Attachment F - Consolidated STENS Site Visit Slides.pdf
PDF 3 MB Posted
- Solicitation number
- DRAFT_RFP_70RSAT22R00000022
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Homeland Security | Science and Technology Directorate
Scientific, Technical, and Engineering Support (STENS) for the Plum Island Animal Disease Center (PIADC) Decontamination and Closure
Plum Island Closure and Support (PICS) Program Welcome and Introductory Remarks
Joseph P. Pianese Contracting Officer
Office of Procurement Operations
DHS STAD
June 29, 2022
Agenda
Welcome and Introductions
Expectations
Presentations
– PIADC Science & Biorisk Mgmt
– PICS Program & STENS Overview
– Biocontainment Virtual Pre-Tour
Biosafety Training
Lunch
Tour of Biocontainment and Reading Room
Biocompound Tour
Closing Remarks
Scientific, Technical, and Engineering Support (STENS) for the Plum Island Animal Disease Center (PIADC) Decontamination and Closure
Plum Island Closure and Support (PICS) Program PIADC Background: Scientific Programs and Biorisk Management
Chris Schutta, PhD Director of Biorisk Management
Plum Island Animal Disease Center U.S. Department of Homeland Security (DHS)
Office of National Laboratories (ONL)
June 29, 2022
Overview
Plum Island Background
PIADC Mission
PIADC Scientific Program Summary
Key Scientific Infrastructure
PIADC Pathogen Inventory
PIADC Biorisk Management Regulatory Framework and Adopted Standards
PIADC Biorisk Management: Key Concepts
PIADC Operational Material and Space Decontamination Practices
Plum Island Background
• 840-acre island
• 8 miles from CT and 1.5 miles from NY
• 1897 Plum Island established as part of the coastal defense infrastructure; construction of Fort Terry commenced that same year
• 1952 selected to be home of a national laboratory for Foot-and-Mouth Disease (FMD) research
• 1954 research operations commenced under United States Department of Agriculture (USDA) ownership first in Building 257 and followed by Building 101 in 1956
• Ownership transferred to DHS from USDA as part of Homeland Security Act (2003)
Harbor
PIADC
Biocompound Fort Terry
PIADC Biocompound – Aerial View
Administrative Building (Bldg. 100)
Biocontainment Labs & Animal Areas (Bldg. 101)
Old Wastewater Thermal Decontamination Plant (Bldg. 102)
North Animal Wing
Replacement Wastewater Thermal Decontamination Plant (Bldg. 111)
PIADC Mission
• Programmatic Mission – To defend the nation’s agricultural infrastructure against the intentional, accidental, or naturally occurring introduction of a Transboundary Animal Disease (TAD) – Food and Agriculture is a critical infrastructure sector
(PPD-21).
• By statute, PIADC is the only facility in the nation that can conduct diagnostics, training, and research using live FMDV (21USC113a).
• PIADC is the only BSL-3 laboratory and BSL-3Ag vivarium federal test bed facility for research, development, test, and evaluation on commercially available and candidate countermeasures for FMD and other TAD.
PIADC Scientific Program Summary
• The DHS S&T Office of National Laboratories (ONL) Science Program - generates actionable data and veterinary medical countermeasures
• The Foreign Animal Disease Research Unit (FADRU), Agricultural Research Service (ARS), USDA – conducts basic and translational research
• The Foreign Animal Disease Diagnostic Laboratory (FADDL), Animal and Plant Health Inspection Service (APHIS), USDA – conducts diagnostics and training, manages vaccine stockpile
PIADC’s mission to be transferred to the National Bio and Agro-Defense Facility in Manhattan, Kansas.
PIADC’s mission to be transferred to the National Bio and Agro-Defense Facility in Manhattan, Kansas.
Key Science Infrastructure
• BSL-2 and BSL-3 Laboratories
• Necropsy (BSL-3Ag)
• Vivarium/animal care spaces
(BSL-3Ag/ABSL-3)
PIADC Biorisk Management Regulatory Framework and Adopted Standards
Regulatory Requirements
• 9 CFR § 121. Possession, Use and Transfer of Select
Agents and Toxins
• 21USC § 113a. Establishment of research laboratories for foot-and-mouth disease and other animal diseases
• USDA Select Agent Registration
• Heavily uses the Biosafety in Microbiological and Biomedical Laboratories (BMBL) for regulatory enforcement
• New York State Regulatory Requirements
• 6 CRR-NY 201-8.3 New York State Air Resources
• 6 NYCRR Part 360 – Solid waste management
Other voluntarily adopted sources/standards
• CEN Workshop Agreement CWA 15793:Laboratory Biorisk
Management
• ISO 35001:2019 Biorisk management for laboratories and other related organizations
• ANSI/ASSE Z9.11-2016, Laboratory Decommissioning
• ISO9001, Quality Management Systems
PIADC Biorisk Management: Key Concepts
• Risk Group/BSL requirements – infrastructure requirements and personal practices
• Pathogen-specific risk analyses
• Hierarchy of Controls (occupational hazard reduction)
• Facility design features, i.e., “box within a box” – unique facility design with machine space surrounding large biocontained area (labs, animal rooms, hallways, etc.)
• Movement control – personnel (showers, movement from clean to dirty, etc.), infectious materials, animals, waste
• Medical Surveillance/Personnel Reliability Program
• Personal Recognizant Quarantine
ZONE 1
All areas and buildings on Plum Island except Bldgs.
101/102
ZONE 1
All areas and buildings on Plum Island except Bldgs.
101/102
ZONE 4
All laboratory areas of Bldg. 101/102 where infectious agents are manipulated in animal isolation and necropsy rooms, BSCs, and primary containment devices
ZONE 4
All laboratory areas of Bldg. 101/102 where infectious agents are manipulated in animal isolation and necropsy rooms, BSCs, and primary containment devices
ZONE 3
All laboratory areas of Bldgs. 101/102 where infectious agents are manipulated in closed vessels
ZONE 3
All laboratory areas of Bldgs. 101/102 where infectious agents are manipulated in closed vessels
ZONE 2
Mechanical spaces, hallways, lunchrooms (areas of no infectious agent use) in Bldgs.
101/102
ZONE 2
Mechanical spaces, hallways, lunchrooms (areas of no infectious agent use) in Bldgs.
101/102
PIADC Operational Zones – Zones 2, 3, and 4 have escalating restrictions for entry and controlled movement of personnel and materials.
PIADC Operational Material and Space Decontamination Practices
• Current approved decontamination practices in operational use at PIADC include
• Chemicals: Paraformaldehyde Fumigation, Virkon-S, Bleach, Sodium hydroxide
• Steam for thermal decontamination in autoclaves and for liquid effluent treatment
• A key role of the STENS contract services will be to test and validate decontamination and monitoring technologies to optimize their availability to meet PICS program effectiveness and efficiency for terminal decontamination objectives
Michael Santillo Facility Operations Specialist
Project Manager/COR Plum Island Animal Disease Center
U.S. Department of Homeland Security
June 29, 2022
Scientific, Technical, and Engineering Support (STENS) for the Plum Island Animal Disease Center (PIADC) Decontamination and Closure
Plum Island Closure and Support (PICS) Program PICS Program and STENS Overview
John M. Searing, PE PMP Deputy Center Director
Program Director – Closure & Transition Plum Island Animal Disease Center
U.S. Department of Homeland Security
PICS Program Overview
PICS Program Overview
The PICS Program involves the closure and conveyance of the DHS Plum Island asset, including all real and personal property, transportation assets, and the Orient Point facility that support operation of PIADC.
PICS Program Overview
Expectations:
• To execute Program activities with the highest transparency, while mitigating risks and meeting Regulatory Entities’ expectations for Program execution in accordance with requirements, standards, and best practices - particularly in regard to separation of design/planning, execution, and verification/validation of program elements.
• To meet other stakeholder (political and public) expectations of transparency and independence with respect to planning, execution, and verification/validation of all work.
End-state goals:
• Minimize PICS Program costs, execution risk, and the period of performance.
• Satisfy all regulatory considerations of Federal Select Agent Program (FSAP) and New York State Department of
Environmental Conservation (NYSDEC).
• Preserve operable island assets deemed by GSA to be valuable.
Objectives:
• Decontaminate biological liabilities in accordance with FSAP and NYSDEC requirements using validated decontamination/validation methodologies. (ANSI/ASSE Z9.11 – 2016, EPA DQO Process and RCRA-like process)
• Remediate environmental liabilities in accordance with NYSDEC requirements. (Waste Management Areas)
• Leave key operable infrastructure in operating condition, in a ‘lay-up’ condition, or decommissioned.
• Complete all other PICS Program Key Performance Parameters as identified in the Program Execution Plan.
STENS Support to PICS Program
The STENS Contractor will provide independent support for terminal decontamination * and validation as well as engineering for major PICS Program workstreams.
* includes oversight for, but not physical execution of, terminal decon
• B257– Biological Sampling & Analysis
• B102– Validation of Decontamination
• B101 & B111
– Planning for Terminal Decontamination and Validation **
– Engineering Planning and Oversight of Required Facility/Utility Modifications
– Oversight of Execution of Decontamination
– Validation of Decontamination
** Includes scientific support to PIADC for determination of appropriate methods for terminal decontamination and validation
STENS Overview
STENS is Key to the PICS Program’s Success
PIADC is the only location in the U.S. where live Foot-and-Mouth Disease virus can be used as part of research. Therefore, terminal decon of the facility is inherently novel.
• Public, regulatory, and legislative scrutiny based on risk of terminal decon failure/incomplete inactivation
• Scientific challenges considering historical pathogen characteristics and use
• Engineering technical challenges for a site-specific solution
STENS will require inherent scientific and engineering knowledge and experience, as well as the ability to collaborate with other parties (federal, state, academic, contractors, etc.).
STENS – Summary of Tasks
• Task 1 – Routine Operation of Mobile Laboratory
• Task 2 – Matrixed Support from SMEs w/ Experience in Biological
Decontamination at Facility-Scale
• Task 3 – Design and Execute Applied Scientific Activities to Enable
Biocontainment Facility Decontamination
• Task 4 – Facility Modification Engineering, Planning, and Implementation
• Task 5 – Subcontract & Manage Independent Third-Party Lab for Biological &
Chemical Indicator Verification & Decontamination Sample Analysis
STENS – Overview of Task 1
Routine Operation of the Mobile Laboratory
• Includes aspects of operating the DHS mobile lab for receiving, processing, and reporting on samples.
• The mobile laboratory will support:
• Sampling and Analysis for B257
• Decontamination of B102
• Decontamination of B101/B111
• Primary on-island lab for processing biological and chemical indicators to provide independent verification/validation of decontamination
• “Independent” from those performing physical decon work
STENS – Overview of Task 1
Note: A certain percentage of samples may need to be sent to an off-island, independent laboratory for confirmatory testing and/or analyses beyond the capability of the on-island mobile laboratory.
MEP
ROOM BSL‐2 LAB ENTRY
OFFICE
8’ 31.5’ 10’
8’
STENS – Overview of Task 2
Matrixed Support from Subject Matter Experts (SMEs) with Experience in Biological Decontamination at Facility-Scale
• Provides access to a body of SMEs with a range of expertise/experience in biological decontamination of facility-scale biocontainment laboratories
• Supports development of key components of scientific planning, plans for facility modification, methodologies for validation, interactions with regulatory officials, etc.
• Aligns with Task 3 to execute scientific studies
STENS – Overview of Task 3
Design and Execute Applied Scientific Activities to Enable Biocontainment Facility Decontamination
• Design and facilitate scientific studies to close knowledge gaps (working w/ PIADC personnel)
• Recommend down-select of decon and validation technologies for use in terminal decon for PIADC
• Develop supporting protocols for application at facility-scale, with support from SMEs (Task 2)
Provides the foundation of the terminal decontamination plan, but also informs best practices among similar facilities and generates peer‐reviewed publications (per foundational science workstream).
Studies will assess decontamination and validation technologies for efficacy specific to the PIADC application.
STENS – Overview of Task 4
Facility Modification Engineering, Planning, and Implementation
• Provide engineering interface to support implementation of decontamination methods for the facility
• Requires integration between engineering and science to ensure methods developed are appropriately applied and required conditions can be attained in the facility
Planning of facility modifications will require collaboration/coordination with PIADC Ops, BioSafety, etc.
STENS – Overview of Task 5
Subcontract and Manage Independent Third-Party Lab for Biological and Chemical Indicator Verification and Decontamination Sample Analysis
• Off-island, independent laboratory will be required to support:
• Confirmatory verification/validation of biological and chemical indicators generated in decontamination activities
• Verification/validation of solids, soils, or solutions generated in decontamination activities (if testing is beyond capability of on-island mobile lab)
Questions
File details come from the government source that posted it. Updated .