Attachment-G_Cost_Estimate.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
HAFC SARA WAYSIDE DB FAB AND INSTALL Federal contract opportunity
Solicitation number
140P2122R0007
Issued by
Department of the Interior National Park Service

About this file

This document contains a government cost estimate spreadsheet and details for a related federal contract opportunity for fabrication and installation services. The cost estimate spreadsheet provides projected costs for project management, layouts and fabrication drawings, proofs and prototypes, exhibit structures, display objects and specialty elements, electrical and electronic components, graphic panels, audio description, project closeout, shipping, installation, and travel. The federal contract opportunity is identified as solicitation number 140P2122R0007 for HAFC SARA WAYSIDE DB FAB AND INSTALL through the Department of the Interior National Park Service. The response appears to be a government cost estimate and details for a solicitation seeking fabrication and installation services.

View the file

Other files for this federal contract opportunity

Other files attached to HAFC SARA WAYSIDE DB FAB AND INSTALL, newest first.
File Type Posted
Sol_140P2122R0007_Amd_0001.pdf PDF
Attachment-C_WaysideGuide(1).pdf PDF
Attachment-F_Chanages.pdf PDF
Attachment-H_Past_Performance_Questionnaire.pdf PDF
Attachment-E_VIS_and_WaysideHardwareSpecificationManual.pdf PDF
Attachment-B_Programtic_Accessibility_Guidlines.pdf PDF
Attachment-D_TactileMapGuidelines.pdf PDF
Attachment-A_WaysideExhibitPackage.pdf PDF
Sol_140P2122R0007.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gov't Est

SARA: Fabrication and Installation Estimate
PROJECT MANAGEMENT$0.00
LAYOUTS & FABRICATION DRAWINGS$0.00
PROOFS/SAMPLES/PROTOTYPE$0.00
EXHIBIT STRUCTURES$0.00
DISPLAY OBJECTS & SPECIALTY$0.00
ELECTRICAL/ ELECTRONIC$0.00
GRAPHIC PANELS$0.00
AUDIO DESCRIPTION$0.00
PROJECT CLOSEOUT$0.00
SHIPPING$0.00
INSTALLATION$0.00
TRAVEL$0.00
TOTAL$0.00
Rounded to$0
PROJECT MANAGEMENT (excluding travel)
LABORhoursxrateamount
Project Managerhours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Project Management $0.00

Layouts and Fabrication Drawings
MATERIALS:qty.unitunit costamount
Miscellaneousjob$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
cartographerhours @$0.00
Designerhours @$0.00
detailerhours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Fabrication Drawings $0.00

Proofs/Samples/Mock-ups/Prototypes
MATERIALS:qty.unitunit costamount
Base for TS10-WS-08ea$0.00
HPL panel for TS10-WS-08ea$0.00
1/4 scale map for TS1-OR-01ea$0.00
1/4 scale map for TS3-WS-03ea$0.00
full size proofs (71 proofs x 2)ea$0.00
sample materialssets$0.00
1/4 scale object for TS2-OB-01ea$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
exhibit spec-fabricationhours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Samples $0.00

Exhibit Structures/Bases
MATERIALS:qty.unitunit costamount
5' 1/2" x 2' 1-1/2" Orientation Displayea$0.00

4' 1-1/2" x 2' 1-1/2" low profile wayside exhibit ea $0.00

Tactile table framesea$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent0

TOTAL ALL MATERIALS $0.00

LABORhoursxrateamount
shop supervisorhours @$0.00
exhibit spec-fabrication. 73 baseshours @$0.00
TOTAL ALL LABOR$0.00

TOTAL Exhibit Structures $0.00

Display Objects and Specialty Elements
MATERIALS:qty.unitunit costamount
Bronze houseea$0.00
Bronze bootea$0.00
Bronze mapsea$0.00
Bronze sawea$0.00
Bronze canon ballea$0.00
Bronze set of dolphinsset$0.00
Bronze canon ball caseea$0.00
Bronze rifleea$0.00
Bronze biscutea$0.00
Bonze group of muskat ballsgroup$0.00
Bronze moccasinsset$0.00
Bronze bone and muskat ballgroup$0.00
modls/clay/platicea$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Map model maker. 33 mapshours @$0.00
Model maker. 13 tactileshours @$0.00
3D printer 46 total tactileshours @$0.00
TOTAL ALL LABOR$0.00

TOTAL DO and SE $0.00

Electrical/Electronic
MATERIALS:qty.unitunit costamount

ea $0.00

SUBTOTAL, AV EQUIPMENT$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Exhibit spec-AV techhours @$0.00
Exhibit sepc - Lightinghours @$0.00
TOTAL ALL LABOR$0.00

TOTAL Electrical/Mechanical/AV $0.00

Graphic Panels
MATERIALS:qty.unitdig outputamount
5' 1/2" x 2' 1-1/2" HPL panelea$0.00
4' 1-1/2" x 2' 1-1/2" HPL panelea$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Graphics supervisorhours @$0.00
Graphics specialist 71 panelshours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Graphics $0.00

Audio Description
MATERIALS:qty.unitunit costamount
Misc.ea$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORxrateamount
Audio Describer. 73 exhibitshours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Conservation $0.00

PROJECT CLOSEOUT
MATERIALS:qty.unitunit costamount
miscellaneous1job$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Project Managerhours @$0.00
TOTAL ALL LABOR$0.00

TOTAL Project Closeout $0.00

SHIPPING
MATERIALS:qty.unitunit costamount
Packingjob @$0.00
Shippingjob @$0.00

TOTAL MATERIALS $0.00

LABORhoursxrateamount
Exhibit Spec - Fabricationhours @$0.00

TOTAL ALL LABOR $0.00

Total Shipping $0.00

INSTALLATION

qty.unitunit costamount
air farejob @$0.00
per diemdays @$0.00
Lodgingdays @$0.00
Rental car and gasdays @$0.00

Misc. concrete, weights, and equipment rental job @ $0.00

TOTAL MATERIALS crew $0.00

LABORhoursxrateamount
Project Managerhours @$0.00
Exhibit Spec - Fabricatorhours @$0.00
Exhibit Spec - Fabricatorhours @$0.00
Exhibit Spec - laborerhours @$0.00

TOTAL ALL LABOR $0.00

Total Installation $0.00

TRAVEL
Post Award
qty.unitunit costamount
air farejob @$0.00
per diemdays @$0.00
lodgingdays @$0.00
Rental car and gasdays @$0.00
Misc.job @$0.00

TOTAL MATERIALS team $0.00

LABORhoursxrateamount
Project Managerhours @$0.00
3D Designerhours @$0.00
Audio Describerhours @$0.00
TOTAL ALL LABOR$0.00

Total Travel $0.00

File details come from the government source that posted it. Updated .