DHS S&T ONL Plum Island Closure and Support (PICS) Program Contract Scope of Work:
Scientific, Technical and Engineering Support for Plum Island Animal Disease Center (PIADC) Decontamination and Closure
Contents
| 1. | Purpose | 1 |
| 1.1 | Background | 1 |
| 1.2 | Facility Description | 2 |
| 2. | Scope of Services | 3 |
| Task 1 – Routine Operation of the Mobile Decontamination Laboratory | 4 | |
| Task 2 – Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-Scale | 6 | |
| Task 3 – Design and Execute Applied Scientific Activities to Enable Biocontainment Facility Decontamination | 8 | |
| Task 4 – Facility Modification Planning, Engineering and Implementation | 11 | |
| Task 5 – Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator Verification and Decontamination Sample Analysis | 12 | |
| 3. | Notional Timeline for Scientific, Technical, and Engineering Support Tasks/Activities | 13 |
| 4. | Qualifications, Special Conditions, and Proposal Template | 14 |
| 4.1 Qualifications | 14 | |
| 4.2 Special Conditions | 15 | |
| 5. | Schedule | 15 |
| 5.1 Proposal Key Dates | 15 | |
| 5.2 Schedule Development | 15 | |
| 6. | Proposed Cost | 16 |
| 7. | Key Assumptions and List of Deliverables | 16 |
| 7.1 Key Assumptions Related to Decontamination & Validation Planning | 17 | |
| 7.2 List of Deliverables | 18 | |
| 8. | Special Contract Requirements | 19 |
| SAFEGUARDING SENSITIVE INFORMATION | 19 | |
| INFORMATION TECHNOLOGY SECURITY AND PRIVACY TRAINING | 27 | |
| HSAR 3052.204-71—CONTRACTOR EMPLOYEE ACCESS (SEP 2012) | 28 | |
| SECURITY REQUIREMENTS FOR CONTRACTOR PERSONNEL | 29 |
1. Purpose The Department of Homeland Security Science and Technology Directorate (DHS S&T) Office of National Laboratories (ONL) is seeking proposals for Scientific, Technical and Engineering Support for PIADC Decontamination and Closure of the major facility buildings (Buildings 257, 102, 101, and 111) and exterior areas (as needed) at the Plum Island Animal Disease Center (PIADC). The Plum Island Closure and Support (PICS) program requires senior and technical level expertise to collaborate in planning/executing applied scientific activities for decontamination method assessment and development, develop decontamination and validation plans, deliver engineering and logistics to implement methods, and provide third-party verification testing.
Measures to facilitate and ensure an approved end-state for the various PIADC structures utilized for execution of, and support for scientific activities will entail various mechanisms of sampling, disinfection, and decontamination. These activities will occur as part of a coordinated plan for facility closure and will entail simultaneous activities at multiple sites on the facility grounds. Consequently, PICS program requires senior and technical level support to provide biological decontamination and decommissioning support services including, but not limited to: planning/executing scientific activities for decontamination methods and validation to include analyses involving various technologies, sampling approaches, monitoring methods, among others; translating results of method development and validation into plans for terminal facility decontamination; delivery of engineering planning, engineering design, and logistics to support implementation of facility decontamination methods and/or independent third-party review of such developed products; integration of scientific, engineering and other technical data in order to produce a comprehensive facility decontamination plan; operation of an on-island mobile laboratory for provision of independent third-party verification/validation testing of biological and chemical indicators (Self-Contained Biological Indicators [SCBIs], spore strips, integrators); and development of documentation of verification/validation results for review by regulatory bodies.
Each activity will be accomplished while working collaboratively with additional PICS federal and contracted personnel, both onsite and offsite. In addition, it should be noted that the subject activities of this RFP do not entail the performance of the primary operations and maintenance functions or physical execution of decontamination activities for the biocontainment buildings at Plum Island.
1.1 Background
Since 1954, the Plum Island Animal Disease Center (PIADC), located on Plum Island, New York, has been operated by the Federal Government for the purposes of agricultural research, training and diagnostics involving transboundary (foreign) animal diseases threatening U.S. agricultural production systems. In 2003, in accordance with the Homeland Security Act, ownership of PIADC was transferred from the U.S. Department of Agriculture (USDA) to the Department of Homeland Security (DHS), including the “assets and liabilities of the Center” (6USC190). The mission of PIADC is now being transferred to the National Bio and Agro-Defense Facility (NBAF), which is currently under construction in Manhattan, Kansas.
Pursuant to the Consolidated Security, Disaster Assistance, and Continuing Appropriation Act of 2009, Congress directed DHS to sell Plum Island (through the GSA) given the decision to transition the scientific mission to the NBAF (P.L. 110-329 - Section 540). Ultimately, as part of the Consolidated Appropriations Act, 2021, which was enacted in December 2021, the prior sale requirement was repealed and revised to ensure that the Plum Island property “be disposed of as a single consolidated asset” by GSA (P.L. 116-260 – Division FF Title V Section 501).
To prepare the island for cessation of government activities, the DHS Plum Island Closure and Support (PICS) program will ensure closure of the Plum Island property in a manner that reduces risks to an acceptable regulatory level for release to any public entity. The PICS program defines requirements for the island’s end-state to satisfy applicable, related laws and regulations and will oversee the execution of the activities necessary for its closure and conveyance.
Due to the nature of scientific activities conducted at PIADC during its operation, it is necessary for the PICS program to collaborate with the New York State Department of Environmental Conservation (NYSDEC) and the USDA Division of Agricultural Select Agents and Toxins (DASAT) regarding the end-state determination of decontamination for the facility and island, prior to its conveyance by GSA.
1.2 Facility Description
PIADC refers to the 840-acre Plum Island as well as the Orient Point, NY Facility which is approximately 9 acres. Brief descriptions of the major facility buildings which have supported the science mission at PIADC and will require terminal decontamination and/or validation of decontamination are provided below. Note that a significant portion of these biocontainment facilities are more than 50 years old.
· Building 101 – The majority of research, diagnostics and training conducted at PIADC occur within Building 101 biocontainment, which is approximately 200,000 square feet and includes Biosafety Level 3 (BSL-3) Enhanced, Biosafety Level 3 Agriculture (BSL-3 Ag), Animal Biosafety Level 3 (ABSL-3) laboratory and animal research facilities, and associated equipment and machinery spaces.
· Building 100 – Research has also been conducted in Building 100 in two Biosafety Level (BSL-2) laboratory suites (each approximately 2,200 square feet and located outside biocontainment).
· Building 102 – This biocontainment space (approximately 12,000 square feet) housed the former (no longer used) effluent thermal decontamination plant for treatment of waste generated in Building 101. (PIADC is in the process of decommissioning Building 102 and has begun development of a decontamination plan for this building.)
· Building 111 – This biocontainment space (approximately 18,000 square feet) was built several years ago to house the new, modern effluent decontamination plant for treatment of waste generated in Building 101.
· Building 257 – Building 257 (approximately 40,000 square feet) was constructed in 1911 and was used as a research laboratory for animal testing from 1954 to 1995. Building 257 has been unoccupied (vacant) for the last 24 years and the structure is compromised, exposing the interior to local weather conditions. (PIADC is in the process of developing a microbial sampling and analysis plan for this building to determine whether any further decontamination activities are required for this facility.)
Additional key supporting facilities include a 55,000 square foot administrative area within Building 100 (outside of biocontainment) which provides office space, meeting rooms, an auditorium, and a cafeteria. Approximately 70,000 square feet of additional support buildings (outside of biocontainment) provide space for systems, equipment, storage and other items and services to support the PIADC mission.
2. Scope of Services DHS requires senior and technical level expertise to support the PICS program at the PIADC. Specifically, this should consist of a range of expertise necessary to support the decontamination and closure of facility biocontainment structures and associated areas. This will entail task areas including, but not limited to: planning/executing scientific activities for decontamination methods and validation to include analyses involving various technologies, sampling approaches, monitoring methods, among others; translating results of method development and validation into plans for terminal facility decontamination; delivery of engineering planning, engineering design, and logistics to support implementation of facility decontamination methods and/or independent third-party review of such developed products; integration of scientific, engineering and other technical data in order to produce a comprehensive facility decontamination plan; operation of an on-island mobile laboratory for provision of independent third-party verification/validation testing of biological and chemical indicators (SCBIs, spore strips, integrators); and development of documentation of verification/validation results for review by regulatory bodies.
It is essential that the performer integrate across task areas, given that results determined and/or procedures developed in one task area will inform and, in some cases, define components of other task area services.
Each activity will be accomplished while working collaboratively with PICS Federal and contracted personnel, both onsite and offsite. These should include but will not be limited to DHS personnel at PIADC and at S&T headquarters, PIADC Center-Wide Support Program (CWSP) contractors performing the primary operations and maintenance functions at the facility, and additional contracted personnel providing various technical services. Detailed descriptions of these tasks are presented in the following pages for the expected five (5) Task areas of support, along with scoping assumptions to clarify the expected level of effort.
· Task 1 – Routine Operation of the Mobile Decontamination Laboratory
· Task 2 – Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-Scale
· Task 3 – Design and Execute Applied Scientific Activities to Enable Biocontainment Facility Decontamination
· Task 4 – Facility Modification Engineering, Planning, and Implementation
· Task 5 – Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator Verification and Decontamination Sample Analysis As noted in Section 4.3 (Proposal Template) a key part of the proposal is articulation of the proposed strategies to complete the following tasks and meet the review constraints of ONL and Regulators, as supported by the Respondent’s estimated Level of Effort and schedule to do so within the overall Period of Performance, in order to demonstrate a clear understanding of the scope of work.
Task 1 – Routine Operation of the Mobile Decontamination Laboratory This includes all aspects of operating the DHS mobile decontamination laboratory from receiving, processing and reporting on samples to maintaining a clean and safe work environment. The mobile laboratory is expected to remain in operation throughout the Period of Performance and will support:
· Sampling & Analysis for B257
· Decontamination of B102
· Decontamination of B101/B111 The mobile laboratory is expected to be the primary laboratory for processing biological or chemical indicators to provide independent verification/validation of decontamination; however, a certain percentage of samples may need to be sent to an off-island laboratory for confirmatory testing and/or analyses beyond the capability of the mobile laboratory (see Task 5). Key tasks related to operation of the mobile laboratory are identified below.
1.1. Oversite of placement of biological or chemical indicators, to support decontamination verification or quality assurance (QA).
1.2. Biological or Chemical Indicator processing for interpretation of results or shipment to a third-party laboratory depending on the needed analysis (See Task 5). This may include SCBIs, spore strips, and preparation and performance of analytical testing of decontamination samples.
1.3. Documentation of sampling and results, including annotated photographs, to record and ensure that methods meet sampling and decontamination requirements. A report with all documentation will be provide quarterly (at a minimum) for review.
1.4. Provide a Monthly Report of Operations. This will include: any safety issues; type and number of samples processed; type and number of positive samples, potential cause of result, and actions taken to remedy, type and number of samples sent for 3rd party analysis; status of documentation; regulatory reports drafted for client review; regulatory concerns or issues.
1.5. Functional activities associated with routine operations of a BSL-2 operational space, including plans and methods to meet existing facility programs, as required.
Task 1 Scoping Assumptions
| Subtask |
| Scoping Assumptions |
| 1.1 |
| Assume oversight of placement of ~200 biological and chemical indicators each month during the (10) year period of performance, for sampling and verification/validation activities in B257, B102, B101, and B111. Note: This is based on an estimate of the density of samples based on facility square footage. It is expected that level of oversight for this activity will vary over the period of performance (i.e., this is assumed as an average for the level of effort). |
| 1.2 |
| Assume processing of ~200 biological and chemical indicators each month during the (10) year period of performance, for sampling and verification/validation activities in B257, B102, B101, and B111. Note: This is based on an estimate of the density of samples based on facility square footage. It is expected that level of effort for this activity will vary over the period of performance (i.e., this is assumed as an average for the level of effort). |
| 1.3 |
| No further scoping assumptions. |
| 1.4 |
| No further scoping assumptions. |
| 1.5 |
| No further scoping assumptions. |
Task 2 – Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-Scale Access to a cadre of SME’s representing a range of expertise and experience in biological decontamination of facility-scale biocontainment laboratories is necessary to facilitate a range of PICS activities. These individuals should be available to work both onsite and remotely, using a labor mix deemed appropriate for the stated activities, along with additional tasks that may arise during the period of performance. However, it is assumed this Task 2 work would be primarily performed with offsite personnel in support of the Task 3 work, which would be primarily performed by on-site personnel.
Note: For this SME-level support, key interfaces with other Tasks in this Scope of Work are noted in the activities below. Key scope assumptions for this SME-level support (expected level of effort) are included in a table at the end of this section.
2.1 Review and development of facility decontamination plans, based on industry-best practices, applicable regulations, regulatory constraints, and prior experience with similar biocontainment facilities that previously utilized high-consequence infectious pathogens as part of programmatic scope, preferably those affecting livestock of economic importance. (This activity interfaces with Tasks 3.1, 3.5, and Task 4; specifically.)
2.2 Method development and validation to facilitate terminal decontamination processes for multiple surfaces and enclosures of facility-scale, involving high-consequence viral and bacterial pathogens. (This activity provides SME-level input to multiple Task 3 activities.)
2.3 Development and operation of quality assurance processes to ensure adequate performance of decontamination practices, i.e., to satisfy scientific and regulatory inquiry. These QA mechanisms shall assist with sampling, indicator selection, analysis methods, etc. both during the experimental validation development phase and during implementation.
2.4 Develop new, or review existing, permitting documents necessary for proposal, planning and/or performance of facility decontamination activities. For example, this could include documents needed to propose the use of terminal decontamination method(s) not previously approved by NYSDEC for use at PIADC.
2.5 Facilitate interactions with regulatory entities (NYSDEC, EPA) regarding permitting and operations of decontamination processes to include activities, but not limited to, preparation of talking points and PowerPoint presentations; preparing meeting agendas, minutes, and after-action reporting; and drafting formal communications for use by federal authorities engaged with regulatory entities.
2.6 Authorship of manuscripts for publication in peer-reviewed journals, in collaboration with federal colleagues, in order to share best practices from applied experience. Includes adherence to all applicable agency document review procedures (for public-facing materials) prior to public release. (This activity provides SME-level input/support to Task 3.3.)
2.7 Provide experience- and science-based recommendations and justifications for decontamination approaches chosen. (This activity provides SME-level input/support to Task 3.4.)
Task 2 Scoping Assumptions
| Subtask |
| Scoping Assumptions |
| 2.1 |
| See Section 7 for Key Assumptions regarding the scope of development/review of decontamination and validation plans. Notably, this scope includes: |
· Review of the B102 Decontamination Plan
· Development of comprehensive Decontamination & Validation Plan(s) for B101 & B111 (i.e., this could be a single plan as these facilities are connected), including cost, schedule, and resource requirements.
· It is important to note that other work scopes within this SOW will define the technologies/methods that will be used for the decontamination & validation (Tasks 3.1 and 3.5) and will define any facility modifications needed to prepare the facility for decontamination (Task 4); i.e., the results of these other Tasks serve as inputs to the development of the overall decontamination & validation plan under this Task 2.1.
| 2.2 |
| No further scoping assumptions. |
| 2.3 |
| Assume development of QA processes to occur in conjunction with the scientific investigations occurring in Years 1 and 2 (Task 3.3). Assume operation of QA mechanisms to begin in Year 2 (to support B102 decontamination) and extend through the period of performance. |
| 2.4 |
| No further scoping assumptions. |
| 2.5 |
| No further scoping assumptions. |
| 2.6 |
| Assume development of a report and then publication for each of five (5) different scientific evaluations. |
| 2.7 |
| Assume results from the five (5) scientific studies will be presented with recommendations for the down-select of decontamination & validation technologies to DHS/PIADC and then presented to Regulators. |
Task 3 – Design and Execute Applied Scientific Activities to Enable Biocontainment Facility Decontamination The purpose of this task is to establish and conduct the requisite scientific studies necessary to close knowledge gaps and enable an informed down-selection of available decontamination technologies for use in terminal decontamination of the PIADC facility. This work should also serve to inform future best-practices for biocontainment facility decontamination, so therefore should be shared in the form of peer-reviewed publications, and prepared in conjunction with DHS personnel. It is anticipated that, aside from facilitating the decontamination and closure of the PIADC, the results of these validation actions will also inform practices at other biocontainment facilities, including the NBAF.
This support is extremely important during the early stages of this project to allow detailed planning and methods to continue, both among related task areas, and in support of the overarching schedule for facility closure.
Note 1: It is anticipated that any validation activities involving use of live primary agent (e.g., FMDV, ASFV) at PIADC may only occur prior to transition of the facility scientific mission to NBAF (approximately in 2023-2024). Therefore, scientifically justifiable alternatives, such as studies utilizing surrogate, non-select agent target organisms, or options to utilize contractor-owned, international or other third-party facilities, could be included in the proposal and planning process to account for this eventuality.
Note 2: In general, these Task 3 activities shall be supported by SME-level support under Task 2. Specific interfaces between Task 3 and Task 2 activities are identified below.
3.1 Conduct a landscape analysis and synthesis of findings to include (1) best practices among existing decontamination technologies applicable to biocontainment facility scale, i.e., fumigants, surface cleaning/disinfection, use of heat/humidity, other approaches deemed relevant, (2) associated monitoring/validation methods, (3) peer-reviewed literature regarding applicable practices, (4) applicable, consensus standards for facility decontamination (academia, healthcare, biomedical, biocontainment, international, etc.), and (5) characteristics of the pathogen repertoire used historically at PIADC, to include those agents studied directly, any used as part of diagnostic or demonstrative activities, and commensal organisms from the animal species utilized. This analysis should draw on expertise of the performer’s SMEs involved, to include familiarity with and applicability of practices employed at other biocontainment facilities. It should also take into consideration PIADC-specific aspects beyond the agents studied, such as age and makeup of the facility, materials present, surfaces present, ambient climate conditions, etc. Each technology should be assessed in enough detail to inform future planning, and should include, but not be limited to, factors of efficacy, optimizing conditions, repeatability, cost, methods of validation, verification of conditions, penetration into surfaces, etc.
This task will result in a report and a presentation (PowerPoint) to be delivered/presented to DHS S&T and PIADC technical points of contact.
3.2 The results of Task 3.1 will be used to develop a plan for a series of validation activities to be conducted at PIADC. These activities should address gaps in knowledge regarding performance/efficacy of methods identified (decontamination and monitoring methods), specifically as applied to the PIADC terminal decontamination scope, and should be conducted in conjunction with federal personnel. They should be conducted with appropriate scientific rigor to serve as the basis for method selection, and support development of scientific publications, in order to share findings within the applied biosafety discipline. Therefore, appropriate controls, statistical analyses, and other processes necessary to validate findings are integral to this activity.
The plan, schedule and resource requirements for these scientific evaluations will be provided to DHS S&T for final review and approval.
It is anticipated that DHS will convene a panel of interagency biocontainment SMEs (“SME Panel”) to review the plan for this program of decontamination studies and may provide input regarding revisions/additions. Supporting equipment available at PIADC includes the following. An available equipment list will be provided as a technical exhibit.
3.2.1 Environmental chamber to evaluate effects of temperature and humidity on pathogen viability
3.2.2 Vaporized Hydrogen Peroxide Generator
3.2.3 Paraformaldehyde Fumigation Generating Equipment
3.2.4 Chlorine Dioxide Generator
3.2.5 Bio-contained space (including different finishes/materials) in which technologies may be evaluated for efficacy, while relevant parameters (humidity, ambient temperature, duration, air changes, etc.) may be controlled.
3.2.6 Sample surfaces of varying representative types for use as part of disinfectant validation.
3.2.7 A dedicated BSL-2 mobile decontamination laboratory to facilitate collection and manipulation of validation technologies (e.g., samples, BI’s, chemical indicators, etc.)
The responder should identify any additional equipment needed as envisioned for the plan.
3.3 The validation task will be executed once approved, coordinating with the DHS PIADC scientific staff. Results of each science-based evaluation will be presented to DHS S&T and PIADC technical points of contact in a report form. The SME panel will also review the results at this stage. Subsequently, publications will be prepared under their oversight. (SME-level support for development of reports and publications is covered under Task 2.6.)
3.4 The performer will prepare formal recommendations as a result of the findings from Tasks 3.1 and 3.3. These recommendations will be presented to DHS S&T and PIADC representatives, so that a final down-selection of terminal decontamination methodologies (or a combination of same), along with monitoring methods, can occur. It is anticipated that the performer will work with PIADC and DHS S&T personnel to prepare and present these results to applicable regulatory authorities, as part of development of the terminal decontamination plan. (SME-level input/support for this task is provided by Task 2.7.)
3.5 The performer will work collaboratively with the performers involved in Task 2 to translate the findings/results of these analyses into application as part of a decontamination plan. They will assist in development of specific protocols for utilization of down-selected technologies for decontamination and monitoring/validation. (SME-level support for this task is provided by Task 2.1 and it should be assumed that activities performed under Task 2.1 will lead this effort.)
Task 3 Scoping Assumptions
| Subtask |
| Scoping Assumptions |
| 3.1 |
| This task will result in a report and a presentation (PowerPoint) to be delivered/presented to DHS S&T and PIADC technical points of contact. |
| 3.2 |
| Assume development of the plan, schedule, and resource requirements for scientific evaluations covering 2 different agents on 3 different substrate surfaces with 2 different indicators. |
| 3.3 |
| Assume development of a report and then a publication for each of the scientific evaluations identified above in Subtask 3.2. |
| 3.4 |
| Assume results from each of these scientific studies will be presented with recommendations for the down-select to DHS/PIADC and then presented to Regulators. |
| 3.5 |
| Assume down-select to two (2) technologies/methods to utilize for decontamination and protocol development for utilization of these two (2) technologies/methods, at the facility level, to be defined in a ~50-page report. |
Assume the majority of work in developing the decontamination plan(s) is executed under Task 2.1.
Task 4 – Facility Modification Planning, Engineering and Implementation This task provides the engineering interface between the science aspects of closure and implementation of the decontamination techniques in the facility. This will require that the engineering effort is integrated with the science conducted, to ensure that methods developed are appropriately applied and required conditions can be attained in the facility.
4.1. Review decontamination scientific results and determine if facility modifications are required to implement recommended methods. This includes, but is not limited to, HVAC systems to provide the necessary temperature and humidity requirements, room/hallway re-configuration to support for decontamination/fumigation (e.g., sectioning off parts of the building with walls or bio-barriers), re-routing or isolation of ducting, electrical, plumbing, etc.
4.2. Provide the necessary engineering calculations and initial cost estimates to support the required modifications. This will include all regulatory, site and biological safety requirements.
4.3. Prepare presentations, reports, and other deliverables, as requested to demonstrate the need for the modifications. These materials may be required for site, DHS S&T or Regulatory review.
4.4. Develop design bases, scopes of work, plans, finalized estimates for schedule and cost, and logistics for implementation of the required modifications.
4.5. Provide engineering oversight during modifications to ensure identified requirements are met.
Task 4 Scoping Assumptions
| Subtask |
| Scoping Assumptions |
| 4.1 |
| Assume output is a report with recommended facility modifications covering structural, electrical, chilled water, steam piping, HVAC, and communication lines (i.e., building management system). |
| 4.2 |
| Assume 6 engineering calculations/evaluations (~20 pages each) are required for modifications covering structural, electrical, chilled water, steam piping, HVAC, and communication lines (i.e., building management system). |
| 4.3 |
| No further scoping assumptions. |
| 4.4 |
| Assume 1 integrated design report for all planned facility modifications covering structural, electrical, chilled water, steam piping, HVAC, and communication lines (i.e., building management system). |
| 4.5 |
| Assume oversight of engineering support is ongoing from end of planning phase to Year 9 of period of performance. |
Task 5 – Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator Verification and Decontamination Sample Analysis As needed, an off-island laboratory will be required to provide analytical testing of samples to support:
· Verification/validation of biological and chemical indicators generated in decontamination activities as described in Task 1. These samples will primarily be composed of indicators generated during autoclave or fumigation activities.
· Verification/validation of solids, soils, or solutions generated in decontamination activities that require analytical testing, if testing is beyond the capabilities of the on-island mobile laboratory.
5.1 Collaborate with DHS personnel and the New York State Department of Environmental Conservation (NYSDEC) to ensure that the chosen independent, third-party laboratory is acceptable and meets their requirements for sample verification, data management, etc. In addition, ensure that in the interest of objectivity, the selected laboratory should be distinct and independent from laboratories currently used for similar purposes by the O&M contractor.
5.2 Ensure that the samples meet the receiving laboratory’s packaging, handling, and preservation requirements.
5.3 Analyze/interpret the results returned from the independent lab for the biological and chemical indicators sent offsite in support of generating certified reports of the results.
5.4 Manage the subcontract agreement to ensure timely result receipt of analysis results as well as other subcontract requirements.
Task 5 Scoping Assumptions
| Subtask |
| Scoping Assumptions |
| 5.1 |
| Assume 10% of samples investigated by the Mobile Laboratory will be sent offsite |
| 5.2 |
| No further scoping assumptions. |
| 5.3 |
| No further scoping assumptions. |
| 5.4 |
| No further scoping assumptions. |
3. Notional Timeline for Scientific, Technical, and Engineering Support Tasks/Activities The high level “notional” timeline (see Figure 1) was assembled by the PICS Program Management Office (PMO) to assist contractors in comprehending the general scope of work and relevant key timelines related to both the science mission transfer from PIADC to NBAF, and the expected Select Agent Registration for the PIADC facility.
However, respondents to this Solicitation should utilize the Task Descriptions listed above and the planned Solicitation Question & Answer period to gain additional understanding of the scope of work in order to support their development of the estimated level of effort for each activity, the activity timelines, and durations in order to develop the proposed schedule for execution (see Section 5) and cost estimates (See Section 6).
Figure 1 – Notional Timeline
Additionally, Figure 2 provides a high-level summary view of the current PICS program schedule, identifying major program activities. As shown, the current Program schedule identifies PICS Program completion on or before December 2030 (“completion threshold”). However, key critical path activities are dependent on the date of the full transition of science from PIADC to NBAF. If there are delays in transitioning the science mission, then the PICS Program schedule may need to be adjusted accordingly. As such, the Notional Timeline (Figure 1) shows the potential for the Scientific, Engineering, and Support tasks/activities to extend into 2031 and 2032.
Figure 2. High-Level Summary View of PICS Program Schedule
4. Qualifications, Special Conditions, and Proposal Template
4.1 Qualifications
Provide an overview of your firm/organization’s technical capabilities to perform scientific, technical, and engineering services in support of strategic planning, oversite of execution, and oversight/quality assurance of the execution of biological decontamination at the facility scale.
Also provide information describing technical experience that is similar to the activities that are described in the Scope of Services, above, in both scope and complexity.
Provide three relevant project descriptions for work performed in the last five years of similar scope and complexity. Older projects can be presented if years of performance are provided along with the project team. Project descriptions should include the facility/site name, the pathogens of concern, and any critical performance standards. A generic site description can be used where confidentiality concerns must be met.
Provide a brief description of the qualifications of responder personnel that would be available to assist with the described Scope of Services, including:
· Team leader and qualifications relevant to the statement of work.
· Proposed team and experience relevant to the statement of work.
· Relevant or follow-on sampling experience will also be considered.
Direct experience at the PIADC is not required.
Resumes of key personnel should be included, and do not count towards the maximum number of pages.
4.2 Special Conditions
Note: Performing work at the Plum Island Animal Disease Center (PIADC) requires integrated logistics with the operations on the island and involves specialized procedures. Additional documents defining these requirements will be provided upon award.
Experience working with NYSDEC for tasks similar to those described in the Scope of Services would be appreciated, but not evaluated as part of the selection process.
ONL requires the following conditions specific to the Scope of Services:
· Signed NDAs for work information provided, work performed, and decisions made
· The work is being performed at a US Government facility and all personnel associated with any contract or visit are subject to security requirements including, but not limited to, background checks, escorting, and various other requirements. Consideration of PIADC logistics, safety, and biosafety procedures must be included in performance of work
· Ability to work with DHS S&T ONL (PIADC and headquarters Federal personnel), SMEs and contractors to meet the requirements of the SOW
· Ability to work with the PICS team in presenting decontamination planning and procedures to state regulators
4.3 Proposal Template
The Proposal should include the following.
· Description of the strategy proposed to complete each task and meet the review constraints of ONL and the NYSDEC.
· Company, Team Leader, and proposed team qualifications
· Signed NDAs
· Schedule for the work (see Section 5)
· Proposed cost (see Section 6), in a format consistent with the attached cost template
5. Schedule
5.1 Proposal Key Dates
· Bids are due by TBD by OPO
· Question and Response Period TBD by OPO
· Award of Contract TBD by OPO
5.2 Schedule Development
The proposal should include a Project schedule that includes at a minimum all activities listed in this statement of work, as further described below.
· Task 1 can be shown as the duration required to equip and train personnel to operate the Mobile Laboratory, with operation of the lab planned for the remaining duration of the period of performance
· For Tasks 2, 3, and 4 provide an estimated timeline for each subtask, based the respondent’s understanding of the scope, and based on the respondent’s previous experience with similar work scopes to support facility level terminal decontamination and validation
2. Matrixed Support of SMEs with Biological Decontamination Experience at Facility-Scale
2.1 Develop and Review Facility Decontamination Plans
2.2 Method Development and Validation to Facilitate Terminal Decontamination Processes
2.3 Develop and Operate QA Mechanism to ensure Decontamination Performance
2.4 Develop New/Review Existing Permitting Documents
2.5 Facilitate Interaction with Regulatory Entities
2.6 Authorship of Manuscripts to Share Best Practices Developed
3. Scientific Activities to Enable Biocontainment Facility Decontamination
3.1 Conduct Landscape Analysis for Best Practices
3.2 Develop the Scientific Plan for Decontamination and Validation Activities
3.3 Execute Scientific Decontamination and Validation Activities Identified
3.4 Prepare Formal Recommendations of Findings
4. Facility Modification Engineering, Planning, and Implementation
| 4.1 | Review decontamination scientific results & determine if facility modifications are required |
| 4.2 | Develop preliminary engineering calculations and cost estimates |
| 4.3 | Prepare presentations, reports, etc. to demonstrate needs for modifications |
| 4.4 | Develop design bases, scope of work, plan, estimates for schedule and cost, and logistics |
| 4.5 | Provide engineering oversight during modifications |
· Task 5 can be shown as the duration to identify, select and complete contracting with the independent third-party laboratories, with use of these laboratories (as needed) planned for the remaining duration of the period of performance
6. Proposed Cost Provide a rate schedule (including all markups) for all labor categories required to complete the Scope of Services, with critical team members identified by task and subtask. Provide an estimate of hours for each labor category by subtask. (See Section 7 for Key Assumptions and List of Deliverables) Costs for supplies, equipment, and travel should be identified as separate line items by subtask to allow for adjustment due to change of location or time frame, as necessary.
A total estimated cost for the project including labor, supplies, travel, and the fixed fee for the project.
The cost workup should be provided in a format consistent with the attached cost template.
7. Key Assumptions and List of Deliverables The following subsections highlight Key Assumptions and a List of Deliverables which Respondents should consider when developing the cost estimate for this Scope of Work.
Note that the list of deliverables is not intended to be a complete list for the full period of performance but is solely intended to provide Respondents additional insight for this Scope of Work. Respondents to this Solicitation should utilize the information in this Section and the planned Solicitation Question & Answer period to gain additional understanding of the Scope of Work in order to support their development of the estimated level of effort for each activity in order to develop their cost estimates.
7.1 Key Assumptions Related to Decontamination & Validation Planning For activities related to Decontamination and Validation planning, development, and oversight of execution, the following key assumptions should be used for the purposes of estimating costs:
Building 257
· A Sampling & Analysis Plan is currently being developed by PIADC in order to determine whether additional decontamination and validation activities in this building are needed after it has remained vacant (unused) for over 24 years and exposed to the environment. Accordingly, development of that Plan is not included in this Scope of Work.
· For the purpose of defining the level of effort to support work in B257, assume that no further decontamination and validation plans will need to be developed for this building.
· Oversight of execution of the Sampling & Analysis Plan (Task 2 & 3), including testing of samples in the Mobile Laboratory (Task 1) is included in this Scope of Work.
Building 102
· A Decontamination Plan is currently being developed by PIADC. Accordingly, the development of that Plan is not included in this Scope of Work.
· However, review of that Decontamination Plan, development of QA/QC processes for verification of proper execution of that Plan, and oversight of its execution (including any planned facility modifications) is included in this Scope of Work.
Building 101
· This Scope of Work includes development of the Decontamination & Validation Plan for this building, including development of engineering modifications to support the decontamination, such as, but not limited to, re-routing of electrical, chilled water, steam, HVAC, and communications, and sectioning off parts of this 200,000 square foot biocontainment building to facilitate decontamination, etc. (Task 4).
· Oversight of the engineering modifications and decontamination work is also included in this scope of work (Task 4).
· Placement and/or oversight of placement of biological indicators to support validation of terminal decontamination, as well as testing of these biological indicators in the Mobile Laboratory is included in this Scope of Work (Task 1).
Building 111
· This Scope of Work includes development of the Decontamination & Validation Plan for this building, including development of engineering modifications to support the decontamination, such as, but not limited to, re-routing of electrical, chilled water, steam, HVAC, and communications, and sectioning off parts of this 18,000 square foot biocontainment building to facilitate decontamination, etc. (Task 4). Note that B111 adjoins B101 and the Decontamination & Validation Plan for these two (2) buildings may be a single, integrated plan.
· Oversight of the engineering modifications and decontamination work is also included in this scope of work (Task 4).
· Placement and/or oversight of placement of biological indicators to support validation of terminal decontamination, as well as testing of these biological indicators in the Mobile Laboratory is included in this Scope of Work (Task 1).
7.2 List of Deliverables
| Task/Subtask Number and Name |
| Milestones/Deliverables |
| Due Date or Completion Date |
Task 1 - Routine Operation of the Mobile Decontamination Laboratory
| 1.3 Routine Operation of Mobile Decontamination Laboratory - Documentation |
| Quarterly Report |
| Due 10 days after end of each calendar quarter |
1.4 Routine Operation of the Mobile Decontamination Laboratory – Monthly Report of Operations
| Monthly Report |
| Due 10 days after end of month |
Task 2 - Matrixed Support of Subject Matter Experts with Experience in Biological Decontamination at Facility-Scale
| 2.1 Matrixed Support – Review of Facility Decontamination Plans |
| Report of each plan reviewed – this can be collected into a single plan if all plans are available are one time |
| Deliverable due 90 days after receipt of plans to be reviewed |
| 2.2 Matrixed Support – Development of Terminal Decontamination Processes |
| Decontamination Process Plan |
| Deliverable due 30 days after approval from PICS Program to proceed. |
2.3 Matrixed Support - Quality Assurance Mechanisms
| Description and Implementation Plan for New QA Mechanism |
| Deliverable due 30 days after approval of QA Mechanism by PICS Program Lead |
| 2.4 Matrixed Support – Permitting Documents |
| Report of Review Conclusions or New Permitting Document |
| Deliverable due 30 days after assignment |
| 2.5 Matrixed Support – Facilitate Interactions with Regulatory Entities |
| Draft Presentations, draft formal communications |
| As requested by DHS. |
| 2.6 Matrixed Support – Manuscripts for Publication |
| Draft Manuscript for Review by PICS Program Team and DHS S&T |
Final Manuscript Deliverables due 90 days after agreement on topic and receipt of comments
2.7 Matrixed Support – Validation Activity Design
| Interim Reports including planning for next phase |
| Deliverables due 30 days after inception and subsequent report comments |
| 2.7 Matrixed Support – Program Recommendations |
| Monthly Status Report |
| Deliverable due 10 days after month end. |
Task 3 - Design and Execute Applied Scientific Activities to Enable Biocontainment Facility Decontamination
| 3.1 Decontamination and Validation Activities – Landscape Analysis |
| Draft Presentation |
Final Presentation Draft due 90 days after inception and Final due 15 days after receiving comments
| 3.2 Decontamination and Validation Activities – Study Development (Plan for Series of Activities) |
| Plan, Schedule and Resource Requirements for each study |
| Due 90 days after inception for each study |
| 3.3 Decontamination and Validation Activities – Decontamination Study Reports |
| Draft Report for Review and Comment |
Final Report Per Plan Schedule included in 3.2
| 3.4 Decontamination and Validation Activities – Formal Presentation of Decontamination Study Results |
| Presentation |
| Due 15 days after submittal of final report in 3.3 |
| 3.5 Decontamination and Validation Activities – Decontamination Plan |
| Draft Plan |
Final Plan Draft due 90 days after submittal of Presentation in 3.4 Final due 15 days after receipt of comments
Task 4 - Facility Modification Engineering, Planning and Implementation
| 4.1 Facility Modifications – Determination of Need |
| Report Assessing Need |
| Deliverable due 15 days after assignment |
| 4.2 Facility Modifications – Engineering Report |
| Report |
| Deliverable due 15 days after assignment |
| 4.3 Facility Modifications – Presentation |
| Presentation |
| Deliverable due 15 days after assignment |
| 4.4 Facility Modifications – Design Report |
| Design Report |
| Deliverable due 60 days after assignment |
| 4.5 Facility Modifications – Oversight |
| Weekly Report |
| Starts after implementation and completes when done |
Task 5 - Subcontract and Manage an Independent Third-Party Laboratory for Biological and Chemical Indicator Verification and Decontamination Sample Analysis
| 5.0 Subcontract for 3rd Party Biological, Chemical, & Decontamination Testing |
| Monthly Report |
| Due 10 days after end of month |
8. Special Contract Requirements
SAFEGUARDING SENSITIVE INFORMATION
The S&T Privacy Office, Office of the Chief Information Officer, and the Office of the Chief Security Office require the insertion of the HSAR 15-01 Safeguarding of Sensitive Information (March 2015), HSAR 15-01 Information Technology Security and Privacy Training (March 2015), and HSAR 3052.204-71 - Contractor Employee Access (Sep 2012). See HSAR 15-01.
HSAR Class Deviation 15-01, Safeguarding of Sensitive Information (MAR 2015)
(a) Applicability. This clause applies to the Contractor, its subcontractors, and Contractor employees (hereafter referred to collectively as “Contractor”). The Contractor shall insert the substance of this clause in all subcontracts.
(b) Definitions. As used in this clause— “Personally Identifiable Information (PII)” means information that can be used to distinguish or trace an individual's identity, such as name, social security number, or biometric records, either alone, or when combined with other personal or identifying information that is linked or linkable to a specific individual, such as date and place of birth, or mother’s maiden name. The definition of PII is not anchored to any single category of information or technology. Rather, it requires a case-by-case assessment of the specific risk that an individual can be identified. In performing this assessment, it is important for an agency to recognize that non-personally identifiable information can become personally identifiable information whenever additional information is made publicly available—in any medium and from any source—that, combined with other available information, could be used to identify an individual.
PII is a subset of sensitive information. Examples of PII include, but are not limited to: name, date of birth, mailing address, telephone number, Social Security number (SSN), email address, zip code, account numbers, certificate/license numbers, vehicle identifiers including license plates, uniform resource locators (URLs), static Internet protocol addresses, biometric identifiers such as fingerprint, voiceprint, iris scan, photographic facial images, or any other unique identifying number or characteristic, and any information where it is reasonably foreseeable that the information will be linked with other information to identify the individual.
“Sensitive Information” is defined in HSAR clause 3052.204-71, Contractor Employee Access, as any information, which if lost, misused, disclosed, or, without authorization is accessed, or modified, could adversely affect the national or homeland security interest, the conduct of Federal programs, or the privacy to which individuals are entitled under section 552a of Title 5, United States Code (the Privacy Act), but which has not been specifically authorized under criteria established by an Executive Order or an Act of…