work.
Accessibility The National Park Service (NPS) is committed to making all park facilities, programs, and services accessible and usable by all people.
Accordingly, each wayside location has been assessed for physical accessibility as part of the wayside exhibit process, as well as possibilities for multi-modal, multi-sensory exhibit components.
Park staff will evaluate wayside exhibit locations and improve site conditions where needed to ensure accessible approaches to all exhibits. All wayside exhibits planned, designed, and fabricated for the NPS follow:
• Programmatic Accessibility Guidelines for National Park Service
• Interpretive Media, Version 2.4 – October 2019
• NPS and Department of the Interior directives, such as DO #42
• Principles of Universal Design
• Architectural Barriers Act
• Americans with Disabilities Act
• Sections 504 and 508 of the Rehabilitation Act as amended
• 21st Century Communications and Video Accessibility Act
Project BackgroundContents
Project Background 2
Element Schedule 3
Diablo Lake Overlook 4–5
Base Structures 6−7
Tactile Object 8
Graphic Panels 9-13
Scenic view of Colonial and Pyramid Peaks and Thunder Creek from Diablo Lake Overlook.
NOCA - Diablo Overlook Wayside Exhibits | FABRICATION - DESIGN INTENT | April 29, 2025 National Park Service | Harpers Ferry Center for Media Design | 3
Element Schedule
Content Group Structure (Base) Graphic Panels Custom Element
Primary Interpretive Exhibits
72” x 24” custom low profile, in-ground (direct embed) wayside; powder-coat finish in NPS Dark Brown
001A 72” x 24” double-sided aluminum
001B
Custom cut 1/2” aluminum print (approx. 72” x 9”);
custom angle bend (V-bend or similar); custom holes drilled for mounting to exhibit base structure; back and edge painted NPS Dark Brown in matte finish
72” x 24” custom low profile, in-ground (direct embed) wayside; powder-coat finish in NPS Dark Brown
002A 72” x 24” double-sided aluminum
002B
Custom cut 1/2” aluminum print (approx. 72” x 8.5”);
custom angle bend (V-bend or similar); custom holes drilled for mounting to exhibit base structure; back and edge painted NPS Dark Brown in matte finish
72” x 24” custom low profile, in-ground (direct embed) wayside; custom holes drilled for custom element mounting; powder-coat finish in NPS Dark Brown
003A 72” x 24” double-sided aluminum; custom holes drilled for custom element mounting approx. 8.75” x 4” bronze-infused resin tactile object; includes stone tool replica, raised-lettering and braille labels, and mounting plate
003B
Custom cut 1/2” aluminum print (approx. 72” x 8”);
custom angle bend (V-bend or similar); custom holes drilled for mounting to exhibit base structure; back and edge painted NPS Dark Brown in matte finish
Rail Exhibits
18” x 12” custom rail-mount; powder-coat finish in NPS Dark Brown
004 18” x 12” double-sided aluminum
18” x 12” custom rail-mount; powder-coat finish in NPS Dark Brown
005 18” x 12” double-sided aluminum
18” x 12” custom rail-mount; powder-coat finish in NPS Dark Brown
006 18” x 12” double-sided aluminum
18” x 12” custom rail-mount; powder-coat finish in NPS Dark Brown
007 18” x 12” double-sided aluminum
18” x 12” custom rail-mount; powder-coat finish in NPS Dark Brown
008 18” x 12” double-sided aluminum
Orientation Exhibits 009 N/A (Park to construct custom bases) 009
24” x 36” double-sided aluminum; six 1/8” holes drilled for mounting
(duplicate)
24” x 36” double-sided aluminum; six 1/8” holes drilled for mounting
NOCA - Diablo Overlook Wayside Exhibits | FABRICATION - DESIGN INTENT | April 29, 2025 National Park Service | Harpers Ferry Center for Media Design | 4
Diablo Lake Overlook
001A/B001A/B
002A/B002A/B
003A/B003A/B
004004
009009
009009008008
007007
006006
005005
NOCA - Diablo Overlook Wayside Exhibits | FABRICATION - DESIGN INTENT | April 29, 2025 National Park Service | Harpers Ferry Center for Media Design | 5
Diablo Lake Overlook
001A/B001A/B
002A/B002A/B
003A/B003A/B
004004
004004
009009 009009
008008
007007
007007 006006005 005
(on outer railing)(on outer railing)
Panorama of Primary Interpretive & Rail Exhibit Locations
Sample Rail Exhibit Locations Orientation Exhibit Locations (Bases to be produced by Park)
NOCA - Diablo Overlook Wayside Exhibits | FABRICATION - DESIGN INTENT | April 29, 2025 National Park Service | Harpers Ferry Center for Media Design | 6
Exhibit Bases: 001, 002, 003
Base Structure Specifications Exhibit bases shall conform to established wayside exhibit specifications contained in the VIS and Wayside Hardware Specification Manual. Custom design elements for the exhibit base structures are as follows:
Fabrication Design Intent
• All measurements shown are approximate.
• 72” x 24” low profile, in-ground (direct embed) with four legs and cane-detection bar on all sides; powder-coated aluminum (NPS dark brown)
• Base structure must allow for graphic panel removal/replacement.
• Graphic panels 001B, 002B, 003B shall securely attach vertically to top edge of base structure.
• EX 003 base structure to have hole(s) drilled for tactile object attachment (See page 11). Hole(s) must be aligned to allow double-sided panel to be flipped.
• Weep holes to be included, as needed, to allow water drainage.
Note: In-ground leg post sections not shown. Posts to extend 30” to 36” below grade and secured with concrete.
NOCA - Diablo Overlook Wayside Exhibits | FABRICATION - DESIGN INTENT | April 29, 2025 National Park Service | Harpers Ferry Center for Media Design | 7
Exhibit Bases: 004, 005, 006, 007, 008
Fabrication Design Intent
• All measurements shown are approximate.
• 18” x 12”custom rail mount; powder-coated aluminum (NPS dark brown)
• Base structure shall securely attach to vertical rail spindles; spindles
5”apart, on center. Exact method to be determined by Contractor.
• Bottom edge of panel capture frame shall detach to allow for exhibit panel removal/replacement without removing the exhibit base from the railing
• Sides and rear of exhibit base shall be solid for cane-detectibility.
• Weep holes to be included, as needed, to allow water drainage.
Base Structure Specifications Exhibit bases shall conform to established wayside exhibit specifications contained in the VIS and Wayside Hardware Specification Manual. Custom design elements for the exhibit base structures are as follows:
NOCA - Diablo Overlook Wayside Exhibits | FABRICATION - DESIGN INTENT | April 29, 2025 National Park Service | Harpers Ferry Center for Media Design | 8
Custom Element (Tactile Object): EX003
Fabrication Design Intent
STONE TOOL
STONE TOOL
replica object
Custom Element Specifications Custom element shall conform to established wayside exhibit specifications contained in the Programmatic Accessibility Guidelines.
Custom design elements for the exhibit base structures are as follows:
• All measurements shown are approximate.
• High-resolution images of stone tool to be provided post-award.
• Final custom element shall include life-size tactile object, raised-lettering, braille, and mounting plate fabricated as a single unit.
• Tactile custom element to be fabricated in bronze-infused resin.
• Custom element shall mount to graphic panel/base structure in a way that allows double-sided graphic panel removal, replacement, and/or rotation (flipping to back side).
• Stone tool edges should be flush with mounting plate (no overhanging edges)
8.75”
7.55”
4”
1.75”
0.625” stone tool replica raised-lettering brailleEdge View
4” 1.75” 5/8”
3/8”
1.2”
1/32”
NOCA - Diablo Overlook Wayside Exhibits | FABRICATION - DESIGN INTENT | April 29, 2025 National Park Service | Harpers Ferry Center for Media Design | 9 low-profile exhibit base structure graphic panel 001B;
0.5” aluminum
135° angle
45° angle
Side ViewGraphic Panels
Fabrication Design Intent
72 X 24 INCHES | MARCH 2025 | NORTH CASCADES NATIONAL PARK | Wayside Exhibit 001A
Retreat of South Cascade Glacier
Stream Stabilizers Glaciers stabilize river and lake temperatures. During summer, they provide an influx of cold meltwater. Salmon depend on this to survive. The chilly Skagit
River supports five native salmon species.
Lessons from the First Stewards Indigenous people live in kinship with the landscape. They balance give and take with its plants and animals. They show us that knowledge rooted deep in the past can help chart a more sustainable future.
The North Cascades’ towering peaks hide more than 300 glaciers from view. As the climate changes, it impacts the most glaciated area in the continental United States.
Hidden Impacts
Losing Ice Glaciers mirror the trends of climate change. Warmer winters mean less snow and less water stored in the snowpack. Warmer summers mean more ice melts.
Glaciers now cover less than half the area they once did.
Silenced Voices The Sqáǰət people can no longer hear their ancestors’ voices in the Skagit River. For millennia, the free-flowing river brought comfort to them. The sound of its turbulent water gave them power. Now that power has been lost. Dams and a bypass route prevent the water’s natural flow, as seen above.
The Skagit River and Thunder Creek carry meltwater from glaciers high above. They flow through steep valleys carved during the Ice Age. These conditions are ideal for creating hydroelectric power to support a growing region. The waters also provide sacred power for the Sqáǰət (Upper Skagit) and other
Indigenous people.
A Place of Power
J
O
SE
F
SC
A Y
LE
A
©© KIMBERLY CAUVEL KIMBERLY CAUVEL
72 X 10 INCHES | MARCH 2025 | NORTH CASCADES NATIONAL PARK | Wayside Exhibit 001B
Colonial Peak Pyramid Peak
Graphic Panel Specifications Graphic panels shall conform to established wayside exhibit specifications contained in the Wayside Exhibit Planning, Design, Fabrication, and Installation Specifications. Custom design elements for the graphic panels are as follows:
24”
7.25”
1.75”
72”
57.5”
EX001B
• ~57.5”x 9”
• single-sided, 1/2” aluminum
• custom cut top edge silhouette with rounded edges and corners
• 135° V-bend angle approx 1.75” from bottom edge (see Side View inset)
• mounting holes drilled
• panel back and edges painted NPS
Dark Brown, matte finish
EX001A
• 72”x24”
• double-sided aluminum
135° angle;
see Side View
NOCA - Diablo Overlook Wayside Exhibits | FABRICATION - DESIGN INTENT | April 29, 2025 National Park Service | Harpers Ferry Center for Media Design | 10
Graphic Panels
Fabrication Design Intent low-profile exhibit base structure graphic panel 002B;
0.5” aluminum
135° angle
45° angle
Side View
72 X 24 INCHES | MARCH 2025 | NORTH CASCADES NATIONAL PARK | Wayside Exhibit 002A
Who “Owns” This Land?
The answer is, it varies, and it’s complicated. When cultures meet, different lifeways interweave. Sometimes they work in harmony; sometimes they clash. Explore the complex history that reveals itself here.
Time Immemorial Today
Sqáǰət (Upper Skagit) and other Indigenous groups live in kinship with and maintain tenure to the land. Their lifeways and the land remain unchanged until colonization.
Sqáǰət and other Indigenous people continue traditional practices in their ancestral homeland. One million visitors come to hike, fish, and sightsee each year.
1855 Under duress, Sqáǰət and Indigenous groups lose ancestral lands in the Treaty of Point Elliott. Most are forced onto reservations.
They keep rights to fish, hunt, and gather.
1890s Sqáǰət spiritual leader Charlie Moses establishes a seasonal cabin near here. He does not relocate to the reservation.
Davises file homestead claim that takes 11 years to finalize.
Diablo Lake forms after Seattle City Light builds Diablo Dam.
Early 1800s European Americans begin fur trapping in these mountains.
1870s From the heart of the mountains, Indigenous loggers raft timber down river to mills.
Seattle City Light receives license from Department of Agriculture to begin hydropower development.
Ross Lake forms after Seattle City Light builds Ross Dam.
This region, then part of Oregon
Territory, opens to homesteading.
Newcomers push Indigenous people out of their homelands.
First wagon road built to
Marblemount, west of here.
1920s Davises construct first power plant, a hydroelectric water wheel.
Gorge Lake forms after Seattle City Light builds Gorge Dam.
1968 President Lyndon B. Johnson establishes North Cascades National Park Service Complex from national forest lands.
1850s Miners prospect for gold and silver, continuing for 100 years.
Lucinda Davis’s family begins a homestead on the land where Charlie Moses’s cabin stands. They build a thriving business hosting travelers.
1897 Lands ceded in treaty become part of Washington Forest Reserve, a precursor to Mount Baker-Snoqualmie National Forest. Treaty rights are diminished for Indigenous people.
Seattle City Light exercises eminent domain and acquires Davis Ranch for hydropower development. The Davis family relocates.
©© KIMBERLY CAUVEL KIMBERLY CAUVEL
FPO
72 X 10 INCHES | MARCH 2025 | NORTH CASCADES NATIONAL PARK | Wayside Exhibit 002B
Diablo Lake Overlook North Cascades National Park Service Complex
24”
6.75”
1.75”
72”
72”
EX002B
• 72”x 8.5”
• single-sided, 1/2” aluminum
• custom cut top edge silhouette with rounded edges and corners
• 135° V-bend angle approx 1.75” from bottom edge (see Side View inset)
• mounting holes drilled
• panel back and edges painted NPS Dark Brown, matte finish
EX002A
• 72”x24”
• double-sided aluminum
NOCA - Diablo Overlook Wayside Exhibits | FABRICATION - DESIGN INTENT | April 29, 2025 National Park Service | Harpers Ferry Center for Media Design | 11
Fabrication Design Intent low-profile exhibit base structure graphic panel 003B;
0.5” aluminum
135° angle
45° angle
Side View
FPO
tactile object
72 X 24 INCHES | MARCH 2025 | NORTH CASCADES NATIONAL PARK | Wayside Exhibit 003A
Lower slopes rounded by continental ice sheet during last Ice Age.The Earth’s tectonic plates mold the world around us as they move. Humans build relationships with plants, animals, water, and soil on this foundation.
How the Land Shapes Us
Fire and Ice The North Cascades tell a dynamic and ever-changing story over millions of years.
Ocean sediments became mountains. Heat and pressure altered rocks. Volcanoes erupted. Thick ice sheets carved steep, U-shaped valleys. The saga continues today as alpine glaciers sculpt the peaks, drawing visitors to the area.
Travel Corridors Rivers offer low-elevation
“highways” through the steep mountains. The road you travel today follows a similar path people have used for millennia.
Indigenous people walked this route to visit family and trade with neighbors.
Nature’s Tool Shed As the area's first miners, Indigenous people understand the useful qualities of the rocks. Through ingenuity and testing, they create stone projectile points to hunt mountain goats and other animals. They make other tools to skin hides, cut meat, and shape bone into more tools. Feel the life-size replica tool to the right.
Valley of the Spirits In the Sqáǰət (Upper Skagit) origin story, Four Brothers were the first people here in the Myth age. They transformed the Earth and named everything. They taught people how to fish, hunt, gather, and make tools.
The Four Brothers created the Skagit River Gorge below you under Diablo Lake. One brother jumped into the whitewater below and claimed, “I am power.”
He sat down in the river and became a boulder. To this day, these ancestors remain in the gorge. They give the
Sqáǰət people spiritual power to live a good life.
Prior to 1924, the Skagit River flowed freely through this deep valley. Today, the water in Gorge, Diablo, and Ross lakes covers the old river.
You Are Here
72 X 10 INCHES | MARCH 2025 | NORTH CASCADES NATIONAL PARK | Wayside Exhibit 003B
Jagged peaks untouched by ice sheets.
24”
6.25”
1.75”
72”
72”
EX003B
• 72”x 8”
• single-sided, 1/2” aluminum
• custom cut top edge silhouette with rounded edges and corners
• 135° V-bend angle approx 1.75” from bottom edge (see Side View inset)
• mounting holes drilled
• panel back and edges painted NPS Dark Brown, matte finish
EX003A
• 72”x24”
• double-sided aluminum
• holes drilled for tactile object attachment
NOCA - Diablo Overlook Wayside Exhibits | FABRICATION - DESIGN INTENT | April 29, 2025 National Park Service | Harpers Ferry Center for Media Design | 12
Fabrication Design Intent
12”
12”
12”
12”
12”
18”
18”
18”
18”
18”
EX004
• 18”x12”
• double-sided aluminum
EX007
• 18”x12”
• double-sided aluminum
EX005
• 18”x12”
• double-sided aluminum
EX008
• 18”x12”
• double-sided aluminum
EX006
• 18”x12”
• double-sided aluminum
18 X 12 INCHES | FEBRUARY 2025 | NORTH CASCADES NATIONAL PARK | Wayside Exhibit 004
What brings you wonder?
Majestic peaks float above cascading waterfalls and creeks. Glaciers nurture alpine meadows filled with wildflowers. Adventure beckons around every corner.
18 X 12 INCHES | FEBRUARY 2025 | NORTH CASCADES NATIONAL PARK | Wayside Exhibit 007
What color is the water today?
Diablo Lake’s color varies. That’s because glaciers grind rock into fine particles as they move. During summer, this glacial flour flows into the lake.
When it refracts sunlight, Diablo Lake changes to brilliant turquoise.
18 X 12 INCHES | FEBRUARY 2025 | NORTH CASCADES NATIONAL PARK | Wayside Exhibit 005
Finding balance between preservation and progress is challenging.
Many visitors are surprised to see dams here. Built before national park designation, they provide power and flood protection. They offer diverse recreational opportunities. They also prevent fish from migrating between the ocean and habitat upstream.
18 X 12 INCHES | FEBRUARY 2025 | NORTH CASCADES NATIONAL PARK | Wayside Exhibit 008
“I think the welfare of salmon is interconnected, not only with our Tribe, but every single one of us and our environment around us—down to the soil we walk on, to the trees that we see on the horizon.”
HOUT-SULI-A (Janelle Schuyler), Sqáǰət (Upper Skagit Indian Tribe)
18 X 12 INCHES | FEBRUARY 2025 | NORTH CASCADES NATIONAL PARK | Wayside Exhibit 006
A symbol of survival, the sx̌ʷiƛ̕əyʔ shows us how closely intertwined humans are with nature.
Traditional hunting grounds for the
Sqáǰət (Upper Skagit) people surround you. The sx ̫̌ iƛə̕yʔ (mountain goat) gives food, wool for clothing and blankets, and horns for tools.
NOCA - Diablo Overlook Wayside Exhibits | FABRICATION - DESIGN INTENT | April 29, 2025 National Park Service | Harpers Ferry Center for Media Design | 13
Fabrication Design Intent
36”
24”
EX009 (plus duplicate)
• 24”x36”
• double-sided aluminum
• Six mounting holes drilled
Explore Your Park
Keep Pets Leashed
Pack It In;
Pack It Out
Drones Prohibited
Don’t Feed Wildlife
Scale varies in this 3D perspective view.
Camping
Restrooms
Picnic area
Trailhead
Diablo Lake Overlook
McMillan Spire 7992ft 2436m
P I C K E T R A N G E
Mount Terror 8151ft 2484m
Terror Glacier
Davis Peak 7051ft 2149m
Thorton Lakes Trail
Happy Creek Forest Walk
Thorton Lakes Road
Gorge Dam
Diablo Dam
Ross Dam
North Cascades National Park Vistor Center
Colonial Glacier
Desolation Peak 6102ft 1860m
Colonial Creek
Jack Mountain 9075ft 2766m
Crater Mountain 8128ft 2477m
Sourdough Mountain
6120ft 1865m
Colonial Peak 7771ft 2369m
Pyramid Peak 7182ft 2189m
Ruby Mountain 7408ft 2258m
Fourth of July Pass 3507ft 1069mNeve
Glacier
NORTH
CASCADES
NATIONAL
PARK
CANADA
UNITED STATES
ROSS LAKE
NATIONAL
RECREATION
AREA
LAKE CHELAN NATIONAL
RECREATION AREA
NORTH
CASCADES
NATIONAL
PARK
Ross Lake
Diablo Lake
Gorge Lake
Fourth of July Trail
Thunder Creek Trail
Pa nt he r C re ek
T ra il
Skagit R iver
You Are Here
You Are Here
Newhalem Creek
Upper Goodell CreekLower
Goodell Creek
Goodell Creek
Snowfield Peak 7771ft 2369m
North
24 X 36 INCHES | APrIL 2025 | NOrTH CASCADES NATIONAL PArK | Wayside Exhibit 009
North Cascades National Park Service Complex National Park Service U.S. Department of the Interior
Happy Creek Forest Walk Take a slow stroll along a cascading creek.
0.3 mi/0.5 km roundtrip
Thunder Creek Trail Explore an easy trail through old growth forest.
4.0 mi/6.4 km roundtrip from campground to bridge; distance and elevation varies beyond
Ross Dam Trail Descend this moderate trail to walk across historic Ross Dam.
1.5 mi/2.4 km roundtrip
The Upper Skagit Indian Tribe welcomes you to this place of ceremonial significance in our history and origin. Hidden beneath the calm water of Diablo Lake lies Skagit River Gorge, a source of spiritual power.
Traditionally, our elders guided newcomers here with traveling and story songs. The Tribe’s identity is based in our continued connections to our homeland on which you stand. Please visit with respect.
—Scott Schuyler, Sqáǰət (Upper Skagit Indian Tribe)
River Loop Trail Walk through the forest to a peaceful gravel bar with sweeping river views.
1.8 mi/2.9 km roundtrip from visitor center
1/8” mounting holes
1/8” mounting holes
File details come from the government source that posted it. Updated .