About this file
This file contains detailed facility and equipment inventory documentation for the Operation and Maintenance of Drainage Canals and Pumps contract at Pacific Missile Range Facility in Kekaha, Kauai, Hawaii, administered by the Agribusiness Development Corporation (ADC) as a subcontract under the U.S. Navy (NAVFAC HAWAII). The scope encompasses operation and maintenance of the Kawai'ele pump station featuring two 200 HP pumps and one 100 HP pump, approximately 32,077 linear feet of canals across eight identified sections (Canal A through Canal H), five culverts, 20 power poles with six pole transformers, 26,320 feet of access road, one dry ditch food gate, two flap gates, and associated pump station infrastructure including 142 linear feet of sheet piling, a crosswalk with railings, two instrument sheds, two debris grills, and approximately 20 feet of three-inch diameter steel conduits. The canal system includes varying measurements with Canal A representing the largest section at 21,750 linear feet, and specific operational requirements such as brush clearing requirements for Canal FF (minimum one time per year with no dredging), environmental restrictions for Canal F due to sea turtle protection, and buffer zone restrictions on bank clearing for Canals A, CC, and D as identified on accompanying maps.
Historical operational data indicates the facility experiences two very heavy rainstorm events annually (exceeding five inches of rainfall in a single day) and requires approximately one pump repair per year. Sheet piling maintenance requires visual observation with condition notation recorded in a logbook, and the Contracting Officer must be notified when repairs are needed. Certain canal sections (Canals E, G, and H) are not included in the contract scope. The contract involves routine maintenance activities including brush removal, bank clearing on specified canal sections, equipment inspections, and emergency repair capabilities to address pump failures and storm-related damage.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14-26-2424 J-1502000-02, Page 1 of 1
ATTACHMENT J-1502000-02
Facilities and Equipment Inventory
1. Kawai’ele pump station: 2 – 200 HP pumps, 1 – 100 HP pumps, 142 linear ft of sheet piling
2. 32,077 linear ft of canals
3. 5 culverts
4. 20 power poles and 6 pole transformers
5. 26,320 ft of access road
6. One Dry Ditch Food Gate
7. Two Flap Gates
8. Pump Stations infrastructure items: 142 linear ft of sheet piling, one cross walk with railings, two instrument sheds, two debris grill and approximately 20 ft of 3” diameter steel conduits.
Note:
The sheet piling maintenance includes a visual observation and notation of condition in the logbook.
Notify the KO when the sheet piling needs repair.
ATTACHMENT H
Attachment J-1502000-03 Canal Measurements
CANAL LENGTH, WIDTH, AND DEPTH BY SECTION (SEE J-1502000-01 MAPS FOR LOCATION AND LAYOUT)
Canal Identification Length
(FT)
Average Width
(FT)
Approximate Depth
(FT)
1 Canal A 21,750 25 -4 2 Canal B 1,500 20 -4 3 Canal C 2,407 30 -3 4 Canal CC 1,093 30 -3 5 Canal D 2,000 20 -2 6 Canal E - 20 Not on Contract 7 Canal F 1,092 20 -1 8 Canal FF 2,235 60 No dredging – brush rem 1x per year 9 Canal G - 20 Not on Contract 10 Canal H - 20 Not on Contract
Total 32,077
Related Information for Canals Canal A – See maps for portions of Canal A that have no clearing of banks on one side of canal (buffer zone.)
Canal B – Clear banks on both sides of canal Canal C – Clear banks on both sides of canal Canal CC – See maps for portion of Canal CC that have no clearing of banks on one side of canal (buffer zone.)
Canal D – See maps for portions of Canal D that have no clearing of banks on one side of canal (buffer zone) Canal E – Not on contract Canal F – The portion of canal near the ocean is a restricted for sea turtles. DO NOT
CUT brush beyond area shown.
Canal FF – No dredging work; only brush clearing is required (min. 1x per year) Canal G – Not on contract Canal H – Not on contract
J-1502000-03, Page 1 of 1
J-1502000-04, Page 1 of 1
Attachment J-1502000-04 Historical Data
Historically there were two very heavy rainstorms (above 5 inches of rain in any one day) per year.
One pump repair per year.