Attachment G - TBO Evaluation Sheet.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
UH-60 Blackhawk Helicopter
Solicitation number
ITN-08362
Issued by
Leon County, Florida

About this file

This document is an Attachment G - TBO Evaluation Sheet for an Invitation to Negotiate (ITN) issued by the Florida Department of Transportation to establish a contract for two refurbished UH-60 Blackhawk Helicopters. The evaluation sheet provides instructions on how to complete the yellow-highlighted cells for each tab, which will be used to determine the remaining hours available for the aircraft before components are required to be overhauled. The total price of the components will be used in the scoring process, and a standardized component price will be determined and used in all calculations to ensure consistent scoring across all aircraft being considered.

The pricing information for the airframe components, engine #1 components, and engine #2 components are provided in Tabs 2, 3, and 4, respectively. Respondents are required to provide their company name, date of submission, and the authorized representative's name. The total cost for each set of components must be provided, and the aircraft with higher overall total TBO times remaining will receive higher scores than aircraft with overall lower TBO times remaining.

View the file

Other files

File Type Posted
Attachment B.docx DOCX document
Attachment A.docx DOCX document
Q_A - FSG-ITN-2324-1002.pdf PDF
FSG-ITN-2324-1002 UH-60 Blackhawk Helicopter.pdf PDF
Solicitation Objective.docx DOCX document
Addendum No. 1 - 1004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

ATTACHMENT G - TBO Evaluation Sheet Tab No. 2 - Airframe Component Status FSG-ITN-23/24-1002: UH-60 Blackhawk Helicopter
INSTRUCTIONS
Please complete all yellow highlited cells for each tab. Tab2 and Tab4 will be used to determine the remaining hours available for the aircraft before components are required to be overhauled.

The total price of the component will be used in the scoring process. A standardized component price will be determined and used in all calculations to keep consistent scoring across all aircraft being considered.

For the components, aircraft with higher overall toal TBO times remaining , will receive higher scores than aircraft with overall total lower TBO times remaining.

DEFINITIONS
Airframe Component/Part DescriptionList all components that have established TBO intervals. The components listed on the sheet can be used as a starting point or a new list can be submitted.
Total Time on ComponentList the total hours on the component.
Remaining Hours/CYCSubtract the total time on component from the Time Between Overhaul hours of the component .
Remove Hours/CYCList the aircraft hour or cycle at which the component must be removed.
TBO Hour of componentThe maximum hour allowed on the componet before the component must be overhauled.
Installed atAircraft hour at which the component was installed.
Estimated Component PriceList the estimated price of the component replacement.

Tab2-Airframe Component Status

ATTACHMENT G - TBO Evaluation Sheet Tab No. 2 - Airframe Component Status FSG-ITN-23/24-1002: UH-60 Blackhawk Helicopter
ABCDEFGI
Item No.% of Component Life RemainingAirframe Component/Part DescriptionTotal Time on ComponentRemaining Hours/CYCRemove Hours/CYCTBO Hour of componentInstalled atEstimated Component Price
1#2 CROSSFEED

VALVE

2 AFT BELL SUPT

ASSY

3AFT BELLCRANK
4AFT TIE ROD ASSY
5AXIAL FAN
6BELLCRANK BOLTS
7BELLCRANK LAT

SERVO

8BIFILAR ASSY
9CUFF ASSEMBLY
10CUFF ASSEMBLY
11CUFF ASSEMBLY
12CUFF ASSEMBLY
13DR SHAFT VIS

BEARING

14 DR SHAFT VIS

BEARING

15 DR SHAFT VIS

BEARING

16FWD BELLCRANK
17FWD SUP ASSY

BELLCK

18M/R SHAFT NUT
19MGB ASSY
20MGB HOUSING ASSY
21MGB SHAFT
22MR BLADE
23MR BLADE
24MR BLADE
25MR BLADE
26MR CONTRL HORN

ASSY

27 MR CONTRL HORN

ASSY

28 MR CONTRL HORN

ASSY

29 MR CONTRL HORN

ASSY

30MR HUB ASSY
31MR SHAFT

EXTENSION

32MR SPINDLE ASSY
33MR SPINDLE ASSY
34MR SPINDLE ASSY
35MR SPINDLE ASSY
36OIL AXIAL BALL

BEARING

37 OIL AXIAL BALL

BEARING

38 PC LINK TO SWASH

BOLT

39PISTON MLG
40PISTON MLG
41PLANET GEAR ASSY
42RH TIE ROD ATT

BOLT

43SAS ACTUATOR
44SAS ACTUATOR
45SAS ACTUATOR
46SERVO ASSY

PRIMARY

47 SERVO ASSY

PRIMARY

48 SERVO ASSY

PRIMARY

49SPINDLE NUT
50SPINDLE NUT
51SPINDLE NUT
52SPINDLE NUT
53STAB ACT ATTACH

BOLT

54 SUPT ASSY AFT TIE

ROD

55SWASH PVT BOLTS
56SWASHPLATE GUIDE
57SWASHPLATE LINK

LAT

58 SWASHPLATE

ROTATING

59 SWASHPLATE

STATION

60TAIL PYLON FITTING
61TIE ROD ASSY LEFT
62TIE ROD ASSY RIGHT
63TR BEVEL GEAR
64TR BLADE ASSY
65TR BLADE ASSY
66TR GEARBOX ASSY
67TR I/B RET PLATE
68TR OTBD RET PLATE
69TR PC SHAFT ASSY
70TR PC SHAFT BRG
71TR SERVO ASSY
72WALKING BEAM

ASSY

Total Cost $ - 0

Respondent's Name (Company):

Date of Submission:

Authorized Representative's Name:

Tab3-Engine #1 Component Status

ATTACHMENT G - TBO Evaluation Sheet Tab No. 3 - Engine # 1 Component Status FSG-ITN-23/24-1002: UH-60 Blackhawk Helicopter
Item No.% of Component Life RemainingEngine #1 Component/Part DescriptionTotal Time on ComponentRemaining Hours/CYCRemove Hours/CYCTBO Hour of componentInstalled atEstimated Component Price
1COMPRESSOR TIE

ROD

2 COMPRESSOR

IMPELLER

3GG TURBINE SHAFT
4POWER TURBINE

SHAFT

5 REAR SHAFT

COMPRESSOR

6SPACER RING
7STAGE 1 AFT COOL

PLT

8STAGE 1 BLISK
9STAGE 1 FWD COOL

PLT

10 STAGE 1 TURBINE

DISK

11 STAGE 2 AFT COOL

PLT

12STAGE 2 BLISK
13STAGE 2 FWD COOL

PLT

14 STAGE 2 TURBINE

DISK

15 STAGE 3 TURBINE

DISK

16STAGE 3&4 BLISK
17STAGE 4 TURBINE

DISK

18STAGE 5 BLISK
Total Cost$ - 0

Respondent's Name (Company):

Date of Submission:

Authorized Representative's Name:

Tab4-Engine #2 Component Status

ATTACHMENT G - TBO Evauation Sheet Tab No. 4 - Engine # 2 Component Status FSG-ITN-23/24-1002: UH-60 Blackhawk Helicopter
Item No.% of Component Life RemainingEngine #2 Component/Part DescriptionTotal Time on ComponentRemaining Hours/CYCRemove Hours/CYCTBO Hour of componentInstalled atEstimated Component Price
1COMPRESSOR TIE

ROD

2 COMPRESSOR

IMPELLER

3GG TURBINE SHAFT
4POWER TURBINE

SHAFT

5 REAR SHAFT

COMPRESSOR

6SPACER RING
7STAGE 1 AFT COOL

PLT

8STAGE 1 BLISK
9STAGE 1 FWD COOL

PLT

10 STAGE 1 TURBINE

DISK

11 STAGE 2 AFT COOL

PLT

12STAGE 2 BLISK
13STAGE 2 FWD COOL

PLT

14 STAGE 2 TURBINE

DISK

15 STAGE 3 TURBINE

DISK

16STAGE 3&4 BLISK
17STAGE 4 TURBINE

DISK

18STAGE 5 BLISK
Total Cost$ - 0

Respondent's Name (Company):

Date of Submission:

Authorized Representative's Name:

File details come from the government source that posted it. Updated .