Attachment_F_Cost_Estimate_Form_SAAN_install.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- 140P2123R0055
About this file
This document is a cost estimate form for the installation of exhibits at San Antonio Missions National Historical Park. The form provides estimated costs for project management, project closeout, shipping, installation, and travel related to removing 51 existing exhibits and installing 123 new exhibits. Costs are estimated at $0 for project management, project closeout, and shipping. Installation is estimated to cost $4,000 for materials such as concrete, weights, and equipment rental, as well as labor costs. Travel costs include airfare, per diem, lodging, rental car and gas, and travel time compensation. The total estimated cost for all work is $4,000.
The related federal contract opportunity is solicitation number 140P2123R0055 for exhibit work at San Antonio Missions National Historical Park, issued by the National Park Service within the Department of the Interior. The solicitation seeks a contractor to remove existing exhibits and install new exhibits as specified in the cost estimate form.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gov't Est - Updated
| Attachment F: Cost Estimate form San Antonio Removal and Installation Estimate | |||
| PROJECT MANAGEMENT | $0.00 | ||
| PROJECT CLOSEOUT | $0.00 | ||
| SHIPPING | $0.00 | ||
| INSTALLATION | $0.00 | ||
| TRAVEL | $0.00 | ||
| TOTAL | $0.00 | ||
| Rounded to | $0 |
| PROJECT MANAGEMENT (excluding travel) | |||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| PROJECT CLOSEOUT | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| miscellaneous | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Project Closeout $0.00
| SHIPPING | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Packing tools | 1 | job @ | $0.00 | ||
| Shipping | 1 | job @ | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Exhibit Spec - Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
INSTALLATION
MATERIALS: qty. unit unit cost amount
Misc. concrete, weights, and equipment rental job @ $0.00
TOTAL MATERIALS 4 crew $0.00
| LABOR (51 removed 123 installed) | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| Exhibit Spec - Fabricator | hours @ | $0.00 | |||
| laborer | hours @ | $0.00 | |||
| laborer | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Installation $0.00
TRAVEL
| MATERIALS: | qty. | unit | unit cost | amount | |
| air fare | job @ | $0.00 | |||
| per diem | days @ | $0.00 | |||
| Lodging | days @ | $0.00 | |||
| Rental car and gas | days @ | $0.00 | |||
| Travel Time (1/2 the hourly rate) | hours @ | $0.00 | |||
| Misc. (Identify) | job @ | $0.00 |
Total Travel $0.00