Attachment-G_Cost_Estimate.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- HAFC SARA WAYSIDE DB FAB AND INSTALL Federal contract opportunity
- Solicitation number
- 140P2122R0007
About this file
This document contains a government cost estimate spreadsheet and details for a related federal contract opportunity for fabrication and installation services. The cost estimate spreadsheet provides projected costs for project management, layouts and fabrication drawings, proofs and prototypes, exhibit structures, display objects and specialty elements, electrical and electronic components, graphic panels, audio description, project closeout, shipping, installation, and travel. The federal contract opportunity is identified as solicitation number 140P2122R0007 for HAFC SARA WAYSIDE DB FAB AND INSTALL through the Department of the Interior National Park Service. The response appears to be a government cost estimate and details for a solicitation seeking fabrication and installation services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2122R0007_Amd_0001.pdf | ||
| Attachment-C_WaysideGuide(1).pdf | ||
| Attachment-F_Chanages.pdf | ||
| Attachment-H_Past_Performance_Questionnaire.pdf | ||
| Attachment-E_VIS_and_WaysideHardwareSpecificationManual.pdf | ||
| Attachment-B_Programtic_Accessibility_Guidlines.pdf | ||
| Attachment-D_TactileMapGuidelines.pdf | ||
| Attachment-A_WaysideExhibitPackage.pdf | ||
| Sol_140P2122R0007.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gov't Est
| SARA: Fabrication and Installation Estimate | |||
| PROJECT MANAGEMENT | $0.00 | ||
| LAYOUTS & FABRICATION DRAWINGS | $0.00 | ||
| PROOFS/SAMPLES/PROTOTYPE | $0.00 | ||
| EXHIBIT STRUCTURES | $0.00 | ||
| DISPLAY OBJECTS & SPECIALTY | $0.00 | ||
| ELECTRICAL/ ELECTRONIC | $0.00 | ||
| GRAPHIC PANELS | $0.00 | ||
| AUDIO DESCRIPTION | $0.00 | ||
| PROJECT CLOSEOUT | $0.00 | ||
| SHIPPING | $0.00 | ||
| INSTALLATION | $0.00 | ||
| TRAVEL | $0.00 | ||
| TOTAL | $0.00 | ||
| Rounded to | $0 |
| PROJECT MANAGEMENT (excluding travel) | |||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| Layouts and Fabrication Drawings | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Miscellaneous | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| cartographer | hours @ | $0.00 | |||
| Designer | hours @ | $0.00 | |||
| detailer | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Fabrication Drawings $0.00
| Proofs/Samples/Mock-ups/Prototypes | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Base for TS10-WS-08 | ea | $0.00 | |||
| HPL panel for TS10-WS-08 | ea | $0.00 | |||
| 1/4 scale map for TS1-OR-01 | ea | $0.00 | |||
| 1/4 scale map for TS3-WS-03 | ea | $0.00 | |||
| full size proofs (71 proofs x 2) | ea | $0.00 | |||
| sample materials | sets | $0.00 | |||
| 1/4 scale object for TS2-OB-01 | ea | $0.00 | |||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| exhibit spec-fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Samples $0.00
| Exhibit Structures/Bases | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| 5' 1/2" x 2' 1-1/2" Orientation Display | ea | $0.00 |
4' 1-1/2" x 2' 1-1/2" low profile wayside exhibit ea $0.00
| Tactile table frames | ea | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | 0 |
TOTAL ALL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| shop supervisor | hours @ | $0.00 | |||
| exhibit spec-fabrication. 73 bases | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Exhibit Structures $0.00
| Display Objects and Specialty Elements | ||||
| MATERIALS: | qty. | unit | unit cost | amount |
| Bronze house | ea | $0.00 |
| Bronze boot | ea | $0.00 |
| Bronze maps | ea | $0.00 |
| Bronze saw | ea | $0.00 |
| Bronze canon ball | ea | $0.00 |
| Bronze set of dolphins | set | $0.00 |
| Bronze canon ball case | ea | $0.00 |
| Bronze rifle | ea | $0.00 |
| Bronze biscut | ea | $0.00 |
| Bonze group of muskat balls | group | $0.00 |
| Bronze moccasins | set | $0.00 |
| Bronze bone and muskat ball | group | $0.00 |
| modls/clay/platic | ea | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Map model maker. 33 maps | hours @ | $0.00 | |||
| Model maker. 13 tactiles | hours @ | $0.00 | |||
| 3D printer 46 total tactiles | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL DO and SE $0.00
| Electrical/Electronic | ||||
| MATERIALS: | qty. | unit | unit cost | amount |
ea $0.00
| SUBTOTAL, AV EQUIPMENT | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Exhibit spec-AV tech | hours @ | $0.00 | |||
| Exhibit sepc - Lighting | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Electrical/Mechanical/AV $0.00
| Graphic Panels | |||||
| MATERIALS: | qty. | unit | dig output | amount | |
| 5' 1/2" x 2' 1-1/2" HPL panel | ea | $0.00 | |||
| 4' 1-1/2" x 2' 1-1/2" HPL panel | ea | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Graphics supervisor | hours @ | $0.00 | |||
| Graphics specialist 71 panels | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Graphics $0.00
| Audio Description | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Misc. | ea | $0.00 | |||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | |||
| LABOR | x | rate | amount | |
| Audio Describer. 73 exhibits | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Conservation $0.00
| PROJECT CLOSEOUT | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| miscellaneous | 1 | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Project Closeout $0.00
| SHIPPING | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Packing | job @ | $0.00 | |||
| Shipping | job @ | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Exhibit Spec - Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
INSTALLATION
| qty. | unit | unit cost | amount | |
| air fare | job @ | $0.00 | ||
| per diem | days @ | $0.00 | ||
| Lodging | days @ | $0.00 | ||
| Rental car and gas | days @ | $0.00 |
Misc. concrete, weights, and equipment rental job @ $0.00
TOTAL MATERIALS crew $0.00
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| Exhibit Spec - Fabricator | hours @ | $0.00 | |||
| Exhibit Spec - Fabricator | hours @ | $0.00 | |||
| Exhibit Spec - laborer | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Installation $0.00
| TRAVEL | |||||
| Post Award | |||||
| qty. | unit | unit cost | amount | ||
| air fare | job @ | $0.00 | |||
| per diem | days @ | $0.00 | |||
| lodging | days @ | $0.00 | |||
| Rental car and gas | days @ | $0.00 | |||
| Misc. | job @ | $0.00 |
TOTAL MATERIALS team $0.00
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| 3D Designer | hours @ | $0.00 | |||
| Audio Describer | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
Total Travel $0.00
File details come from the government source that posted it. Updated .