Attachment_E_-_Location_Details.pdf

PDF 497 KB Posted

Attached to
Janitorial Services for Parks "NORTH" Locations (Bid Discount)
Solicitation number
26-P-00245
Issued by
Hillsborough County, Florida

About this file

This is a location details attachment for a janitorial services contract opportunity with the City of Tampa, Florida, specifically for Parks Department "North" locations. The contract encompasses comprehensive janitorial and day-porter services across 16 distinct facilities, including community centers, parks, pools, and athletic complexes. Facilities range from small restroom facilities (156 square feet at Henry & Ola) to large multi-building complexes (23,714 square feet at New Tampa Gymnastics Center). Service requirements vary by location, with mandatory staffing levels of two to three employees per day, service frequencies ranging from two to seven days per week, and daily hour requirements ranging from 30 minutes to three hours per location. The document details specific square footage for various flooring types at each location (ceramic tile, concrete finish, VCT tile, carpet, gymnasium wood floors, epoxy flooring, and terrazzo), total restroom counts, and fixture quantities including toilets, urinals, sinks, baby changing stations, hand dryers, and showers.

The attachment provides granular specifications necessary for bidders to develop accurate pricing for services across all 16 locations. Bidders must account for diverse facility types and cleaning requirements, including specialized flooring surfaces and varying occupancy patterns (parks facilities operate seven days weekly, while most community centers operate five business days weekly). The contract structure allows for flat-rate day-porter services on an as-needed basis as directed by the City Representative. This comprehensive location detail specification ensures bidders can develop firm pricing schedules that reflect the actual scope and complexity of janitorial services required across the City of Tampa's North parks locations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

att

Janitorial Services

City of Tampa North Locations

LOCATION: Benito Community Center/Park - 100656 Cross Creek Blvd

PARKS GROUNDS RESTROOM FACILITY

1 Total Building Area SF 240

2 Restrooms Buildings # 1

3 Total Restrooms # 2

4 Restroom Total Square Footage (Concrete Finish) SF 240

5 Toilets # 3

6 Urinals # 1

7 Baby Changing Station # 0

8 Sinks # 4

9 Hand Dryers # 4

10 Minimum Mandatory Employee/Daily Hours (2 Employees). 30 Mins Each

11 Service days: Seven Days; Schedule will be provided.

COMMUNITY CENTER

12 Total Building Area SF 1,346

13 Sinks # 1

14 Concrete Finish (Floor) Area SF 1,346

15 Minimum Mandatory Employee/Daily Hours (2 Employees). 1 Hour Each

16 Service days: Five Days (M-F); Schedule will be provided.

ATTACHMENT E - LOCATION DETAILS

City of Tampa North Locations

LOCATION: Copeland Park (restroom 102) - 11001 N 15th Street

PARKS GROUNDS RESTROOM FACILITY

1 Total Building Area SF 498 2 Restrooms Buildings # 1 3 Total Restrooms # 2 4 Toilets # 7 5 Urinals # 1 6 Baby Changing Station # 0 7 Sinks # 8 8 Hand Dryers # 2 9 Restroom Total Square Footage (Ceramic Tile) SF 429

10 Restroom Total Square Footage (Concrete Finish) SF 69

11 Minimum Mandatory Employee/Daily Hours (2 Employees). 30 Mins Each

12 Service days: Seven Days; Schedule will be provided.

LOCATION: Copeland Community Center / Pool - 11001 N 15th Street

POOL

1 Total Building Area SF 3,456 2 Restroom Total Square Footage (Epoxy Flooring) SF 2,163 3 Total Restrooms # 2 4 Toilets # 12 5 Urinals # 6 6 Baby Changing Station # 2 7 Sinks # 13 8 Hand Dryers # 12 9 Ceramic Tile Area (Floor) SF 331

10 Concrete Finish (Floor) SF 309 11 VCT Tile Area SF 653 12 Showers # 9 13 Minimum Mandatory Employee/Daily Hours (2 Employees). 1.5 Hour Each 14 Service days: Five Days (M-F); Schedule will be provided.

COMMUNITY CENTER

15 Total Building Area SF 12,409 16 Carpet Area SF 1,448 17 VCT Tile Area SF 5,395 18 Gymnasium Wood Floor Area SF 5,451

19 RESTROOMS # 2

20 Restrooms Square Footage (Ceramic Tile) SF 115 21 Total Restrooms # 2 22 Toilets # 2 23 Urinals # 0 24 Baby Changing Stations # 0 25 Sinks # 2 26 Hand Dryers # 2 27 Minimum Mandatory Employee/Daily Hours (2 Employees). 3 Hours Each

28 Service days: Five Days(M-F); Schedule will be provided.

LOCATION: Lowry Park Restrooms - 7525 North Boulevard

1 Total Building Area SF 671

2 Restrooms Buildings # 3

3 Total Restrooms # 6

4 Restroom Total Square Footage (Concrete Finish) SF 671

5 Toilets # 10

6 Urinals # 3

7 Baby Changing Station # 0

8 Sinks # 8

9 Hand Dryers # 4

10 Minimum Mandatory Employee/Daily Hours (2 Employees). 2 Hours Each

11 Service days: Seven Days; Schedule will be provided.

LOCATION: Danny Del Rio Pool - 10105 North Boulevard

POOL

1 Total Building Area SF 1,904

2 Concrete Finish (Floor) Area SF 864

2 Sinks # 1

3 Showers # 9

4 RESTROOMS # 2

5 Restrooms square footage SF 1,040

6 Total Restrooms # 2

7 Toilets # 6

8 Urinals # 3

9 Baby changing stations # 2

10 Ceramic Tile Area (Floor) SF 1,040

11 Sinks # 4

12 Hand Dryers # 0

13 Minimum Mandatory Employee/Daily Hours (2 Employees). 2 Hours Each

14 Service days: Six Days; Schedule will be provided.

LOCATION: Forest Hills Park - 724 W 109th Ave

1 Total Building Area SF 172 2 Restrooms Buildings # 1 3 Restroom Total Square Footage (Ceramic Tile) SF 172 4 Total Restrooms # 2 5 Toilets # 3 6 Urinals # 1 7 Baby Changing Station # 0 8 Sinks # 4 9 Hand Dryers # 2

10 Minimum Mandatory Employee/Daily Hours (2 Employees). 30 Mins Each

12 Total Building Area SF 13,193 13 VCT Tile Area SF 6,293 14 Terrazzo Floor SF 2,130

Sinks # 1 15 Gymnasium Wood Floor Area SF 4,390

16 RESTROOMS # 2

17 Restrooms Square Footage (Ceramic Tile) SF 380 18 Total Restrooms # 2 19 Toilets # 6 20 Urinals # 2 21 Baby Changing Stations # 2 22 Sinks # 5 23 Hand Dryers # 4 24 Minimum Mandatory Employee/Daily Hours (2 Employees). 3 Hours Each

25 Service days: Five Days (M-F); Schedule will be provided.

LOCATION: Greco Softball Complex - 11000 N 50th Street

SOFTBALL COMPLEX

1 Total Building Area SF 1,807

2 Ceramic Tile Area (Floor) SF 1,283

3 Restrooms Buildings # 1

4 Total Restrooms # 2

5 Restroom Total Square Footage (Ceramic Tile) # 524

6 Toilets # 8

7 Urinals # 2

8 Baby Changing Station # 0

9 Sinks # 4

10 Hand Dryers # 4

11 Minimum Mandatory Employee/Daily Hours (2 Employees). 2 Hours Each

12 Service days: Seven Days; Schedule will be provided.

LOCATION: Henry & Ola - 502 W Henry Ave

1 Total Building Area SF 156 2 Restrooms Buildings # 1 3 Total Restrooms # 2 4 Restroom Total Square Footage (Concrete Finish) # 156 5 Toilets # 3 6 Urinals # 1 7 Baby Changing Station # 0 8 Sinks # 2 9 Hand Dryers # 0

12 Total Building Area SF 831 13 Carpet Area SF 762 14 Sinks # 1 15 VCT Tile Area SF 16

16 RESTROOMS # 1

17 Restrooms Square Footage (Epoxy Floor) SF 53 18 Total Restrooms # 1 19 Toilets # 1 20 Urinals # 0 21 Baby changing stations # 0 22 Sinks # 1 23 Hand Dryers # 0

24 Minimum Mandatory Employee/Daily Hours (2 Employees). 1 Hour Each

25 Service days: Five Days (M-F); Schedule will be provided.

LOCATION: Mickey McGuire Creative Art Studio - 6108 N Rome Ave

1 Total Building Area SF 2,322

2 Sinks # 1

3 VCT Tile Area SF 2,255

4 RESTROOMS # 2

5 Restrooms Square Footage (VCT Tile) SF 67

6 Total Restrooms # 2

7 Toilets # 2

8 Urinals # 0

9 Baby Changing Stations # 0

10 Sinks # 2

11 Hand Dryers # 0

12 Minimum Mandatory Employee/Daily Hours (2 Employees). 30 Mins Each

13 Service days: Two Days; Schedule will be provided.

1 Total Building Area SF 683 2 Restrooms Buildings # 2 3 Total Restrooms # 6 4 Restroom Total Square Footage (Ceramic Tile) SF 683 5 Toilets # 14 6 Urinals # 2 7 Baby Changing Station # 2 8 Sinks # 11 9 Hand Dryers # 0

10 Minimum Mandatory Employee/Daily Hours (2 Employees). 1 Hour Each

LOCATION: New Tampa Ball Field - 17302 Commerce Park Blvd

LOCATION: New Tampa Gymnastics Center / Park - 17302 Commerce Park Blvd

1 Total Building Area SF 23,714 2 Carpet Area SF 12,405 3 VCT Tile Area SF 3,914 4 Green Turf Area SF 1,193 5 Gymnasium Wood Floor Area SF 4,337 6 Sinks # 4 7 Epoxy Area (Floor) SF 253

8 RESTROOMS # 10

9 Restrooms Square Footage (Epoxy Floor) SF 1,013

10 Total Restrooms # 10 11 Toilets # 15 12 Urinals # 2 13 Baby Changing Stations # 2 14 Concrete Finish Floor SF 52 15 Sinks # 17

16 Minimum Mandatory Employee/Daily Hours (3 Employees) 3 Hours Each 17 Service days: Six Days; Schedule will be provided.

ATTACHED RESTROOMS

18 Total Building Area SF 151 19 Restrooms Buildings # 1 20 Total Restrooms # 3 21 Toilets # 3 22 Urinals # 0 23 Baby Changing Station # 1 24 Sinks # 3 25 Hand Dryers # 3 26 Restroom Total Square Footage (Epoxy Floor) SF 51 27 Restroom Total Square Footage (Concrete Finish) SF 100 28 Minimum Mandatory Employee/Daily Hours (2 Employees) 30 Mins Each

30 Service days: Seven Days; Schedule will be provided.

LOCATION: New Tampa Liberty Middle Play Court - 17400 Commerce Park Blvd

ATHLETIC BUILDING- RESTROOMS

1 Total Building Area SF 83

2 RESTROOMS # 2

3 Restrooms Square Footage (Concrete Finish) SF 83

4 Total Restrooms # 2

5 Toilets # 2

6 Urinals # 0

7 Baby Changing Stations # 0

8 Sinks # 2

9 Hand Dryers # 0

LOCATION: North Tampa Park / George Bartholomew - 8608 N 12th Street

1 Total Building Area SF 6,132 2 VCT Tile Area SF 85 3 Matted Floor Tile Area SF 580 4 Sinks # 1 5 Wood Floor Area SF 4,978

6 RESTROOMS # 2

7 Restrooms Square Footage (Ceramic Tile) SF 489 8 Total Restrooms # 2 9 Toilets # 7

10 Urinals # 2 11 Baby changing stations # 0 12 Sinks # 7 13 Hand Dryers # 2 14 Minimum Mandatory Employee/Daily Hours (2 Employees). 2 Hours Each

15 Service days: Three Days; Schedule will be provided.

LOCATION: Rowlett Park - 2401 E Yukon Street

PARK GROUNDS RESTROOM FACILITY

1 Total Building Area SF 1,148

2 Restroom Buildings # 4

3 Restroom Total Square Footage (Ceramic Tile) # 1,148

4 Total Restrooms # 8

5 Toilets # 20

6 Urinals # 6

7 Baby Changing Station # 0

8 Sinks # 14

9 Hand Dryers # 4

10 Minimum Mandatory Employee/Daily Hours (2 Employees). 2 Hours Each

LOCATION: Rowlett Activity Center - 2313 E Yukon St

1 Total Building Area SF 5,300

2 Carpet Area SF 287

3 VCT Tile Area SF 1,757

4 Sinks # 4

5 Terrazzo Flooring SF 2,487

6 RESTROOMS # 3

7 Restrooms Square Footage (Epoxy Floor) SF 446

8 Total Restrooms # 3

9 Toilets # 8

10 Urinals # 2

11 Baby Changing Stations # 1

12 Sinks # 6

13 Hand Dryers # 0

14 Minimum Mandatory Employee/Daily Hours (2 Employees). 2 Hours

15 Service days: Five Days (M-F); Schedule will be provided.

LOCATION: Springhill Community Center / Park - 1001 E Eskimo Ave

ATTACHED RESTROOM FACILITY

1 Total Building Area SF 56 2 Restroom Buildings # 1 3 Restroom Total Square Footage (Ceramic Tile) # 56 4 Total Restrooms # 1 5 Toilets # 1 6 Urinals # 0 7 Baby Changing Station # 1 8 Sinks # 1 9 Hand Dryers # 0

12 Total Building Area SF 13,077 13 Carpet Area SF 310 14 VCT Tile Area SF 6,554 15 Ceramic Tile Area SF 250 16 Sinks # 4 17 Gymnasium Wood Floor Area SF 5,146

18 RESTROOMS # 4

19 Restrooms Square Footage SF 817 20 Total Restrooms # 4 21 Toilets # 11 22 Urinals # 2 23 Baby Changing Stations # 5 24 Ceramic Tile Area (Floor) SF 817 25 Sinks # 10 26 Hand Dryers # 7 27 Minimum Mandatory Employee/Daily Hours (2 Employees). 3 Hours Each

28 Service days: Seven Days; Schedule will be provided.

LOCATION: Temple Crest - 8116 N 37th Street

1 Total Building Area SF 4,235

2 VCT Tile Area SF 1,887

3 Sinks # 1

4 Mosaic Ceramic Tile Area SF 2,099

5 RESTROOMS # 4

6 Total Restrooms # 4

7 Toilets # 5

8 Urinals # 1

9 Restrooms Square Footage (VCT Tile) # 167

10 Restrooms Square Footage (Ceramic Tile) SF 82

11 Sinks # 4

12 Hand Dryers # 4

13 Minimum Mandatory Employee/Daily Hours (2 Employees). 1 Hour Each

14 Service days: Five Days (M-F); Schedule will be provided.

LOCATION: Wayne Pappy - 106 E Sligh Ave

1 Total Buildings # 2

2 Total Buildings Area SF 21,182

3 Carpet Area SF 12,165

4 VCT Tile Area SF 4,578

5 Sinks # 3

6 Marley Floor Area SF 3,503

7 RESTROOMS # 9

8 Total Restrooms # 9

9 Toilets # 14

10 Urinals # 1

11 Restrooms square footage (VCT Tile) # 936

12 Restrooms square footage (Ceramic Tile) SF 133

13 Sinks # 13

14 Hand Dryers # 2

15 Minimum Mandatory Employee/Daily Hours (2 Employees). 3 Hours Each

16 Service days: Six Days; Schedule will be provided.

File details come from the government source that posted it. Updated .