ATTACHMENT E - Experience Information Sheet.pdf
PDF 789 KB Posted
- Solicitation number
- 36C24822R0041
About this file
This solicitation requests proposals for design-build services for a magnetic resonance imaging (MRI) replacement site preparation project at a Department of Veterans Affairs medical facility. The solicitation is set aside exclusively for verified Service-Disabled Veteran-Owned Small Businesses. Interested firms must be registered in the System for Award Management and certified as a Service-Disabled Veteran-Owned Small Business in the Vendor Information Pages VetBiz database to be considered. The project involves providing all labor, materials, equipment and other resources necessary for the design and construction of the MRI replacement site preparation. The period of performance is 210 calendar days from notice to proceed. The project location is the VA Viera Outpatient Clinic in Viera, Florida. The estimated value is between $500,000 and $1,000,000. Proposals will be evaluated using a tradeoff source selection process to select the best value to the government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PHASE ONE - RFIs Tracking Log 11.24.2021.pdf | ||
| VIERA Asbestos Report 2016.pdf | ||
| 36C24822R0041 0001_1.docx | DOCX document | |
| ATTACHMENT C - Contract Progress Schedule.docx | DOCX document | |
| ATTACHMENT F - Past Performance Questionnaire.docx | DOCX document | |
| SOLICITATION 36C24822R0041.pdf | ||
| ATTACHMENT D - EMR.pdf | ||
| 36C24822R0041_1.docx | DOCX document | |
| ATTACHMENT B - DBA WD FL20210001 10.29.2021.pdf | ||
| ATTACHMENT A - Viera MRI Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXPERIENCE INFORMATION SHEET
PROJECT NO. [ ] Page 1
a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)
b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)
c. Project Title/Name and Location
d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)
e. Percent (%) of project work performed by your company
f. If you work as subcontractor, who was the prime?
(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)
g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).
ATTACHMENT E {3 PAGES}
PROJECT NO. [ ] Page 2
h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:
Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary
ATTACHMENT F {3 PAGES}
PROJECT NO. [ ] Page 3
i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution
j. Describe unforeseen conditions and how each were resolved
k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date: original completion date, if not completed, projected completion date (mm/dd/yyyy)
l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?
Actual Completion Date:
If not completed, Why?
m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.
n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.
Original Contract Price: Final Contract Price:
Explain Differences:
ATTACHMENT F {3 PAGES}
File details come from the government source that posted it. Updated .