Attachment - Enclosure 1_ES507.pdf

PDF 128 KB Posted

Attached to
LP-37 FUEL FARM SECONDARY TRUCK RECEIPT
Solicitation number
Not on record
Issued by

About this file

This is a technical drawing sheet (ES507) from the US Army Corps of Engineers showing an offload stand detail for a Type III Pressurized Hydrant Fueling System. The drawing depicts the electrical and mechanical components of an off-load pump station, including the control panel/starter, motor junction box, flow switch, level sensors, air eliminator tank, and ground connections.

The detail includes specific requirements for lighting, noting that 150-watt HPS flood lights should be provided only if there is no offload canopy lighting present. The system includes grounding specifications with a 3/4" x 10' copper ground rod and 1/0 bare copper cable connections. The drawing also shows the integration of components such as an insulating flange, proving ground panel, and the relationship between electrical controls and mechanical equipment. The drawing is part of a larger set (AW 078-24-28) issued by the Omaha District in March 2020.

View the file

Other files

File Type Posted
Amendment 0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C

A P

IT

A L A

V E

O M

A H

A

N E

X X

X X

X X -X

X -X -X

X X

X

X X

X X

X X -X

X -X -X

X X

X

M

A H

A D

IS

T R

IC

T

M A

R C

H

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

A N

S I

D

D O

D S

T A

N D

A R

D D

E S

IG

N A

W

-2

-2

P R

E S

S U

R

IZ

E D H

Y D

R A

N T F

U E

L

IN

G S

Y S

T E

M

T Y

P E I

II

D

E

S .d w g

PG

BOX

JUNCTION

MOTOR

SENSORS

TO LEVEL

FLOW SWITCH

TO VALVE

SWITCH

TO FLOW

/STARTER

CONTROL PANEL

OFF LOAD PUMP

ON SHEET ES510

STATION, SEE DETAIL

OFF-LOAD PUMP EPDS

1/0 BARE COPPER CABLE

GROUND ROD WITH

STATION.

EPDS & GROUNDING

TO OFF-LOAD PUMP

CONNECT GROUND ROD

PANEL

PROVING

GROUND

(NOTE)

LT. SW.

INSULATING FLANGE

THE TRUCK SIDE OF THE

#1/0 CABLE TO PIPING ON

TO PANEL

GROUND ROD

3/4" x 10' COPPER

TANK

ELIMINATOR

AIR

PUMP

OFF LOAD

AS SHOWN, AND BE CONTROLLED BY THE LIGHT SWITCH INDICATED ON THIS DETAIL.

THERE IS NO OFFLOAD CANOPY LIGHTING, THEN OFFLOAD FLOOD LIGHTS SHALL BE PROVIDED

THE LIGHT SWITCH INDICATED IS ONLY REQUIRED IF THERE IS NO OFFLOAD CANOPY LIGHTING. IF

LIGHTING NOTE:

A P

P R

O X

LIGHTING NOTE BELOW)

CANOPY LIGHTING IS BEING USED (SEE

DO NOT ADD FLOOD LIGHTS IF OFFLOAD

150 WATT HPS FLOOD LIGHT;

LIGHTING NOTE BELOW)

CANOPY LIGHTING IS BEING USED (SEE

DO NOT ADD FLOOD LIGHTS IF OFFLOAD

150 WATT HPS FLOOD LIGHT;

\\nwofpcadd01\AEC_WS_001\Standards\OD74\40000 Design Products\CAD_BIM\_Sheets\OD74ES507.dwg

10:29:57 AM 3/11/2020 PD: NWO_pdf.pltcfg DS: NWO_Screen.dscript.dscript

D

E

S .d w g

F F

L O

A D S

T A

N D D

E T

A

IL

ES507

C2

OFFLOAD STAND DETAIL

SCALE: NTS

File details come from the government source that posted it. Updated .