Attachment F - Prevailing Wage.pdf

PDF 88 KB Posted

Attached to
Truck Wash Tension Fabric Roof Replacement
Solicitation number
6100022307
Issued by
Carbon County, Lewistown Borough, Pennsylvania

About this file

This document is a Prevailing Wage Determination issued by the Pennsylvania Department of Labor & Industry. It outlines the prevailing hourly wage rates and fringe benefits for various construction trade classifications to be used on a project in Carbon County, Pennsylvania. The project is the "Truck Wash TARP Replacement" and the Contract Award Date is 4/2/2012. The document includes detailed wage and benefit information for over 50 different trade classifications covering building, heavy, and highway construction work, with effective dates ranging from 2009 to 2016.

The document provides comprehensive prevailing wage and fringe benefit rates for all labor categories required for the project. It covers a wide range of trades including carpenters, masons, operators, laborers, electrical workers, plumbers, and truck drivers, among others. The rates are specific to the geographic region and are updated periodically, with the most recent changes effective in 2016. This information is critical for ensuring that workers on the project are properly compensated in accordance with state prevailing wage laws.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3/7/2012Determination Date:

BuildingProject Classification:

12-01336Serial Number:

4/2/2012Contract Award Date:

Awarding Agency:

Carbon County Truck Wash TARP ReplacementProject Name:

PREVAILING WAGES PROJECT RATES

Assigned Field Office:

Carbon County

877-214-3962Toll Free Phone Number:

570-963-4577Field Office Phone Number:

Scranton

PennDOT

Effective

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

7/1/2010 $15.32$32.28 $47.60Asbestos & Insulation Workers

7/1/2011 $15.32$32.28 $47.60Asbestos & Insulation Workers

1/1/2010 $15.15$23.59 $38.74Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2011 $16.02$24.22 $40.24Boilermaker (Commercial, Institutional, and Minor Repair Work)

1/1/2011 $28.12$37.35 $65.47Boilermakers

1/1/2012 $29.85$37.62 $67.47Boilermakers

5/2/2011 $15.77$30.28 $46.05Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

4/29/2012 $16.02$30.58 $46.60Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

4/28/2013 $16.29$31.01 $47.30Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/4/2014 $16.56$31.54 $48.10Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/3/2015 $16.83$32.12 $48.95Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/1/2016 $17.11$32.74 $49.85Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/1/2010 $19.67$33.34 $53.01Carpenters

11/1/2010 $20.17$30.99 $51.16Carpenters

5/1/2011 $21.47$31.09 $52.56Carpenters

5/1/2012 $21.47$32.69 $54.16Carpenters

Page 1 of 11 03/07/2012

PREVAILING WAGES PROJECT RATES

Effective

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

5/1/2013 $21.47$34.49 $55.96Carpenters

5/1/2009 $16.43$25.60 $42.03Cement Masons

5/2/2010 $15.32$27.01 $42.33Cement Masons

5/1/2011 $15.37$27.71 $43.08Cement Masons

4/30/2012 $15.42$28.41 $43.83Cement Masons

1/1/2010 $12.25$29.95 $42.20Dockbuilder, Pile Drivers

1/1/2011 $13.10$30.35 $43.45Dockbuilder, Pile Drivers

1/1/2012 $13.70$30.85 $44.55Dockbuilder, Pile Drivers

1/1/2013 $14.20$31.45 $45.65Dockbuilder, Pile Drivers

7/1/2010 $27.57$37.60 $65.17DockBuilder/Pile Drivers (Building, Heavy

& Highway)

7/1/2011 $28.27$38.15 $66.42DockBuilder/Pile Drivers (Building, Heavy

& Highway)

5/1/2009 $12.57$23.31 $35.88Drywall Finisher

5/1/2010 $13.42$23.86 $37.28Drywall Finisher

5/1/2011 $15.42$23.86 $39.28Drywall Finisher

3/1/2006 $14.64$35.15 $49.79Electric Lineman

6/1/2009 $11.98$36.74 $48.72Electricians & Telecommunications

Installation Technician

12/1/2009 $12.33$37.17 $49.50Electricians & Telecommunications

Installation Technician

6/1/2010 $12.66$37.60 $50.26Electricians & Telecommunications

Installation Technician

12/1/2010 $12.84$38.20 $51.04Electricians & Telecommunications

Installation Technician

6/1/2011 $13.26$38.54 $51.80Electricians & Telecommunications

Installation Technician

12/1/2011 $14.27$38.53 $52.80Electricians & Telecommunications

Installation Technician

1/1/2008 $16.47$37.85 $54.32Elevator Constructor

1/1/2010 $20.24$40.08 $60.32Elevator Constructor

1/1/2011 $25.30$41.33 $66.63Elevator Constructor

1/1/2005 $0.00$0.00 $0.00Elevator Tender (Use Elevator Apprentice or Constructor)

5/1/2010 $22.46$28.22 $50.68Floor Layer

6/1/2008 $12.64$27.00 $39.64Glazier

6/1/2009 $11.92$29.22 $41.14Glazier

1/1/2012 $14.38$28.01 $42.39Glazier

Page 2 of 11 Serial Number: 12-01336

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

5/1/2012 $15.38$28.01 $43.39Glazier

5/1/2013 $16.88$28.01 $44.89Glazier

7/10/2010 $23.00$33.05 $56.05Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2011 $23.50$33.05 $56.55Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

5/1/2009 $11.98$22.80 $34.78Laborers (Class 01 - See notes)

5/1/2010 $13.68$22.80 $36.48Laborers (Class 01 - See notes)

5/1/2011 $14.39$22.84 $37.23Laborers (Class 01 - See notes)

5/1/2012 $15.64$22.84 $38.48Laborers (Class 01 - See notes)

5/1/2009 $11.98$23.83 $35.81Laborers (Class 02 - See notes)

5/1/2010 $13.68$23.83 $37.51Laborers (Class 02 - See notes)

5/1/2011 $14.39$23.87 $38.26Laborers (Class 02 - See notes)

5/1/2012 $15.64$23.87 $39.51Laborers (Class 02 - See notes)

5/1/2009 $11.98$24.15 $36.13Laborers (Class 03 - See notes)

5/1/2010 $13.68$24.15 $37.83Laborers (Class 03 - See notes)

5/1/2011 $14.39$23.44 $37.83Laborers (Class 03 - See notes)

5/1/2012 $15.09$23.44 $38.53Laborers (Class 03 - See notes)

5/1/2013 $15.89$23.44 $39.33Laborers (Class 03 - See notes)

5/1/2009 $11.98$24.15 $36.13Laborers (Class 04 - See notes)

5/1/2010 $13.68$24.15 $37.83Laborers (Class 04 - See notes)

5/1/2011 $14.39$23.44 $37.83Laborers (Class 04 - See notes)

5/1/2012 $15.09$23.44 $38.53Laborers (Class 04 - See notes)

5/1/2013 $15.89$23.44 $39.33Laborers (Class 04 - See notes)

5/3/2009 $12.11$26.15 $38.26Laborers (Class 05 - See notes)

5/1/2010 $13.68$26.15 $39.83Laborers (Class 05 - See notes)

5/1/2011 $14.39$25.44 $39.83Laborers (Class 05 - See notes)

5/1/2012 $15.09$25.44 $40.53Laborers (Class 05 - See notes)

5/1/2013 $15.89$25.44 $41.33Laborers (Class 05 - See notes)

5/1/2011 $14.39$23.44 $37.83Laborers (Class 06 - See notes)

5/1/2012 $15.64$23.44 $39.08Laborers (Class 06 - See notes)

7/1/2008 $21.50$31.95 $53.45Millwright

Page 3 of 11 Serial Number: 12-01336

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

7/1/2009 $23.49$33.11 $56.60Millwright

7/1/2010 $24.33$33.11 $57.44Millwright

7/1/2011 $24.99$33.76 $58.75Millwright

5/1/2009 $16.89$29.42 $46.31Operators (Building/Heavy, Class 01 -

See Notes)

5/1/2010 $17.85$30.76 $48.61Operators (Building/Heavy, Class 01 -

See Notes)

5/1/2011 $18.85$32.06 $50.91Operators (Building/Heavy, Class 01 -

See Notes)

5/1/2009 $17.55$31.67 $49.22Operators (Building/Heavy, Class 01a -

See Notes)

5/1/2010 $18.51$33.01 $51.52Operators (Building/Heavy, Class 01a -

See Notes)

5/1/2011 $19.51$34.31 $53.82Operators (Building/Heavy, Class 01a -

See Notes)

5/1/2009 $16.81$29.13 $45.94Operators (Building/Heavy, Class 02 -

See Notes)

5/1/2010 $17.77$30.47 $48.24Operators (Building/Heavy, Class 02 -

See Notes)

5/1/2011 $18.77$31.77 $50.54Operators (Building/Heavy, Class 02 -

See Notes)

5/1/2009 $17.48$31.38 $48.86Operators (Building/Heavy, Class 02a -

See Notes)

5/1/2010 $18.44$32.72 $51.16Operators (Building/Heavy, Class 02a -

See Notes)

5/1/2011 $19.44$34.02 $53.46Operators (Building/Heavy, Class 02a -

See Notes)

5/1/2009 $15.94$26.22 $42.16Operators (Building/Heavy, Class 03 -

See Notes)

5/1/2010 $16.91$27.55 $44.46Operators (Building/Heavy, Class 03 -

See Notes)

5/1/2011 $17.91$28.85 $46.76Operators (Building/Heavy, Class 03 -

See Notes)

5/1/2009 $15.61$25.08 $40.69Operators (Building/Heavy, Class 04 -

See Notes)

5/1/2010 $16.57$26.42 $42.99Operators (Building/Heavy, Class 04 -

See Notes)

5/1/2011 $17.57$27.72 $45.29Operators (Building/Heavy, Class 04 -

See Notes)

5/1/2009 $15.47$24.64 $40.11Operators (Building/Heavy, Class 05 -

See Notes)

5/1/2010 $16.44$25.97 $42.41Operators (Building/Heavy, Class 05 -

See Notes)

5/1/2011 $17.44$27.27 $44.71Operators (Building/Heavy, Class 05 -

See Notes)

5/1/2009 $15.21$23.76 $38.97Operators (Building/Heavy, Class 06 -

See Notes)

5/1/2010 $16.18$25.09 $41.27Operators (Building/Heavy, Class 06 -

See Notes)

5/1/2011 $17.18$26.39 $43.57Operators (Building/Heavy, Class 06 -

See Notes)

Page 4 of 11 Serial Number: 12-01336

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

5/1/2009 $19.38$35.30 $54.68Operators (Building/Heavy, Class 07/A -

See Notes)

5/1/2010 $20.43$36.91 $57.34Operators (Building/Heavy, Class 07/A -

See Notes)

5/1/2011 $21.53$38.47 $60.00Operators (Building/Heavy, Class 07/A -

See Notes)

5/1/2009 $19.27$34.96 $54.23Operators (Building/Heavy, Class 07/B -

See Notes)

5/1/2010 $20.33$36.56 $56.89Operators (Building/Heavy, Class 07/B -

See Notes)

5/1/2011 $21.43$38.12 $59.55Operators (Building/Heavy, Class 07/B -

See Notes)

5/1/2009 $12.57$22.75 $35.32Painters Class 1 (see notes)

5/1/2010 $13.42$23.30 $36.72Painters Class 1 (see notes)

5/1/2011 $14.52$24.05 $38.57Painters Class 1 (see notes)

5/1/2009 $12.57$24.75 $37.32Painters Class 2 (see notes)

5/1/2010 $13.42$25.30 $38.72Painters Class 2 (see notes)

5/1/2011 $14.52$26.05 $40.57Painters Class 2 (see notes)

5/1/2009 $12.57$25.60 $38.17Painters Class 3 (see notes)

5/1/2010 $13.42$29.60 $43.02Painters Class 3 (see notes)

5/1/2011 $14.52$30.35 $44.87Painters Class 3 (see notes)

1/1/2009 $12.00$43.28 $55.28Pile Driver Divers (Building, Heavy, Highway)

1/1/2010 $12.25$44.39 $56.64Pile Driver Divers (Building, Heavy, Highway)

1/1/2010 $12.25$44.39 $56.64Pile Driver Divers (Building, Heavy, Highway)

7/1/2010 $27.57$37.60 $65.17Pile Driver Divers (Building, Heavy, Highway)

1/1/2011 $13.00$45.53 $58.53Pile Driver Divers (Building, Heavy, Highway)

1/1/2012 $13.60$46.28 $59.88Pile Driver Divers (Building, Heavy, Highway)

1/1/2013 $14.10$47.18 $61.28Pile Driver Divers (Building, Heavy, Highway)

5/1/2009 $15.51$26.43 $41.94Plasterers

5/1/2010 $16.96$26.93 $43.89Plasterers

5/1/2011 $20.16$25.68 $45.84Plasterers

6/1/2009 $17.56$35.40 $52.96Plumbers and Steamfitters

6/1/2010 $18.26$37.15 $55.41Plumbers and Steamfitters

6/1/2011 $17.76$38.89 $56.65Plumbers and Steamfitters

6/1/2012 $18.36$39.39 $57.75Plumbers and Steamfitters

Page 5 of 11 Serial Number: 12-01336

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

6/1/2013 $19.01$39.89 $58.90Plumbers and Steamfitters

5/1/2009 $23.10$30.00 $53.10Roofers (Composition)

5/1/2010 $24.95$30.75 $55.70Roofers (Composition)

5/1/2011 $25.95$30.75 $56.70Roofers (Composition)

5/1/2011 $15.62$23.75 $39.37Roofers (Shingle, Slate, Tile)

5/1/2009 $13.62$23.25 $36.87Roofers (Shingle, Slate, Tiles)

5/1/2009 $17.29$28.56 $45.85Sheet Metal Workers

5/1/2010 $18.33$28.68 $47.01Sheet Metal Workers

5/1/2011 $18.78$28.93 $47.71Sheet Metal Workers

1/1/2010 $17.60$33.85 $51.45Sprinklerfitters

1/1/2011 $18.45$33.35 $51.80Sprinklerfitters

4/1/2011 $18.45$34.18 $52.63Sprinklerfitters

1/1/2012 $18.60$34.18 $52.78Sprinklerfitters

4/1/2012 $18.65$35.21 $53.86Sprinklerfitters

1/1/2013 $18.80$35.21 $54.01Sprinklerfitters

5/1/2009 $14.37$26.54 $40.91Terrazzo Finisher

5/1/2010 $14.42$27.89 $42.31Terrazzo Finisher

5/1/2011 $14.42$28.14 $42.56Terrazzo Finisher

5/1/2009 $17.27$25.86 $43.13Terrazzo Setter

5/1/2010 $17.32$27.21 $44.53Terrazzo Setter

5/1/2011 $17.32$27.46 $44.78Terrazzo Setter

5/1/2009 $13.08$21.13 $34.21Tile & Marble Finisher

5/1/2010 $13.21$21.88 $35.09Tile & Marble Finisher

5/1/2011 $13.21$22.83 $36.04Tile & Marble Finisher

5/1/2009 $14.72$25.11 $39.83Tile & Marble Layer

5/1/2010 $15.22$25.36 $40.58Tile & Marble Layer

5/1/2011 $15.22$26.31 $41.53Tile & Marble Layer

1/1/2010 $12.25$29.95 $42.20Tilesetters & Marble Masons

1/1/2010 $12.25$29.95 $42.20Tilesetters & Marble Masons

1/1/2011 $13.00$30.35 $43.35Tilesetters & Marble Masons

1/1/2011 $13.00$30.35 $43.35Tilesetters & Marble Masons

Page 6 of 11 Serial Number: 12-01336

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalBuilding

1/1/2012 $13.60$30.85 $44.45Tilesetters & Marble Masons

1/1/2012 $13.60$30.85 $44.45Tilesetters & Marble Masons

1/1/2013 $14.10$31.45 $45.55Tilesetters & Marble Masons

1/1/2013 $14.10$31.45 $45.55Tilesetters & Marble Masons

5/1/2009 $0.00$28.58 $28.58Truckdriver class 1(see notes)

5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)

5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)

5/1/2009 $0.00$28.65 $28.65Truckdriver class 2 (see notes)

5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)

5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)

5/1/2009 $0.00$29.14 $29.14Truckdriver class 3 (see notes)

5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)

5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)

Page 7 of 11 Serial Number: 12-01336

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalHeavy/Highway

5/1/2010 $19.67$36.67 $56.34Carpenter - Chief of Party (Surveying &

Layout)

11/1/2010 $20.17$34.09 $54.26Carpenter - Chief of Party (Surveying &

Layout)

5/1/2011 $21.47$34.20 $55.67Carpenter - Chief of Party (Surveying &

Layout)

5/1/2012 $21.47$35.96 $57.43Carpenter - Chief of Party (Surveying &

Layout)

5/1/2013 $21.47$37.94 $59.41Carpenter - Chief of Party (Surveying &

Layout)

5/1/2010 $19.67$33.34 $53.01Carpenter - Instrument Person (Surveying

& Layout)

11/1/2010 $20.17$30.99 $51.16Carpenter - Instrument Person (Surveying

& Layout)

5/1/2011 $21.47$31.09 $52.56Carpenter - Instrument Person (Surveying

& Layout)

5/1/2012 $21.47$32.69 $54.16Carpenter - Instrument Person (Surveying

& Layout)

5/1/2013 $21.47$34.49 $55.96Carpenter - Instrument Person (Surveying

& Layout)

5/1/2010 $19.67$24.00 $43.67Carpenter - Rodman (Surveying & Layout)

11/1/2010 $20.17$22.31 $42.48Carpenter - Rodman (Surveying & Layout)

5/1/2011 $21.47$22.38 $43.85Carpenter - Rodman (Surveying & Layout)

5/1/2012 $21.47$23.54 $45.01Carpenter - Rodman (Surveying & Layout)

5/1/2013 $21.47$24.83 $46.30Carpenter - Rodman (Surveying & Layout)

5/1/2010 $10.83$25.98 $36.81Carpenters

11/1/2010 $20.17$30.99 $51.16Carpenters

5/1/2011 $21.47$31.09 $52.56Carpenters

5/1/2012 $21.47$32.69 $54.16Carpenters

5/1/2013 $21.47$34.49 $55.96Carpenters

5/1/2009 $11.03$16.22 $27.25Laborers (Class 01 - See notes)

5/1/2010 $11.88$16.77 $28.65Laborers (Class 01 - See notes)

5/1/2011 $12.78$17.32 $30.10Laborers (Class 01 - See notes)

5/1/2009 $11.03$22.84 $33.87Laborers (Class 02 - See notes)

5/1/2010 $11.88$23.39 $35.27Laborers (Class 02 - See notes)

5/1/2011 $12.78$23.94 $36.72Laborers (Class 02 - See notes)

5/1/2009 $11.03$19.83 $30.86Laborers (Class 03 - See notes)

5/1/2010 $11.88$20.38 $32.26Laborers (Class 03 - See notes)

5/1/2011 $12.78$20.93 $33.71Laborers (Class 03 - See notes)

Page 8 of 11 Serial Number: 12-01336

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalHeavy/Highway

5/1/2009 $11.03$20.18 $31.21Laborers (Class 04 - See notes)

5/1/2010 $11.88$20.73 $32.61Laborers (Class 04 - See notes)

5/1/2011 $12.78$21.28 $34.06Laborers (Class 04 - See notes)

5/1/2009 $11.03$20.85 $31.88Laborers (Class 05 - See notes)

5/1/2010 $11.88$21.40 $33.28Laborers (Class 05 - See notes)

5/1/2011 $12.78$21.95 $34.73Laborers (Class 05 - See notes)

5/1/2009 $11.03$20.27 $31.30Laborers (Class 06 - See notes)

5/1/2010 $11.88$20.82 $32.70Laborers (Class 06 - See notes)

5/1/2011 $12.78$21.37 $34.15Laborers (Class 06 - See notes)

5/1/2009 $11.03$20.56 $31.59Laborers (Class 07 - See notes)

5/1/2010 $11.88$21.11 $32.99Laborers (Class 07 - See notes)

5/1/2011 $12.78$21.66 $34.44Laborers (Class 07 - See notes)

5/1/2009 $11.03$21.04 $32.07Laborers (Class 08 - See notes)

5/1/2010 $11.88$21.59 $33.47Laborers (Class 08 - See notes)

5/1/2011 $12.78$22.14 $34.92Laborers (Class 08 - See notes)

5/1/2009 $16.30$27.45 $43.75Operators (Highway, Class 01 - See

Notes)

5/1/2010 $17.26$28.79 $46.05Operators (Highway, Class 01 - See

Notes)

5/1/2011 $18.26$30.09 $48.35Operators (Highway, Class 01 - See

Notes)

5/1/2009 $16.98$29.70 $46.68Operators (Highway, Class 01a - See

Notes)

5/1/2010 $17.94$31.04 $48.98Operators (Highway, Class 01a - See

Notes)

5/1/2011 $18.94$32.34 $51.28Operators (Highway, Class 01a - See

Notes)

5/1/2009 $15.96$26.27 $42.23Operators (Highway, Class 02 - See

Notes)

5/1/2010 $16.92$27.61 $44.53Operators (Highway, Class 02 - See

Notes)

5/1/2011 $17.92$28.91 $46.83Operators (Highway, Class 02 - See

Notes)

5/1/2009 $15.75$25.58 $41.33Operators (Highway, Class 03 - See

Notes)

5/1/2010 $16.72$26.91 $43.63Operators (Highway, Class 03 - See

Notes)

5/1/2011 $17.72$28.21 $45.93Operators (Highway, Class 03 - See

Notes)

5/1/2009 $15.62$25.13 $40.75Operators (Highway, Class 04 - See

Notes)

Page 9 of 11 Serial Number: 12-01336

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalHeavy/Highway

5/1/2010 $16.59$26.46 $43.05Operators (Highway, Class 04 - See

Notes)

5/1/2011 $17.59$27.76 $45.35Operators (Highway, Class 04 - See

Notes)

5/1/2009 $15.47$24.62 $40.09Operators (Highway, Class 05 - See

Notes)

5/1/2010 $16.44$25.95 $42.39Operators (Highway, Class 05 - See

Notes)

5/1/2011 $17.44$27.25 $44.69Operators (Highway, Class 05 - See

Notes)

5/1/2009 $16.36$27.69 $44.05Operators (Highway, Class 06 - See

Notes)

5/1/2010 $17.32$29.03 $46.35Operators (Highway, Class 06 - See

Notes)

5/1/2011 $18.32$30.33 $48.65Operators (Highway, Class 06 - See

Notes)

5/1/2009 $17.02$29.94 $46.96Operators (Highway, Class 06/A - See

Notes)

5/1/2010 $17.98$31.28 $49.26Operators (Highway, Class 06/A - See

Notes)

5/1/2011 $18.98$32.58 $51.56Operators (Highway, Class 06/A - See

Notes)

5/1/2009 $18.67$32.94 $51.61Operators (Highway, Class 07/A - See

Notes)

5/1/2010 $19.72$34.55 $54.27Operators (Highway, Class 07/A - See

Notes)

5/1/2011 $20.83$36.10 $56.93Operators (Highway, Class 07/A - See

Notes)

5/1/2009 $18.25$31.53 $49.78Operators (Highway, Class 07/B - See

Notes)

5/1/2010 $19.31$33.13 $52.44Operators (Highway, Class 07/B - See

Notes)

5/1/2011 $20.41$34.69 $55.10Operators (Highway, Class 07/B - See

Notes)

5/1/2009 $9.86$25.30 $35.16Piledrivers

5/1/2010 $10.83$25.98 $36.81Piledrivers

5/1/2011 $11.73$27.03 $38.76Piledrivers

5/1/2010 $26.09$30.27 $56.36Steamfitters (Heavy and Highway - Gas

Distribution)

5/1/2009 $0.00$28.58 $28.58Truckdriver class 1(see notes)

5/1/2010 $0.00$29.58 $29.58Truckdriver class 1(see notes)

5/1/2011 $0.00$30.73 $30.73Truckdriver class 1(see notes)

5/1/2009 $0.00$28.65 $28.65Truckdriver class 2 (see notes)

5/1/2010 $0.00$29.65 $29.65Truckdriver class 2 (see notes)

5/1/2011 $0.00$30.80 $30.80Truckdriver class 2 (see notes)

5/1/2009 $0.00$29.14 $29.14Truckdriver class 3 (see notes)

Page 10 of 11 Serial Number: 12-01336

Date

Expiration

Date

Hourly

Rate

Fringe

Benefits TotalHeavy/Highway

5/1/2010 $0.00$30.14 $30.14Truckdriver class 3 (see notes)

5/1/2011 $0.00$31.29 $31.29Truckdriver class 3 (see notes)

Notes:

If you can not find a classification under Heavy/Highway please refer to the Building classifications.

For further information on construction types review the on the Labor and Industry Website. Go to www.dli.state.pa.us, scroll down to the picture labeled "Labor Law Compliance" and click the picture. Then scroll down on the left menu and click on the "Prevailing Wage" link.

"Notes as Referenced in Predeterminations"

Page 11 of 11 Serial Number: 12-01336 http://www.portal.state.pa.us/portal/server.pt/community/prevailing_wage/10519/forms/553564

File details come from the government source that posted it. Updated .